MFG-SHIP13-06 · Lesson 5 · 18 clock hours · lab
Pipe Hanger and Support Fabrication and Installation
Objective. The student fabricates and installs two different hanger types (clevis and U-bolt) at drawing-specified frame locations and heights, with each hanger plumb within 1/8 inch and support spacing not exceeding the drawing requirement.
Pipe Hanger and Support Fabrication and Installation
Pipe systems aboard a vessel carry fuel, seawater, freshwater, hydraulic fluid, exhaust, and bilge drainage. Every pipe run must be held firmly in place so vibration, thermal expansion, and vessel motion cannot overstress joints or bulkhead penetrations. Pipe hangers and supports transfer the pipe load to the ship's structure, and they must be fabricated and installed exactly where the design drawing says — at the right frame location, at the right height, and plumb and level within tight tolerances.
Types of Hangers Used in Marine Work
Clevis hangers consist of a U-shaped clevis fitting that cradles the pipe, a threaded rod that carries the load upward, and a top fitting or welded bracket anchored to the overhead or a web frame. The clevis pin can be removed to drop the pipe clear during maintenance. Clevis hangers are the most common hanger type for below-deck piping on steel vessels.
U-bolt hangers use a bent-rod U shape that wraps around the pipe; the two threaded legs pass through a steel saddle plate and are secured with nuts. U-bolts grip the pipe more rigidly and are often used where vibration is higher or where the pipe must be prevented from moving laterally as well as vertically.
Both types may be used together on a single pipe run when the drawing calls for it, as each offers different restraint characteristics.
Reading the Drawing and Transferring Locations
Before drilling or welding anything, read the isometric or orthographic pipe drawing completely. Locate the following for every hanger:
- Frame number or reference dimension from a baseline
- Height of the pipe centerline above the deck or below the overhead
- Hanger type and hardware size
- Maximum support spacing (a maximum distance between hangers is always stated; never exceed it)
To transfer a hanger location from the drawing to the actual hull frame, use a tape measure to find the correct frame bay, then use a plumb bob dropped from the overhead or a level extended from the frame flange to establish the exact vertical line at which the bracket will land. Mark the drill center with a center punch before drilling — this prevents the bit from walking.
Fabricating the Bracket and Assembly
For a welded flat-bar bracket, cut mild steel flat bar to the length shown on the detail drawing using a bandsaw or cutoff wheel. Deburr all edges with a file or grinder. Lay out and center-punch hole locations for the threaded rod and for the frame attachment bolts. Drill a pilot hole first — typically 1/8 inch smaller than the finish diameter — then step up to the finish drill size. This two-step process produces a cleaner, rounder hole in steel and reduces drill breakage.
A threaded insert welded into the bracket provides the anchor point for the threaded rod. Position the insert, tack-weld in two places, confirm it is square to the bar using a small square, then complete the weld passes. Allow the weld to cool before threading in the rod to avoid heat damage to the threads.
Inspect the completed assembly against the shop drawing before installation: check overall length, hole location, weld quality (no visible cracks or porosity), and thread engagement.
Installing and Torquing the Hanger
Offer the bracket up to the web frame at the marked location. Use a combination level or plumb bob to confirm the bracket face is plumb — the allowable deviation in this shop is 1/8 inch over the bracket height. Clamp or hold the bracket while a partner verifies plumb, then drill through the frame flange at the marked centers using a portable drill. Install fasteners, run nuts up finger-tight, recheck plumb, then torque to the specification shown on the drawing or in the hardware manufacturer's table. Use a calibrated torque wrench, apply steady increasing force — do not jerk — and stop the moment the wrench clicks or the pointer reaches the target value. Record the torque value and fastener size on the inspection record form.
Thread the clevis hanger rod to the correct height so the pipe centerline will land at the elevation shown on the drawing. Height tolerance in this exercise is ±1/4 inch. Hang the pipe spool, lock the clevis pin, and make a final plumb check.
For the U-bolt, slide the U over the pipe, pass the legs through the saddle plate, and tighten the nuts evenly — alternate from side to side in small increments — until the specified torque is reached. Uneven tightening cocks the U-bolt and can ovalize thin-wall pipe.
Safety
- Eye and face protection is required at all times during drilling and welding. Flying chips from drill operations are a leading cause of eye injury in the shop.
- Wear welding PPE — helmet, leather gloves, flame-resistant clothing, and steel-toed boots — whenever the MIG welder is energized.
- Apply lockout/tagout procedures on the drill press before changing bits or clearing a jam. Follow your shop's written LOTO procedure.
- When working overhead to install a bracket, secure all tools with lanyards or set them in a tool bag — a dropped drill or wrench at head height can cause serious injury.
- Inspect the torque wrench calibration date before use. An out-of-calibration wrench can produce under- or over-torqued joints; report any wrench that shows damage or is past its calibration due date.
Completing the Inspection Record
Every hanger installation must be documented. The inspection record form captures: hanger type, location (frame number), pipe size, installed height (measured), torque value applied, plumb reading, and the signatures of the student and the instructor. An incomplete or unsigned record is a failing result regardless of how good the physical work is — the same standard applies in commercial shipyards, where traceability of every installed system is a quality requirement.
Key terms8
Clevis hangerA pipe support consisting of a U-shaped fitting that cradles the pipe, connected by a threaded rod to an overhead or structural anchor; the clevis pin can be removed to release the pipe.
U-bolt hangerA bent-rod fastener shaped like the letter U that wraps around a pipe; the two threaded legs pass through a saddle plate and are secured with nuts to clamp the pipe in place.
Support spacingThe maximum allowable distance between consecutive pipe supports as specified on the design drawing; exceeding it can cause pipe sag, joint stress, and vibration damage.
PlumbPerfectly vertical, as confirmed by a plumb bob or level; a hanger rod or bracket that is out of plumb transfers side loads to the pipe it supports.
Pilot holeA small-diameter hole drilled first to guide and reduce the cutting load when stepping up to the full finish drill diameter; prevents bit walking on steel.
Torque wrenchA wrench calibrated to measure and limit the rotational force applied to a fastener, ensuring the fastener is neither under-tightened (loose joint) nor over-tightened (stripped or cracked).
Threaded insertA short threaded fitting or nut welded or pressed into a bracket to provide a secure anchor point for a threaded rod or bolt.
Inspection recordA signed, written document that records measured values (height, plumb, torque) for an installed component, providing quality-control traceability required by shipyard and classification society standards.
Worked examples4
1. The drawing shows a pipe centerline height of 84 inches above the deck. After installing the clevis hanger and hanging the spool, you measure the actual pipe centerline at 84-5/8 inches. Is this within the ±1/4-inch tolerance?
- State the tolerance: the allowable range is 84 inches ± 1/4 inch, which means any measurement from 83-3/4 inches to 84-1/4 inches passes.
- Convert the measurement to the same units: actual height = 84-5/8 inches = 84.625 inches; upper limit = 84-1/4 inches = 84.25 inches.
- Compare: 84.625 inches is greater than 84.25 inches, so the hanger is outside the tolerance band.
Answer: No — 84-5/8 inches exceeds the upper limit of 84-1/4 inches by 3/8 inch. The threaded rod must be adjusted downward until the pipe centerline falls between 83-3/4 inches and 84-1/4 inches.
2. You are using a plumb bob to check a bracket that is 6 inches tall. The top of the bracket is plumb-bob true, but the bottom edge of the bracket measures 3/16 inch away from the plumb line. Does the bracket pass the 1/8-inch plumb tolerance?
- State the tolerance: maximum allowable deviation from plumb is 1/8 inch (0.125 inch) measured across the hanger height.
- Convert the measured deviation: 3/16 inch = 0.1875 inch.
- Compare: 0.1875 inch is greater than 0.125 inch.
Answer: No — the bracket is out of plumb by 3/16 inch, which exceeds the 1/8-inch limit. Loosen the fasteners, realign the bracket, recheck plumb, and re-torque.
3. The drawing specifies a maximum hanger spacing of 7 feet 0 inches for a 2-inch steel pipe run. You have one hanger at frame 22 (station 132 inches from the bow reference) and need to place the next hanger. What is the farthest aft station (in inches) at which the second hanger may be installed?
- Convert the maximum spacing to inches: 7 feet × 12 inches/foot = 84 inches.
- Add the spacing to the first hanger station: 132 inches + 84 inches = 216 inches.
Answer: The second hanger must be installed no farther aft than station 216 inches (18 feet 0 inches from the bow reference). Installing it beyond that point would exceed the maximum spacing and violate the drawing requirement.
4. Your threaded rod has 1/2-inch-13 UNC threads (13 threads per inch). The pipe centerline is currently sitting 3/4 inch too high. How many full turns must you back the rod nut out to lower the pipe by 3/4 inch?
- Determine thread pitch (travel per turn): 1 ÷ 13 threads per inch = approximately 0.0769 inch per turn.
- Divide the required travel by the pitch: 0.75 inch ÷ 0.0769 inch/turn ≈ 9.75 turns.
- Round to a whole number of turns that meets or slightly exceeds the required travel: 10 full turns will lower the rod approximately 10 × 0.0769 = 0.769 inch, which brings the pipe to approximately 3/4 inch lower (within tolerance); verify with tape measure after adjustment.
Answer: Approximately 10 full turns will lower the pipe roughly 3/4 inch on 1/2-13 UNC threads. Always measure the actual centerline height after adjustment and before recording on the inspection form.
In class: Instructor demo on a mock hull section: transferring hanger locations from a drawing to structure using a plumb bob and measuring tape, drilling pilot and finish holes in a steel web frame, and installing a threaded-rod clevis hanger to a torque specification using a torque wrench. · Hands-on fabrication: each student cuts and drills a mild-steel flat-bar bracket, welds a threaded insert, and assembles a clevis hanger assembly; fit and finish are inspected against a shop drawing before installation. · Installation exercise on mock hull section: students install their hanger and a second U-bolt hanger at marked locations, hang a 2-inch spool section, check plumb with a level, and record measured heights on an inspection record form.
Materials: Mock hull section (steel web frames), mild steel flat bar, threaded rod, clevis and U-bolt hanger hardware, drill press and portable drill, twist drill set, torque wrench, combination level, plumb bob, tape measure, MIG welder, welding PPE, inspection record forms
Check: Instructor checks plumb (within 1/8 inch using level), installed height within ±1/4 inch of drawing, and hanger torque verified with torque wrench; all three pass criteria required; inspection record must be fully completed and signed.
Practice check8