This course plan, its lessons and its assessments has not yet been verified by a licensed engineer or certified journey-level tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
9 courses · 1,800 clock hours · 12 mo full-time. Grading is competency-based: each course requires the written exam, a competent skills demonstration with zero safety faults, a signed log, and a passed safety audit; percentage weights only rank performance above the competency floor.
This foundational course equips learners with the safety knowledge, trade mathematics, technical literacy, and professional skills required to work safely and effectively in a shipyard or marine fabrication facility. Content is anchored in OSHA 10-hour construction standards, first aid and CPR, and the measurement and drawing-reading tasks that appear daily in hull construction, welding, and fitting work. Successful completion prepares learners for every subsequent course in the program and satisfies the safety and core-competency prerequisites for NCCER Shipfitting and NCCER Maritime Welding credentialing.
OutcomesThis foundational course equips learners with the safety knowledge, trade mathematics, technical literacy, and professional skills required to work safely and effectively in a shipyard or marine fabrication facility. Content is anchored in OSHA 10-hour construction standards, first aid and CPR, and the measurement and drawing-reading tasks that appear daily in hull construction, welding, and fitting work. Successful completion prepares learners for every subsequent course in the program and satisfies the safety and core-competency prerequisites for NCCER Shipfitting and NCCER Maritime Welding credentialing.
How the course runs. 7 blocks: Shipyard Hazard Recognition and OSHA 10 Construction Safety; Confined-Space Entry, Fall Protection, and Fire Watch; First Aid, CPR, and AED for Shipyard Workers; Trade Math for Marine Fabrication; Reading Shipbuilding Drawings, Weld Symbols, and Work Orders; Digital Tools, Documentation, and Communication in the Shipyard; Career Readiness, Workplace Professionalism, and Program Introduction.
What competent looks like. Demonstrate OSHA 10-hour construction safety knowledge and apply lockout/tagout, confined-space entry, and fall-protection procedures correctly in a shipyard context. Perform trade math calculations—including fraction and decimal conversion, area, volume, and angle measurement—to the accuracy required for marine fabrication layout and material takeoff. Read and interpret shipbuilding drawings, weld symbols per AWS A2.4, and written work orders well enough to extract dimensions and specifications without assistance. Use basic digital tools—including a job-related calculator application, a digital angle finder, and a shipyard safety management system interface—to record and communicate work information. Administer hands-only CPR and use an AED, and provide basic first-aid response appropriate to common shipyard injuries. Demonstrate career-readiness behaviors including punctuality, professional communication with supervisors and co-workers, and accurate completion of timesheets and incident-report forms.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Shipyard Hazard Recognition and OSHA 10 Construction Safety | 28 | theory | Students correctly identify and categorize the OSHA Focus Four hazards—falls, struck-by, caught-in/between, and electrocution—as they appear in shipyard and marine fabrication environments, and explain the regulatory framework governing each. |
| OSHA 10-hour Construction Industry outreach course materials; OSHA 29 CFR 1926 Subpart M (fall protection) and Subpart S (underground construction, caissons—used for confined-space analogy); NCCER Core Curriculum Module on Safety; shipyard hazard photo set; LOTO training board and hasp-and-lock kit; laminated OSHA Focus Four quick-reference cards. | Scored worksheet: students must correctly classify at least 16 of 20 hazard photographs by OSHA category (80%). LOTO role-play evaluated by instructor against a 10-step checklist; all safety-critical steps must be performed correctly (100% on critical steps). |
| 2 | Confined-Space Entry, Fall Protection, and Fire Watch | 14 | demo | Students demonstrate the permit-required confined-space entry sequence, correct use of a self-retracting lifeline and harness, and fire-watch duties during simulated hot work, meeting the procedural requirements referenced in OSHA standards for the shipbuilding industry. |
| Calibrated four-gas multi-gas monitor (training unit); confined-space entry permit forms (blank); full-body harnesses (one per student) and self-retracting lifeline; 10-lb ABC dry-chemical fire extinguisher (training unit); hot-work permit forms; OSHA 29 CFR 1915 Subpart B (confined spaces in shipyards) reference handout. | Competency checklist evaluated by instructor: confined-space atmospheric test recorded correctly and decision justified (pass/fail); harness donned with zero critical errors on six-point inspection (100% on critical points); fire-watch positioning and response to simulated spark migration correct (pass/fail). All three stations must pass to earn credit for the lesson. |
| 3 | First Aid, CPR, and AED for Shipyard Workers | 14 | lab | Students perform hands-only CPR at the correct rate and depth on a manikin, operate a training AED through one complete cycle, and apply first aid to the four most common shipyard injuries—laceration, eye contamination, burn, and crush/musculoskeletal—following current American Red Cross or American Heart Association guidelines. |
| CPR manikins with feedback capability (one per two students); training AED units; eyewash station; sterile gauze, bandage rolls, triangular bandages; burn gel and non-stick dressings; rigid splints; American Red Cross or American Heart Association First Aid/CPR/AED student manual. | CPR manikin feedback must show compression rate 100–120/min and depth at least 2 inches for at least 70% of compressions during the two-minute test. AED cycle must reach simulated shock delivery without skipping a prompt. All four first-aid stations scored pass/fail by peer checklist; instructor verifies any marginal results. Students who fail any station receive immediate remediation and one retest. |
| 4 | Trade Math for Marine Fabrication | 30 | theory | Students solve trade math problems—fraction and decimal conversion, ratio and proportion, area and volume of geometric shapes common to hull sections, angle calculation, and unit conversion between imperial and metric—with at least 80% accuracy on timed problems representative of NCCER Shipfitting and Maritime Welding assessments. |
| Scientific calculators (non-graphing, the type permitted in NCCER testing); steel tape measures; combination squares; digital protractor/angle finder; steel plate samples and pipe coupons; steel weight reference chart (pounds per square foot by thickness); NCCER Core Curriculum math modules; instructor-prepared problem sets. | Timed 25-question trade math quiz at end of lesson: students must score at least 20/25 (80%). Problems cover all topic areas taught. Students scoring below 80% complete a targeted review and a parallel-form retest before proceeding. |
| 5 | Reading Shipbuilding Drawings, Weld Symbols, and Work Orders | 24 | theory | Students extract dimensions, weld type, groove geometry, and material specification from a set of multi-view orthographic shipbuilding drawings and annotate a blank reference line with the correct AWS A2.4 weld symbol for a specified joint, achieving at least 80% on a drawing-reading exercise. |
| Set of shipbuilding structural drawings (industry-sourced or instructor-prepared to realistic standards); AWS A2.4 Standard Symbols for Welding, Brazing, and Nondestructive Examination (current edition, reference copy); AWS A3.0 welding terminology reference; sample work orders and revision-cloud drawing; drafting templates. | Drawing-reading exercise graded against answer key: 80% correct on dimensions and specifications extracted. Weld symbol decode scored: 12 of 15 correct (80%). Work-order exercise: student must correctly identify the revision, material change, and hold point—all three required for pass. |
| 6 | Digital Tools, Documentation, and Communication in the Shipyard | 18 | practice | Students use a digital angle finder, a tablet-based safety observation app, and a standard word-processing tool to complete a written near-miss report and a digital material-request form that meet the accuracy and format standards used in commercial shipyards. |
| Digital angle finders (one per two students); tablets or laptops with spreadsheet software and a word processor; sample safety observation app interface (instructor-demonstrated); near-miss report form template; toolbox-talk visual-aid examples; professional communication rubric. | Digital measurement log: all five angle readings recorded in correct format; mean and range calculated correctly; tolerance decision correct for all five. Near-miss report scored on a 10-item checklist: 8 of 10 items complete and accurate (80%). Toolbox-talk rubric: average peer score of 70% or higher, with instructor override for factual errors. |
| 7 | Career Readiness, Workplace Professionalism, and Program Introduction | 20 | field | Students articulate the career pathway from entry-level shipfitter or welder to journeyman and beyond, complete a program credential plan mapping each course to target credentials, and demonstrate professional workplace behaviors by punctual arrival, correct PPE donning, and accurate timesheet completion across the final week of the course. |
| Program credential chart (instructor-prepared); NCCER Registry overview handout; AWS Certified Welder program overview; ABS/USCG welder qualification overview; timesheet forms; PPE kit (hard hat, safety glasses, hearing protection, steel-toed boots, gloves); daily pre-task safety checklist. | Written reflection on industry panel: minimum one page, must reference at least two specific pieces of advice—graded pass/fail by instructor. Credential plan: complete with no blank fields and logical course-to-credential mapping—pass/fail. Five-day PPE and timesheet compliance: 90% compliance rate (no more than one missed item across all five days) required to pass. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| OSHA and Shipyard Safety Knowledge Exam | Written exam | 25% | 70% correct (28 of 40 questions); all questions on lockout/tagout critical steps and confined-space entry decision-making must be answered correctly regardless of overall score. | A 40-question multiple-choice and true/false written exam covering OSHA Focus Four hazards, lockout/tagout procedure, permit-required confined-space entry, fire-watch duties, fall protection, and first aid/CPR protocols as applied to a shipyard environment. Questions are written at the level and style of the NCCER Core Curriculum module assessments so students gain familiarity with that format while demonstrating genuine safety knowledge. Accuracy · Safety · Communication · Professionalism |
| Trade Math and Drawing-Reading Knowledge Exam | Written exam | 25% | 80% correct (32 of 40 questions); the weld-symbol section (10 questions) requires at least 7 correct independently of the overall score. | A 40-question timed written exam combining trade math problems (fraction conversion, area, volume, angle, unit conversion, and material takeoff) with drawing-reading questions (dimension extraction, AWS A2.4 weld symbol interpretation, and work-order analysis) representative of the math and print-reading content assessed in both NCCER Shipfitting and NCCER Maritime Welding written tests. Students use only a basic scientific calculator, as permitted in credentialing exams. Accuracy · Safety · Communication · Professionalism |
| Integrated Safety and Documentation Project | Project | 25% | Score of 75% or higher on the rubric (30 of 40 points); the near-miss report and pre-task safety checklist sections are each required to score at least 70% independently. | Students receive a scenario packet describing a planned hot-work operation inside a double-bottom tank on a vessel under construction; they must produce a complete confined-space entry permit, a hot-work permit, a near-miss report for a described earlier incident, a personal PPE selection list with justification, and a one-page toolbox-talk outline for the crew. Each document is scored on accuracy, completeness, and professional format using a detailed rubric that mirrors the documentation standards used in a commercial shipyard. Accuracy · Safety · Communication · Professionalism |
| Career and Safety Oral Defense | Oral / panel | 25% | Pass on all four evaluation criteria: safety rationale (correct and complete), math or drawing question answered correctly within three minutes, credential plan defensible, and professional communication rating of satisfactory or above. | In a 10-minute one-on-one oral session with the instructor, each student explains their personal credential plan and defends one randomly drawn safety scenario (for example, responding to an unconscious worker found in a void space), answers one trade math or drawing-reading question drawn at random from the course problem bank, and describes one realistic career goal and the steps needed to reach it. The instructor uses a four-criterion rubric; all four criteria must be rated passing for the student to earn credit for this assessment and advance to Course 2. Accuracy · Safety · Communication · Professionalism |
Students learn to interpret naval architectural drawings and construct steel and aluminum ship hull structures from keel to deck, following American Bureau of Shipping (ABS) rules and industry-standard fabrication sequences. Lessons progress from reading lines plans and structural drawings through plate layout, frame fabrication, erection, and fairness inspection. Work is performed to ABS/USCG weld-quality standards and NCCER Shipfitting competency areas.
OutcomesStudents learn to interpret naval architectural drawings and construct steel and aluminum ship hull structures from keel to deck, following American Bureau of Shipping (ABS) rules and industry-standard fabrication sequences. Lessons progress from reading lines plans and structural drawings through plate layout, frame fabrication, erection, and fairness inspection. Work is performed to ABS/USCG weld-quality standards and NCCER Shipfitting competency areas.
How the course runs. 12 blocks: Ship Structure Fundamentals and Drawing Interpretation; Hull Safety: Confined Spaces, Heights, and Hazardous Energy; Blueprint Reading for Hull Fabrication; Material Identification, Handling, and Storage; Layout and Marking of Hull Plates; Plate Cutting: Plasma, Oxy-Fuel, and Mechanical Methods; Frame Fabrication: Transverse Frames and Floors; Keel, Girder, and Longitudinal Installation; Shell Plating Fit-Up and Tacking; Bulkhead Fabrication and Installation; Fairness Inspection, Punch List, and Dimensional Survey; Hull Construction Documentation and Quality Records.
What competent looks like. Interpret hull structural drawings, including lines plans, frame schedules, and bill-of-materials tables, to extract fabrication and erection data. Lay out, mark, and cut steel and aluminum hull plates and structural members to dimensional tolerances acceptable under ABS rules. Fabricate and erect transverse frames, longitudinal stringers, floors, girders, and bulkheads in correct sequence using approved fit-up and tack-weld practices. Apply lockout/tagout, confined-space entry, and fall-protection procedures specific to hull erection environments before each evolution. Perform dimensional and fairness checks on erected hull structure using straight-edges, fairing battens, templates, and levels, and document nonconformances on a punch list. Produce a complete set of fabrication records—cutting lists, fit-up inspection reports, and a weld map—meeting program quality-control requirements.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Ship Structure Fundamentals and Drawing Interpretation | 18 | theory | Given a set of structural drawings for a steel hull, the student identifies and describes the function of every major structural element—keel, frames, floors, girders, stringers, longitudinals, deck beams, bulkheads, and shell plating—and locates each on plan, profile, and body-plan views. |
| ABS Rules for Building and Classing Steel Vessels (current edition, relevant structural chapters); NCCER Shipfitting Level 1 trainee guide; sample structural GA drawings and lines plans (instructor-supplied); pencils, scales, colored highlighters | 10-question drawing-identification quiz; students must correctly name and locate at least 18 of 20 labeled structural elements (90% pass mark). Mapped to NCCER Shipfitting core knowledge area: ship structure nomenclature. |
| 2 | Hull Safety: Confined Spaces, Heights, and Hazardous Energy | 14 | theory | The student correctly applies OSHA permit-required confined-space entry procedures, lockout/tagout sequences, and fall-protection requirements as they apply to tank and void spaces, staging inside a hull, and powered cutting equipment before any hands-on hull work begins. |
| OSHA 29 CFR 1910.146 (confined spaces) and 29 CFR 1926 Subpart M (fall protection) quick-reference cards; employer LOTO procedure template; hard hats, safety glasses, harnesses, and lanyards for demonstration; gas monitor (four-gas) for confined-space demo | Written OSHA 10-aligned safety quiz covering confined-space, LOTO, and fall protection; minimum 80% correct. Students also complete a practical LOTO demonstration on assigned equipment without prompting; any missed step is an automatic fail requiring repeat. Mapped to NCCER Shipfitting safety competency. |
| 3 | Blueprint Reading for Hull Fabrication | 16 | theory | Given a hull structural drawing package including a shell-expansion plan, frame drawing, and detail sheets, the student extracts plate dimensions, material specifications, weld symbols, and erection notes with no more than one error per drawing. |
| Shell-expansion plan and frame detail drawings (instructor-supplied, based on a small commercial vessel or workboat); AWS A2.4 Standard Symbols for Welding (reference copy); architect's scale and engineer's scale; blank drawing-takeoff worksheets | Drawing-takeoff assignment graded by instructor; students must correctly extract all plate dimensions and material grades with no more than one error per drawing sheet and achieve an overall score of 85% or higher. Mapped to NCCER Shipfitting Level 1: blueprint reading. |
| 4 | Material Identification, Handling, and Storage | 10 | demo | The student correctly identifies ABS-grade structural steel and marine-grade aluminum alloys by mill certificate, heat number, and marking, and demonstrates safe material handling and storage practices that prevent distortion and contamination. |
| Sample CMTRs for ASTM A36, ABS Grade A steel, and 5083/6061 aluminum; marked plate coupons; dunnage lumber; color-coded material tags; wire brushes, angle grinders with flap discs; SDS for acetone or comparable surface prep solvent; PPE: gloves, safety glasses, face shield | Instructor observation checklist: student correctly reads CMTR and matches to plate (pass/fail, all five must match); storage setup evaluated against a 10-point checklist with a minimum score of 8/10. Mapped to NCCER Shipfitting: material identification. |
| 5 | Layout and Marking of Hull Plates | 20 | lab | Using a structural drawing and a cutting list, the student lays out the shape of a hull plate on flat stock to within 1/16-inch dimensional tolerance using scribers, soapstone, combination squares, tape measures, and straight-edges. |
| Flat steel plate (A36, 3/16" and 1/4") and aluminum sheet (5083, 3/16"); scribers, soapstone, silver pencils; steel tape measures, combination squares, framing squares; flexible batten (wood or aluminum); offset tables from course hull project; safety glasses, gloves | Instructor measures each laid-out plate against the cutting list; all dimensions must be within 1/16 inch and all bevel marks correct; 100% of critical dimensions must pass before student proceeds to cutting. Mapped to NCCER Shipfitting: layout and fabrication. |
| 6 | Plate Cutting: Plasma, Oxy-Fuel, and Mechanical Methods | 20 | lab | The student cuts steel and aluminum hull plates to the laid-out lines using plasma arc cutting and, for steel, oxy-fuel cutting, achieving cut edges within 1/8-inch dimensional tolerance and surface quality acceptable for fit-up without excessive grinding. |
| Plasma cutting machine with appropriate consumables; oxy-fuel cutting outfit with cutting torch and correct tips; angle grinders with cutting and grinding discs; ear protection, face shields, leather gloves, leather apron, safety glasses; marked plates from Lesson 5; fire extinguisher; welding curtains | Instructor measures cut plates against cutting list; dimensional tolerance within 1/8 inch on all edges; no undercut or excessive dross that cannot be remediated by grinding; instructor signs cut-plate inspection form. Mapped to NCCER Shipfitting: cutting and beveling; supports ABS/USCG weld test preparation (edge preparation). |
| 7 | Frame Fabrication: Transverse Frames and Floors | 22 | lab | The student fabricates a transverse web frame and a floor plate from cut components, fitting and tacking all parts to dimensional tolerances specified on the frame drawing, with all joints prepared for welding per the applicable weld symbol. |
| Structural steel shapes (flatbar, angle, T-bar per cutting list); floor plate blanks; strongback or layout table; plumb bob, torpedo level, angle blocks, clamps, dogs, wedges; tack-weld capable MIG or SMAW equipment; angle grinder; frame drawing from course hull project; steel tape, combination square | Instructor checks completed frame assembly against drawing using tape measure and square; web height, flange width, and overall frame squareness must each be within 1/8 inch of nominal; all tack welds visually acceptable (no cracks, proper size); instructor signs frame inspection report. Mapped to NCCER Shipfitting: frame fabrication. |
| 8 | Keel, Girder, and Longitudinal Installation | 18 | lab | The student correctly positions and tack-welds a keel plate or bar keel, center girder, and at least two longitudinal members onto a hull bottom mock-up, maintaining baseline reference and longitudinal alignment within 1/8-inch tolerance. |
| Keel plate and center girder sections (from cutting list); longitudinal bar stock; erection blocks or horses; chalk line; laser level or transit level; batten (wood or aluminum, 8 ft minimum); clamps, dogs, strongbacks; MIG tack-weld setup; hull bottom mock-up framing from previous lessons | Instructor measures keel offset from baseline and checks longitudinal fairness with batten; maximum allowable deviation from straight is 1/8 inch in any 10-foot run; instructor signs erection inspection sheet. Mapped to NCCER Shipfitting: hull erection and alignment. |
| 9 | Shell Plating Fit-Up and Tacking | 22 | lab | The student fits and tacks a strake of shell plating to a framed hull section, achieving a root gap and land dimension within the tolerances specified by the applicable weld procedure, and a fair exterior surface verified by batten. |
| Shell plate blanks (cut in Lesson 6); hydraulic or mechanical clamps, dogs, jacks, strongbacks; fairing batten; root-gap gauges; WPS (instructor-issued, matching the joint type); MIG welding setup; soapstone for marking; safety glasses, gloves, hearing protection | Instructor measures root gap at five equally spaced points along the joint using a feeler gauge or root-gap gauge; all five readings must be within the WPS tolerance; batten fairness check must show no deviation greater than 1/8 inch. Mapped to NCCER Shipfitting: shell plating; supports ABS/USCG weld test fit-up requirements. |
| 10 | Bulkhead Fabrication and Installation | 18 | lab | The student fabricates a transverse watertight bulkhead panel with vertical stiffeners, installs it in the hull mock-up plumb and square, and prepares all perimeter weld joints to drawing and WPS requirements. |
| Bulkhead plate and stiffener stock; layout table; overhead crane (instructor-supervised); digital level; dogs, shims, clamps; pre-weld inspection forms; ABS Rules summary (instructor-provided excerpt); MIG setup; tape measure, combination square | Bulkhead plumb checked with digital level in both planes: must be within 1/8 inch per 4 feet; perimeter gap within WPS tolerance at all measured points; pre-weld inspection form complete and signed; instructor signs off before welding begins. Mapped to NCCER Shipfitting: bulkhead installation. |
| 11 | Fairness Inspection, Punch List, and Dimensional Survey | 17 | field | The student conducts a complete dimensional and fairness survey of the assembled hull mock-up, documents all nonconformances on a punch list using industry-standard terminology, and prioritizes corrections in the sequence a production shipyard would follow. |
| Assembled hull mock-up from Lessons 7–10; steel tape measures; digital level; laser level or transit; plumb bob; fairing battens; dimensional check sheets (instructor-issued); punch list forms; pencils | Dimensional check sheet scored by instructor against the instructor's own survey of the same section; student measurements must agree with instructor measurements within 1/16 inch on all critical dimensions; punch list must capture all nonconformances found by instructor (no missed items allowed for a pass). Mapped to NCCER Shipfitting: inspection and quality control; supports ABS/USCG inspection preparation. |
| 12 | Hull Construction Documentation and Quality Records | 10 | theory | The student assembles a complete fabrication record package—including a material traceability log, weld map, fit-up inspection reports, and punch list close-out sheet—that meets a stated quality-management requirement and would satisfy an ABS surveyor's documentation review. |
| Sanitized sample quality records from instructor; blank weld map forms; reduced-scale GA drawing; students' own inspection reports and punch lists from earlier lessons; word processor or lined paper for memo; pen | Weld map graded for completeness: all joints numbered, all WPS numbers correctly assigned, all inspection results recorded—must be 100% complete to pass; close-out memo graded on a 10-point rubric (accuracy, completeness, professional language) with a minimum score of 8/10. Mapped to NCCER Shipfitting: documentation; supports ABS/USCG surveyor documentation requirements. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Hull Structures and Drawing Reading Knowledge Exam | Written exam | 25% | 75% correct (minimum 38 of 50 questions) | A 50-question written exam covering ship structure nomenclature, blueprint reading conventions, material identification, ABS-grade material designations, weld symbols, and hull erection sequence. Questions are aligned to NCCER Shipfitting core knowledge areas and ABS/USCG documentation concepts introduced throughout the course. Standard met · Safety · Time · Quality/finish · Documentation |
| Frame Fabrication and Shell Plating Skills Demonstration | Skills demonstration | 45% | All critical dimensions within tolerance and all safety steps performed without prompting; instructor signs competency checklist | The student independently fabricates a transverse web frame and fits one shell plate to a framed section within a timed window, demonstrating layout, cutting, fit-up, and tacking without instructor assistance. The instructor evaluates dimensional accuracy (all critical dimensions within 1/8 inch), joint preparation per WPS, safe equipment operation, and correct PPE use throughout; any unsafe act or missed LOTO step is an automatic fail requiring a full repeat. Mapped to NCCER Shipfitting fabrication competencies and ABS/USCG weld fit-up standards. Standard met · Safety · Time · Quality/finish · Documentation |
| Fabrication Lab Log | Log | 15% | All required entries present and legible; dimensional data accurate to within 1/16 inch of instructor reference measurements; overall score 80% or higher on completeness rubric | Students maintain a cumulative lab log throughout the course that includes: dated entries for every lab session, sketches or photographs of work at each stage, completed dimensional check sheets from Lessons 5–11, all inspection forms, the weld map, and the punch list with close-out status. The log is submitted at course end and graded against a 20-item completeness and accuracy rubric. Standard met · Safety · Time · Quality/finish · Documentation |
| Hull Construction Safety Check | Safety audit | 15% | 100% on critical safety items (confined-space permit, LOTO, fall protection) and 80% overall on the full checklist; any critical item scored 0 requires a safety remediation session and recheck before the student may continue | An unannounced practical safety observation is conducted once during the lab phase of the course: the instructor observes the student setting up for a hull erection task and scores performance against a 15-item checklist covering confined-space permit requirements, LOTO procedure, PPE selection and donning, housekeeping, and tool inspection. Mapped to NCCER Shipfitting safety competencies and OSHA 29 CFR 1910/1926 requirements reviewed in Lesson 2. Standard met · Safety · Time · Quality/finish · Documentation |
Students develop hands-on proficiency in shielded metal arc welding (SMAW), flux-cored arc welding (FCAW), gas metal arc welding (GMAW), and gas tungsten arc welding (GTAW) on carbon steel and marine-grade aluminum alloys used in shipbuilding. Instruction integrates AWS D1.1 structural steel and AWS D1.2 aluminum welding codes, ABS/USCG qualification requirements, and NCCER Maritime Welding competency areas throughout every lesson. Safe shop practices, distortion control, and weld inspection are embedded in all lab and practice sessions.
OutcomesStudents develop hands-on proficiency in shielded metal arc welding (SMAW), flux-cored arc welding (FCAW), gas metal arc welding (GMAW), and gas tungsten arc welding (GTAW) on carbon steel and marine-grade aluminum alloys used in shipbuilding. Instruction integrates AWS D1.1 structural steel and AWS D1.2 aluminum welding codes, ABS/USCG qualification requirements, and NCCER Maritime Welding competency areas throughout every lesson. Safe shop practices, distortion control, and weld inspection are embedded in all lab and practice sessions.
How the course runs. 12 blocks: Marine Welding Safety, Hot-Work Permits, and Weld Shop Orientation; Reading Welding Symbols, WPS Documents, and AWS/ABS Code Basics; SMAW Fundamentals on Carbon Steel — Flat and Horizontal; SMAW Vertical and Overhead Positions — Structural Steel; FCAW-G and FCAW-S on Shipbuilding Steel — Production Techniques; GMAW on Carbon Steel and Transition to Aluminum Alloys; GTAW on Carbon Steel and Marine Aluminum; Weld Distortion Control and Thermal Management in Marine Structures; Weld Inspection: Visual Testing, NDE Introduction, and AWS Acceptance Criteria; Pipe and Tubular Welding for Marine Outfitting Applications; ABS/USCG and AWS Certified Welder Qualification Test Preparation; Integrated Welding Project: Marine Panel Assembly with Full QA Documentation.
What competent looks like. Set up and operate SMAW, FCAW, GMAW, and GTAW equipment safely to produce sound welds on carbon steel plate and pipe in multiple positions per AWS D1.1 workmanship requirements. Set up and operate GMAW and GTAW equipment to weld marine-grade aluminum alloys per AWS D1.2, controlling heat input to prevent distortion and burn-through. Interpret welding symbols, joint-detail drawings, and weld procedure specifications (WPS) used in shipyard production to select correct process, filler, and parameters. Perform visual weld inspection using AWS acceptance criteria and conduct basic nondestructive examination (NDE) tasks including visual testing (VT) and guided-bend test interpretation. Apply lockout/tagout, hot-work permit procedures, ventilation controls, and PPE selection specific to marine welding environments including confined spaces and coated steel. Qualify a weld test coupon to ABS/USCG and AWS Certified Welder requirements by demonstrating consistent technique, acceptable visual appearance, and passing guided-bend results.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Marine Welding Safety, Hot-Work Permits, and Weld Shop Orientation | 12 | theory | Students will correctly identify all hazards specific to shipyard welding environments and apply the appropriate controls, PPE, lockout/tagout, and hot-work permit procedures before performing any welding task. |
| OSHA 29 CFR 1910.147 LOTO standard excerpt, ANSI Z49.1 Safety in Welding Cutting and Allied Processes, NFPA 51B excerpt, shop hazard diagram, blank hot-work permit forms, welding PPE sets, welding machine with lockout tags and hasp, fire extinguisher (training unit) | Students complete a 20-question written safety quiz (70% pass) and demonstrate LOTO and PPE donning with zero critical errors as observed on a pass/fail instructor checklist. |
| 2 | Reading Welding Symbols, WPS Documents, and AWS/ABS Code Basics | 10 | theory | Students will decode standard AWS welding symbols on shipbuilding drawings and extract joint type, process, filler, position, and preheat requirements from a weld procedure specification (WPS) without assistance. |
| AWS A2.4 Standard Symbols for Welding, AWS D1.1 current edition (instructor copy and student excerpts), sample prequalified WPS documents, shipbuilding structural drawings (scantling plans), ABS Rules for Materials and Welding excerpts, ruler, pencils | Students correctly decode 8 of 10 welding symbols on a timed drawing quiz and answer 7 of 10 WPS interpretation questions correctly; both 70% thresholds must be met. |
| 3 | SMAW Fundamentals on Carbon Steel — Flat and Horizontal | 20 | lab | Students will run stringer and weave beads with E6010 and E7018 electrodes in flat (1G/1F) and horizontal (2G/2F) positions, producing welds that meet AWS D1.1 visual acceptance criteria for reinforcement, uniformity, undercut, and overlap. |
| CC/DC welding machines, E6010 and E7018 electrodes (rod oven for E7018), 3/8-inch and 1/2-inch carbon steel plate coupons, angle grinder, wire brush, chipping hammer, fillet weld gauges, undercut gauges, AWS D1.1 visual acceptance table (laminated reference cards), lab log notebooks, PPE | Instructor visually inspects two graded coupons per student (one 1F fillet, one 2G groove) against AWS D1.1 Table 6.1 criteria; all six visual criteria must pass, and fillet leg size must be within +1/4 inch / -0 inch of specified size. |
| 4 | SMAW Vertical and Overhead Positions — Structural Steel | 16 | lab | Students will produce E7018 fillet and groove welds in vertical-up (3F/3G) and overhead (4F/4G) positions that meet AWS D1.1 visual acceptance criteria, demonstrating control of molten pool and correct electrode angle adjustments for each position. |
| CC/DC welding machines, E7018 electrodes (rod oven), 3/8-inch carbon steel groove and fillet coupons pre-tacked in 3G and 4G fixtures, overhead welding positioners/fixtures, guided-bend test fixture (plunger-type), band saw or press for coupon sectioning, fillet gauges, lab log notebooks, PPE including overhead-appropriate ear and neck protection | One 3G groove coupon per student is bend-tested (root and face); both bends must pass AWS bend acceptance. One 4F fillet is visually inspected by the instructor against D1.1 criteria. Both assessments must pass for lesson completion credit. |
| 5 | FCAW-G and FCAW-S on Shipbuilding Steel — Production Techniques | 18 | lab | Students will set up and operate both gas-shielded (FCAW-G) and self-shielded (FCAW-S) flux-cored processes on carbon steel in flat, horizontal, and vertical-up positions, selecting wire classification and parameters from the WPS to produce welds meeting ABS workmanship standards. |
| CV welding machines with wire feeders, E70T-1C wire (gas-shielded), E71T-8 wire (self-shielded), 75/25 Ar/CO2 shielding gas cylinders with regulators, 1/2-inch carbon steel plate, weld profile gauges, spatter chippers, wire brush, ABS Rules for Materials and Welding Part 2 Section 4 excerpt, WPS documents, lab log notebooks, PPE | Students submit a completed 1/2-inch multi-pass T-joint fillet coupon with a self-inspection report; instructor confirms visual acceptance per ABS criteria and verifies lab log entries for parameter sets are complete. Both required for credit. |
| 6 | GMAW on Carbon Steel and Transition to Aluminum Alloys | 16 | demo | Students will distinguish GMAW transfer modes (short-circuit, spray, pulsed spray) and correctly configure equipment to produce sound GMAW welds on both A36 carbon steel and 5083/6061 marine-grade aluminum in flat and horizontal positions. |
| CV/pulsed GMAW machines, ER70S-6 wire (steel), ER5356 wire (aluminum), aluminum drive rolls (U-groove), Teflon or Nylon gun liners, 100% argon shielding gas for aluminum, 75/25 Ar/CO2 for steel, 1/4-inch A36 plate, 1/4-inch 5083 aluminum plate, digital multimeter, hand-held magnifier (10x), AWS D1.2 current edition excerpts, equipment changeover checklist, lab log notebooks, PPE (clean gloves for aluminum) | Students correctly complete the equipment changeover checklist with zero errors (instructor verifies) and produce two aluminum lap joints in flat position that pass AWS D1.2 visual acceptance criteria checked by instructor; both required. |
| 7 | GTAW on Carbon Steel and Marine Aluminum | 22 | lab | Students will set up a GTAW machine with correct polarity, tungsten type, and shielding gas for both carbon steel (DCEN) and aluminum (AC) and produce full-penetration butt welds on thin-gauge material that meet AWS D1.1 and D1.2 visual acceptance criteria respectively. |
| AC/DC GTAW machines, 2% ceriated tungsten (3/32 and 1/8 inch), pure or zirconiated tungsten, ER70S-2 filler rods, ER4043 filler rods, 100% argon shielding gas, 3/16-inch carbon steel plate, 1/8-inch 5052 aluminum plate, tungsten grinder with diamond wheel, bench magnifier, AWS D1.1 and D1.2 visual acceptance table cards, lab log notebooks, PPE (clean cotton gloves for GTAW aluminum) | One steel butt weld and one aluminum butt weld per student are inspected by the instructor against respective AWS visual criteria; additionally, one aluminum coupon is face-bent in the guided-bend fixture and must show no cracks greater than 1/8 inch. All three checks must pass. |
| 8 | Weld Distortion Control and Thermal Management in Marine Structures | 14 | theory | Students will predict distortion types (angular, longitudinal, transverse, buckling) produced by welding sequences on a given joint configuration and select proven distortion-control methods — presetting, backstep, skip welding, and clamping — appropriate for a shipyard production scenario. |
| Digital angle gauges, 12-inch carbon steel T-joint coupons (pre-tacked), SMAW or FCAW machines, distortion case-study photograph set (printed), ship frame drawing with weld callouts, straightedges, clamps and strongbacks, Lincoln Electric Welding Handbook or equivalent reference chapter on distortion, lab log notebooks | Students submit a lab log entry with measured angular distortion values from both weld sequences and a written comparison; they also score 70% or higher on a 10-question written distortion-control quiz administered at the end of the lesson. |
| 9 | Weld Inspection: Visual Testing, NDE Introduction, and AWS Acceptance Criteria | 14 | theory | Students will perform a thorough visual weld inspection (VT) per AWS D1.1 acceptance criteria, correctly classify discontinuities as acceptable or rejectable, and describe the purpose and basic principles of liquid penetrant (PT), magnetic particle (MT), and ultrasonic (UT) testing methods used in shipyard QA. |
| Set of 8 seeded-defect weld coupons, fillet weld gauges, undercut gauges, ruler, 10x magnifier, AWS D1.1 Table 6.1 visual acceptance criteria (laminated), liquid penetrant testing kit (penetrant, developer, cleaner), magnetic particle yoke with iron powder, ABS inspection report forms, NDE reference posters or Lincoln Electric NDE reference guide excerpts | Students correctly classify at least 12 of 16 accept/reject decisions across the coupon rotation (75%) and submit a complete mock inspection report with all required fields filled; incomplete reports are returned for correction before credit is granted. |
| 10 | Pipe and Tubular Welding for Marine Outfitting Applications | 18 | lab | Students will weld carbon steel pipe coupons in 2G (horizontal-fixed) and 5G (horizontal-rolled and fixed vertical) positions using SMAW with E6010 root and E7018 fill/cap, producing full-penetration welds that pass visual inspection and a guided-bend test. |
| CC/DC welding machines, E6010 and E7018 electrodes (rod oven), 3-inch Schedule 40 carbon steel pipe (pre-beveled and pre-tacked in 2G and 5G fixtures), pipe positioners/clamps, contact thermometer, angle grinder, band saw or pipe cutter for coupon sectioning, guided-bend test fixture, fillet/profile gauges, lab log notebooks, PPE | Guided-bend test on the 2G coupon must show no cracks or open discontinuities greater than 1/8 inch; the 5G coupon must pass visual inspection per AWS D1.1. Instructor signs off lab log entries for temperature readings. Both bend and visual checks required. |
| 11 | ABS/USCG and AWS Certified Welder Qualification Test Preparation | 22 | practice | Students will produce welder qualification test coupons following ABS/USCG and AWS Certified Welder procedural requirements for the process and position relevant to their intended qualification, demonstrating consistent pre-weld, in-process, and post-weld practices that an independent examiner would observe. |
| CC/DC and CV welding machines, E7018 and E70T-1C electrodes/wire per WPS, qualification test coupon blanks (pre-beveled per AWS D1.1 or ABS specification), guided-bend fixture, blank WQR forms, AWS D1.1 Annex I welder qualification tables (excerpts), ABS Rules for Materials and Welding welder qualification section (excerpts), defect-cause reference cards, lab log notebooks, PPE | Each student produces at least one complete practice qualification coupon; the guided-bend test result is documented. Students must correctly complete the pre-test WQR form with all required fields (100% completion) and articulate in writing the cause and correction for any bend failure. Progress is tracked on instructor's qualification readiness matrix. |
| 12 | Integrated Welding Project: Marine Panel Assembly with Full QA Documentation | 23 | lab | Students will independently plan, fabricate, and inspect a multi-material marine panel assembly (carbon steel frame with aluminum insert or deck fitting) using at least two welding processes, completing all production, inspection, and QA documentation to shipyard standards. |
| Assorted carbon steel plate and structural shapes (3/8 and 1/2 inch), 5083 or 6061 aluminum plate and extrusions, SMAW/FCAW/GMAW/GTAW equipment as selected, full consumables per WPS, contact thermometer, fillet and undercut gauges, 10x magnifier, digital camera or phone, ABS inspection report forms, production traveler template, AWS D1.1 and D1.2 visual acceptance criteria cards, PPE | QA package graded on a four-category rubric (fabrication quality, visual inspection accuracy, documentation completeness, distortion control); students must achieve 70% overall with no category below 60%. Panels with rejectable unrepaired weld defects are returned for correction before final grading. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Welding Theory and Code Knowledge Exam | Written exam | 25% | 70% correct (35 of 50 questions) | A 50-question written exam covering AWS D1.1 and D1.2 code provisions, welding symbol interpretation, WPS reading, GMAW/FCAW/SMAW/GTAW process fundamentals, defect identification, NDE method selection, and marine welding safety requirements aligned to NCCER Maritime Welding and AWS Certified Welder knowledge areas. Questions are multiple-choice and short-answer; students have 90 minutes to complete. Standard met · Safety · Time · Quality/finish · Documentation |
| Welder Qualification Skills Demonstration | Skills demonstration | 45% | Guided-bend test passes AWS acceptance criteria (no linear discontinuity greater than 1/8 inch on any bend); visual inspection passes all six AWS D1.1 Table 6.1 criteria | Each student welds a designated qualification coupon (SMAW E7018 in 3G position on 3/8-inch carbon steel or FCAW in 2G per instructor assignment) under test conditions matching ABS/USCG and AWS Certified Welder procedural requirements; the coupon undergoes guided-bend testing and full visual inspection by the instructor acting as examiner. This demonstration directly prepares students for the actual ABS/USCG and AWS D1.1 Certified Welder performance qualification. Standard met · Safety · Time · Quality/finish · Documentation |
| Welding Lab Log Portfolio | Log | 15% | All 12 lesson lab log entries present and complete; at least 10 of 12 entries rated Meets Standard on the four-point rubric (data accuracy, observations, accept/reject decisions, corrective actions) | Students maintain a chronological lab log throughout the course recording equipment settings, coupon results, measured dimensions, inspection findings, bend test outcomes, and corrective actions for every hands-on lesson; the completed log is submitted as a portfolio at the end of the course and graded against a four-point rubric aligned to NCCER Maritime Welding documentation competencies. Standard met · Safety · Time · Quality/finish · Documentation |
| Hot-Work and Welding Safety Compliance Check | Safety audit | 15% | Zero critical errors; all items on the safety checklist marked Satisfactory by the instructor | A live unannounced safety observation conducted once during a lab session: the instructor uses a standardized 15-item checklist to verify correct PPE, machine grounding, electrode storage, ventilation operation, fire-watch readiness, and LOTO compliance; any critical error (defined as an item posing immediate injury risk) requires the student to stop work, correct the deficiency, and repeat the full check before continuing. This check is directly aligned to OSHA 29 CFR 1910.252 electric welding requirements and ABS hot-work expectations. Standard met · Safety · Time · Quality/finish · Documentation |
Students develop the geometric layout, measurement, and marking skills required to position, fit, and fair structural ship components from working drawings and lofting data. The course covers flat-plate layout, curved-surface development, template making, and the use of precision measuring tools on both steel and aluminum structure. Lessons map directly to NCCER Shipfitting credential competency areas covering layout, fit-up, and structural assembly.
OutcomesStudents develop the geometric layout, measurement, and marking skills required to position, fit, and fair structural ship components from working drawings and lofting data. The course covers flat-plate layout, curved-surface development, template making, and the use of precision measuring tools on both steel and aluminum structure. Lessons map directly to NCCER Shipfitting credential competency areas covering layout, fit-up, and structural assembly.
How the course runs. 12 blocks: Shipbuilding Drawings and Notation; Precision Measurement Tools and Their Use; Lines, Offsets, and the Lofting Process; Geometric Construction for Layout; Template Making — Flat Plate and Brackets; Spiling and Curved-Surface Template Development; Frame Layout — Straight and Cambered; Bulkhead and Longitudinal Fit-Up; Fairness and Distortion Control; Laser and Digital Layout Tools; Material Take-Off and Fit-Up Documentation; Integrated Layout and Fit-Up Practical.
What competent looks like. Interpret shipbuilding structural drawings, including frame tables, offsets, and bill of materials, and transfer dimensions to the shop floor or plate with an accuracy of ±1/16 inch. Apply geometric construction and basic trigonometry to lay out straight frames, curved frames, bulkheads, and deck camber using chalk lines, trammel points, and optical or laser levels. Develop flat-pattern templates and spiling boards for curved hull plating and pipe penetrations, and verify template accuracy against the original drawing before cutting. Use precision measuring tools—combination squares, bevel gauges, contour gauges, plumb bobs, laser levels, and digital angle finders—to check fairness, plumb, and alignment of fitted assemblies. Execute a complete plate-to-assembly fit-up sequence, including tacking, temporary shoring, and checking for distortion, following shipyard safety rules and applicable NCCER Shipfitting standards. Produce required fit-up documentation—sketch, material take-off, inspection checklist—that satisfies a sample shipyard quality-assurance sign-off.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Shipbuilding Drawings and Notation | 14.5 | theory | Students will correctly read and extract dimensions, weld symbols, material specifications, and part marks from a set of structural shipbuilding drawings with zero critical errors on a graded interpretation exercise. |
| Full-size sample structural drawings (frame sections, deck plan, shell expansion), weld symbol reference chart per AWS A2.4, NCCER Shipfitting Module 1 textbook, pencils, ruler, highlighters | Graded interpretation worksheet: students must correctly answer at least 80% of 25 questions covering drawing views, notation, weld symbols, and material callouts to pass. |
| 2 | Precision Measurement Tools and Their Use | 13 | demo | Students will select and correctly use combination squares, bevel gauges, trammel points, digital angle finders, contour gauges, and measuring tapes to take and record six assigned measurements within the tolerance specified on the drawing. |
| Combination squares, bevel gauges (analog and digital), contour gauges, trammel points, 25-ft and 100-ft steel tapes, plumb bobs, laser level, digital angle finder, scrap plate assemblies, measurement data sheet | All six station measurements recorded and compared to nominal; students must achieve four of six readings within the drawing tolerance and correctly identify the two that are out of tolerance to pass. |
| 3 | Lines, Offsets, and the Lofting Process | 16.5 | theory | Students will explain the purpose of a lines plan and offset table and manually plot at least eight hull-form points onto a full-size lofting grid, producing a faired curve that deviates no more than 1/8 inch from the instructor's reference curve. |
| 1:1 paper lofting grid (minimum 4 ft × 8 ft kraft paper), sample offset table, flexible battens, batten weights or ducks, chalk line, steel tape, pencils, NCCER Shipfitting lofting chapter | Faired curve plotted and traced; checked at eight stations—curve must be within 1/8 inch of reference at six of eight stations to pass. |
| 4 | Geometric Construction for Layout | 14.5 | lab | Students will construct perpendicular lines, bisect angles, divide a line into equal parts, and lay out a 3-4-5 right angle on a shop floor using only chalk lines and a steel tape, with all constructed angles within 1/8 inch of true over a 10-foot run. |
| Shop floor (concrete), chalk lines and chalk, 100-ft steel tape, 25-ft steel tape, plumb bobs, digital angle finder, knee pads | Instructor measures all five constructed elements; all must be within 1/8 inch of true per 10-foot run, and the 3-4-5 right angle must be within 0.5° to pass. |
| 5 | Template Making — Flat Plate and Brackets | 16.5 | lab | Students will fabricate a flat-pattern cardboard template for an assigned structural bracket, mark all bend lines and reference points, and verify the template against the drawing so that the actual part cut from the template will be within ±1/16 inch in all dimensions. |
| Bracket detail drawings (min. three different designs), cardboard sheets, straight-edge, compass, combination square, digital calipers, marking pens, scissors or snips, template fit-check sheet | Fit-check sheet reviewed by instructor; all critical dimensions must be within ±1/16 inch and part marking must be complete and legible to pass. |
| 6 | Spiling and Curved-Surface Template Development | 16.5 | lab | Students will use spiling technique to develop a template for a curved hull strake segment on a mock-up frame assembly, achieving a fit with a gap of no more than 3/16 inch at any point around the perimeter when test-fitted to the frame. |
| Curved hull-section mock-up (wood or steel frame), Masonite or heavy cardboard, flexible batten, compass (spiling compass), jigsaw or snips, china markers, tape measure, process log sheet, NCCER Shipfitting template chapter | Instructor measures gap around the full perimeter of the fitted template with a feeler gauge or ruler; maximum 3/16-inch gap at any point to pass. |
| 7 | Frame Layout — Straight and Cambered | 16.5 | lab | Students will lay out a transverse flat-bar frame and a deck beam with the correct camber from a given deck-camber table, tack the assembly to the layout marks, and verify plumb and camber within the tolerances specified in the assignment. |
| Steel layout floor or plate table, flat-bar and angle stock for frame mockup, chalk lines, flexible batten, straight edge, taper gauge, digital level, clamps, MIG welder for tacking, layout inspection form, calculator | Layout inspection form reviewed: camber must be within ±1/8 inch at all five stations and assembly must be plumb within 1/8 inch per 10-foot height to pass. |
| 8 | Bulkhead and Longitudinal Fit-Up | 18 | lab | Students will position and tack a transverse bulkhead and at least two longitudinal stiffeners in a simulated hull-section jig, achieving plumb, fair, and spacing within tolerances and completing the required fit-up inspection checklist. |
| Mock hull jig with keel bar and frame brackets, pre-cut mild-steel plate bulkhead, flat-bar longitudinals, clamps, strong-backs, MIG welder for tacking, plumb bob, digital level, 25-ft tape, straight-edge batten, fit-up inspection checklist | Completed and signed fit-up inspection checklist: all critical dimensions (plumb ±1/8 inch per 10 ft, spacing ±1/8 inch, tack spacing within specification) must pass before sign-off; all items must be green to pass the lesson. |
| 9 | Fairness and Distortion Control | 14.5 | theory | Students will identify at least four causes of weld distortion in ship structure and describe one appropriate pre-fit or post-fit corrective method for each, scoring 80% or higher on a written scenario quiz. |
| Slide presentation, distortion reference chart, photographs of distorted assemblies, case study packets, NCCER Shipfitting distortion chapter, AWS D1.1 reference sections on distortion control | Written scenario quiz scored by instructor; students must correctly address four of five scenarios with correct cause identification and a defensible corrective method—80% or higher to pass. |
| 10 | Laser and Digital Layout Tools | 13 | demo | Students will set up and use a rotating laser level and a digital theodolite (or total station) to establish a baseline, transfer a reference elevation, and check the plumb of a vertical structural member, with all readings within 1/8 inch of true. |
| Rotating laser level with receiver, digital theodolite or total station (or digital level), laser safety glasses (appropriate class), tripods, grade rod, vertical post setup, data recording sheet | Data recording sheet reviewed; all five elevation transfers must be within 1/8 inch of the reference and plumb readings must be within 1/8 inch per 10-foot height to pass. |
| 11 | Material Take-Off and Fit-Up Documentation | 16.5 | theory | Students will produce a complete material take-off list and a fit-up sketch for a given structural assembly, including all part marks, quantities, material grades, and dimensions, with the take-off matching the drawing to within a 5% quantity error. |
| Multi-part assembly drawings, shipyard material take-off forms, fit-up sketch worksheet, pencils, ruler, AWS A2.4 weld symbol reference, NCCER Shipfitting documentation chapter | Material take-off form and fit-up sketch graded by instructor: take-off must have all parts listed with correct data and total quantity within 5% of drawing; sketch must show correct orientation, weld symbols, and sequence—80% score to pass. |
| 12 | Integrated Layout and Fit-Up Practical | 34 | practice | Students will independently complete the full layout, template development, and fit-up sequence for an assigned multi-part hull-section assembly, satisfying all dimensional tolerances and producing a complete documentation package, which serves as the primary skills assessment for the course. |
| Full drawing package (unique per student), steel layout floor or plate table, full precision-tool kit, cardboard or Masonite for templates, clamps, strongbacks, MIG welder for tacking, full documentation forms, safety PPE (hard hat, safety glasses, leather gloves, steel-toed boots) | Final assembly measured at all critical dimensions by instructor using calibrated tools; all primary dimensions must be within ±1/8 inch, all templates must have been approved before cutting, documentation package must be complete—all three gate sign-offs required and final dimensional check must pass to receive a passing grade on this lesson. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Shipfitting Layout Knowledge Exam | Written exam | 25% | 75% correct (38 of 50 questions) | A 50-question written exam covering drawing interpretation, lofting principles, geometric construction, offset tables, camber calculations, distortion causes and corrections, material take-off, and tool selection, mapped to NCCER Shipfitting written-test competency areas. Questions are a mix of multiple-choice and short-answer; students may use a calculator and a weld symbol reference card. Standard met · Safety · Time · Quality/finish · Documentation |
| Integrated Layout and Fit-Up Skills Demonstration | Skills demonstration | 45% | All three milestone gates signed off; all primary dimensions within ±1/8 inch; documentation package complete and accepted | Students independently execute the Lesson 12 practical assignment—laying out, templating, and tacking a multi-part hull-section assembly from a drawing package—under instructor observation. Performance is evaluated against an NCCER-aligned skills verification checklist covering layout accuracy, template quality, fit-up sequence, tack placement, and documentation; this assessment directly mirrors NCCER Shipfitting performance-test task requirements. Standard met · Safety · Time · Quality/finish · Documentation |
| Lab Log and Documentation Portfolio | Log | 15% | Eight of twelve lesson documentation packages submitted, complete, and scoring 80% or higher on the standard review rubric | Students maintain a running lab log throughout the course, submitting a structured documentation package for each hands-on lesson: measurement data sheets, layout records, template fit-check sheets, fit-up inspection checklists, and material take-off forms. The portfolio is reviewed at mid-course and again at course end; completeness, accuracy, and legibility are scored against a standard rubric aligned to shipyard quality-assurance expectations. Standard met · Safety · Time · Quality/finish · Documentation |
| Safety and PPE Compliance Check | Safety audit | 15% | Zero critical violations observed across the full course; any single critical violation requires a documented corrective action and re-check before the student may continue lab work | The instructor conducts unannounced safety walk-throughs during every lab and practice lesson, using a standardized shipyard safety observation form that checks for correct PPE (hard hat, safety glasses or face shield, leather gloves, steel-toed boots, hearing protection in noisy areas), proper housekeeping, correct tool handling, adherence to shipyard lockout/tagout procedures when applicable, and safe material-handling practices. Results are logged for each student and form part of the final course grade. Standard met · Safety · Time · Quality/finish · Documentation |
This course covers the complete protective coating process used in shipbuilding and marine repair, from surface preparation through final topcoat application, in compliance with SSPC, NACE, and shipyard quality standards. Students learn to read and apply coating specifications, operate blasting and spray equipment, identify and document coating defects, and work safely with flammable and toxic coating materials. Lessons map to NCCER Shipfitting core competencies related to surface protection and to the quality-control knowledge tested in ABS/USCG weld and fabrication qualification contexts.
OutcomesThis course covers the complete protective coating process used in shipbuilding and marine repair, from surface preparation through final topcoat application, in compliance with SSPC, NACE, and shipyard quality standards. Students learn to read and apply coating specifications, operate blasting and spray equipment, identify and document coating defects, and work safely with flammable and toxic coating materials. Lessons map to NCCER Shipfitting core competencies related to surface protection and to the quality-control knowledge tested in ABS/USCG weld and fabrication qualification contexts.
How the course runs. 12 blocks: Corrosion, Coating Fundamentals, and the Marine Environment; Hazard Recognition, SDS Interpretation, and Coating-Area PPE; Surface Cleanliness Standards and Visual Inspection; Hand-Tool and Power-Tool Surface Preparation; Abrasive Blasting: Equipment, Media, and Safety; Abrasive Blasting Practice and Surface Profile Measurement; Reading Coating Specifications and Mixing Multi-Component Coatings; Coating Application Methods: Brush, Roller, and Airless Spray; Dry-Film Thickness Measurement and Holiday Detection; Antifouling and Bottom Paint Systems; Tank Coatings and Confined-Space Coating Operations; Coating Inspection, Quality Documentation, and Defect Remediation.
What competent looks like. Select and apply the correct personal protective equipment and ventilation controls for each phase of surface preparation and coating application in compliance with OSHA standards and SDS requirements. Prepare steel and aluminum marine surfaces to specified SSPC cleanliness grades using hand tools, power tools, and abrasive blasting, and verify results with visual comparator standards. Read and execute a coating system specification sheet, mixing multi-component coatings to correct ratio, applying each coat within the documented overcoat window, and achieving specified dry-film thickness. Operate airless spray, conventional spray, and roller/brush application equipment, performing basic maintenance and troubleshooting to minimize defects such as runs, sags, pinholes, and holidays. Inspect coated surfaces using wet-film and dry-film thickness gauges, holiday detectors, and adhesion test equipment, and document results on a standard inspection record. Explain the purpose and requirements of common marine coating systems including anti-corrosion primers, intermediate coats, antifouling bottom paints, and tank linings, and relate proper application to vessel service life.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Corrosion, Coating Fundamentals, and the Marine Environment | 14 | theory | Students will explain why steel and aluminum corrode in marine service and identify the components and function of a multi-coat protective coating system. |
| Whiteboard, projector, sample coating spec sheets from major marine coating manufacturers (e.g., Jotun, Sherwin-Williams Marine, Hempel), SSPC Painting Manual Vol. 1, corroded steel coupon samples for visual reference. | 10-question written quiz covering corrosion mechanisms, coating layer terminology (primer, intermediate, topcoat, DFT, WFT), and spec sheet reading; pass mark 70%. |
| 2 | Hazard Recognition, SDS Interpretation, and Coating-Area PPE | 16 | theory | Students will identify health and physical hazards associated with marine coating materials, select correct PPE for each task, and extract required safety information from a Safety Data Sheet. |
| Printed SDS packets for at least five coating products, PPE sample kit (half-face and full-face respirators with organic vapor cartridges, supplied-air apparatus for demonstration, nitrile and neoprene gloves, chemical splash goggles, Tyvek coveralls), OSHA 29 CFR 1915 Subpart B reference handout. | Students must correctly match PPE to all five scenarios without instructor prompting and correctly identify all four critical SDS sections on an oral check; 100% accuracy required on PPE selection before advancing to hands-on lessons. |
| 3 | Surface Cleanliness Standards and Visual Inspection | 14 | theory | Students will identify and distinguish SSPC surface preparation grade descriptors for hand-tool, power-tool, and blast-cleaned steel, and match visual conditions to the correct SSPC/NACE standard using comparator cards. |
| SSPC VIS 1 visual standard booklet (one per student or shared set), steel coupons prepared to multiple SP grades, Bresle patch test kit for demonstration, conductivity meter, SSPC Painting Manual Vol. 2. | Students grade a blind set of eight coupon photos using SSPC VIS 1; at least six of eight must match the key grade within one grade level, and all must be within the correct SP category (hand tool vs. blast); pass mark 75%. |
| 4 | Hand-Tool and Power-Tool Surface Preparation | 18 | lab | Students will prepare a corroded steel test panel to SSPC-SP 3 Power Tool Cleaning using angle grinders, needle scalers, and wire brushes, meeting the visual standard and recording results on an inspection form. |
| Corroded mild-steel coupons (min. 12×12 in.), angle grinders with grinding and flap-disc attachments, needle scalers, wire-brush cups, chipping hammers, SSPC VIS 1, inspection record forms, face shields, hearing protection, leather gloves, dust masks (N95 minimum). | Instructor visually grades the finished panel against SSPC VIS 1 SP 3; panel must reach SP 3 with no more than trace loose rust remaining. Inspection record must be complete and accurate. Both must pass; either failure requires rework and re-check. |
| 5 | Abrasive Blasting: Equipment, Media, and Safety | 18 | demo | Students will describe the components of a dry-abrasive blast system, select appropriate blast media for steel and aluminum substrates, and explain safety controls including pressure vessel inspection, blast suit requirements, and respiratory air quality. |
| Blast pot (properly tagged out for demonstration), blast hose and nozzle samples, deadman valve, blast helmet with supplied-air line, CO monitor, media sample set (labeled jars), surface profile comparator kit, OSHA 29 CFR 1910.134 reference handout on breathing air. | Oral quiz: instructor asks each student to name all major blast system components and their function, identify the correct media for aluminum versus steel, and state the minimum respiratory requirement for blasting; all three must be answered correctly to pass. |
| 6 | Abrasive Blasting Practice and Surface Profile Measurement | 20 | lab | Students will blast-clean assigned steel panels to SSPC-SP 10 Near-White Metal Blast Cleaning and measure the resulting surface profile using a replica tape method, recording results within specification. |
| Blast pot with garnet media, steel panels (12×12 in., pre-rusted), SSPC VIS 1, Testex replica tape kit (coarse and X-coarse), spring micrometer, inspection record forms, full blast PPE (supplied-air helmet, Tyvek suit, leather gloves, steel-toed boots), containment sheeting. | Panel must be graded SP 10 by instructor using SSPC VIS 1. Profile readings must be recorded correctly and averaged; the average must fall within 1.5–3.0 mil to pass. Inspection form must be complete. Any unsafe act during blasting results in immediate stop and mandatory safety debrief before resuming. |
| 7 | Reading Coating Specifications and Mixing Multi-Component Coatings | 16 | theory | Students will interpret a marine coating product data sheet, calculate mix ratios by volume for two-component coatings, and explain pot-life limitations and their consequences. |
| Product data sheets for at least two marine epoxy coatings and one polyurethane topcoat, calculators, mixing ratio worksheet handout, sample cured and degraded material samples for visual comparison. | Calculation quiz: five mix-ratio problems; students must answer all five correctly (100%) to proceed to mixing lab — errors in mix ratio can cause coating failures and are treated as a zero-defect skill. |
| 8 | Coating Application Methods: Brush, Roller, and Airless Spray | 22 | lab | Students will apply a two-component epoxy primer to prepared steel panels using brush, roller, and airless spray, achieving the specified wet-film thickness and uniform coverage with no major defects. |
| Two-component epoxy primer (properly mixed per prior lesson), SP 10 blasted steel panels, airless spray unit with appropriate tip, brushes (natural bristle and synthetic), 3/8-inch nap rollers, wet-film thickness gauges, mixing sticks, graduated mixing containers, solvent for cleanup, respirators (OV cartridges), chemical-resistant gloves, ventilated spray booth or outdoor application area. | Wet-film thickness readings at three points on each panel must average within the specified range on the product data sheet (±20%); no more than two minor defects (pinhole or light dry spray) per panel allowed; runs or bare areas are automatic rework. Defect map must be complete and accurate. |
| 9 | Dry-Film Thickness Measurement and Holiday Detection | 16 | lab | Students will measure dry-film thickness on cured coating panels using a calibrated magnetic pull-off gauge, and detect holidays (coating voids) on tank-lining panels using a wet-sponge holiday detector, documenting results on an inspection record. |
| Calibrated magnetic DFT gauge (Type 1 or Type 2 per SSPC-PA 2), certified shim standards, cured epoxy-coated test panels of varied thickness, wet-sponge holiday detector (low-voltage), conductive sponge and water with wetting agent, paint markers, inspection record forms, SSPC-PA 2 reference handout. | DFT survey: all readings recorded, mean calculated correctly, and any out-of-spec readings correctly flagged — 100% accuracy on data recording required. Holiday detection: student must locate at least 90% of seeded holidays on the demonstration panel to pass. |
| 10 | Antifouling and Bottom Paint Systems | 14 | theory | Students will explain how self-polishing copolymer and hard antifouling coatings function, identify environmental and regulatory constraints on antifouling paint selection, and describe the correct surface preparation and application sequence for a bottom paint system. |
| Product data sheets for antifouling systems (instructor-sourced from manufacturers), EPA antifouling regulation summary handout, application sequence planning worksheet, projector for regulatory document review. | Completed application sequence plan reviewed by instructor; plan must include all required coats in correct order, correct SSPC surface prep grade, and recoat windows read accurately from the product data sheet — any omission of a required coat or incorrect SP grade requires revision before credit is given. |
| 11 | Tank Coatings and Confined-Space Coating Operations | 22 | lab | Students will apply an epoxy tank-lining coating system to the interior of a simulated tank structure following a confined-space entry plan, achieving specified coverage and documenting the work on a coating log. |
| Confined-space mock enclosure or tank trainer, four-gas monitor, mechanical air-mover ventilation unit, two-component epoxy tank lining material, brushes and short-nap rollers, wet-film gauges, thermometer and psychrometer or digital hygrometer, coating log forms, full PPE (supplied-air or powered-air purifying respirator appropriate for the coating per SDS, Tyvek suit, chemical-resistant gloves), OSHA 29 CFR 1915 Subpart B reference. | Pre-entry permit and atmospheric test must be approved by instructor before entry is permitted — no exceptions. WFT readings must average within specified range. Coating log must be complete with all required entries signed. Any unauthorized confined-space entry during the exercise results in automatic failure requiring lesson repeat. |
| 12 | Coating Inspection, Quality Documentation, and Defect Remediation | 14 | lab | Students will conduct a complete coating inspection of a multi-coat finished panel, identify and classify all defects, determine correct remediation actions, and produce a finished inspection package meeting a shipyard quality-record standard. |
| Pre-prepared 24×24-inch multi-coat defect panels, DFT gauge, wet-sponge holiday detector, panel sketch forms, SSPC Painting Manual Vol. 2 (inspection sections), inspection record forms, file folders or binders for package assembly. | Student must identify and correctly classify at least 90% of seeded defects. Remediation procedures must be technically correct per product data sheet and SSPC guidance. Inspection package must contain all required documents in legible, complete form. Incomplete packages require revision before final course grade is recorded. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Marine Coatings Written Knowledge Exam | Written exam | 25% | 75% or higher (must score 100% on confined-space entry and respirator selection questions to pass regardless of overall score) | A 60-question multiple-choice and short-answer exam covering corrosion theory, SSPC surface preparation grades, SDS interpretation, coating system components, mix ratios, pot life, DFT and WFT concepts, antifouling system types, and confined-space coating hazards; questions are drawn from NCCER Shipfitting knowledge domains related to surface protection. Standard met · Safety · Time · Quality/finish · Documentation |
| Coating Application Skills Demonstration | Skills demonstration | 45% | All four criteria must be met: correct PPE worn throughout; mixed coating within ±5% of specified mix ratio; applied coat achieves average DFT within specification range on at least 80% of readings; no runs, bare areas, or major defects on finished panel | Each student independently mixes a batch of two-component epoxy primer, applies it to a blasted 12×12-inch steel panel using airless spray, and completes a DFT survey of the cured panel, with the instructor evaluating safety practices, mixing accuracy, application technique, and final film quality against a scored rubric. Standard met · Safety · Time · Quality/finish · Documentation |
| Coating Inspection Lab Log | Log | 15% | Log must contain all 12 lesson entries; all DFT calibration records, profile measurements, WFT readings, holiday detection results, and application logs must be complete, legible, and signed; at least 85% of recorded measurements must match instructor's concurrent readings within gauge tolerance | Students maintain a bound lab log throughout the course recording all measurements, equipment calibration steps, inspection results, and application parameters from every hands-on lesson; the completed log is submitted at the end of the course and evaluated as a professional quality-control document. Standard met · Safety · Time · Quality/finish · Documentation |
| Confined-Space and Coating Hazards Safety Check | Safety audit | 15% | 100% — any single failure to correctly perform a safety-critical step requires an immediate stop, remedial instruction, and full repeat of the check; no partial credit | A practical safety evaluation conducted in the confined-space mock enclosure in which each student must independently complete the pre-entry permit, correctly operate a four-gas monitor and interpret readings, select and don the correct respiratory protection from the SDS, and brief a simulated attendant on emergency procedures before instructor authorization is granted. Standard met · Safety · Time · Quality/finish · Documentation |
Students install, fit, and secure the mechanical, structural, and interior systems that convert a bare hull into a functional vessel, including pipe systems, HVAC ducting, deck equipment foundations, joiner bulkheads, and access hatches. Work is performed to commercial shipbuilding standards using blueprints, isometric drawings, and equipment manuals. Lessons map directly to NCCER Shipfitting layout and systems modules and reinforce the fabrication quality requirements tested by ABS/USCG weld qualification.
OutcomesStudents install, fit, and secure the mechanical, structural, and interior systems that convert a bare hull into a functional vessel, including pipe systems, HVAC ducting, deck equipment foundations, joiner bulkheads, and access hatches. Work is performed to commercial shipbuilding standards using blueprints, isometric drawings, and equipment manuals. Lessons map directly to NCCER Shipfitting layout and systems modules and reinforce the fabrication quality requirements tested by ABS/USCG weld qualification.
How the course runs. 12 blocks: Outfitting Drawings and Work-Package Fundamentals; Outfitting Safety: Confined Spaces, Hot Work, and Fall Protection; Pipe System Fundamentals and Material Identification; Pipe Spool Fabrication: Layout, Cutting, and Fit-Up; Pipe Hanger and Support Fabrication and Installation; Pipe Penetrations, Sleeves, and Stuffing-Box Installations; Deck Equipment Foundations: Bitts, Cleats, and Fairleads; Joiner Bulkheads: Layout, Framing, and Panel Installation; Insulation Installation: Blankets, Spray Foam, and Fire-Rated Systems; Access Hatches, Manholes, and Watertight Closures; Systems Integration: Multi-Trade Coordination and Conflict Resolution; Outfitting Work-Package Completion, As-Built Documentation, and Final Inspection.
What competent looks like. Read and interpret outfitting drawings, piping isometrics, and equipment-arrangement plans to locate, orient, and install shipboard systems within stated tolerances. Fabricate and install pipe spools, hangers, and penetration sleeves in steel and aluminum to applicable shipbuilding standards, achieving leak-free joints on a hydrostatic pressure test. Fit and secure deck equipment foundations, bitts, cleats, and fairleads using correct fastener specifications and weld symbols from the design package. Install and fasten joiner bulkheads, insulation blankets, ceiling panels, and access hatches plumb, level, and square to within accepted shipyard tolerances. Apply confined-space entry, LOTO, hot-work permit, and fall-protection procedures correctly on every outfitting evolution without a prompted reminder. Produce and maintain an outfitting work package including material take-offs, inspection records, red-line as-builts, and a completed punch-list cleared to zero.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Outfitting Drawings and Work-Package Fundamentals | 16 | theory | Given a sample outfitting work package, the student correctly identifies every drawing type, locates specified components by zone and frame number, and extracts a complete material list with zero omissions. |
| Sample commercial outfitting drawing sets (GA, isometrics, arrangement plans), Autodesk DWG TrueView on lab computers, NCCER Shipfitting Module 3 (Drawings and Plans), blank MTQ forms, drawing scales and triangular scales | Completed MTQ log checked against instructor key; student must achieve 80% accuracy on component identification and material quantities to pass. |
| 2 | Outfitting Safety: Confined Spaces, Hot Work, and Fall Protection | 14 | theory | The student correctly classifies a described shipboard space as permit-required or non-permit confined space, completes a hot-work permit form, and identifies the fall-protection system required for a given work scenario, scoring 80% or better on a written check. |
| OSHA 29 CFR 1910.146 confined-space standard (reference copy), shipyard hot-work permit blank forms, 4-gas personal atmospheric monitor, OSHA 29 CFR 1926 Subpart M fall-protection reference, PPE samples (harness, lanyard, self-retracting lifeline), dry-erase scenario cards | Written 20-question quiz on confined-space classification, permit completion, and fall-protection selection; pass mark 80%; students scoring below 80% receive remediation and retest before proceeding. |
| 3 | Pipe System Fundamentals and Material Identification | 14 | theory | The student identifies common shipboard pipe materials, schedule ratings, and end-preparation methods, and correctly selects pipe and fitting specifications from a piping class schedule for three given service systems. |
| Pipe sample kit (various materials and schedules), vernier calipers, ASME B36.10 nominal pipe size table (reference excerpt), simplified shipboard piping class schedule handout, P&ID symbol reference sheet, ISA-5.1 symbol standard excerpt | Material identification worksheet and P&ID symbol quiz combined score must reach 80%; calipers reading checked by instructor for correct technique before worksheet is accepted. |
| 4 | Pipe Spool Fabrication: Layout, Cutting, and Fit-Up | 20 | lab | The student fabricates a two-offset carbon-steel pipe spool to a given isometric, with each cut square within 1°, end-to-end dimension within ±1/16 inch, and fit-up gap within the applicable welding procedure specification (WPS) range. |
| 2-inch Schedule 40 carbon steel pipe cut stock, pipe isometric drawings, portable band saw, angle grinder with cutting and grinding wheels, pipe vise, V-blocks, soapstone, combination square, machinist square, fit-up weld gauge, WPS reference sheet, hearing protection, grinding face shield, welding gloves | Instructor measures finished spool: dimension within ±1/16 inch, squareness within 1°, root gap within WPS tolerance; all three criteria must be met for pass; failed spools are reworked and re-checked once. |
| 5 | Pipe Hanger and Support Fabrication and Installation | 18 | lab | The student fabricates and installs two different hanger types (clevis and U-bolt) at drawing-specified frame locations and heights, with each hanger plumb within 1/8 inch and support spacing not exceeding the drawing requirement. |
| Mock hull section (steel web frames), mild steel flat bar, threaded rod, clevis and U-bolt hanger hardware, drill press and portable drill, twist drill set, torque wrench, combination level, plumb bob, tape measure, MIG welder, welding PPE, inspection record forms | Instructor checks plumb (within 1/8 inch using level), installed height within ±1/4 inch of drawing, and hanger torque verified with torque wrench; all three pass criteria required; inspection record must be fully completed and signed. |
| 6 | Pipe Penetrations, Sleeves, and Stuffing-Box Installations | 16 | lab | The student locates, cuts, and fits a welded pipe sleeve through a steel bulkhead to drawing dimensions, achieving a flush inside face, correct annular clearance, and a full-perimeter fillet weld meeting visual inspection criteria. |
| 3/8-inch mild steel plate mock bulkhead panels, 2-inch Schedule 40 carbon steel sleeve stock, plasma cutter, angle grinder, MIG welder, transfer punch, center finder, tape measure, combination square, weld fillet gauge, AWS D1.1 visual inspection acceptance criteria excerpt, inspection record forms, full welding PPE | Instructor measures annular clearance (per drawing spec ±1/16 inch) and sleeve standout; performs visual weld inspection to AWS D1.1 visual acceptance criteria; any rejectable discontinuity or out-of-tolerance dimension requires repair and re-inspection before lesson credit is awarded. |
| 7 | Deck Equipment Foundations: Bitts, Cleats, and Fairleads | 18 | lab | The student lays out, fabricates, and welds a deck cleat foundation pad to a structural drawing, with the pad located within ±1/8 inch of the drawing dimension, flat within 1/16 inch across the bolt-hole pattern, and all welds meeting visual inspection criteria. |
| Mild steel plate and flat bar stock, drill press, jobber drill set, drill jig, MIG welder, angle grinder, combination square, steel rule, level, straight edge, scribe, tap and die set, weld gauge, foundation arrangement and detail drawings, inspection record forms, full welding PPE | Instructor verifies location within ±1/8 inch, flatness within 1/16 inch, bolt-hole spacing to drawing ±1/32 inch, and visual weld quality to AWS D1.1; completed signed inspection record is required; any single criterion failure requires rework. |
| 8 | Joiner Bulkheads: Layout, Framing, and Panel Installation | 18 | lab | The student installs a framed joiner bulkhead panel in a mock compartment plumb within 1/8 inch in any 8-foot run, square to the adjacent structure within 1/4 inch, and fastened with the correct fastener type, spacing, and torque specified on the drawing. |
| Mock compartment frame fixture, plywood-core joiner panels, aluminum extrusion track, stiffeners, appropriate fastener assortment (screws, rivets), adhesive sealant, chalk line, 4-foot level, torpedo level, combination square, tape measure, drill-driver with torque clutch, torque wrench, inspection checklist forms, punch-list forms | Lead instructor measures plumb (±1/8 inch per 8 feet) and squareness (±1/4 inch) independently; fastener spacing verified by count and tape; torque spot-checked with torque wrench on five random fasteners; punch-list must be cleared to zero before pass is recorded. |
| 9 | Insulation Installation: Blankets, Spray Foam, and Fire-Rated Systems | 14 | demo | The student installs mineral wool blanket insulation and a fire-rated foam collar around a pipe penetration to manufacturer instructions and the applicable shipboard specification, with no visible gaps, correct compression, and collar fully seated and fastened. |
| Mineral wool blanket insulation rolls, intumescent pipe collars (listed product), speed clips and pins, utility knife, straight edge, tape measure, mock hull bay fixture, mock bulkhead with installed pipe sleeves, N95 respirators, safety glasses, nitrile gloves, long-sleeve coveralls, manufacturer installation instructions, shipboard insulation specification excerpt | Instructor inspects blanket installation for gaps (none greater than 1/4 inch) and compression (not over-compressed below manufacturer minimum thickness); collar installation checked against manufacturer instructions step-by-step; both must pass; photograph must be in work package. |
| 10 | Access Hatches, Manholes, and Watertight Closures | 18 | lab | The student lays out and installs a deck access hatch coaming and cover on a mock deck panel, with the coaming located to drawing dimensions within ±1/8 inch, dogging hardware operating without binding, and a hydrostatic/hose test showing no leakage. |
| Mock deck plate panels, access hatch kit (coaming, cover, gasket, dogs, hardware), plasma cutter, MIG welder, angle grinder, combination square, tape measure, scribe, torque wrench, garden hose with nozzle for hose test, inspection record forms, full welding PPE, hearing protection | Instructor measures coaming location (±1/8 inch), checks dog operation (no binding, uniform gasket compression), and witnesses hose test with zero leakage for 60 seconds of direct spray; all three criteria must pass; inspection record must be signed by student and instructor. |
| 11 | Systems Integration: Multi-Trade Coordination and Conflict Resolution | 20 | practice | The student identifies and resolves at least three spatial conflicts between pipe, HVAC duct, cable tray, and structural elements in a given compartment drawing set, producing a written conflict-resolution log with proposed solutions and drawing mark-ups. |
| Multi-trade compartment drawing sets (piping, HVAC, electrical raceway, structural overlaid), conflict-resolution log forms, red and blue pencils, drawing scales, NCCER Shipfitting Module reference on drawing coordination, CAD viewer computers for digital review | Conflict-resolution log checked by instructor: all embedded conflicts identified (must find at least 80%), each proposed resolution technically feasible and clearly described, drawing mark-ups legible and dimensionally specific; individual written scenario scored out of 10; pass mark 8/10. |
| 12 | Outfitting Work-Package Completion, As-Built Documentation, and Final Inspection | 18 | practice | The student produces a complete outfitting work package for a designated mock compartment, including updated red-line as-builts, a cleared punch-list, and a signed final inspection record, with no open items remaining. |
| Completed mock compartment from previous lessons, full drawing set for that compartment, red pencils, black pens, punch-list forms, multi-point final inspection checklist, NCCER Shipfitting quality and documentation reference, camera or phone for photographic documentation | Instructor reviews completed work package: red-line as-builts must capture all pre-seeded deviations (100% required for safety items, 90% overall); punch-list must show all 10 deficiencies found and each one initialed closed; final inspection checklist must show zero open items; any open safety item is an automatic fail requiring immediate correction. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Outfitting Systems Knowledge Exam | Written exam | 25% | 80% correct (40 of 50 questions) | A 50-question written exam covering pipe material and schedule identification, P&ID and isometric drawing reading, piping class schedule selection, hanger and support types, joiner and insulation specifications, access-hatch and watertight-closure requirements, multi-trade conflict-resolution principles, and outfitting work-package documentation; questions are mapped to NCCER Shipfitting core knowledge areas and administered under closed-book conditions. Standard met · Safety · Time · Quality/finish · Documentation |
| Pipe Spool and Foundation Installation Skills Demonstration | Skills demonstration | 45% | All six pass/fail criteria met on first or second attempt; second attempt requires instructor-supervised remediation between attempts | The student fabricates and installs a two-offset pipe spool to a given isometric (dimension ±1/16 inch, cuts square within 1°, root gap within WPS), installs two hangers at correct locations and heights (plumb within 1/8 inch), and welds a deck equipment foundation pad (location ±1/8 inch, flatness within 1/16 inch, welds passing AWS D1.1 visual criteria); a certified instructor scores each criterion pass/fail using a standardized rubric aligned to NCCER Shipfitting performance profile tasks. Standard met · Safety · Time · Quality/finish · Documentation |
| Outfitting Work-Package Lab Log | Log | 15% | 90% of required entries present, accurate, and signed; all safety-hold-point entries must be 100% complete | A cumulative log maintained throughout all lab and practice lessons, containing material take-off sheets, dimensional inspection records, weld visual inspection records, hose-test records, red-line as-builts, punch-list forms, and the final inspection checklist for the mock compartment; the log demonstrates the student's ability to create and maintain the documentation required on a commercial shipyard outfitting package. Standard met · Safety · Time · Quality/finish · Documentation |
| Outfitting Safety Compliance Check | Safety audit | 15% | Zero critical failures (any unsafe act or omission directly affecting life safety); no more than one minor procedural finding; pass/fail overall | An unannounced observational safety audit conducted by the lead instructor during a lab session in lessons 4 through 10, evaluating correct PPE selection and use, hot-work permit compliance, confined-space entry procedures if entered, LOTO application on powered tools, housekeeping, and fall-protection use when working above four feet; any critical failure (e.g., no eye protection while grinding, entry into confined space without atmospheric test) results in immediate work stoppage, remediation, and a mandatory re-audit before the student may continue lab work. Standard met · Safety · Time · Quality/finish · Documentation |
Students design, fabricate, fit, and finish a multi-material marine structural assembly—such as a small vessel section, watertight compartment mockup, or deck module—integrating shipfitting layout, steel and aluminum welding, outfitting, and marine coatings skills acquired across the program. Each student produces a complete fabrication package including drawings, weld maps, inspection records, and a coating log, then defends the project before a panel of instructors and an industry evaluator. This course serves as the primary evidence of job-readiness and maps directly to NCCER Shipfitting, NCCER Maritime Welding, AWS D1.1, AWS D1.2, and ABS/USCG Weld Test competency areas.
OutcomesStudents design, fabricate, fit, and finish a multi-material marine structural assembly—such as a small vessel section, watertight compartment mockup, or deck module—integrating shipfitting layout, steel and aluminum welding, outfitting, and marine coatings skills acquired across the program. Each student produces a complete fabrication package including drawings, weld maps, inspection records, and a coating log, then defends the project before a panel of instructors and an industry evaluator. This course serves as the primary evidence of job-readiness and maps directly to NCCER Shipfitting, NCCER Maritime Welding, AWS D1.1, AWS D1.2, and ABS/USCG Weld Test competency areas.
How the course runs. 4 blocks: Project Planning, Specifications, and Safety Pre-Task; Structural Fabrication: Fit-Up, Tacking, and Full Welding; Surface Preparation and Multi-Coat Marine Coating Application; Final Inspection, Documentation Package, and Project Defense.
What competent looks like. Plan and document a marine fabrication project by producing a bill of materials, weld map, fit-up sequence, and inspection checklist that conform to applicable drawing conventions and project specifications. Fabricate a structurally sound multi-material assembly (mild steel and aluminum components) using SMAW, GMAW, or FCAW processes, meeting AWS D1.1 and AWS D1.2 dimensional and visual weld quality standards. Apply surface preparation and a multi-coat marine coating system following manufacturer data sheets and SSPC surface-prep standards, documented in a coating log with DFT readings. Demonstrate safe work practices throughout the build, including lockout/tagout procedures, confined-space awareness, correct PPE selection, and compliance with OSHA maritime and general industry standards. Evaluate own work against industry acceptance criteria—visual weld inspection per AWS, fit-up tolerances per NCCER Shipfitting standards, and coating continuity—and produce a nonconformance and corrective-action record. Present and defend project documentation, fabrication decisions, and quality results clearly before a panel, demonstrating professional communication skills required for shipyard employment.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Project Planning, Specifications, and Safety Pre-Task | 36 | theory | Given a project brief and set of marine drawings, the student will produce a complete fabrication plan—bill of materials, weld symbol interpretation map, fit-up sequence, hazard identification, and pre-task safety checklist—that an evaluator judges complete and accurate. |
| Assigned project drawing set (instructor-prepared, isometric + orthographic), weld symbol reference chart (AWS A2.4), NCCER Shipfitting core curriculum, JHA blank form, bill-of-materials template, calculator, pencils, scale rule | Instructor reviews completed weld map, BOM, sequence document, and JHA using a 20-point rubric; student must score 16/20 (80%) with no safety items left blank or incorrect before proceeding to fabrication. |
| 2 | Structural Fabrication: Fit-Up, Tacking, and Full Welding | 108 | lab | Following the approved fabrication plan, the student will cut, fit, tack, and fully weld all steel and aluminum components of the assigned assembly to dimensional tolerances and weld quality standards acceptable under AWS D1.1 (steel) and AWS D1.2 (aluminum), as verified by instructor visual and dimensional inspection. |
| Mild-steel plate and structural shapes (instructor-specified grade), aluminum plate/extrusions (6061-T6 or equivalent), SMAW power source with E7018 electrodes, FCAW wire feeder, GMAW unit with aluminum-rated liner and ER4043 or ER5356 filler wire, plasma cutter or oxy-fuel cutting outfit, angle grinders with flap discs and grinding wheels, welding table/fixture, clamps and strong-backs, layout tools (soapstone, scribers, combination square, tape measure), weld gauges (fillet and groove), AWS D1.1 and D1.2 visual acceptance criteria reference cards, full PPE (welding helmet auto-darkening min. shade 10, leather gloves, FR clothing, steel-toed boots, hearing protection, respirator rated for welding fume) | Instructor performs dimensional inspection (all critical dimensions within ±1/16 in.) and VWI of all welds against AWS D1.1 and D1.2 visual acceptance criteria; student's own inspection log must match instructor findings within one minor discrepancy. Any weld failing VWI must be repaired and re-inspected; student must achieve 100% VWI-passing welds and ≥80% dimensional conformance score before moving to coatings phase. |
| 3 | Surface Preparation and Multi-Coat Marine Coating Application | 36 | lab | The student will prepare all surfaces of the completed assembly to the cleanliness level specified on the coating system data sheet and apply a minimum two-coat marine coating system, documenting surface profile, ambient conditions, and dry film thickness (DFT) readings in a coating log that meets project specification requirements. |
| Abrasive blast equipment or angle grinders with wire cup and flap disc attachments, sling psychrometer or digital dewpoint meter, Testex Press-o-Film replica tape, marine primer (zinc-rich or epoxy, instructor-specified), marine topcoat (polyurethane or epoxy), mixing sticks, graduated mixing cups, brushes and rollers, airless or conventional spray gun (if available), DFT gauge (magnetic and/or electronic), SSPC surface preparation standards reference, coating manufacturer product data sheets, full PPE (supplied-air or half-mask respirator with organic vapor/P100 cartridges appropriate to coating SDS, chemical-splash goggles, nitrile gloves, disposable coveralls) | Instructor reviews completed coating log for all required entries; DFT readings must fall within the manufacturer's specified range on all measured zones; surface preparation record must show correct SSPC level was achieved. Coating log is graded on a 10-point checklist; student must score 8/10 with no DFT zones out of specification accepted without documented repair. |
| 4 | Final Inspection, Documentation Package, and Project Defense | 36 | field | The student will compile a complete project documentation package, present the finished assembly to a panel of instructors and one industry evaluator, and verbally defend fabrication decisions, quality findings, and safety practices to a passing standard on the defense rubric. |
| Completed assembly, full documentation package (printed and organized in a project binder), final inspection checklist, presentation notes or cue cards (no formal slide deck required but permitted), panel evaluation rubric (provided to student one week before defense), trade references available for consultation during prep (NCCER Shipfitting and Maritime Welding curricula, AWS D1.1 and D1.2 visual criteria cards) | Panel scores the defense on a 30-point rubric: documentation completeness (10 pts), assembly quality against specification (10 pts), and oral defense clarity and technical accuracy (10 pts); student must score 24/30 overall with no sub-category below 7/10. A student who scores below threshold on documentation or assembly may be given one remediation opportunity within five school days; oral defense below threshold requires a full re-defense. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Finished Marine Assembly — Project Assessment | Project | 60% | All welds pass AWS D1.1 and/or D1.2 visual acceptance criteria with 100% conforming joints; all critical dimensions within ±1/16 in. on ≥80% of inspection points; all coating zones within specified DFT range with no unrepaired holidays; overall project rubric score ≥ 80%. | The physical assembly is evaluated by the instructor and the industry panel evaluator against the project specification, the weld map, and the coating data sheet using a structured inspection checklist that mirrors the criteria used in NCCER Shipfitting performance verification and ABS/USCG weld acceptance. Any nonconforming weld or coating zone identified during panel inspection that was not already documented and corrected in the student's own inspection record is treated as a critical deficiency and must be resolved before a passing score is awarded. Meets specification · Within estimate · Workmanship · Safety · Documentation |
| Project Documentation Portfolio | Portfolio | 20% | Portfolio graded on a 40-point rubric covering completeness, accuracy, use of trade terminology, and professional organization; minimum passing score is 32/40 (80%) with no required section missing. | The project binder is reviewed by the instructor before the defense date and must contain: the approved fabrication plan (BOM, weld map, sequence), all dimensional and VWI inspection logs with student signatures, the nonconformance and corrective-action record, the coating log with DFT entries, and the one-page project summary. This portfolio maps to the documentation and record-keeping competencies tested in NCCER Registry performance profiles for both Shipfitting and Maritime Welding and demonstrates the record-keeping habits required in AWS- and ABS-certified production environments. Completeness · Organization · Evidence quality |
| Project Defense — Oral Examination | Oral / panel | 20% | Panel rubric score ≥ 24/30 overall, with no individual sub-category (documentation review, assembly quality discussion, or Q&A response) scoring below 7/10. | The student presents the completed project and answers panel questions in a format that mirrors the kind of technical communication expected in shipyard production meetings and quality audits, including explaining code references, justifying process choices, and identifying corrective actions taken. The oral defense is the primary evidence mapped to the career-readiness and professional-communication outcomes of the program and reinforces the verbal explanation of welding procedure and quality rationale required during ABS/USCG weld qualification interviews. Explains decisions · Answers technical questions · Professional communication |
Students complete 324 supervised hours at a licensed shipyard, marine fabrication facility, or boat-manufacturing plant, applying hull construction, fitting, welding, coating, and outfitting skills under journeyman or foreman oversight. Each student is evaluated by their site supervisor against industry performance standards and maintains a structured daily log documenting tasks, safety observations, and credential-relevant skill areas. The externship bridges classroom competency with professional production expectations required for NCCER Shipfitting, NCCER Maritime Welding, AWS D1.1/D1.2, and ABS/USCG weld-test employment contexts.
OutcomesStudents complete 324 supervised hours at a licensed shipyard, marine fabrication facility, or boat-manufacturing plant, applying hull construction, fitting, welding, coating, and outfitting skills under journeyman or foreman oversight. Each student is evaluated by their site supervisor against industry performance standards and maintains a structured daily log documenting tasks, safety observations, and credential-relevant skill areas. The externship bridges classroom competency with professional production expectations required for NCCER Shipfitting, NCCER Maritime Welding, AWS D1.1/D1.2, and ABS/USCG weld-test employment contexts.
How the course runs. 4 blocks: Site Orientation, Safety Integration, and Work-Log Launch; Production Fitting and Welding: Supervised Task Rotations; Independent Task Performance and Professional Skill Development; Final Hours, Employer Evaluation, and Exit Interview.
What competent looks like. Perform assigned shipfitting and welding tasks at a host employer's facility to production-quality standards with no more than one corrective intervention per week by Week 6. Demonstrate consistent compliance with the host site's lockout/tagout procedures, PPE requirements, and confined-space protocols throughout all 324 hours as verified by the site supervisor. Interpret and execute work from employer-issued blueprints, weld symbols, and cut lists without additional clarification on at least 80 percent of assigned tasks by mid-term. Complete a structured daily work log that documents task descriptions, safety observations, tools and processes used, and self-assessed NCCER/AWS skill areas, with entries rated satisfactory by the program coordinator. Receive a final employer evaluation score of at least 75 out of 100 across competency categories including workmanship, safety behavior, communication, and attendance. Identify at least three specific technical or professional skills developed during the externship and articulate their connection to credentialed exam areas in the exit interview.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Site Orientation, Safety Integration, and Work-Log Launch | 40 | field | Students complete the host employer's site-specific safety orientation, establish daily logging habits, and map the facility's operations to the NCCER and AWS credential areas they will practice. |
| Employer orientation packet, program daily-log template (printed and digital), NCCER Shipfitting and Maritime Welding module task lists, AWS D1.1 and D1.2 scope summaries, OSHA 1915 Maritime Industry standards reference card, hard hat, safety glasses, steel-toed boots, hearing protection, hi-vis vest. | Employer orientation acknowledgment form on file; first-week logs submitted with all columns complete and at least one NCCER or AWS skill area identified per entry; annotated facility sketch reviewed by coordinator — pass requires all three deliverables submitted and coordinator rates log quality as satisfactory (meets template requirements with no blank required fields). |
| 2 | Production Fitting and Welding: Supervised Task Rotations | 160 | field | Students perform assigned production tasks in at least three of the five trade areas — hull fitting, structural welding, outfitting, plate preparation, or marine coatings — to employer quality standards while maintaining uninterrupted daily logs. |
| Employer-issued production tools and PPE (welding helmet rated for process in use, leather gloves, face shield, respirator appropriate to coating or grinding task), combination square, chalk line, plumb bob, grinder, chipping hammer, wire brush, measuring tape, digital camera or smartphone for weld photos, daily log binder, AWS D1.1 and D1.2 visual inspection criteria reference card, NCCER task-area checklist. | Supervisor initials present on daily log for each observed production task; minimum of three trade-area rotations documented with photos or reflections; mid-term employer evaluation (completed at approximately 160 cumulative hours) scores student at 70 or above out of 100 across workmanship, safety, communication, and attendance — students scoring below 70 receive a written improvement plan with specific measurable benchmarks and a coordinator check-in within five business days. |
| 3 | Independent Task Performance and Professional Skill Development | 84 | field | Students progressively perform assigned tasks with reduced direct supervision, demonstrate professional workplace behaviors, and accumulate documented evidence of competency across NCCER and AWS credential areas. |
| Production tools as assigned by employer, program professional-skills self-assessment rubric, quality-control checklist (employer-issued or program-supplied), daily log binder, AWS D1.1 visual weld inspection reference, ABS survey inspection overview handout, NCCER task-competency checklist. | At least one documented lead task in the log with problem-solving narrative; one quality-control participation entry with criteria and outcome recorded; professional self-assessment and supervisor parallel rating both on file and gap goal documented — pass requires all three components submitted and supervisor confirms the student's lead-task performance was acceptable for production at that stage (verbal confirmation recorded by coordinator). |
| 4 | Final Hours, Employer Evaluation, and Exit Interview | 40 | field | Students complete their final production hours, receive and discuss the formal employer evaluation, compile a complete externship portfolio, and articulate skill growth and credential readiness in a structured exit interview with the program coordinator. |
| Complete daily log binder (all weeks), employer final evaluation form, program externship portfolio checklist, NCCER credential task maps, AWS D1.1 and D1.2 scope summaries, exit interview guide (coordinator-held). | Final log binder complete with no missing required fields across all weeks; employer final evaluation form signed by both parties and on file; exit interview completed with three credential-area skill mappings documented in writing — pass requires employer evaluation overall score of 75 or above out of 100 and coordinator rates exit interview as satisfactory (student can name and correctly map all three skills without prompting). |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Employer Worksite Skills Demonstration Evaluation | Skills demonstration | 70% | Composite score of 75 or above out of 100 on the final employer evaluation form, with no individual category (workmanship, safety behavior, communication, attendance) scored below 60. | The host employer's journeyman or foreman supervisor rates the student on four competency categories — workmanship quality, safety behavior, professional communication, and attendance/reliability — using the program's standardized 100-point evaluation form completed at mid-term and again at the conclusion of the externship. A student whose mid-term score falls below 70 receives a written improvement plan; failure to reach 75 on the final evaluation requires the coordinator and employer to determine whether additional hours or a remediation plan is feasible before the student advances to Exam Prep. Competency · Safety · Attendance · Conduct · Initiative |
| Externship Daily Work Log Portfolio | Log | 30% | All log entries complete with no required fields left blank, supervisor initials present for every observed production task, weld photos or rotation reflections attached as specified, and coordinator rates overall log quality as satisfactory on the program rubric (meets requirements in at least 80 percent of evaluated entries). | Students maintain a structured daily work log for all 324 hours using the program's standardized template, documenting tasks performed, processes and tools used, safety observations, and self-assessed NCCER and AWS credential-area connections; the complete binder — including the professional self-assessment, quality-control participation record, and signed employer evaluations — is submitted as a portfolio within three business days of the final site day and reviewed by the program coordinator against a completeness checklist. Complete · Verified |
This 90-hour course systematically reviews every knowledge and performance domain covered by the NCCER Shipfitting, NCCER Maritime Welding, AWS D1.1 Structural Steel Certified Welder, AWS D1.2 Aluminum Certified Welder, and ABS/USCG Weld Test credentials. Learners identify personal knowledge gaps through diagnostic quizzes, then drill targeted content through timed practice tests, hands-on weld performance rehearsals, and shipfitting layout simulations that mirror actual exam conditions. The course closes with full-length mock exams under proctored, timed conditions for all five credentials.
OutcomesThis 90-hour course systematically reviews every knowledge and performance domain covered by the NCCER Shipfitting, NCCER Maritime Welding, AWS D1.1 Structural Steel Certified Welder, AWS D1.2 Aluminum Certified Welder, and ABS/USCG Weld Test credentials. Learners identify personal knowledge gaps through diagnostic quizzes, then drill targeted content through timed practice tests, hands-on weld performance rehearsals, and shipfitting layout simulations that mirror actual exam conditions. The course closes with full-length mock exams under proctored, timed conditions for all five credentials.
How the course runs. 4 blocks: Credential Landscape, Diagnostic Assessment & Gap Analysis; NCCER Knowledge Domain Review: Shipfitting & Maritime Welding; AWS D1.1 / D1.2 & ABS/USCG Performance Qualification Rehearsal; Full Mock Certification Exams Under Proctored Conditions.
What competent looks like. Score at or above the passing threshold on full-length NCCER Shipfitting and NCCER Maritime Welding practice knowledge tests administered under timed, closed-book conditions. Produce groove and fillet weld test coupons in steel and aluminum that meet AWS D1.1 and D1.2 visual and destructive-test acceptance criteria as rehearsal for the Certified Welder performance qualification. Complete a timed shipfitting layout exercise—including template development, layout lines, and fit-up to tolerance—replicating NCCER Shipfitting performance task conditions. Demonstrate correct weld procedure, position, and documentation practices required for the ABS/USCG Weld Test, including pre-weld cleaning, interpass temperature control, and visual inspection of the finished coupon. Explain the purpose, format, sponsoring body, and scheduling process for each of the five target credentials, and correctly complete sample credential application paperwork. Develop a personalized study plan based on diagnostic gap analysis that allocates remaining independent study time to lowest-scoring exam domains before test day.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Credential Landscape, Diagnostic Assessment & Gap Analysis | 12 | theory | Learners will correctly identify the format, sponsoring body, exam domains, and passing standards of all five target credentials and will score each diagnostic practice test to produce a written gap-analysis plan. |
| NCCER Shipfitting Trainee Guide (current edition), NCCER Maritime Welding Trainee Guide (current edition), AWS D1.1 Structural Welding Code—Steel (current edition), AWS D1.2 Structural Welding Code—Aluminum (current edition), ABS Rules for Materials and Welding (current edition), printed diagnostic quiz packets, gap-analysis worksheet template, highlighters, pencils. | Learner submits a complete, instructor-approved gap-analysis plan; scores ≥60% on the diagnostic quiz are noted as baseline (no pass/fail gate here—data drives differentiation); instructor confirms all five credential matrix rows are accurate before the lesson closes. |
| 2 | NCCER Knowledge Domain Review: Shipfitting & Maritime Welding | 28 | theory | Learners will answer practice questions drawn from every NCCER Shipfitting and Maritime Welding knowledge domain at or above the NCCER passing standard on two timed module-level practice tests. |
| NCCER Shipfitting Trainee Guide, NCCER Maritime Welding Trainee Guide, printed NCCER-style practice test packets (school-developed from module review questions), marine construction drawing sets from the capstone project, welding symbol reference charts per AWS A2.4, whiteboard and markers, OSHA 29 CFR 1915 Subparts B and Q reference cards. | Learner scores ≥70% on both the Shipfitting and Maritime Welding timed practice tests before advancing; learners below 70% on any domain receive a targeted re-teach from the instructor and must re-attempt that domain's 20-question mini-quiz to ≥70% before the course proceeds. |
| 3 | AWS D1.1 / D1.2 & ABS/USCG Performance Qualification Rehearsal | 38 | lab | Learners will produce steel and aluminum weld test coupons in the positions required by their target AWS D1.1, AWS D1.2, and ABS/USCG qualifications, and each coupon will pass visual inspection and guided bend-test rehearsal to the applicable code acceptance criteria. |
| SMAW, GMAW, and FCAW welding machines with appropriate consumables (E7018 low-hydrogen electrodes, ER70S-6 wire, E71T-1 flux-core wire for steel; ER4043 or ER5356 wire for aluminum), carbon steel plate and 6061-T6 aluminum plate cut to AWS test coupon dimensions, dedicated stainless steel brushes for aluminum, angle grinders with grinding and flap-disc wheels, welding PPE (auto-darkening helmet ≥ANSI Z87.1, FR sleeves, leather gloves, steel-toed boots), weld gauges (fillet gauge, undercut gauge), AWS D1.1 and D1.2 current editions open at visual acceptance criteria tables, ABS Rules for Materials and Welding, bend-test jig (guided-bend fixture per applicable code dimensions), oxy-fuel or propane torch for interpass temperature check with temp-sticks, LOTO equipment for machine setup. | Each steel coupon passes AWS D1.1 visual acceptance criteria (no cracks, complete fusion, undercut ≤1/32 in where permitted, reinforcement within limits) and survives guided bend without open discontinuities >1/8 in; each aluminum coupon passes D1.2 visual criteria and bend rehearsal; ABS simulation coupon passes instructor visual inspection against ABS criteria; learners who fail a coupon must identify the defect cause, adjust technique, and re-weld a replacement coupon to passing standard before the mock exam session. |
| 4 | Full Mock Certification Exams Under Proctored Conditions | 12 | practice | Learners will complete full-length mock versions of the NCCER Shipfitting and Maritime Welding knowledge tests and a timed ABS/USCG weld performance simulation under proctored, exam-equivalent conditions, scoring at or above each credential's passing standard. |
| Printed mock exam packets (NCCER Shipfitting and Maritime Welding full-length, school-developed from published module review banks), AWS D1.1 and D1.2 written practice quiz packets, non-programmable calculators, blank scratch paper, analog wall clock or proctor timer, individual learner credential application checklists (NCCER Registry, AWS QC7, ABS), instructor readiness sign-off form. | Learner scores ≥70% on the NCCER Shipfitting mock exam AND ≥70% on the NCCER Maritime Welding mock exam AND ≥70% on the combined AWS D1.1/D1.2 written quiz to receive a full readiness sign-off; learners who score 65–69% on any section receive a conditional sign-off with a written remediation task (minimum 4 hours self-study on specified domains) before scheduling that exam; learners below 65% on any section meet with the instructor for an extended remediation plan and may not schedule that specific credential exam until the next available retake window. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Full-Program Mock Certification Examination Suite | Mock certification exam | 100% | ≥70% on each of the two NCCER knowledge mock exams (Shipfitting and Maritime Welding) and ≥70% on the combined AWS D1.1/D1.2 written practice quiz; ABS/USCG weld coupon passes visual inspection to ABS acceptance criteria as evaluated by the instructor; all four components must be passed to receive the course completion credential-readiness sign-off. | Administered in Lesson 4 under proctored, timed, closed-book conditions that replicate actual exam environments, this suite includes a full-length NCCER Shipfitting knowledge mock exam, a full-length NCCER Maritime Welding knowledge mock exam, an AWS D1.1/D1.2 written practice quiz, and instructor evaluation of the ABS/USCG weld coupon produced in Lesson 3; results from all four components are reviewed in a one-on-one debrief that produces either a full credential-readiness sign-off or a written remediation plan identifying specific domains and retake conditions before the learner schedules any live credential exam. Score · Time management |
Students sit the NCCER Shipfitting and NCCER Maritime Welding knowledge and performance assessments administered through an NCCER-accredited training sponsor, the AWS Certified Welder performance qualification tests under D1.1 (structural steel) and D1.2 (aluminum) administered at an AWS-Accredited Test Facility, and the ABS/USCG welder qualification test administered by an authorized ABS surveyor or approved test facility. Pass standard: Credential issued by the body.
Back to Shipbuilding / Marine Fabrication · How the school gets authority to award these credentials
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.