MFG-SHIP13-04 · Lesson 11 · 16.5 clock hours · theory
Material Take-Off and Fit-Up Documentation
Objective. Students will produce a complete material take-off list and a fit-up sketch for a given structural assembly, including all part marks, quantities, material grades, and dimensions, with the take-off matching the drawing to within a 5% quantity error.
What Is a Material Take-Off?
A material take-off (MTO) is a complete, itemized list of every piece of material required to build a structural assembly. In a shipyard, the MTO is the bridge between the engineering drawing and the shop floor: it tells the material handler what to pull from stock, tells the fitter what to expect at the work site, and gives the project manager cost and weight data. An incomplete or inaccurate MTO causes delays, rework, and wasted material—all of which cost money and time on a production schedule where vessel sections must flow smoothly through the build.
For the NCCER Shipfitting credential, you are expected to read a fabrication drawing, identify every part, and record the information on a standard take-off form without missing any item and without introducing significant errors.
Reading the Drawing Before You Write Anything
Before you fill in a single line of the MTO form, study the entire drawing:
1. Title block – Confirms the assembly name, drawing number, revision level, scale, and applicable material specification (for example, ABS Grade A plate or ASTM A36 structural steel).
2. Bill of materials (BOM) block – Usually located in the upper-right corner or along the right border. It lists each part by part mark (sometimes called item number or piece mark), description, material designation, quantity required, and often the raw size.
3. Detail views and section cuts – Clarify geometry that the plan view cannot show. Check every view before recording a dimension.
4. General notes – May specify painting, surface preparation, edge treatment, or weld quality class that affects fit-up.
Never scale dimensions from a drawing unless the drawing specifically authorizes it and you are using the stated scale. Always read printed dimensions.
Completing the Material Take-Off Form
A standard shipyard MTO form contains at minimum these columns:
| Column | What to Record |
|---|---|
| Part Mark | Alphanumeric identifier from the BOM (e.g., P-1, F-2) |
| Description | Plate, flat bar, angle, T-bar, etc. |
| Material Grade | ABS Grade A, ASTM A36, 5083-H116 aluminum, etc. |
| Quantity (Qty) | Number of identical pieces required |
| Thickness or Size | Flange width × web height for shapes; thickness for plate |
| Length | Cut length per piece in inches or millimeters |
| Unit Mass | Weight of one piece (lb or kg) |
| Total Mass | Unit mass × quantity |
Common errors to avoid:
Transposing digits in a dimension (writing 63 mm instead of 36 mm).
Forgetting to multiply unit mass by quantity when totaling.
Recording the nominal section size instead of the actual cut length.
Missing a mirrored part (port vs. starboard) that has a separate part mark.
Using the wrong material grade when the drawing shows a revision that changed the spec.
A quantity error of more than 5% on any line means the downstream material pull will be wrong. Check every line against the BOM before submitting the form.
Producing the Fit-Up Sketch
A fit-up sketch is a freehand, dimensioned drawing—not a CAD plot—that a fitter uses at the assembly table to orient parts correctly, confirm sequence, and identify each weld joint before the first tack is struck. A good fit-up sketch shows:
Part orientation: Which face is up, which edge is the reference edge, port vs. starboard.
Part marks labeled on each piece so anyone picking up the sketch can match it to the MTO.
Weld symbols per AWS A2.4: the reference line, arrow, tail, and the correct symbol for joint type (fillet, groove, plug, etc.). Weld symbols on a sketch must match the drawing—never improvise.
Assembly sequence (numbered steps or a sequence table): for example, tack the keel plate first, then add frames, then attach the face bar. Sequence prevents distortion and access problems.
Fit-up tolerances called out in general notes or the applicable code (ABS rules, AWS D1.1 for steel, or AWS D1.2 for aluminum).
Safety Points for the Shop Environment
Even a documentation task connects to shop safety:
When you verify dimensions in the shop, you may be near active welding or grinding operations. Wear your full PPE: safety glasses, hearing protection, and steel-toed footwear as a minimum.
Never handle plate or structural shapes without cut-resistant gloves; edges are sharp from the cutting table.
If you must access a confined space or elevated platform to read a part mark, apply the proper fall-protection and confined-space entry procedures before entering—documentation work does not exempt you.
Keep your sketch and paperwork away from welding arc flash zones. Arc flash can ignite paper and damage your eyes even at a distance.
Why Accuracy to 5% Matters
A 5% quantity error threshold is not arbitrary. If a 100-piece assembly ships to the build dock short by six pieces, the fitter stops work, the crane is tied up, and a rush material pull disrupts the cut shop schedule. Accuracy on the MTO is a direct production-efficiency requirement, not a classroom standard alone.
Key terms9
Material Take-Off (MTO)An itemized list of every part in an assembly, including part mark, material grade, quantity, size, length, and mass, used to pull stock and track costs.
Part MarkAn alphanumeric identifier (e.g., P-1, F-3) assigned to each unique piece in a fabrication drawing so it can be tracked from the BOM through the MTO to the assembly floor.
Bill of Materials (BOM)A tabular block on a fabrication drawing that lists all parts by mark, description, material, and quantity; the primary source for completing the MTO.
Fit-Up SketchA freehand dimensioned drawing that shows part orientation, part marks, weld symbols per AWS A2.4, and the assembly sequence used to guide tacking and welding.
Material GradeThe specification that defines a material's chemical composition and mechanical properties, such as ABS Grade A plate, ASTM A36 steel, or 5083-H116 aluminum.
Assembly SequenceThe numbered order in which parts are tacked and welded to control distortion, maintain access to joints, and meet fit-up tolerance requirements.
Weld Symbol (AWS A2.4)A standardized graphical notation on a drawing or sketch that specifies weld type, size, location, and finish, as defined by the American Welding Society standard A2.4.
Fit-Up ToleranceThe maximum allowable gap, misalignment, or out-of-square condition at a joint before welding begins, set by the applicable code (ABS rules, AWS D1.1, or AWS D1.2).
Title BlockThe boxed area on a drawing—typically lower right—containing the drawing number, revision, scale, material specification, and approval signatures.
Worked examples4
1. A BOM shows Part Mark F-2 as a 3/8 in. × 4 in. flat bar, 36 in. long, ASTM A36, quantity 4. Carbon steel weighs approximately 0.284 lb per cubic inch. Calculate the unit mass and total mass for the MTO.
Step 1 – Find the volume of one piece. Volume = thickness × width × length = 0.375 in. × 4 in. × 36 in. = 54 cubic inches.
Step 2 – Calculate unit mass. Unit mass = 54 in³ × 0.284 lb/in³ = 15.336 lb. Round to 15.3 lb.
Step 3 – Calculate total mass. Total mass = 15.3 lb × 4 pieces = 61.2 lb.
Step 4 – Record on the MTO form: Part Mark F-2 | Flat Bar | ASTM A36 | Qty 4 | 3/8 × 4 in. | 36 in. | Unit 15.3 lb | Total 61.2 lb.
Answer: Unit mass ≈ 15.3 lb; total mass ≈ 61.2 lb.
2. A five-part assembly MTO lists quantities of 2, 1, 4, 2, and 3 pieces. The drawing BOM shows totals of 2, 1, 4, 2, and 3 as well. A student accidentally records the fourth part as quantity 3 instead of 2. What is the percentage quantity error for that line, and does it exceed the 5% threshold?
Step 3 – Compare to threshold. 50% >> 5%, so this line fails the accuracy requirement and the MTO must be corrected before it can be approved.
Answer: 50% error on that line—far above the 5% threshold; the form must be corrected.
3. You are totaling the mass column of an MTO. Six parts have total masses of 18.4 lb, 61.2 lb, 9.7 lb, 44.0 lb, 22.5 lb, and 5.8 lb. What is the assembly total mass?
Step 1 – Add the values in order: 18.4 + 61.2 = 79.6 lb.
Step 2 – 79.6 + 9.7 = 89.3 lb.
Step 3 – 89.3 + 44.0 = 133.3 lb.
Step 4 – 133.3 + 22.5 = 155.8 lb.
Step 5 – 155.8 + 5.8 = 161.6 lb.
Step 6 – Record 161.6 lb as the assembly total mass in the MTO summary row.
Answer: Total assembly mass = 161.6 lb.
4. A drawing BOM lists 8 identical gusset plates. You locate only 7 part marks in the detail views. What should you do before finalizing the MTO?
Step 1 – Recheck every view in the drawing (plan, elevation, and all sections) for the eighth part mark; it may appear only in a section cut that is easy to overlook.
Step 2 – Check the general notes and any reference drawing called out in the title block, as mirrored or symmetrical parts are sometimes shown on a companion drawing.
Step 3 – If the part is still unlocated after a thorough review, flag the discrepancy in writing to your supervisor or the engineering department before the MTO is submitted—never assume a BOM entry is an error without verification.
Step 4 – Record 8 pieces per the BOM as your MTO quantity and note the discrepancy; do not reduce the quantity based on an incomplete drawing review.
Answer: Re-examine all views and reference drawings; escalate a written discrepancy notice if the eighth part mark cannot be found—do not reduce the BOM quantity without engineering authorization.
The math in this lesson2
Learners total part masses in the material take-off.
In class: Instructor demonstrates reading a bill of materials block and completing a standard shipyard material take-off form from a sample assembly drawing, highlighting common errors. · Students individually complete a material take-off for a five-part weld assembly drawing, listing each part with part mark, material designation, quantity, size, length, and mass. · Students produce a freehand fit-up sketch of the same assembly showing part orientation, weld symbols, and assembly sequence, then exchange with a peer for a blind review against the drawing. Materials: Multi-part assembly drawings, shipyard material take-off forms, fit-up sketch worksheet, pencils, ruler, AWS A2.4 weld symbol reference, NCCER Shipfitting documentation chapter Check: Material take-off form and fit-up sketch graded by instructor: take-off must have all parts listed with correct data and total quantity within 5% of drawing; sketch must show correct orientation, weld symbols, and sequence—80% score to pass.
Practice check8
Answer each question, then check it. Nothing is recorded; this is your own practice.
NCCER Shipfitting – Documentation and Drawings
1. What is the PRIMARY purpose of a material take-off (MTO) in shipyard fabrication?
NCCER Shipfitting – Documentation and Drawings
2. On a fabrication drawing, where is the bill of materials (BOM) block most commonly located?
NCCER Shipfitting – Documentation and Drawings
3. A student records a part quantity of 6 on the MTO. The drawing BOM shows the correct quantity is 4. What is the percentage quantity error for that line?
NCCER Shipfitting – Layout and Fit-Up
4. Which of the following MUST appear on a fit-up sketch to meet shipyard documentation standards?
AWS Certified Welder – Drawing Interpretation
5. Which AWS standard governs weld symbols used on fabrication drawings and fit-up sketches?
NCCER Shipfitting – Documentation and Drawings
6. A fitter is completing an MTO and finds the BOM lists 10 pieces of Part Mark A-3, but can only locate 9 part marks in the drawing views. What is the CORRECT first action?
NCCER Shipfitting – Layout and Fit-Up
7. Why is assembly sequence important on a fit-up sketch for a welded structural assembly?
NCCER Shipfitting – Safety
8. A documentation task requires a fitter to walk through an active welding bay to read part marks. Which PPE is the MINIMUM required for that walkthrough?
Record this lesson on my transcript.Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.