MFG-SHIP13-06 · Lesson 1 · 16 clock hours · theory

Outfitting Drawings and Work-Package Fundamentals

Objective. Given a sample outfitting work package, the student correctly identifies every drawing type, locates specified components by zone and frame number, and extracts a complete material list with zero omissions.

What Is a Work Package?

A work package is the complete set of documents a shipyard issues to a craft crew before they begin installing systems in a hull section or compartment. It bundles every drawing, specification, and material list the crew needs to complete their scope without hunting for missing information. Understanding how to read and use a work package is the foundation of every outfitting trade — shipfitter, pipefitter, electrician, and joiner alike.

Types of Drawings in an Outfitting Set

General Arrangement (GA) Drawing

The GA is the top-level plan of the entire vessel. It shows the overall hull outline, deck levels, major compartments, and the locations of large equipment such as engines, tanks, and accommodation blocks. Use the GA to orient yourself: find where your compartment sits relative to the bow, stern, and centerline before opening any detail drawing.

Compartment Drawings

Compartment drawings zoom into a single room or hull section. They show structural boundaries (bulkheads, decks, frames), penetrations through those boundaries, and the rough locations of equipment foundations and insulation. These are your primary reference for structural fit-up and for verifying that pipe and cable runs have clear passage.

Piping Isometric Drawings (Isos)

An isometric drawing represents a three-dimensional pipe run in a 2-D view that preserves relative lengths and angles. Every fitting, valve, flange, hanger, and branch connection appears with a label and a bill of materials (BOM) in the title block or revision block. Piping isos are the main takeoff document for pipe assemblies.

Electrical Raceway Drawings

Raceway drawings show cable-tray routes, conduit runs, junction-box locations, and penetration seals. They are read alongside compartment drawings to confirm physical clearance between pipe hangers and cable trays.

Equipment Arrangement Plans

These plans give exact centerline coordinates and bolt-pattern dimensions for every piece of machinery, panel, or fixture being installed. They allow fabrication of foundations before the equipment arrives on the berth.

Zone and Frame Numbering

Shipyards divide the hull into a coordinate grid so that any point on the vessel can be named without ambiguity.

Always record all three references — zone, frame, and offset from CL — when logging a component on a material take-off.

Reading a Material Take-Off (MTQ)

A material take-off (sometimes called MTQ, material takeoff quantity) is the written list of every item — pipe spool, fitting, hanger, foundation plate, joiner panel — that must be procured and installed to complete the work package. An incomplete MTQ causes material shortages that stop work and cost money.

To build a complete MTQ:

1. Open the piping iso or arrangement plan.

2. Work through the drawing systematically — left to right and top to bottom — so nothing is skipped.

3. Record each item's tag number, description, specification (material grade, schedule or wall thickness, pressure rating), and quantity.

4. Cross-reference the BOM table in the drawing title block; the BOM must match your field count.

5. Note any items marked "by others" or "GFE" (Government Furnished Equipment) — these are excluded from your install MTQ but must still appear as reference items.

Safety Points for the Drawing Office and Lay-Down Area

Even in drawing review, safety habits matter:

Putting It Together

A skilled marine outfitter can pick up an unfamiliar work package, identify the GA to orient, move to the compartment drawing to confirm structural boundaries, pull every piping iso for that compartment, and build an accurate MTQ in a single review session. That skill — reading fast, recording completely, and cross-checking everything — is what separates a productive installer from one who is constantly chasing parts. The exercises in today's class will drill exactly that workflow.

Key terms10

Work PackageThe complete bundle of drawings, specifications, and material lists issued to a craft crew for a defined scope of outfitting work on a vessel.
General Arrangement (GA)The top-level vessel plan showing overall hull layout, deck levels, major compartments, and large equipment locations; used for initial orientation.
Piping Isometric (Iso)A 2-D drawing that represents a 3-D pipe run, showing every fitting, valve, hanger, and branch with a bill of materials; the primary document for pipe material take-offs.
Frame NumberA longitudinal reference number assigned to each structural frame, used to pinpoint any location along the length of the hull.
ZoneA defined region of the hull — typically one block or one inter-bulkhead space on a given deck — used with frame numbers to create a full coordinate address for any component.
Centerline (CL)The longitudinal axis of the vessel from which port and starboard dimensions are measured; all equipment positions reference this line.
Material Take-Off (MTQ)A complete written list of every item — pipe, fittings, hangers, foundations, joiner panels — required to execute a work package, including description, specification, and quantity.
Bill of Materials (BOM)The itemized table printed on or accompanying a drawing that lists every component shown, serving as the cross-check for a field-generated MTQ.
Firestop FittingAn approved penetration seal installed where pipe or cable passes through a fire-rated bulkhead or deck; required by USCG rules and must appear on the MTQ whenever the drawing specifies a rated boundary.
GFE (Government Furnished Equipment)Equipment supplied by the government (in Navy or Coast Guard contracts) rather than purchased by the shipyard; noted on drawings so it is excluded from procurement MTQs but tracked as a reference item.
In class: Instructor-led walkthrough of a commercial shipyard work package: general arrangement, compartment drawings, piping isometrics, electrical raceways, and equipment-arrangement plans; students annotate a printed set with zone, frame, and centerline references. · Small-group exercise: each team receives a different compartment drawing and must produce a written material take-off (MTQ) for all pipe, hangers, foundations, and joiner components listed, then cross-check against instructor answer key. · Individual digital exercise using a CAD viewer (Autodesk DWG TrueView or equivalent): students navigate a multi-sheet drawing set, answer ten locating questions, and record answers in a log sheet submitted for grading.
Materials: Sample commercial outfitting drawing sets (GA, isometrics, arrangement plans), Autodesk DWG TrueView on lab computers, NCCER Shipfitting Module 3 (Drawings and Plans), blank MTQ forms, drawing scales and triangular scales
Check: Completed MTQ log checked against instructor key; student must achieve 80% accuracy on component identification and material quantities to pass.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

NCCER Shipfitting — Drawings and Plans
1. A pipefitter is handed a work package for a machinery-room installation. Which drawing should she consult FIRST to understand where the machinery room sits relative to the rest of the vessel?
NCCER Shipfitting — Drawings and Plans
2. On a piping isometric, the bill of materials lists 14 pipe hangers for a cooling-water run. During the field take-off a student counts only 12 hangers shown on the drawing. What is the correct next step?
ABS/USCG Weld Test — Regulatory Compliance
3. A compartment drawing shows the label 'A-60' on a bulkhead that a ventilation duct must penetrate. What does this classification require the installer to include in the MTQ?
NCCER Shipfitting — Drawings and Plans
4. A student is locating a seawater strainer described as 'FR 67, 850 mm P of CL, Deck 2.' What does '850 mm P of CL' mean?
NCCER Shipfitting — Safety
5. Before a crew uses a work package to begin cutting into an existing piping system for a modification, which safety procedure must be completed first?
NCCER Shipfitting — Drawings and Plans
6. Which drawing type would a marine electrician use to determine the routing path and support locations of a new cable tray running through a compartment?
NCCER Shipfitting — Drawings and Plans
7. A student's MTQ for a joiner work package lists all pipe but omits pipe hangers and foundation pads because they seemed minor. The instructor marks the MTQ as failing. Why?
NCCER Maritime Welding — Materials and Specifications
8. During a CAD-viewer exercise a student must confirm the pipe specification for a 3-inch run shown on an isometric. The drawing shows 'ASTM A106 Gr. B, SCH 40' next to the run. What information does 'SCH 40' provide?