🚧 Under construction — VoTechWorks is being built. A free tech program — complimentary, as our commitment to get America working.
voTechWorksGrade 13 · a vocational technology learning center, by urbanicity
newSchoolWorks.com › VoTechWorks › Building & Construction › HVAC/R › Courses
Building & Construction · course plan
⚠ Pending professional review

This course plan, its lessons and its assessments has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.

VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.

HVAC/R

10 courses · 1,800 clock hours · 9–12 mo full-time. Grading is competency-based: each course requires the written exam, a competent skills demonstration with zero safety faults, a signed log, and a passed safety audit; percentage weights only rank performance above the competency floor.

$19,640 COMPLIMENTARYprogram tuition
10courses
91lessons
1,800hours
35assessments
Development progressPlanCourses, lessons and assessments written for this tradeLessons91 of 91 lesson pages writtenPractice728 practice questionsResources117 reference entries (study list)Review88 lesson pages reviewed by a licensed professional
Study now: 91 lesson pages are open (lesson titles below are links).
BLD-HVAC07-01 Universal core

Universal Core: Safety, Math, Communication & Career for HVAC/R

148 hr · $1,185 COMPLIMENTARY

This course establishes the foundational safety practices, trade mathematics, technical literacy, and professional skills every HVAC/R technician needs before touching any equipment. Learners earn OSHA 10-Hour Construction Industry certification, practice the calculations and measurements that underpin refrigeration and electrical work, and develop the workplace communication habits employers expect. Lesson content is mapped to NCCER HVAC Level 1 core competencies and supports the safety and professionalism domains tested in NATE and HVAC Excellence credentialing.

Outcomes
Course text

This course establishes the foundational safety practices, trade mathematics, technical literacy, and professional skills every HVAC/R technician needs before touching any equipment. Learners earn OSHA 10-Hour Construction Industry certification, practice the calculations and measurements that underpin refrigeration and electrical work, and develop the workplace communication habits employers expect. Lesson content is mapped to NCCER HVAC Level 1 core competencies and supports the safety and professionalism domains tested in NATE and HVAC Excellence credentialing.

How the course runs. 7 blocks: Hazard Recognition and OSHA 10 Construction Safety; Lockout/Tagout, PPE, and Emergency Response for HVAC/R; Trade Math I: Arithmetic, Fractions, Decimals, and Unit Conversion; Trade Math II: Geometry, Algebra, and HVAC/R Applied Calculations; Technical Reading: Manuals, SDS, Wiring Diagrams, and Trade Drawings; Digital Tools and Professional Documentation for HVAC/R; Career Readiness, Credential Pathways, and Personal Study Planning.

What competent looks like. Demonstrate lockout/tagout, PPE selection, and hazard communication procedures that meet OSHA 29 CFR 1926 construction-site standards and pass a written OSHA 10 assessment. Apply arithmetic, algebra, unit conversion, and measurement skills to solve HVAC/R trade problems—including pressure, temperature, area, and electrical quantity calculations—with at least 80% accuracy. Read and interpret manufacturer installation manuals, safety data sheets, wiring diagrams, and HVAC/R trade drawings to extract specifications and follow procedures. Use digital tools—including a scientific calculator, basic spreadsheet software, and an industry job-management application—to record data, create simple reports, and communicate results. Communicate professionally in written work orders, verbal toolbox-talk presentations, and team problem-solving exercises that reflect trade workplace expectations. Identify the credential pathways relevant to this program (EPA 608, NATE, HVAC Excellence, NCCER HVAC), explain what each certifies, and outline a personal study plan for each exam.

Lessons · 7 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1Hazard Recognition and OSHA 10 Construction Safety24theoryStudents will identify the top construction-site hazards—falls, electrical, struck-by, caught-in/between—and explain the OSHA rights, responsibilities, and reporting requirements that apply to HVAC/R installation and service work.
  1. Complete all ten OSHA 10-Hour Construction Industry modules (delivered by an OSHA-authorized instructor or OSHA-authorized online provider) and document completion for the card application.
  2. Analyze four short case-study incident reports drawn from OSHA inspection records; for each, identify the violated standard, the hazard category, and at least two corrective actions the employer and worker should have taken.
  3. Participate in a classroom hazard hunt: given photographs of realistic HVAC/R jobsite conditions (rooftop unit installation, crawl space refrigerant line work, electrical panel proximity), students complete a written Job Hazard Analysis (JHA) form identifying hazards, risk level, and required controls.
OSHA 10-Hour Construction Industry course materials; OSHA publication 3151 (Job Hazard Analysis); OSHA 29 CFR 1926 Subparts C, K, M reference pages; printed JHA blank forms; jobsite photograph setStudents score at least 70% on the OSHA 10 final assessment required for card issuance AND submit a completed JHA that correctly identifies all seeded hazards in the photograph set with no safety-critical omissions; instructor signs off on both.
2Lockout/Tagout, PPE, and Emergency Response for HVAC/R20demoStudents will demonstrate a complete lockout/tagout (LOTO) procedure on a simulated HVAC unit, select the correct PPE for a given HVAC/R task, and perform hands-on first aid and CPR to the current American Heart Association (AHA) Heartsaver standard.
  1. Watch instructor demonstration of a six-step LOTO sequence on a training disconnect and practice panel; each student then performs the full sequence on the training equipment while the instructor observes, and a peer records the steps on a LOTO verification checklist.
  2. Given a task card describing five different HVAC/R jobs (e.g., brazing refrigerant lines, working near a live 208 V panel, handling R-410A), students select PPE from a classroom kit, justify each choice citing the relevant hazard, and compare selections in a group debrief.
  3. Complete a certified AHA Heartsaver First Aid CPR AED course (classroom or blended format) covering adult, child, and infant CPR, AED use, and basic first-aid skills including burns and chemical exposure relevant to refrigerant incidents.
Training HVAC disconnect with lockout hasp and padlocks; LOTO verification checklist form; PPE kit (safety glasses, face shield, leather gloves, chemical-resistant gloves, hard hat, steel-toed boots, hearing protection, respirator samples); AHA Heartsaver First Aid CPR AED course kit with training AED and manikins; ANSI/ASSP Z244.1 reference excerptStudent completes LOTO demonstration with zero critical-step errors (critical steps: de-energize, isolate, lock, try); PPE selection exercise scored on a rubric—at least 80% of choices correct with written justification; AHA Heartsaver card issued upon passing the AHA skills check.
3Trade Math I: Arithmetic, Fractions, Decimals, and Unit Conversion20theoryStudents will solve HVAC/R-contextualized arithmetic problems—including fraction and decimal operations and multi-step unit conversions between Imperial and SI units—with at least 80% accuracy using a scientific calculator.
  1. Work through a structured problem set of 40 items covering addition, subtraction, multiplication, and division of whole numbers, fractions, and decimals in HVAC/R contexts (e.g., calculating refrigerant charge by weight, converting feet to meters for an equipment schedule).
  2. Complete a unit-conversion relay activity in pairs: each pair receives a chain of five conversions (e.g., BTU/hr → watts → kilowatts; °F → °C → K; inches of water column → psi) and must show each step; pairs swap papers to verify and discuss errors.
  3. Use a spreadsheet template to enter raw measurement data from a simulated service call (suction pressure in psi, outdoor temperature in °F, indoor coil temperature in °F), apply conversion formulas, and produce a formatted data table—introducing the concept of digital documentation.
Scientific calculator (one per student); NCCER HVAC Level 1 Core Curriculum textbook (math chapters); unit conversion reference card; laptop or tablet with spreadsheet software; printed problem setsScored problem set: students must achieve at least 80% (32/40 correct); spreadsheet output reviewed by instructor for correct formula use and accurate conversions—all conversion results within ±1% accepted.
4Trade Math II: Geometry, Algebra, and HVAC/R Applied Calculations22practiceStudents will apply geometric area and volume formulas and basic algebraic manipulation to solve HVAC/R problems including duct area, room volume, and Ohm's Law calculations, demonstrating at least 80% accuracy.
  1. Complete a guided worksheet applying area formulas (rectangle, circle) and volume formula to calculate floor area, ceiling plenum volume, and circular duct cross-sectional area for three building floor-plan sketches; results are used in a follow-up discussion about why volume matters for load calculation and equipment sizing.
  2. Practice algebraic rearrangement using Ohm's Law (V = IR) and its derivatives: given a set of ten electrical problems (find voltage, resistance, or current when the other two are known), students show step-by-step work and check answers on a peer-review sheet—directly supporting the NCCER HVAC electrical core content and NATE Air Distribution fundamentals.
  3. Timed applied-math quiz simulation: 20 mixed problems (geometry, unit conversion, Ohm's Law, percentage calculations for efficiency ratings) completed in 30 minutes under test-like conditions; instructor reviews common errors as a class debrief.
Scientific calculator; printed floor-plan sketches (three scenarios); Ohm's Law practice worksheet; NCCER HVAC Level 1 Core Curriculum; whiteboard for instructor-led problem solving; rulers and scale referenceApplied-math quiz: at least 80% (16/20 correct) to pass; floor-plan worksheet reviewed for correct formula selection and arithmetic—instructor initials each student's work; peer-review sheets collected as participation evidence.
5Technical Reading: Manuals, SDS, Wiring Diagrams, and Trade Drawings24theoryStudents will locate specified information within a manufacturer installation manual, a Safety Data Sheet, a ladder-logic wiring diagram, and a basic mechanical floor plan, and accurately answer comprehension questions about each document type.
  1. Document scavenger hunt: given a real manufacturer installation manual for a split-system air conditioner, students answer 15 questions requiring them to navigate the table of contents, electrical data tables, refrigerant charge charts, and torque specifications—simulating the technician's need to find critical information quickly under field conditions.
  2. SDS analysis exercise: students read the SDS for a common HVAC/R refrigerant and one common brazing flux; for each, they complete a structured form extracting the GHS hazard category, first-aid measures, required PPE, and spill-response procedures—reinforcing Section 1 (Hazard Communication) OSHA requirements covered in Lesson 1.
  3. Wiring diagram reading lab: using a printed ladder-logic diagram for a gas furnace control circuit, students trace the path of each control circuit, label components (thermostat, limit switch, inducer relay, gas valve), and answer ten questions about circuit behavior under normal and fault conditions—directly aligned with NATE and HVAC Excellence electrical knowledge domains.
Real manufacturer installation and service manual (split-system air conditioner); SDS sheets for a common HFC refrigerant and brazing flux (instructor-sourced from manufacturer websites); printed ladder-logic wiring diagram; mechanical floor-plan print (simplified); NCCER HVAC Core Curriculum; highlighters; structured comprehension formsScavenger hunt: at least 12/15 correct; SDS form: all four fields completed accurately for both documents with no safety-critical errors; wiring diagram: at least 8/10 questions correct—any student below threshold reviews with instructor and re-attempts a parallel form within one week.
6Digital Tools and Professional Documentation for HVAC/R18practiceStudents will use a scientific calculator app, spreadsheet software, and a representative digital field-service application to record job data, generate a formatted service report, and send a professional email—meeting basic workplace digital-literacy standards.
  1. Hands-on walkthrough of a free or school-licensed digital field-service or job-management app (instructor selects from commonly used platforms in the region): students create a mock customer account, log a service call with equipment model, serial number, refrigerant type, measurements, and work performed, and export or print the completed work order.
  2. Create a simple spreadsheet service log: students enter data from three fictitious service calls (suction pressure, discharge pressure, superheat, subcooling, outdoor temperature, indoor temperature), use basic formulas to flag out-of-range readings with conditional formatting or color coding, and format the sheet for readability.
  3. Professional email and work-order writing workshop: students draft (a) an email to a fictional supervisor reporting a refrigerant leak found on a commercial rooftop unit and the immediate steps taken, and (b) a customer-facing service summary using plain language—peer-reviewed against a rubric covering accuracy, tone, completeness, and spelling.
Laptop, tablet, or computer lab; spreadsheet software (e.g., Google Sheets or Microsoft Excel); digital field-service app access (instructor-selected); sample work-order template; email rubric; NCCER Core Curriculum reference for documentation practicesCompleted digital work order reviewed by instructor against a checklist—all required fields populated accurately; spreadsheet formulas verified by instructor; email and service summary scored on rubric with a minimum score of 75%; any student below threshold revises and resubmits within three days.
7Career Readiness, Credential Pathways, and Personal Study Planning20theoryStudents will explain the purpose, format, and subject domains of the EPA 608, NATE, HVAC Excellence, and NCCER HVAC credentials and produce a written personal study plan that maps each credential's exam areas to the remaining courses in this program.
  1. Panel or video presentation by two or three local HVAC/R technicians or service managers discussing how they use credentials in hiring, advancement, and wage negotiation; students prepare at least three questions in advance and submit a one-page reflection connecting the panel discussion to their own career goals.
  2. Credential mapping activity: using official exam content outlines published by EPA, NATE, HVAC Excellence, and NCCER, students complete a provided matrix matching each credential's major knowledge domains (e.g., EPA 608 core: ozone depletion, recovery, recycling, reclaim; NATE: installation, service, specialty areas) to the ten courses in the program—this becomes the student's personal reference for exam-area coverage throughout the year.
  3. Resume, job-application, and toolbox-talk practice: students draft a one-page resume reflecting current skills and the credentials they are working toward; then each student delivers a two-minute toolbox-talk safety briefing to the class on a topic of their choice from Lessons 1 or 2, developing the verbal communication habit required on every HVAC/R jobsite.
EPA 608 exam content summary (EPA website); NATE candidate information bulletin (NATE website); HVAC Excellence candidate guide (HVAC Excellence website); NCCER HVAC core and level credential descriptions; credential matrix worksheet template; resume template; toolbox-talk rubric; guest speaker or recorded interviewCredential matrix reviewed by instructor for accuracy against official content outlines—at least 90% of domains correctly placed; resume must include all required sections (contact, objective or summary, education, skills) and be free of spelling errors; toolbox talk scored on rubric with minimum 75%—any student below 75% on the matrix must correct and resubmit.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
OSHA and Safety Knowledge ExamWritten exam25%70% or higher (to match OSHA 10 card issuance standard); students below 70% receive one retake after instructor review sessionA 50-question multiple-choice and short-answer written exam covering OSHA 10 Construction content, LOTO procedures, PPE selection, hazard communication (SDS interpretation), and emergency response scenarios specific to HVAC/R work. Questions are drawn from the content covered in Lessons 1 and 2 and aligned to NCCER HVAC Level 1 core safety competencies.
Accuracy · Safety · Communication · Professionalism
Trade Math and Technical Reading Knowledge ExamWritten exam25%80% or higher; students below 80% complete a targeted remediation worksheet and retake a parallel form within one weekA 50-question timed exam (60 minutes) combining 30 math problems (arithmetic, unit conversion, geometry, Ohm's Law, percentage calculations in HVAC/R contexts) and 20 technical-reading comprehension questions based on a provided excerpt of a manufacturer manual, a wiring diagram segment, and one SDS. This exam is aligned to the math and technical-literacy competencies required in the NCCER HVAC core curriculum and supports the background knowledge tested in NATE and HVAC Excellence written exams.
Accuracy · Safety · Communication · Professionalism
Digital Service Report ProjectProject25%75% or higher on the project rubric across all four scored dimensions; students below 75% revise and resubmit onceStudents receive a detailed fictitious service-call scenario (equipment description, field measurements, a fault condition, and customer information) and must produce: a completed digital work order in the field-service app, a formatted spreadsheet log with flagged out-of-range readings, and a professional written service summary email to a supervisor. The project is scored on a four-dimension rubric: technical accuracy of recorded data, correct use of digital tools, written communication quality, and document completeness.
Accuracy · Safety · Communication · Professionalism
Credential Pathway Oral DefenseOral / panel25%Satisfactory on all four oral-defense criteria (each scored 1–3); minimum total score of 9/12 required; any criterion scored 1 requires a follow-up conversation within one weekIn a 10-minute one-on-one conversation with the instructor, each student presents their completed credential matrix and personal study plan, then responds to four probing questions covering: (1) why EPA 608 certification is legally required before handling refrigerants, (2) how one NATE or HVAC Excellence exam domain connects to a specific upcoming course, (3) one safety rule the student would share at a jobsite toolbox talk and why, and (4) one professional goal and the concrete steps they plan to take to reach it. This oral assessment develops the communication skills HVAC/R employers consistently cite as a workforce gap.
Accuracy · Safety · Communication · Professionalism
BLD-HVAC07-02 Trade course

Refrigeration Cycle: Principles, Components, and System Operation

171 hr · $2,360 COMPLIMENTARY

This course builds the foundational knowledge and hands-on skills needed to understand, trace, and diagnose the mechanical refrigeration cycle as it applies to residential and light commercial HVAC/R systems. Students study thermodynamic principles, refrigerant properties, system components, refrigerant handling regulations, and pressure-temperature relationships through a combination of classroom instruction, demonstrations, and live equipment labs. Successful completion prepares students for EPA 608 Universal certification and supports NATE, HVAC Excellence, and NCCER HVAC credentialing in refrigeration fundamentals.

Outcomes
Course text

This course builds the foundational knowledge and hands-on skills needed to understand, trace, and diagnose the mechanical refrigeration cycle as it applies to residential and light commercial HVAC/R systems. Students study thermodynamic principles, refrigerant properties, system components, refrigerant handling regulations, and pressure-temperature relationships through a combination of classroom instruction, demonstrations, and live equipment labs. Successful completion prepares students for EPA 608 Universal certification and supports NATE, HVAC Excellence, and NCCER HVAC credentialing in refrigeration fundamentals.

How the course runs. 12 blocks: Heat, Energy, and the Refrigeration Effect; Refrigerants: Types, Properties, and Environmental Regulations; The Vapor-Compression Refrigeration Cycle: Theory and Tracing; Pressure-Temperature Relationships and PT Chart Use; System Components: Compressors and Condensers; System Components: Metering Devices and Evaporators; Accessory Components: Receivers, Accumulators, Filter-Driers, and Sight Glasses; Refrigerant Manifold Gauge Sets: Reading, Connecting, and Safety; Refrigerant Recovery, Recycling, and Reclaim: EPA 608 Compliance in Practice; Superheat and Subcooling: Measurement and Diagnosis; System Leak Detection and Pressure Testing; System Commissioning, Operational Check, and Refrigeration Cycle Integration.

What competent looks like. Explain the four processes of the vapor-compression refrigeration cycle—compression, condensation, expansion, and evaporation—and identify where each occurs in a real system. Identify and state the function of the compressor, condenser, metering device, and evaporator, plus common accessory components such as the receiver, accumulator, filter-drier, and sight glass. Read and interpret a pressure-temperature (PT) chart and a refrigerant manufacturer's data sheet for common refrigerants including R-410A, R-22, R-134a, and R-404A. Connect a refrigerant manifold gauge set to a system, record operating pressures, and convert those readings to saturation temperatures without exceeding safe pressure limits. Handle, recover, and document refrigerants in full compliance with EPA Section 608 regulations, using approved recovery equipment and completing required records. Perform a basic operational check—including superheat and subcooling measurements—and identify at least three abnormal operating conditions from gauge readings and temperature data.

Lessons · 12 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1Heat, Energy, and the Refrigeration Effect12theoryStudents will define heat, sensible heat, latent heat, and enthalpy, and explain how heat moves from a warmer to a cooler substance as the basis of refrigeration.
  1. Lecture with whiteboard diagrams showing sensible versus latent heat using a water-heating curve; students plot temperature vs. heat added on graph paper.
  2. Small-group problem set: calculate the BTUs required to change the state of a given mass of refrigerant using latent heat values from a refrigerant data table.
  3. Demonstration: instructor heats water to boiling in an open pot while students record temperature every 30 seconds to observe the latent heat plateau at phase change.
Whiteboard, BTU/latent heat reference tables, refrigerant manufacturer data sheets (R-410A, R-22), scientific calculators, graph paper, ASHRAE Fundamentals Handbook excerptStudents complete a 10-question written quiz on heat definitions and BTU calculations; pass mark is 75%. Instructor reviews each student's plotted heat curve for correct identification of sensible and latent zones.
2Refrigerants: Types, Properties, and Environmental Regulations14theoryStudents will classify common refrigerants by chemical family and safety group, state their global warming potential and ozone depletion potential, and summarize the core requirements of EPA Section 608 that technicians must follow.
  1. Guided reading and annotation of an EPA Section 608 fact sheet; students highlight technician certification requirements, venting prohibitions, and record-keeping obligations.
  2. Refrigerant identification card sort: groups match refrigerant names, ASHRAE number designations, safety classifications (ASHRAE 34), and environmental impact ratings on a large table.
  3. Case-study discussion: instructor presents two real-world regulatory violation scenarios; students identify which EPA Section 608 rules were broken and what the correct action should have been.
EPA Section 608 regulations fact sheet, ASHRAE Standard 34 safety classification table, refrigerant data sheets for R-22, R-410A, R-134a, R-404A, R-32, and R-454B, whiteboardStudents complete a written classification worksheet matching 10 refrigerants to their ASHRAE number, safety group, and ODP/GWP category; pass mark is 80%. Verbal spot-check: instructor calls on students to state at least two Section 608 technician obligations.
3The Vapor-Compression Refrigeration Cycle: Theory and Tracing15theoryStudents will trace refrigerant through all four stages of the vapor-compression cycle on a system schematic, identifying the state of the refrigerant (liquid, vapor, or mixture) and the direction of heat flow at each component.
  1. Instructor-led cycle trace on a large laminated system schematic posted on the wall; students use colored markers to draw the high-side, low-side, liquid line, and suction line.
  2. Each student individually completes a blank refrigeration cycle diagram, labeling all four major components, the state of the refrigerant entering and leaving each component, and pressure regions (high and low side).
  3. Pressure-Enthalpy (P-H) diagram introduction: instructor walks through a simple P-H plot for R-410A; students locate the four cycle points and connect them with lines representing the four processes.
Laminated refrigeration system schematics, blank cycle diagrams for student completion, colored markers, P-H diagram worksheets for R-410A, Refrigeration and Air Conditioning Technology textbook (Whitman, Johnson, Tomczyk, or equivalent)Completed blank diagram is graded using a rubric (10 points); students must correctly identify refrigerant state at all four component inlet/outlet points and both pressure regions. Pass mark is 80%.
4Pressure-Temperature Relationships and PT Chart Use12theoryStudents will use a standard refrigerant pressure-temperature (PT) chart to determine saturation temperature from a given gauge pressure and vice versa for at least four common refrigerants.
  1. Instructor demonstrates PT chart lookup for three refrigerants using a physical laminated chart and a digital PT chart app; students follow along and record answers.
  2. Timed PT chart drill: students complete 20 lookup exercises (psig to °F and °F to psig) for R-22, R-410A, R-134a, and R-404A using a physical chart only, scored for accuracy and speed.
  3. Real-world scenario exercise: instructor calls out operating pressures from a fictional job ticket; students use the PT chart to determine if the system is operating within normal saturation temperature ranges.
Laminated refrigerant PT charts, PT chart drill worksheets, digital PT chart application on instructor tablet for comparison, job ticket scenario handouts, calculatorsDrill worksheet scored: students must achieve at least 80% accuracy (16 of 20 correct). Instructor observes each student performing at least two unaided PT chart lookups during the scenario exercise.
5System Components: Compressors and Condensers14demoStudents will identify reciprocating, scroll, and rotary compressor types and describe the operating principle of each, and distinguish between air-cooled and water-cooled condensers by construction and application.
  1. Instructor-led teardown tour of three cutaway compressor models on the workbench; students label a diagram of each type with major parts (pistons, scrolls, crankshaft, valves, motor windings) while following along.
  2. Condenser comparison demonstration: instructor shows a bench-mounted air-cooled condenser coil alongside a shell-and-coil water-cooled condenser, pointing out refrigerant and heat-transfer fluid paths; students sketch each with refrigerant flow arrows.
  3. Matching activity: students receive a set of cards with compressor/condenser characteristics, failure symptoms, and applications and must correctly pair them; pairs compare and discuss disagreements.
Cutaway reciprocating, scroll, and rotary compressor models, air-cooled condenser section, shell-and-coil water-cooled condenser sample, component labeling worksheets, component card sets, markersStudents complete a labeled diagram for each of the three compressor types; instructor checks for correct identification of at least five parts per compressor type. Pass mark is 80% correct labels across all diagrams.
6System Components: Metering Devices and Evaporators14demoStudents will explain how a thermostatic expansion valve (TXV), automatic expansion valve (AXV), and fixed orifice (piston/cap tube) each regulate refrigerant flow, and describe the construction and purpose of a direct-expansion evaporator coil.
  1. Instructor disassembles a TXV on the workbench, identifies the needle, seat, sensing bulb, superheat spring, and external equalizer port, then reassembles it; students annotate a cross-section diagram throughout.
  2. Side-by-side comparison: instructor places a cap tube, fixed piston orifice, TXV, and AXV on the bench; student groups examine each, answer guided questions about where and why each metering device is used.
  3. Evaporator airflow simulation: using a small fan and a real evaporator coil section, instructor demonstrates frost formation when airflow is blocked; students record observations and explain the connection to low suction pressure and low evaporator saturation temperature.
Disassembly TXV with external equalizer, AXV sample, cap tube sample, fixed piston orifice sample, evaporator coil section, small box fan, component cross-section diagrams, frost simulation materials (ice or freezer)Each student correctly labels a TXV cross-section diagram (minimum 6 of 8 parts correct) and verbally explains to the instructor in one to two sentences how the TXV responds to a change in superheat. Pass requires both the diagram label check and a satisfactory verbal explanation.
7Accessory Components: Receivers, Accumulators, Filter-Driers, and Sight Glasses10demoStudents will state the location, function, and maintenance significance of common refrigeration accessories and identify visible indicators of system problems observable at the sight glass.
  1. Bench display station rotation: instructor places a liquid-line receiver, suction-line accumulator, filter-drier, and sight glass at four stations; student groups rotate through each station and complete a function/location data card.
  2. Sight glass interpretation demonstration: instructor connects a clear sight glass in-line on a demonstration system and varies refrigerant charge; students observe and record changes in bubbles, oil contamination, and moisture indicator color.
  3. Group discussion using a troubleshooting chart: instructor presents three abnormal sight glass conditions (steady bubbles, milky appearance, yellow indicator) and students trace each to a probable system cause.
Liquid receiver sample, suction accumulator sample, filter-drier samples (new and saturated for comparison), sight glass samples, demonstration refrigeration system with sight glass installed, moisture indicator color reference card, data cards for station activityCompleted data cards are reviewed; students must correctly state the function and location of all four accessory components. Verbal check: each student must correctly interpret one sight glass condition described by the instructor. Pass requires 100% on function/location and a satisfactory sight glass interpretation.
8Refrigerant Manifold Gauge Sets: Reading, Connecting, and Safety16labStudents will safely connect a manifold gauge set to a system service port, read both high-side and low-side pressures accurately, and disconnect the gauges without refrigerant release.
  1. Pre-lab PPE and safety briefing: instructor reviews refrigerant contact hazards, required PPE (safety glasses, gloves), and the prohibition on venting; students don PPE before approaching any equipment.
  2. Gauge set identification exercise: students identify each component of the manifold gauge set (high-side gauge, low-side gauge, manifold body, hoses, Schrader depressors) and read pressures from a static pressurized nitrogen training cylinder set to known pressures.
  3. Supervised lab: each student individually connects their gauge set to an assigned operational training unit, records high-side and low-side pressures, converts readings to saturation temperatures using a PT chart, then properly disconnects gauges while instructor observes the entire procedure.
Two-valve manifold gauge sets (one per student pair), nitrogen-charged training cylinders at known pressures, operational refrigeration training units, PT charts, safety glasses, refrigerant-rated gloves, lab worksheetInstructor observes connection and disconnection procedure using a step-by-step safety checklist (must complete all safety steps without prompting to pass). Pressure readings recorded must be within ±2 psig of instructor-verified reading. Pass requires a clean safety checklist and accurate readings; any unsafe act is an automatic recheck before the student may proceed.
9Refrigerant Recovery, Recycling, and Reclaim: EPA 608 Compliance in Practice16labStudents will operate an EPA-approved refrigerant recovery machine to recover refrigerant from a small system to EPA-required recovery levels, and complete the associated service documentation correctly.
  1. Pre-lab regulatory review: students read the core recovery requirements from an EPA Section 608 summary sheet and complete a short pre-lab quiz identifying required recovery levels for different system types.
  2. Instructor demonstration of full recovery procedure on a charged training unit: setup, leak check of recovery cylinder, machine connection, recovery to required vacuum level, cylinder weighing, and cylinder labeling.
  3. Student lab: in pairs, students recover refrigerant from an assigned charged training unit following a written procedure card, record start/end weights on a service log, label the recovery cylinder, and submit the completed log for review.
EPA-approved refrigerant recovery machines, recovery cylinders (DOT-approved, properly labeled), scale accurate to 0.1 lb, training refrigeration units pre-charged with R-410A or R-134a, EPA Section 608 summary sheet, service log forms, safety glasses, refrigerant-rated gloves, pre-lab quiz handoutService log must include correct start weight, end weight, refrigerant type, cylinder ID, and technician signature; any missing field is a fail requiring correction. Recovery machine operation is observed by instructor using a procedure checklist; student must complete all steps in correct order. Pass mark: complete and accurate log plus a clean procedure checklist.
10Superheat and Subcooling: Measurement and Diagnosis18labStudents will measure actual superheat at the evaporator outlet and actual subcooling at the condenser outlet using manifold gauges and temperature clamps, compare results to manufacturer specifications, and identify at least one system abnormality from the data.
  1. Instructor-led calculation review: using a whiteboard, instructor works three superheat and three subcooling calculation examples from pressure and temperature data, emphasizing that superheat = actual suction temperature minus saturation temperature at suction pressure, and subcooling = saturation temperature at discharge pressure minus actual liquid line temperature.
  2. Lab measurement exercise: student pairs connect gauges and attach temperature clamps to the suction line and liquid line on an operational training unit, record all four values (two pressures, two temperatures), then calculate superheat and subcooling and compare to the posted target range for that unit.
  3. Fault diagnosis activity: instructor pre-sets three training units with different faults (low charge, overcharge, restricted filter-drier); student groups rotate through each unit, record data, calculate superheat and subcooling, and write a one-paragraph diagnosis identifying the probable fault and supporting evidence.
Operational refrigeration training units (at least three, with instructor-set faults), manifold gauge sets, digital clamp-on thermometers or temperature probes with clamps, PT charts, superheat/subcooling calculation worksheets, manufacturer specification cards for each unitSuperheat and subcooling calculations are checked for correct arithmetic and correct identification of saturation temperatures from the PT chart; values must be within ±2°F of instructor-calculated correct answer. Fault diagnosis paragraph must correctly name the fault and cite at least two data points as evidence. Pass mark: 80% on calculations and a satisfactory diagnosis write-up.
11System Leak Detection and Pressure Testing14labStudents will perform a refrigerant leak check using an electronic leak detector and nitrogen standing-pressure test on a training system, locating and documenting any leak found.
  1. Leak detector familiarization: instructor demonstrates calibration and operation of an electronic heated-diode leak detector and a UV dye method, discussing when each is appropriate and their limitations; students practice powering on and calibrating the electronic detector.
  2. Nitrogen standing-pressure test: student pairs pressurize a training system loop with dry nitrogen to the manufacturer-recommended test pressure (not exceeding the low-side design pressure), mark the gauge reading, wait a set time period, and record any pressure drop; instructor reviews the procedure for safe nitrogen cylinder handling and regulator use.
  3. Electronic leak search lab: instructor introduces a small leak at a fitting on each training unit; students move the leak detector probe slowly around all joints, service ports, and fittings to locate and mark the leak, then complete a leak report form documenting location, suspected cause, and recommended repair.
Electronic refrigerant leak detectors (heated diode type), UV dye leak detection kit with UV lamp and safety glasses, nitrogen cylinders with two-stage regulator and relief valve, pressure gauges, tubing and fittings for training loop, soap bubble solution, leak report formsNitrogen test: students must record start and end pressure correctly and state whether a leak is present based on pressure drop; instructor verifies reading accuracy. Leak search: student must locate the instructor-placed leak within the allotted time and submit a complete leak report. Pass requires accurate pressure test documentation and successful leak location with a complete report.
12System Commissioning, Operational Check, and Refrigeration Cycle Integration16labStudents will perform a complete operational check of a training refrigeration system—including startup, steady-state pressure and temperature recording, superheat and subcooling measurement, and a written system status report—integrating all skills developed in the course.
  1. Pre-startup inspection checklist: each student independently completes a written pre-startup inspection of their assigned training unit, checking electrical connections, refrigerant charge indicators at the sight glass, airflow paths, and safety controls before energizing the system.
  2. Full operational data collection: with the system running at steady state, students record suction pressure, discharge pressure, suction line temperature, liquid line temperature, supply air temperature, and return air temperature, then calculate superheat and subcooling and compare all values to manufacturer specifications.
  3. System status report: each student writes a one-page operational summary identifying whether the system is operating normally or abnormally, citing specific data points as evidence, and recommending a next diagnostic or corrective step if any abnormality is found; reports are submitted and returned with instructor feedback.
Operational refrigeration training units, manifold gauge sets, digital thermometers with clamps, PT charts, manufacturer specification sheets, pre-startup inspection checklist forms, lined paper or word-processed report templatePre-startup checklist must be fully completed before the instructor allows system energization (incomplete checklist = system stays off until corrected). Data collection values must be within ±2 psig and ±2°F of instructor-verified readings. System status report is graded on a rubric: correct data-driven conclusion (40%), supporting evidence cited (30%), logical recommendation (30%); pass mark is 75% overall.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
Refrigeration Fundamentals Knowledge ExamWritten exam25%75% (38 of 50 questions correct)A 50-question written exam covering heat theory, refrigerant classification and EPA Section 608 regulations, vapor-compression cycle processes, PT chart interpretation, component identification, and accessory component functions. Questions are multiple-choice and short-answer, mapped to EPA 608 Universal exam content areas and NATE/NCCER HVAC refrigeration fundamentals domains.
Standard met · Safety · Time · Quality/finish · Documentation
Manifold Gauge and Recovery Skills DemonstrationSkills demonstration45%All critical safety steps completed without prompting; pressure readings within ±2 psig; recovery log complete and accurateEach student individually connects a manifold gauge set to a live training system, records operating pressures, converts to saturation temperatures, then recovers the refrigerant to EPA-required levels using a recovery machine and completes a service log—all observed by the instructor using a scored checklist. Any unsafe act (e.g., venting refrigerant, improper PPE) results in an immediate stop and a mandatory recheck session before re-attempt.
Standard met · Safety · Time · Quality/finish · Documentation
Lab Log and Operational Reports PortfolioLog15%80% average across all submitted lab worksheets and reports; no incomplete or missing entriesStudents submit a compiled portfolio of all lab worksheets, service logs, leak reports, and the final system status report completed throughout the course. Each entry is evaluated for completeness, data accuracy, correct calculations, and clear written conclusions; the portfolio score is the average of all rubric-graded entries.
Standard met · Safety · Time · Quality/finish · Documentation
Refrigerant Handling Safety CheckSafety audit15%100% on all mandatory safety behaviors; any critical failure requires a recheck before course completion is grantedA dedicated direct-observation safety evaluation in which the instructor watches each student don required PPE, connect and disconnect gauges without refrigerant release, handle a recovery cylinder safely (correct labeling, no overfilling, proper storage orientation), and demonstrate knowledge of emergency response for refrigerant skin or eye contact. This check is administered as a gate requirement; students who do not pass cannot advance to Course 3.
Standard met · Safety · Time · Quality/finish · Documentation
BLD-HVAC07-03 Trade course

Electrical Controls for HVAC/R Systems

171 hr · $2,360 COMPLIMENTARY

This course develops the electrical theory, wiring skills, and control-circuit troubleshooting competencies required of entry-level HVAC/R technicians. Students read wiring diagrams, build and test common HVAC/R control circuits, and safely diagnose electrical faults in heating, cooling, and refrigeration equipment. Lessons are mapped to EPA 608, NATE Core, HVAC Excellence, and NCCER HVAC credential exam content areas involving electrical fundamentals and system controls.

Outcomes
Course text

This course develops the electrical theory, wiring skills, and control-circuit troubleshooting competencies required of entry-level HVAC/R technicians. Students read wiring diagrams, build and test common HVAC/R control circuits, and safely diagnose electrical faults in heating, cooling, and refrigeration equipment. Lessons are mapped to EPA 608, NATE Core, HVAC Excellence, and NCCER HVAC credential exam content areas involving electrical fundamentals and system controls.

How the course runs. 12 blocks: Electrical Safety: LOTO, Arc Flash, and NFPA 70E; Electrical Theory: Voltage, Current, Resistance, and Power; Test Instruments: Multimeter, Clamp Ammeter, and Megohmmeter; Reading Wiring Diagrams: Ladder, Schematic, and Pictorial; Control Transformers and Low-Voltage Thermostat Circuits; Contactors, Relays, and Motor Starters; Capacitors: Run, Start, and Dual-Round; Pressure Switches, Flow Switches, and Safety Controls; Time-Delay Relays, Defrost Controls, and Sequencers; Three-Phase Power and Motor Controls; Systematic Troubleshooting of HVAC/R Electrical Circuits; Integrated Electrical Lab: Diagnose, Repair, and Commission a Full Control Circuit.

What competent looks like. Apply Ohm's Law and basic electrical theory to calculate voltage, current, resistance, and power in series, parallel, and series-parallel HVAC/R circuits. Safely use a digital multimeter, clamp ammeter, and megohmmeter to measure electrical quantities and diagnose circuit faults, following NFPA 70E shock-risk and PPE requirements. Read and interpret ladder diagrams, schematic diagrams, and pictorial wiring diagrams for residential and light-commercial HVAC/R equipment. Wire, test, and verify correct operation of common HVAC/R control components including contactors, relays, thermostats, pressure switches, time-delay relays, and motor starters. Systematically troubleshoot electrical faults in single-phase and three-phase HVAC/R systems using a logical half-split diagnostic method, documenting findings on a service report. Demonstrate lockout/tagout (LOTO) procedures and arc-flash PPE selection for every energized-equipment task, achieving zero safety violations across all lab sessions.

Lessons · 12 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1Electrical Safety: LOTO, Arc Flash, and NFPA 70E11.5theoryStudents will correctly identify shock and arc-flash hazards on HVAC/R equipment and perform a complete LOTO sequence before simulated electrical work, with zero procedural errors.
  1. Instructor-led review of NFPA 70E shock-risk boundaries, PPE categories, and arc-flash warning labels found on common HVAC/R disconnect boxes and panel boards.
  2. Students practice LOTO on a de-energized training panel: isolate, lock, tag, test, and verify absence of voltage using a calibrated multimeter before signing a training log.
  3. Case-study analysis of three real HVAC electrical incident reports (OSHA investigation summaries); students identify what LOTO or PPE failure caused each event and write a corrective action.
NFPA 70E Standard for Electrical Safety in the Workplace (current edition), OSHA 1910.147 handout, training lockout panel, personal locks and tags, insulated gloves (Class 00 minimum), safety glasses, face shield, HVAC/R equipment nameplates, student workbookInstructor observes each student perform LOTO on the training panel without prompting; all six steps completed in correct order with voltage verified at zero = pass. Any skipped step or energized-circuit contact = repeat before advancing.
2Electrical Theory: Voltage, Current, Resistance, and Power13.5theoryStudents will apply Ohm's Law and the power formula to calculate unknown values in HVAC/R circuit problems and predict meter readings within ±5% of actual measured values.
  1. Lecture and worked examples: V = IR, P = VI, and their transpositions applied to compressor-motor nameplate data and control-transformer sizing for a 24 V thermostat circuit.
  2. Students complete a 20-problem worksheet covering series, parallel, and series-parallel resistive circuits typical of HVAC control boards, self-checking with an answer key before instructor review.
  3. Paired lab exercise: students build a simple resistive circuit on a breadboard, predict voltage drops across each resistor using Ohm's Law, then measure with a digital multimeter and record percent error.
Scientific calculators, HVAC/R electrical theory textbook (e.g., Refrigeration and Air Conditioning Technology, Tomczyk et al., current edition), breadboards, resistor assortment, 12 V DC power supply, digital multimeters, student worksheetsWorksheet score ≥ 75% correct and breadboard measurements within ±5% of calculated values = pass. Students who score below 75% receive targeted re-teaching before the next lesson.
3Test Instruments: Multimeter, Clamp Ammeter, and Megohmmeter11.5demoStudents will select the correct instrument and range, make safe measurements of AC voltage, current, resistance, and insulation resistance on HVAC/R components, and record results accurately.
  1. Instructor demonstration: proper lead insertion, range selection, and safety CAT rating significance for a digital multimeter; students mirror each step on their own meters using a live 120 V training outlet strip with instructor present.
  2. Rotation stations: students measure amperage draw of a small single-phase blower motor with a clamp ammeter, compare to nameplate FLA, and flag any reading above 105% of nameplate as a service concern.
  3. Megohmmeter demonstration on a motor winding removed from service: students record insulation resistance readings at 500 V DC and compare to a minimum-acceptable table from the manufacturer guide, deciding pass or fail.
Digital multimeters (True RMS), clamp ammeters (True RMS), megohmmeter, 120/240 V training outlet strips (GFCI-protected), single-phase blower motor, retired motor for megohm testing, insulated gloves, safety glasses, motor nameplate data sheetsInstructor checklist: correct lead placement, appropriate range selected before probing, readings recorded with units and ±tolerance; all three instrument tasks completed without meter damage or unsafe probe placement = pass.
4Reading Wiring Diagrams: Ladder, Schematic, and Pictorial13.5theoryStudents will correctly trace any circuit path on a residential split-system ladder diagram and identify the state (open/closed) of each switch and load for three specified operating modes.
  1. Guided comparison of ladder, schematic, and pictorial diagrams for the same split-system air conditioner: students annotate a packet, color-coding power circuits red and control circuits yellow.
  2. Sequence-of-operation exercise: given a residential cooling-mode ladder diagram, students trace current path from thermostat through contactor coil to compressor and condenser fan, labeling each component and its normal state.
  3. Small-group challenge: each group receives a different equipment wiring diagram (heat pump, packaged rooftop, walk-in cooler) and presents the cooling or defrost circuit trace to the class for peer critique.
Residential split-system wiring diagram packets (OEM service manuals), heat pump and packaged-RTU wiring diagrams, colored pencils or highlighters, projector for group presentations, HVAC/R textbook electrical chaptersStudents correctly identify every component, trace all current paths, and state open/closed status for all three required modes on their diagram packet with ≥ 80% accuracy = pass.
5Control Transformers and Low-Voltage Thermostat Circuits13.5labStudents will wire a 24 VAC control circuit from a step-down transformer through a thermostat sub-base to a relay coil, verify correct voltage at each point, and explain the function of the R, C, G, Y, and W thermostat terminals.
  1. Instructor demonstrates transformer primary/secondary wiring and explains VA rating selection for a typical residential application; students record the formula for transformer sizing in their lab logs.
  2. Students wire a low-voltage control circuit on a training board: transformer primary to 120 VAC, secondary to thermostat sub-base terminals R and C, then Y terminal through a contactor coil to C, verifying 24 VAC at each terminal with a multimeter.
  3. Fault-insertion exercise: instructor opens one wire in the student's completed circuit; student uses a multimeter to half-split the circuit, locates the open, corrects it, and documents the diagnosis in the lab log.
Control transformers (40 VA, 120/24 VAC), thermostat sub-bases, contactor coils (24 VAC), training wiring boards, terminal strips, 18 AWG thermostat wire, wire strippers, digital multimeters, lab log formsCircuit operates correctly (relay pulls in when Y terminal is jumpered), voltage readings within ±1 V of nominal at all checkpoints, and fault diagnosis documented with correct half-split logic = pass. Wiring must pass instructor visual inspection before energizing.
6Contactors, Relays, and Motor Starters13.5labStudents will wire, energize, and verify correct operation of a contactor and a motor-start relay, measure coil and contact resistance, and explain how each component functions in a system circuit.
  1. Disassembly and inspection of used contactors and relays: students identify coil terminals, normally-open and normally-closed contacts, arc hoods, and wear indicators, recording observations in the lab log.
  2. Students wire a contactor into a training-board circuit, apply 24 VAC to the coil, verify line-side and load-side voltages, and measure voltage drop across closed contacts to confirm contact condition.
  3. Potential-type motor-start relay bench test: students wire a start relay for a hermetic compressor simulator, observe the start capacitor drop-out sequence with an ammeter, and compare starting current to run current on a data sheet.
Single-phase and three-phase contactors, 24 VAC coil relays, potential-type motor-start relays, start and run capacitors, hermetic compressor training simulator or equivalent motor, training boards, digital multimeters, clamp ammeters, lab log forms, OEM wiring diagramsContactor circuit wired correctly without reversed coil polarity, load-side voltage verified, and contact voltage drop within published specification; relay bench test amperage trace documented with pass/fail notation = pass.
7Capacitors: Run, Start, and Dual-Round11.5labStudents will safely discharge, test, and evaluate run capacitors and start capacitors using a capacitance meter, and replace an out-of-tolerance capacitor while following discharge and LOTO procedures.
  1. Safety briefing: instructor demonstrates stored-charge hazard and correct two-resistor discharge procedure before any student handles a capacitor; students practice discharge on a charged test capacitor before proceeding.
  2. Capacitor evaluation lab: students use a capacitance meter to measure µF values of a set of run and start capacitors labeled with rated values, calculate percent deviation, and apply the industry-accepted tolerance range to grade each as serviceable or failed.
  3. Replacement exercise: students remove an out-of-tolerance dual-round capacitor from a condenser training unit (de-energized and LOTO applied), install a same-rated replacement, verify connections against the wiring diagram, and record findings on a service report form.
Assortment of run capacitors (various µF ratings), dual-round capacitors, start capacitors, capacitance meter, two-resistor discharge tool (10,000 Ω, 5 W), insulated-grip screwdrivers, digital multimeter, condenser training unit, LOTO hardware, service report formsDischarge procedure performed before every capacitor contact, capacitance meter readings documented with pass/fail notation, replacement installed correctly and matching rated µF ±5% = pass. Any contact with an undischarged capacitor = immediate stop and safety review.
8Pressure Switches, Flow Switches, and Safety Controls13.5demoStudents will identify high-pressure, low-pressure, and oil-pressure safety switches on training equipment, test switch continuity across the operating range, and explain how each protects the refrigeration system.
  1. Instructor-led identification walk-around on a trainer refrigeration unit: students locate and label each safety switch on a diagram, recording setpoint data from the nameplate or OEM spec sheet.
  2. Bench continuity test: students use a multimeter to verify the normally-closed or normally-open status of a high-pressure switch and a low-pressure switch at atmospheric pressure, then predict the state change that would occur at trip pressure.
  3. Simulated fault scenario: instructor disables the low-pressure switch signal on the training unit (using a switch bypass tool, unit off); students diagnose the resulting control circuit fault, determine whether to replace or reset the switch, and document the service call on a report form.
Training refrigeration unit with accessible safety switches, high-pressure and low-pressure switch samples, oil-pressure differential switch sample, digital multimeters, OEM spec sheets, switch bypass tool, service report forms, student workbookStudents correctly identify each switch by function, record proper normal state (NO or NC), and complete the simulated-fault diagnosis with correct root cause and corrective action documented = pass at ≥ 80% accuracy on the report form.
9Time-Delay Relays, Defrost Controls, and Sequencers13.5theoryStudents will explain the purpose and wiring function of time-delay-on-break, time-delay-on-make, defrost time-clock, and heat-sequencer controls in HVAC/R applications and correctly wire a time-delay relay into a training circuit.
  1. Lecture and diagram analysis: time-delay relay types (TDOE, TDOD) and their role in anti-short-cycle protection for compressors; students annotate ladder diagrams showing where each type appears in a typical split system.
  2. Defrost control deep-dive: students trace the defrost time-clock and defrost termination thermostat circuit on a commercial reach-in cooler wiring diagram, explaining the sequence of events from initiation to termination in writing.
  3. Wiring lab: students wire a TDOD relay into a training board to simulate compressor anti-short-cycle protection, set the delay period, and verify that the relay holds the compressor circuit open for the set time after a simulated thermostat call, recording timing with a stopwatch.
Time-delay relay assortment (adjustable TDOD and TDOE, 24 VAC coil), defrost time-clock control (commercial refrigeration type), heat sequencer sample, training wiring boards, stopwatch, digital multimeter, commercial reach-in cooler wiring diagrams, student workbookWired TDOD circuit holds load open for set delay ±10% of dial setting, timing documented, and written defrost sequence explanation contains all five required events = pass.
10Three-Phase Power and Motor Controls13.5theoryStudents will identify three-phase voltage and current characteristics on a wiring diagram, check phase rotation with a phase-rotation meter, and explain the function and wiring of a three-phase magnetic motor starter including overload relays.
  1. Lecture: three-phase power advantages, delta vs. wye connections, phase-to-phase and phase-to-neutral voltage relationships, and nameplate data interpretation for three-phase HVAC compressors and air handlers.
  2. Instructor demonstration of phase-rotation meter use on a three-phase training panel; students record phase sequence, then observe what happens to a three-phase motor when two leads are swapped (using a small training motor at safe voltage).
  3. Magnetic motor starter wiring exercise: students follow a ladder diagram to wire a three-phase motor starter (contactor + overload relay) on a training board, verify coil voltage, test manual overload trip, and reset, documenting each step in the lab log.
Three-phase training panel (208 VAC, properly guarded), phase-rotation meter, three-phase magnetic motor starter with overload relay, small three-phase training motor, digital multimeter, clamp ammeter, safety glasses, insulated gloves, ladder diagram handout, lab log formsPhase rotation identified correctly, starter wired per diagram with instructor verification before energizing, overload trip and reset sequence performed and documented = pass. Any wiring error found during instructor check must be corrected before panel is energized.
11Systematic Troubleshooting of HVAC/R Electrical Circuits13.5practiceStudents will apply a six-step half-split diagnostic method to locate an instructor-inserted electrical fault in a complete residential split-system training unit within 20 minutes, documenting every measurement and decision.
  1. Instructor presents the half-split method as a six-step checklist: gather information, identify symptoms, list possible causes, test at midpoint of circuit, eliminate half, and continue; students copy the checklist and work two instructor-guided examples on paper diagrams.
  2. Paired troubleshooting rounds: each pair receives a split-system training board with one hidden fault (open wire, failed capacitor, failed relay contact, or tripped safety); students apply the checklist, record every multimeter reading, and identify the fault without instructor assistance.
  3. Debrief and documentation: students complete a full service report for their fault scenario including symptom description, diagnostic steps, root cause, corrective action, and component replaced; reports are exchanged for peer review using an instructor-provided rubric.
Residential split-system training boards with fault-insertion points, digital multimeters, clamp ammeters, half-split checklist cards, service report forms, peer-review rubrics, OEM wiring diagrams for training units, stopwatchFault correctly identified within 20 minutes with all intermediate measurements documented, service report complete with correct root cause and corrective action, peer-review rubric score ≥ 80% = pass.
12Integrated Electrical Lab: Diagnose, Repair, and Commission a Full Control Circuit28.5labStudents will independently diagnose and restore full electrical operation of a residential or light-commercial HVAC/R unit containing multiple instructor-inserted faults, completing all LOTO steps, recording all measurements, and producing a professional service report.
  1. Individual pre-task briefing: each student receives a unit assignment, an OEM wiring diagram, and a service order describing reported symptoms; student performs a complete LOTO sequence before opening any panel, verified by instructor signature on the LOTO log.
  2. Diagnosis and repair phase (unassisted): student systematically tests the control circuit, measures capacitors, checks contactors and safety switches, identifies all faults (two to three per unit), replaces or repairs each, then re-energizes following LOTO reversal protocol and verifies normal system operation in all required modes.
  3. Service report and verbal defense: student submits a complete service report and answers five instructor questions about the diagnostic process, component function, and safety decisions made during the lab; answers are scored against a key.
Residential split-system and/or light-commercial packaged units (operational, fault-capable), digital multimeters, clamp ammeters, capacitance meters, replacement capacitors, contactors, and relays, LOTO hardware sets, OEM service manuals and wiring diagrams, service report forms, verbal-defense scoring rubricAll faults correctly identified and repaired, unit operating normally in all tested modes, LOTO log signed at start and reversal, service report complete, and verbal-defense score ≥ 75% = pass. Any energized-equipment contact without completed LOTO = automatic fail with safety counseling required before re-attempt.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
Electrical Theory and Diagram Knowledge ExamWritten exam25%75% or higher (75 out of 100 questions correct)A 100-question written exam covering Ohm's Law calculations, power formulas, component identification, wiring diagram interpretation, three-phase theory, and control device function as mapped to NATE Core, HVAC Excellence Electrical, and NCCER HVAC electrical content areas. Questions are drawn from lesson content and representative of the style used in credential exams.
Standard met · Safety · Time · Quality/finish · Documentation
Wiring and Troubleshooting Skills DemonstrationSkills demonstration45%All required tasks completed correctly with zero safety violations; service report score ≥ 75%Each student independently wires a complete 24 VAC control circuit on an assigned training board, performs LOTO before and after, uses instruments correctly to verify operation, diagnoses one instructor-inserted fault using the half-split method, and completes a service report; scored by instructor using a task checklist aligned to NCCER HVAC and NATE Core performance standards.
Standard met · Safety · Time · Quality/finish · Documentation
Laboratory Log PortfolioLog15%All 10 required lab entries submitted, ≥ 80% average score across entries using the lab-log rubricStudents maintain a cumulative lab log from Lessons 5 through 12, recording LOTO steps, instrument readings with units, component test results, fault diagnoses, corrective actions, and reflections; each entry is scored on accuracy, completeness, and professional format using a 10-point rubric aligned to NCCER documentation standards.
Standard met · Safety · Time · Quality/finish · Documentation
Electrical Safety Compliance CheckSafety audit15%100% compliance — any single safety violation results in immediate fail and mandatory safety counseling before re-assessmentThe instructor completes an unannounced safety observation checklist at least twice during the course's lab phase, verifying that each student correctly selects and dons PPE, completes LOTO before opening panels, discharges capacitors before handling, uses insulated tools, and maintains NFPA 70E approach boundaries on every observed task.
Standard met · Safety · Time · Quality/finish · Documentation
BLD-HVAC07-04 Trade course

Heat Pumps: Principles, Installation, and Service

170 hr · $2,345 COMPLIMENTARY

This course covers the refrigeration cycle in reverse, teaching students how air-source and ground-source heat pumps move heat during both heating and cooling modes, and how reversing valves, defrost controls, and supplemental heat systems work together. Students install, commission, troubleshoot, and service residential heat pump systems following manufacturer specifications, NEC requirements, and current refrigerant-handling regulations. Lessons are mapped to EPA 608 Universal refrigerant-handling competencies, NATE Core and Air-to-Air Heat Pump specialty areas, HVAC Excellence Employment Ready and Professional Level areas, and NCCER HVAC Levels 3–4 heat pump modules.

Outcomes
Course text

This course covers the refrigeration cycle in reverse, teaching students how air-source and ground-source heat pumps move heat during both heating and cooling modes, and how reversing valves, defrost controls, and supplemental heat systems work together. Students install, commission, troubleshoot, and service residential heat pump systems following manufacturer specifications, NEC requirements, and current refrigerant-handling regulations. Lessons are mapped to EPA 608 Universal refrigerant-handling competencies, NATE Core and Air-to-Air Heat Pump specialty areas, HVAC Excellence Employment Ready and Professional Level areas, and NCCER HVAC Levels 3–4 heat pump modules.

How the course runs. 12 blocks: Heat Pump Fundamentals: Reverse-Cycle Refrigeration and System Overview; The Reversing Valve: Operation, Wiring, and Common Failures; Heat Pump Electrical Circuits: Thermostats, Contactors, and Auxiliary Heat; Refrigerant Safety and EPA Section 608 Compliance for Heat Pumps; Refrigerant Recovery, Evacuation, and Recharge: Heat Pump Procedures; Metering Devices in Heat Pumps: TXVs, Check Valves, and Bi-Flow Devices; Defrost Systems: Controls, Sensors, and Termination Logic; Auxiliary and Emergency Heat: Electric Strip Heaters and Gas Backup Systems; Heat Pump Installation: Siting, Line Sets, and Electrical Rough-In; System Start-Up and Commissioning: Performance Verification; Systematic Troubleshooting: Diagnosis of Common Heat Pump Faults; Ground-Source (Geothermal) Heat Pumps: Principles, Loop Types, and Service Differences.

What competent looks like. Explain how a heat pump transfers heat in both heating and cooling modes and identify every major system component by function and location on a refrigerant circuit diagram. Safely recover, evacuate, and recharge a heat pump system with the correct refrigerant type and charge in compliance with EPA Section 608 requirements and using calibrated instruments. Wire a heat pump thermostat, contactor, defrost board, and emergency/auxiliary heat circuit from a wiring diagram, verifying correct operation with a digital multimeter. Diagnose reversing valve failures, refrigerant charge faults, defrost control malfunctions, and airflow restrictions using a systematic, manufacturer-approved troubleshooting procedure. Complete a start-up and commissioning checklist — including static and operating pressures, supply-air temperature rise, amperage draw, and defrost initiation — and document results to industry standards. Demonstrate required personal protective equipment use, lockout/tagout procedures, and safe refrigerant-handling practices throughout every lab exercise without prompting.

Lessons · 12 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1Heat Pump Fundamentals: Reverse-Cycle Refrigeration and System Overview12theoryThe student will explain how a heat pump moves heat in both heating and cooling modes and correctly label all major components on a refrigerant circuit diagram.
  1. Annotate a printed refrigerant circuit diagram for a split-system heat pump, labeling compressor, reversing valve, outdoor coil, indoor coil, metering device, accumulator, and refrigerant flow direction in each mode.
  2. Compare a standard air conditioner P-H (pressure-enthalpy) diagram with a heat pump P-H diagram in heating mode; discuss in small groups why the outdoor coil acts as an evaporator in winter.
  3. Watch a manufacturer training video on heat pump operation, then complete a guided note-taking sheet that requires students to define coefficient of performance (COP) and heating seasonal performance factor (HSPF) in their own words.
Whiteboard, refrigerant circuit diagrams (manufacturer service literature), P-H diagram worksheets, manufacturer training video (e.g., Carrier or Trane heat pump fundamentals series), AHRI glossary handout, student notebooksLabeled diagram quiz: student correctly identifies and describes the function of all eight labeled components; pass mark 80%.
2The Reversing Valve: Operation, Wiring, and Common Failures14demoThe student will describe how a four-way reversing valve shifts refrigerant flow and demonstrate how to test the valve solenoid coil and pilot tube operation using a multimeter and manifold gauge set.
  1. Instructor demonstrates reversing valve operation on a cut-away valve mounted on a display board, energizing and de-energizing the solenoid coil while students observe the slide shifting and record inlet/outlet pressure changes.
  2. Students measure solenoid coil resistance with a digital multimeter, compare reading to manufacturer specification range, and determine whether the coil is serviceable or failed.
  3. Complete a troubleshooting decision tree worksheet covering three scenarios: stuck slide, leaking slide, and failed solenoid coil; identify the correct diagnostic steps and repair actions for each.
Cut-away reversing valve display board, Ranco or Sporlan reversing valve service bulletin, digital multimeter, manifold gauge set, manufacturer wiring diagram, troubleshooting worksheetInstructor observation checklist: student correctly measures coil resistance and interprets result; correctly traces the valve position on a wiring diagram; pass mark 80% of checklist items.
3Heat Pump Electrical Circuits: Thermostats, Contactors, and Auxiliary Heat16theoryThe student will interpret a multi-stage heat pump thermostat wiring diagram and trace the low-voltage and line-voltage circuits from the thermostat through the contactor to the compressor, outdoor fan, and auxiliary electric heat strip.
  1. Using a color-coded wiring diagram, trace and highlight all low-voltage signal paths (Y1, Y2, W1, W2, O/B, G, C terminals) with colored pencils, then explain each terminal's function to a lab partner.
  2. Identify the contactor coil circuit and load circuit on a ladder diagram; calculate expected amperage draw of an electric heat strip using Ohm's law given voltage and resistance values from a strip heater data plate.
  3. Complete a matching exercise that maps thermostat modes (Emergency Heat, Auxiliary Heat, Cooling, Heating) to which relays and contactors are energized in each mode, using a generic residential heat pump wiring diagram.
Residential heat pump wiring diagrams (multiple manufacturers), colored pencils, calculator, electric heat strip data plate examples, Ohm's law reference card, NATE Core knowledge guideWritten quiz on circuit tracing: student correctly identifies terminal functions and traces three specified circuits; pass mark 80%.
4Refrigerant Safety and EPA Section 608 Compliance for Heat Pumps10theoryThe student will state the venting prohibition and technician certification requirements of EPA Section 608 and correctly identify the refrigerants most commonly used in residential heat pumps along with their safety classifications.
  1. Read the relevant sections of the EPA Section 608 regulatory summary and complete a structured Q&A worksheet covering who must be certified, what activities require certification, and what the venting prohibition covers.
  2. Compare refrigerant safety data sheets (SDS) for R-410A and R-32 side by side; identify GWP, ASHRAE safety classification, required PPE, and first-aid steps for exposure, and record findings in a table.
  3. Role-play a service call scenario in pairs: one student plays the technician and must verbally explain to an inspector (the partner) why recovery is performed before opening the system and which documentation is required.
EPA Section 608 regulatory summary (EPA.gov), refrigerant SDS sheets (R-410A, R-32), ASHRAE 34 refrigerant classification chart, PPE samples (safety glasses, gloves, face shield), EPA 608 Universal prep guideShort-answer quiz on EPA 608 key rules; student correctly answers questions on certification scope, venting prohibition, and refrigerant classification; pass mark 80%.
5Refrigerant Recovery, Evacuation, and Recharge: Heat Pump Procedures18labThe student will recover, evacuate to 500 microns or less, and recharge a heat pump trainer unit with the correct refrigerant type and factory charge weight using a recovery machine, manifold gauge set, micron gauge, and refrigerant scale.
  1. Set up the recovery machine on the heat pump trainer following the equipment manufacturer's procedure; recover the refrigerant charge into an approved recovery cylinder, verifying the cylinder is not filled beyond 80% capacity.
  2. Connect micron gauge to the system after recovery; pull a deep vacuum and verify the system holds at or below 500 microns for five minutes before breaking the vacuum with dry nitrogen for a leak check.
  3. Weigh in the factory-specified refrigerant charge using a digital refrigerant scale; verify charge using manufacturer superheat or subcooling method; record all readings on the lab log sheet.
Heat pump trainer unit, recovery machine (UL-listed), manifold gauge set (rated for R-410A), micron gauge, digital refrigerant scale, recovery cylinder, dry nitrogen tank with regulator, refrigerant (R-410A or R-32 per trainer), safety glasses, gloves, face shield, EPA 608 prep reference, lab log sheetsInstructor verifies micron gauge reading at or below 500 microns and holds for five minutes; final refrigerant weight within ±2 oz of target; all PPE worn throughout; lab log complete; pass mark: all three criteria met.
6Metering Devices in Heat Pumps: TXVs, Check Valves, and Bi-Flow Devices12demoThe student will explain how refrigerant metering changes between heating and cooling modes in a heat pump and correctly identify TXV, bi-flow TXV, check valve, and fixed-orifice metering devices on actual components and diagrams.
  1. Instructor disassembles a TXV and bi-flow TXV on the bench; students sketch both and label sensing bulb, equalizer port, needle and seat, and spring; instructor explains how the bi-flow valve allows refrigerant in both directions.
  2. Students trace refrigerant flow on a dual-metering-device circuit diagram (one TXV per coil with check valves) in both heating and cooling modes, noting which metering device is active and which is bypassed in each mode.
  3. Bench exercise: using a hand valve and pressure gauge, students open and close check valves to simulate mode switching and observe pressure differential, then record observations and answer analysis questions on the lab sheet.
Disassembled TXV and bi-flow TXV (cut-away or serviceable units), check valves, dual-metering circuit diagram, hand valves, pressure gauges, lab sheets, ASHRAE Fundamentals chapter on expansion devicesStudents correctly label all components on a blank diagram and answer three analysis questions about metering device function in each mode; pass mark 80%.
7Defrost Systems: Controls, Sensors, and Termination Logic14theoryThe student will describe how a demand defrost control board initiates and terminates a defrost cycle and correctly interpret defrost board wiring, sensor placement, and fault indicators using a manufacturer service manual.
  1. Study a manufacturer defrost board schematic; identify time/temperature initiation, pressure-switch initiation, and demand defrost methods; fill in a comparison table describing how each method senses frost and triggers defrost.
  2. Read a fault code chart from a defrost control board service manual; given three simulated fault codes, write out what each code means, what component is suspect, and what the next diagnostic step should be.
  3. Simulate a defrost cycle on a heat pump trainer: initiate defrost manually per the service manual procedure, observe reversing valve shift and outdoor fan shutdown, measure outdoor coil temperature at initiation and termination, and record in a lab log.
Manufacturer defrost control board and service manual, defrost board wiring diagram, heat pump trainer unit, thermometer with coil probe, lab log sheets, NATE Air-to-Air Heat Pump specialty study guideLab log reviewed by instructor: student correctly records initiation temperature, termination temperature, and elapsed time, and answers three analysis questions; pass mark 80%.
8Auxiliary and Emergency Heat: Electric Strip Heaters and Gas Backup Systems12demoThe student will measure the voltage, amperage, and resistance of an electric heat strip, verify correct sequencer operation, and explain when the thermostat switches to Emergency Heat mode.
  1. Instructor demonstrates safe access to an air handler auxiliary heat section using lockout/tagout; students observe the sequencer energizing individual heat elements in stages and record amp draw at each stage with a clamp-on ammeter.
  2. Students use a digital multimeter to test element continuity and measure resistance of each heat strip element, comparing readings to the data plate rating and flagging any open elements.
  3. Diagram exercise: students draw the control circuit from the W2 thermostat terminal through the sequencer coil to the heat element contactor, then trace what changes electrically when the thermostat is set to Emergency Heat.
Air handler with electric heat strip (lab unit), lockout/tagout kit, clamp-on ammeter, digital multimeter, electric heat strip data plate, sequencer, wiring diagram, lab sheetsInstructor checklist: LOTO applied correctly before access; resistance measurement within ±10% of data plate value; control circuit diagram complete and accurate; pass mark: all three items passed.
9Heat Pump Installation: Siting, Line Sets, and Electrical Rough-In18labThe student will select an outdoor unit location meeting manufacturer clearance requirements, correctly size and install a refrigerant line set including insulation, and rough-in the line-voltage disconnect and low-voltage wiring per NEC requirements and manufacturer instructions.
  1. Using a manufacturer installation manual, determine required clearances for an outdoor unit at a mock installation site; mark the pad location, verify levelness, and record why each clearance dimension matters for airflow and serviceability.
  2. Measure, cut, flare, and braze copper line set sections to connect indoor and outdoor units on the lab mock-up; insulate suction line per manufacturer specification; pressure-test with dry nitrogen to manufacturer-specified pressure before vacuuming.
  3. Install the line-voltage disconnect box at the required distance from the outdoor unit per NEC and manufacturer instructions; run and terminate low-voltage thermostat wiring between thermostat base, air handler control board, and outdoor unit control board.
Heat pump lab unit (split system), copper tubing (various sizes), tube cutter, flaring tool, brazing torch, nitrogen tank with regulator, insulation, disconnect box, conduit fittings, thermostat wire, manufacturer installation manual, NEC codebook reference, level, tape measure, lab logInstructor inspects: nitrogen pressure test holds at specified pressure for 15 minutes (no leak); flares visually acceptable per AHRI standard; disconnect and wiring meet NEC requirements per instructor checklist; pass mark: all three criteria met.
10System Start-Up and Commissioning: Performance Verification16labThe student will complete a manufacturer start-up and commissioning checklist for a fully installed heat pump system, measuring and recording operating pressures, supply-air temperature, airflow, and amperage draw in both heating and cooling modes.
  1. Before energizing the system, complete a pre-start checklist: verify refrigerant charge weight log, electrical connections torqued, crankcase heater energized at least four hours, filters installed, and all panels secured.
  2. Operate the system in cooling mode; measure suction and discharge pressure, suction-line temperature, liquid-line temperature, supply and return air temperature, and outdoor and indoor unit amperage; calculate subcooling and superheat; record all data on the commissioning form.
  3. Switch system to heating mode; repeat pressure and temperature measurements; verify defrost can be manually initiated and terminates correctly; complete the commissioning form and compare all values to manufacturer specifications, flagging any readings outside acceptable range.
Fully installed heat pump lab unit, manifold gauge set, clamp-on ammeter, digital thermometer with multiple probes, anemometer or flow grid, commissioning checklist form (manufacturer), calculator, lab logCommissioning form submitted with all fields completed; at least 90% of measured values within manufacturer acceptance ranges; instructor verifies student correctly identified and explained any out-of-range reading; pass mark: form complete and 90% in-range.
11Systematic Troubleshooting: Diagnosis of Common Heat Pump Faults18practiceThe student will apply a systematic diagnostic procedure to identify the root cause of at least four instructor-seeded faults in a heat pump trainer and document findings and corrective actions on a standardized service report.
  1. Instructor seeds four faults (for example: overcharged system, failed reversing valve solenoid, open defrost sensor, restricted filter) in the heat pump trainer; students use a systematic approach — gather symptoms, measure, compare to specification, isolate fault — without being told what the faults are.
  2. Students complete a service report for each fault: list observed symptoms, instruments and readings used, comparison to specification, conclusion (root cause), and corrective action taken or recommended.
  3. Debrief as a group: each student presents one fault diagnosis; class discusses alternative diagnostic paths and any safety steps that must be taken before and during each measurement.
Heat pump trainer unit with seeded faults, manifold gauge set, digital multimeter, clamp-on ammeter, digital thermometer, service report forms, NATE Air-to-Air Heat Pump and HVAC Excellence troubleshooting referencesFour service reports reviewed: student correctly identifies root cause and corrective action for at least three of four faults; all reports include instrument readings compared to specification; pass mark: 3 of 4 faults correctly diagnosed with supporting data.
12Ground-Source (Geothermal) Heat Pumps: Principles, Loop Types, and Service Differences10theoryThe student will compare the operating principles of ground-source heat pump systems to air-source systems and identify the major loop configurations, fluid types, and unique service considerations for geothermal equipment.
  1. Read a manufacturer or IGSHPA overview of horizontal, vertical, and pond/lake loop configurations; complete a comparison table listing loop type, typical application, approximate depth or length, and one advantage and one limitation of each.
  2. Examine a ground-source heat pump cutaway diagram; identify water-to-refrigerant heat exchanger (replacing the outdoor coil), desuperheater, flow center, and expansion tank; explain how each differs from air-source equipment.
  3. Case study discussion: given a scenario where a ground-source unit is not reaching setpoint in winter, identify which diagnostic steps are unique to geothermal (loop fluid temperature and flow, antifreeze concentration) versus those shared with air-source troubleshooting.
IGSHPA reference materials or manufacturer geothermal training guide, ground-source heat pump cutaway diagram, comparison table worksheet, case study handout, NATE and HVAC Excellence credential study references for geothermal contentComparison table and case study responses reviewed; student correctly identifies all five major components and provides accurate comparison of diagnostic steps; pass mark 80%.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
Heat Pump Written Knowledge ExaminationWritten exam25%75% or higher on a 60-question multiple-choice examA 60-question multiple-choice exam covering reverse-cycle refrigeration theory, reversing valve operation, defrost control logic, metering devices, EPA Section 608 requirements for heat pump refrigerants, and electrical circuit interpretation. Questions are drawn from lesson content and aligned to NATE Air-to-Air Heat Pump specialty knowledge areas, HVAC Excellence Employment Ready exam domains, and NCCER HVAC Level 3 heat pump module objectives.
Standard met · Safety · Time · Quality/finish · Documentation
Heat Pump Skills DemonstrationSkills demonstration45%Instructor checklist score of 80% or higher with no safety violations; any critical safety item failed requires a full re-attemptThe student independently performs a complete service sequence on the heat pump trainer: applies lockout/tagout, connects gauges, recovers refrigerant, evacuates to 500 microns and verifies hold, recharges to factory weight, operates system in both modes, measures superheat or subcooling, and documents results on a commissioning form. The instructor scores each step on a standardized checklist mapped to NATE Core, EPA 608 Universal, and NCCER HVAC competency standards.
Standard met · Safety · Time · Quality/finish · Documentation
Laboratory Log PortfolioLog15%All 12 lesson lab logs submitted; average score of 80% or higher across scoring rubric; any incomplete log must be corrected and resubmittedStudents maintain a running lab log for every hands-on lesson, recording pre-task safety checks, instrument readings, comparison to specifications, and a brief analysis of results. The portfolio is reviewed at course end using a rubric that evaluates completeness, measurement accuracy, units and tolerances, and quality of written analysis; it serves as evidence of consistent competency across all lab activities and supports NCCER HVAC registry documentation requirements.
Standard met · Safety · Time · Quality/finish · Documentation
Safety and Regulatory Compliance CheckSafety audit15%100% score required; any failed item is immediately corrected with re-check before the student may continue lab workA structured, unannounced observation conducted by the instructor during one of the installation or commissioning labs, using a binary (yes/no) checklist of non-negotiable safety behaviors: correct PPE selected and worn, lockout/tagout applied before opening electrical panels, refrigerant recovery completed before opening the refrigerant circuit, nitrogen cylinder secured upright and regulated correctly, and no open-flame source near refrigerant work area. This check is aligned to OSHA General Industry and Construction standards for the hazards present and is a prerequisite for passing the course regardless of other assessment scores.
Standard met · Safety · Time · Quality/finish · Documentation
BLD-HVAC07-05 Trade course

Ductwork: Design, Fabrication, and Installation

170 hr · $2,345 COMPLIMENTARY

Students learn to design, fabricate, and install residential and light-commercial duct systems using industry-standard methods including sheet-metal layout, flexible duct, and duct-board construction. Emphasis is placed on Manual D sizing principles, SMACNA installation standards, sealing and insulation requirements, air balancing, and safe work practices throughout. Lessons map directly to NATE, HVAC Excellence, and NCCER HVAC credentialing exam content areas covering air distribution and system performance.

Outcomes
Course text

Students learn to design, fabricate, and install residential and light-commercial duct systems using industry-standard methods including sheet-metal layout, flexible duct, and duct-board construction. Emphasis is placed on Manual D sizing principles, SMACNA installation standards, sealing and insulation requirements, air balancing, and safe work practices throughout. Lessons map directly to NATE, HVAC Excellence, and NCCER HVAC credentialing exam content areas covering air distribution and system performance.

How the course runs. 12 blocks: Air Distribution Fundamentals and Duct System Types; Duct System Math: Airflow, Velocity, and Sizing; Sheet-Metal Tools, Safety, and Shop Orientation; Sheet-Metal Measurement, Layout, and Pattern Development; Sheet-Metal Fabrication: Cutting, Forming, and Joining; Flexible Duct and Duct Board: Materials and Installation Techniques; Duct Sealing: Mastic, Tape, and Energy Code Requirements; Duct Insulation: Selection, R-Values, and Installation; Registers, Grilles, Diffusers, and Dampers; SMACNA Standards, Codes, and Quality Installation Practices; Static Pressure Measurement and Air Balancing; Full System Installation: Planning, Execution, and Inspection.

What competent looks like. Design a duct system layout for a residential structure using Manual D principles and calculate supply and return duct sizes to meet specified airflow requirements. Fabricate straight runs, fittings, and transitions from sheet metal and duct board using hand tools and power snips, meeting dimensional tolerances within 1/8 inch. Install flexible duct, rigid sheet-metal duct, and duct board in accordance with SMACNA and manufacturer guidelines, including proper support spacing and connection methods. Seal all duct joints and seams with code-compliant mastic or UL 181-rated tape and insulate to the minimum R-value required by current energy codes. Perform a basic duct system air balance by measuring static pressure and outlet airflow, adjusting dampers to bring each zone within 10% of design CFM. Apply lockout/tagout procedures and fall-protection protocols when working inside air-handling systems or on ladders and in attic or crawl-space environments.

Lessons · 12 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1Air Distribution Fundamentals and Duct System Types10theoryStudents will identify the major types of duct systems—radial, extended-plenum, and trunk-and-branch—and explain how each moves conditioned air from the air handler to occupied spaces.
  1. Annotate printed floor-plan diagrams labeling supply trunk, branch runs, return plenum, and registers for each of three system types.
  2. Compare airflow paths by tracing color-coded airflow arrows on a large classroom poster of each system type, then discuss trade-offs in a facilitated Q&A.
  3. Complete a short written matching exercise connecting system type to a common application (e.g., slab-on-grade ranch home vs. two-story with interior chases).
Residential HVAC textbook (ACCA/AHRI aligned), ACCA Manual D (overview excerpts), floor-plan handouts, color markers, classroom projectorScore 80% or higher on a 20-question multiple-choice quiz identifying system types and airflow paths.
2Duct System Math: Airflow, Velocity, and Sizing14theoryStudents will calculate required duct cross-sectional area using the CFM and FPM relationship and size rectangular and round ducts for given airflow values using duct-sizing charts.
  1. Work through instructor-led sample problems using the formula CFM = Area × Velocity, converting between rectangular and round equivalent diameters with a duct-sizing slide rule and chart.
  2. Practice six progressively harder sizing problems in pairs, selecting duct dimensions from a friction-rate chart at 0.1 in. w.g. per 100 ft. total effective length.
  3. Enter data into ACCA's publicly available Wrightsoft or equivalent duct-sizing tool to verify hand-calculated answers and record discrepancies in a worksheet.
Scientific calculators, ACCA Manual D friction-rate chart (Appendix), duct-sizing slide rule, computer workstation with duct-sizing software, sizing worksheet packetComplete a timed problem set of eight duct-sizing problems; all answers must fall within one standard duct size of the reference solution to pass.
3Sheet-Metal Tools, Safety, and Shop Orientation10demoStudents will identify hand tools and power equipment used in sheet-metal ductwork, demonstrate safe handling of sheet stock, and apply required PPE before any cutting or forming operation.
  1. Instructor-led tool identification tour of the shop: hand snips (straight, left, right), notcher, Pittsburgh lock former, drive-cleat bender, sheet-metal shear, and drill; students label a tool ID sheet.
  2. Demonstrate and practice donning PPE (cut-resistant gloves, safety glasses, hearing protection) and inspect a sheet for burrs before and after safe deburring with a file.
  3. Walk through lockout/tagout procedure on the shop's power shear following OSHA 29 CFR 1910.147 steps; each student performs one complete LOTO cycle under supervision.
Sheet-metal hand tools (full set), floor-standing power shear, LOTO station kit, cut-resistant gloves, safety glasses, hearing protection, burr file, PPE inspection checklistInstructor signs off on PPE donning checklist and each student completes one observed LOTO cycle with zero procedural errors before any power equipment is used.
4Sheet-Metal Measurement, Layout, and Pattern Development16labStudents will lay out and scribe patterns for a straight rectangular duct section, an S-drive slip joint, and a 45-degree elbow transition on sheet metal within 1/8-inch tolerance.
  1. Use a combination square and scratch awl to scribe a full-size flat-pattern layout for a 10-inch × 8-inch × 48-inch rectangular duct section including Pittsburgh lock and drive-cleat allowances.
  2. Develop an elbow gore pattern on paper using geometric layout methods, transfer to sheet stock, and scribe cut lines for each gore piece.
  3. Measure finished layouts with a steel rule and compare to design dimensions; record all measurements in a lab log and recalculate allowances where deviations exceed tolerance.
26-gauge galvanized sheet steel (pre-cut to safe blanks), combination squares, scratch awls, steel rules, paper for pattern development, lab-log notebooks, duct-design reference tablesInstructor measures three critical dimensions on each student's scribed layout; all must be within 1/8 inch of specification to advance to fabrication.
5Sheet-Metal Fabrication: Cutting, Forming, and Joining20labStudents will cut, fold, and assemble a complete rectangular duct section with Pittsburgh lock seams and drive-cleat cross-joints that are square, tight, and free of sharp external edges.
  1. Cut the scribed blank from Lesson 4 on the hand shear (or bench-top shear where appropriate) and form the Pittsburgh lock edges using the lock former, following the step sequence demonstrated by the instructor.
  2. Fold the duct body on the cornice brake, square corners with a framing square, and close the Pittsburgh seam by hand driving with a mallet; inspect for gap greater than 1/16 inch.
  3. Attach drive cleats to both ends, slide a pre-made mating section together, and perform a visual and tactile inspection of the assembled joint for squareness and seam tightness.
Scribed sheet-metal blanks from Lesson 4, cornice brake, hand notcher, Pittsburgh lock former, drive-cleat bender, tin snips, dead-blow mallet, framing square, steel rule, file for deburring, gloves and safety glassesInstructor inspects assembled duct: seam gap must not exceed 1/16 inch, corners within 1/16 inch of square on a framing-square check, and all exposed edges deburred; any sharp edge is an immediate fail requiring rework.
6Flexible Duct and Duct Board: Materials and Installation Techniques14demoStudents will install a flexible duct run and a duct-board plenum section using manufacturer-specified connection methods, support spacing, and bend-radius minimums in a mock-up frame.
  1. Watch instructor demonstrate flexible-duct installation on a wall mock-up: slide flex over collar, use two-step draw-band connection, secure outer jacket, and hang at correct support spacing per manufacturer and SMACNA guidelines.
  2. Each student installs a 6-foot flexible-duct branch on the mock-up frame, verifying minimum bend radius with a radius template card and recording support locations in the lab log.
  3. Fabricate and assemble a simple duct-board supply plenum (score-and-fold method) using a utility knife and straightedge; apply duct-board staples at corner joints and inspect for gaps.
Class-1 flexible duct (assorted diameters), draw bands (UL 181B rated), duct-board panels (R-6 foil-faced), utility knife, straightedge, duct-board stapler, bend-radius template cards, mock-up framing, lab-log notebooksInstructor checks flexible-duct bend radius (must meet manufacturer minimum), draw-band position (within specified distance of collar end), and duct-board corner joints for gaps greater than 1/8 inch; all three checks must pass.
7Duct Sealing: Mastic, Tape, and Energy Code Requirements12labStudents will seal duct joints on a fabricated mock-up system using fiberglass-reinforced mastic and UL 181-rated tape, meeting minimum coverage and continuity standards required by current IECC energy code guidelines.
  1. Instructor demonstrates proper mastic application technique—brush application fully bridging the joint gap, embedded mesh on gaps wider than 1/8 inch—then students practice on sample couplings.
  2. Each student seals all longitudinal seams and transverse joints on their assembled duct section from Lesson 5, applying mastic with a brush and embedding mesh tape where required.
  3. Inspect finished seals using a flashlight and feeler gauge; students also apply UL 181B-FX listed foil tape to a flexible-duct joint as an alternative method, documenting both methods in the lab log.
Water-based duct mastic (pail), fiberglass mesh tape, foam brushes, UL 181A/B listed metallic foil tape, putty knives, flashlight, feeler gauge set, IECC residential energy code excerpt (sealing requirements section), lab-log notebooks, nitrile glovesInstructor inspects each joint under flashlight: mastic must be continuous with no visible gaps or pinholes; feeler gauge must not penetrate any sealed seam; incomplete coverage is reworked before the lesson is marked complete.
8Duct Insulation: Selection, R-Values, and Installation10labStudents will select the correct insulation type and R-value for a given duct location (conditioned space, unconditioned attic, crawl space) and install duct wrap on a rigid duct assembly without voids or compression.
  1. Use a code-compliance table to match three installation scenarios (attic, basement, and conditioned mechanical room) to minimum R-value requirements; record rationale in the lab log.
  2. Wrap a fabricated rectangular duct section with R-8 duct wrap: cut to length, butt-join at seams, and secure with fiberglass-reinforced foil tape at every 12-inch interval and at all joints.
  3. Inspect a pre-installed intentionally defective duct wrap sample (provided by instructor) and write a punch-list of defects including voids, compression, and unsealed lap seams.
R-6 and R-8 duct wrap insulation rolls, foil-face tape (UL listed), steel rule, utility knife, straightedge, fabricated duct assemblies from previous labs, IECC duct insulation requirement table (handout), lab-log notebooksInstructor checks installed duct wrap: no voids larger than 1/4 inch, no compression of insulation exceeding 20% of nominal thickness, and all seams and joints fully taped; any void is reworked on the spot.
9Registers, Grilles, Diffusers, and Dampers10demoStudents will distinguish the function of supply registers, return grilles, ceiling diffusers, and volume-dampers, then correctly install a register and manual damper in a mock-up supply branch.
  1. Sort a collection of hardware samples into categories (supply register, return grille, ceiling diffuser, exhaust grille, manual damper) and record the distinguishing features of each in a reference chart.
  2. Instructor demonstrates cutting a register opening in gypsum-board mock-up paneling using a drywall saw, installing a flush-mount register boot, and setting the register's deflection vanes for a specified throw.
  3. Each student installs a manual volume damper in a 6-inch round branch duct, sets it to 50% open using the locking handle, and verifies position by shining a flashlight through the duct opening.
Assorted registers, grilles, and diffusers (sample kit), ceiling diffuser with equalizer, manual volume dampers (round, 6-inch), register boots, drywall saw, gypsum-board mock-up panel, flashlight, screwdrivers, tape measureStudents correctly categorize all hardware samples (100% accuracy required) and instructor verifies that the installed damper handle is secure, positioned at the marked 50% setting, and does not rattle when air is blown through.
10SMACNA Standards, Codes, and Quality Installation Practices12theoryStudents will apply SMACNA HVAC Duct Construction Standards to specify correct gauge, reinforcement, and joint class for duct sections at stated operating pressures, and identify common installation defects from photographs.
  1. Read assigned sections of SMACNA HVAC Duct Construction Standards (residential and light-commercial excerpts provided) and complete a table specifying minimum gauge for rectangular ducts at low, medium, and high pressure.
  2. Analyze a set of ten installation photographs; identify and label each visible defect (unsupported flex duct sag, missing mastic, wrong tape type, excessive duct length) referencing the relevant SMACNA or IECC requirement.
  3. Participate in a case-study discussion: given a failing system description, determine which SMACNA requirements were violated and propose corrections, presenting findings to the class.
SMACNA HVAC Duct Construction Standards excerpts (instructor-provided handout packet), IECC residential energy code excerpt, defect-photo handout set, whiteboard, projectorScore 80% or higher on a 25-question written quiz covering SMACNA gauge tables, joint classes, support spacing, and code-required sealing; each photograph defect identified in class must match the reference answer sheet.
11Static Pressure Measurement and Air Balancing22labStudents will use a digital manometer and a flow hood (or balometer) to measure total external static pressure and outlet airflow on a live lab duct system, then adjust dampers to bring all outlets within 10% of design CFM.
  1. Connect a digital manometer to static-pressure taps at the supply plenum and return plenum of the lab air-handling unit; record total external static pressure and compare to the unit's rated operating range, documenting findings in the lab log.
  2. Use a flow hood to measure CFM at each of four supply registers and one return grille on the lab system; record readings on a balance sheet and calculate the percentage deviation from the design CFM listed on the system drawing.
  3. Adjust manual dampers in sequence (starting farthest from AHU) using the proportional balance method until all outlets are within 10% of design CFM; perform a final measurement pass and record the balanced readings.
Digital manometer with static-pressure probes and hoses, flow hood (or rotating-vane anemometer with traverse kit), lab air-handling unit with duct system and manual dampers, balance data sheet, lab-log notebooks, system design drawing (instructor-provided)All four supply outlets must read within 10% of design CFM on the final recorded measurement pass; total external static pressure must be documented with correct units; lab log entry reviewed and initialed by instructor.
12Full System Installation: Planning, Execution, and Inspection20fieldStudents will plan, install, seal, insulate, and document a complete small-scale duct system in the program's full-size mock structure, passing a final installation inspection against a structured checklist.
  1. Working in teams of two or three, develop a duct layout drawing for the mock-structure floor plan including trunk size, branch sizes, register locations, and return path; submit for instructor review before any installation begins.
  2. Install the complete duct system—trunk, all branches, registers, and return grille—applying mastic and mesh to every joint, insulating all runs, and maintaining correct support spacing and flexible-duct bend radius throughout.
  3. Conduct a peer inspection using the program's duct installation checklist, then receive an instructor final inspection; any item marked 'fail' must be corrected and re-inspected before the lesson is recorded as complete.
Full-size mock structure, sheet-metal duct components, flexible duct, duct board, mastic and mesh tape, duct wrap insulation, registers and grilles, manual dampers, support strapping and hardware, drill/driver, snips, level, tape measure, duct installation inspection checklist, lab-log notebooksInstructor completes the 20-item duct installation checklist; students must pass at least 18 of 20 items with no safety-critical items (sharp edges, unsecured sections over head height, unmasticized joints in attic simulation) failed; failed items corrected before sign-off.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
Ductwork Systems Knowledge ExamWritten exam25%70% or higher (28/40 questions correct)A 40-question multiple-choice and short-answer written exam covering duct system types, Manual D sizing concepts, SMACNA gauge and pressure classifications, code-required sealing and insulation R-values, and air-balancing principles. Questions are aligned to NATE Core exam air-distribution content and NCCER HVAC Level 2 ductwork module objectives.
Standard met · Safety · Time · Quality/finish · Documentation
Sheet-Metal Fabrication and Installation Skills DemonstrationSkills demonstration45%Pass all critical items; score 80% or higher on total rubric (24/30 points)Each student independently fabricates a rectangular duct section with Pittsburgh seam, seals it with mastic, insulates it with duct wrap, and installs it in the mock structure within a 90-minute window. An instructor evaluates dimensional accuracy, seam quality, mastic coverage, insulation integrity, and safe tool use using a scored rubric; any sharp exposed edge or LOTO violation results in an automatic fail and mandatory repeat.
Standard met · Safety · Time · Quality/finish · Documentation
Lab Log PortfolioLog15%All 10 required lab-log entries submitted; average score of 80% or higher on the portfolio rubricStudents compile a lab log maintained throughout the course containing measurement records, balance data sheets, inspection checklists, and written reflections from at least ten designated lab activities. Each entry is evaluated for accuracy of recorded measurements, completeness of required data fields, and evidence of corrective action taken when results were out of tolerance; missing entries score zero.
Standard met · Safety · Time · Quality/finish · Documentation
Ductwork Safety and PPE Compliance CheckSafety audit15%Pass (no items failed); any single failed item requires immediate corrective demonstration before course credit is awardedAn unannounced or announced 15-minute observed check conducted during a lab session in which the instructor verifies correct PPE selection and donning, a complete LOTO cycle on the shop shear, proper handling of sheet-metal stock (no bare-hand contact with cut edges), and correct ladder or step-stool positioning for overhead work. This check aligns with OSHA 10 construction hazard recognition requirements covered in Course 1 and is a non-negotiable gateway to the Capstone.
Standard met · Safety · Time · Quality/finish · Documentation
BLD-HVAC07-06 Trade course

Load Calculation for HVAC/R Systems

170 hr · $2,345 COMPLIMENTARY

Students learn to size heating and cooling systems correctly using industry-standard manual methods and software, applying heat transfer principles to residential and light-commercial buildings. The course covers Manual J residential load calculation, Manual S equipment selection, and Manual D duct sizing inputs, with emphasis on accurate field measurement, code compliance, and energy efficiency. Outcomes map directly to NATE Core and Specialty exam knowledge areas, NCCER HVAC Level 3 load calculation competencies, and HVAC Excellence Professional certification domains.

Outcomes
Course text

Students learn to size heating and cooling systems correctly using industry-standard manual methods and software, applying heat transfer principles to residential and light-commercial buildings. The course covers Manual J residential load calculation, Manual S equipment selection, and Manual D duct sizing inputs, with emphasis on accurate field measurement, code compliance, and energy efficiency. Outcomes map directly to NATE Core and Specialty exam knowledge areas, NCCER HVAC Level 3 load calculation competencies, and HVAC Excellence Professional certification domains.

How the course runs. 12 blocks: Why Size Matters: Consequences of Oversizing and Undersizing; Heat Transfer Fundamentals for Load Calculation; Design Conditions and Climate Data; Building Envelope Measurement and Takeoff; Infiltration, Ventilation, and Internal Gains; Solar Gain and Fenestration Loads; Manual J Room-by-Room Calculation — Residential Case Study; Load Calculation Software: Introduction and Workflow; Equipment Selection Using Manual S; Duct System Inputs from Load Data (Manual D Fundamentals); Energy Codes and Load Calculation Compliance; Field Measurement Safety, Attic and Crawlspace Entry, and Course Synthesis.

What competent looks like. Perform a complete ACCA Manual J residential heat loss and heat gain calculation for a single-family dwelling using both manual worksheets and approved software, producing results within acceptable tolerance. Select correctly sized heating and cooling equipment using ACCA Manual S criteria, justifying selections in writing with manufacturer capacity data at design conditions. Identify and apply local ASHRAE 99% heating and 1% cooling outdoor design conditions and indoor design setpoints from published climate data tables. Measure and record building envelope components—wall, ceiling, window, and door areas, U-values, and infiltration—accurately enough to serve as load calculation inputs. Interpret a completed load calculation report to explain to a customer or inspector how equipment size was determined and why it meets energy code intent. Demonstrate safe work practices during all field measurement activities, including fall awareness, confined-space awareness when entering attics and crawlspaces, and proper PPE selection.

Lessons · 12 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1Why Size Matters: Consequences of Oversizing and Undersizing10theoryStudents explain how improperly sized HVAC equipment causes comfort complaints, high energy bills, premature failure, and code violations, citing at least three specific failure modes.
  1. Analyze three real-world case studies (one undersized, one oversized, one correctly sized system) and identify symptoms, callbacks, and energy data provided by instructor.
  2. Compare published efficiency ratings (SEER, HSPF, AFUE) for correctly sized versus one-size-up equipment selections and calculate estimated annual energy cost differences using local utility rate.
  3. Class discussion: students review an ACCA position paper on right-sizing and write a one-page summary connecting oversizing to short-cycling, humidity problems, and IAQ.
ACCA Manual J 8th Edition (Abridged or Full), ACCA position papers on right-sizing, whiteboard, projector, sample energy bills, ASHRAE Fundamentals Handbook (instructor reference)Exit quiz: 8 short-answer questions on consequences of mis-sizing; pass = 75% correct answers.
2Heat Transfer Fundamentals for Load Calculation14theoryStudents calculate conductive, convective, and radiant heat transfer through building envelope assemblies using U-value, area, and design temperature difference, achieving correct answers on all three heat transfer modes.
  1. Work through instructor-led example problems calculating heat flow (BTU/h) through a wall assembly given R-values, area, and indoor/outdoor temperature difference, converting between R-value and U-value.
  2. Using a set of sample wall, ceiling, roof, floor, window, and door assemblies provided on data sheets, students compute U-values from component R-values and then calculate heat loss in BTU/h for each assembly.
  3. Lab worksheet: students build a simple steady-state heat flow model for a one-room box structure, summing envelope losses and comparing answers with a partner for accuracy check.
ACCA Manual J 8th Ed. tables, ASHRAE Fundamentals Handbook Chapter on Heat Transfer, scientific calculators, printed worksheet packet, R-value/U-value conversion reference cardsGraded worksheet: 10 heat transfer calculation problems; pass = 80% of problems solved correctly with work shown.
3Design Conditions and Climate Data8theoryStudents look up the correct ASHRAE outdoor design dry-bulb and wet-bulb temperatures and indoor design conditions for a given project location and justify their selection in writing.
  1. Using ASHRAE climate data tables (or the freely available ACCA Manual J climate data appendix), students look up heating and cooling design conditions for five different cities chosen by the instructor and record values on a structured data sheet.
  2. Instructor demonstrates how daily temperature range (DTR) affects the cooling load calculation and students apply DTR correction factors from Manual J tables to a sample problem.
  3. Small group exercise: each group is assigned a different U.S. climate zone; they identify design conditions, indoor setpoints, and humidity targets, then present findings to the class on a one-page summary sheet.
ACCA Manual J 8th Ed. Appendix climate data, ASHRAE 90.1 indoor design condition references, U.S. climate zone map, printed data sheets, markersFive-city lookup exercise graded by instructor; pass = all five locations have correct heating and cooling design temperatures and humidity ratio values within published tolerances.
4Building Envelope Measurement and Takeoff16labStudents measure and record all envelope areas, orientations, and construction details for a training-facility room or mock building using tape measures and a floor plan, producing a takeoff sheet accurate to within 5% of instructor reference measurements.
  1. Instructor demonstrates how to read a residential floor plan and elevation drawing, identify wall, window, door, and ceiling areas, and record compass orientation for each surface on a Manual J Room-by-Room worksheet.
  2. Students pair up and physically measure all surfaces of two designated rooms in the training facility or mock-up structure, sketching dimensions, recording window sizes, wall heights, and orientation, and noting construction type.
  3. Students transfer field measurements to a structured takeoff worksheet, calculate net wall areas (gross wall minus openings), and compare their totals to the instructor's reference sheet, identifying and correcting discrepancies.
25-ft tape measures, 100-ft tape measure, laser distance meter (one per pair), pencils, graph paper, printed Manual J Room-by-Room worksheets, training facility or mock building, hard hats and safety glasses (PPE for attic or crawlspace entry if applicable)Completed takeoff worksheet compared to instructor reference; pass = all calculated areas within 5% of reference values and all orientations correctly identified.
5Infiltration, Ventilation, and Internal Gains12theoryStudents calculate infiltration heat loss and gain using the Manual J blower-door confirmed or estimated ACH method, and add correct internal gain credits for occupants, lighting, and appliances.
  1. Lecture and worked example: instructor walks through the Manual J infiltration calculation using construction quality categories and the simplified ACH method, then shows how a blower-door test result (CFM50) translates to natural infiltration rate.
  2. Students complete a structured infiltration worksheet for a sample 1,500 sq ft single-story house using three different construction quality assumptions (loose, average, tight) and compare the BTU/h differences.
  3. Students review ASHRAE 62.2 ventilation rate requirements for residential buildings (concept level, not full code compliance calculation) and add a fixed mechanical ventilation load to their infiltration worksheet.
ACCA Manual J 8th Ed. infiltration tables and worksheets, ASHRAE 62.2 summary reference sheet, scientific calculators, printed worksheet packet, blower-door test result sample reports (instructor-provided)Graded infiltration worksheet for the sample house; pass = infiltration BTU/h values within 10% of instructor key for all three construction quality levels.
6Solar Gain and Fenestration Loads14theoryStudents calculate the peak solar heat gain through windows and glass doors for each orientation of a sample building using Manual J SHGC values and cooling load factors, and identify which orientation produces the highest summer load.
  1. Instructor demonstration: walk through the Manual J window cooling load calculation step by step, explaining solar heat gain coefficient (SHGC), window area, shade factors (overhangs, internal shading), and how orientation and latitude affect peak load timing.
  2. Students complete a solar gain calculation worksheet for a sample house with windows on all four orientations and compare the contribution of south-facing versus west-facing windows to afternoon peak load.
  3. Design exercise: students rerun the worksheet with a low-SHGC window substitution and an overhang on the west side, then calculate the BTU/h reduction and discuss energy code implications.
ACCA Manual J 8th Ed. fenestration tables, NFRC window label samples, printed calculation worksheets, scientific calculators, protractor (for overhang shading calculation), projector for instructor demoSolar gain worksheet graded by instructor; pass = correct peak BTU/h values for each orientation within 10% of key and correct identification of highest-load orientation.
7Manual J Room-by-Room Calculation — Residential Case Study24labStudents complete a full Manual J 8th Edition room-by-room heating and cooling load calculation for a provided single-family residential floor plan, producing a correctly formatted report with sensible and latent totals for each room and for the whole building.
  1. Using the floor plan, elevation drawings, window schedule, and construction specifications provided, students complete all Manual J worksheets by hand: envelope losses, infiltration, solar gain, internal gains, and latent loads, room by room.
  2. Students cross-check their room subtotals and whole-building totals against a partner's independently completed worksheets, reconciling any differences exceeding 10% before submitting.
  3. Students write a one-page narrative summarizing the dominant load drivers for the building (e.g., 'West glazing accounts for 28% of the peak cooling load') and recommending one envelope improvement.
ACCA Manual J 8th Ed. (student copies or program-provided), full residential case study drawing set (floor plan, elevations, window schedule, wall section details), Manual J blank worksheets, scientific calculators, rulers, highlightersCompleted Manual J report submitted to instructor; pass = whole-building heating and cooling totals within 8% of instructor key, all rooms present, sensible and latent loads separated, and narrative submitted.
8Load Calculation Software: Introduction and Workflow12demoStudents enter project data into industry-standard load calculation software and produce a printed or PDF load report that matches their Manual J hand calculation for the residential case study within acceptable software tolerance.
  1. Instructor live demonstration: enter the residential case study data into the classroom-licensed load calculation software (such as Wrightsoft Right-J, Elite RHVAC, or equivalent), narrating each input screen and explaining how software fields correspond to Manual J worksheet sections.
  2. Students independently enter the same case study data into the software on classroom computers, using their completed Manual J worksheets as the source document, and generate a preliminary report.
  3. Students compare their software output to their hand-calculated totals, identify any discrepancies larger than 10%, trace the source of each discrepancy (data entry error vs. software methodology difference), and correct entries as needed.
Classroom computers with load calculation software installed (Wrightsoft Right-J, Elite RHVAC, or program-approved equivalent), software user guides, completed Manual J worksheets from Lesson 7, printer or PDF export capabilitySoftware-generated load report printed and submitted; pass = whole-building totals within 10% of hand-calculated values with all discrepancies documented and explained in a brief annotation.
9Equipment Selection Using Manual S16theoryStudents select a correctly sized air-conditioning system for the residential case study using ACCA Manual S procedures, verifying that the selected unit's sensible and total capacity at ARI rating conditions matches the calculated load within Manual S allowable sizing limits.
  1. Instructor lecture and worked example: explain Manual S capacity verification process — why nameplate tonnage is insufficient, how to read manufacturer expanded capacity tables at actual design entering wet-bulb and outdoor dry-bulb conditions, and what the Manual S allowable sizing range is for cooling and heating.
  2. Students use two or three manufacturer expanded capacity tables (provided as printed excerpts) to find the actual sensible and total capacity of candidate equipment at the design conditions from their case study, and record whether each candidate passes Manual S criteria.
  3. Students write a formal equipment selection memo documenting the chosen model, its verified capacity at design conditions, the load it must meet, the percentage by which it is over or under nominal capacity, and confirmation that it falls within Manual S limits.
ACCA Manual S (student reference or instructor-provided excerpts), manufacturer expanded capacity data tables (two or three brand examples, instructor-provided), students' completed Manual J load reports, word processor or printed memo templateEquipment selection memo graded by instructor; pass = correct capacity values extracted from expanded tables, correct load comparison, explicit Manual S compliance statement, and equipment within allowable sizing band.
10Duct System Inputs from Load Data (Manual D Fundamentals)14theoryStudents use room-by-room load calculation results to determine required CFM for each room and identify trunk and branch duct sizes from Manual D friction rate charts, producing a duct sizing summary sheet for the residential case study.
  1. Instructor explains the connection between load calculation and duct design: how room CFM is derived from room sensible load and equipment total airflow, and how Manual D friction rate method uses total effective length to set available static pressure for sizing.
  2. Students calculate required CFM for each room of the residential case study using the formula (Room Sensible BTU/h ÷ System Sensible BTU/h) × Total System CFM and record on a room CFM summary sheet.
  3. Using a Manual D friction rate chart provided by instructor, students size two supply trunk segments and three branch ducts for the case study, recording duct diameter or equivalent rectangular dimensions on a simple duct layout sketch.
ACCA Manual D (instructor-provided excerpts or summary charts), students' room-by-room Manual J reports, equipment selection memos (from Lesson 9), printed CFM summary worksheet, friction rate charts, pencils, rulersCFM summary sheet and duct sizing sketch submitted; pass = all room CFMs correctly calculated (within 5% of key) and at least five duct sizes correctly selected from friction rate chart.
11Energy Codes and Load Calculation Compliance16theoryStudents explain how the International Energy Conservation Code (IECC) and ASHRAE 90.1 require load calculations as a basis for equipment sizing and describe what documentation a jurisdiction typically requires for permit approval.
  1. Instructor overview of IECC residential and commercial mechanical provisions related to equipment sizing: students read the relevant IECC section (current adopted edition) requiring heating and cooling loads to be determined in accordance with ACCA Manual J or equivalent, and answer guided reading questions.
  2. Case study review: students examine a sample residential permit application packet that includes a load calculation report and equipment specification sheet, identify what information the jurisdiction requires, and note how the load report supports the permit.
  3. Role-play exercise: one student acts as a building inspector and another as the HVAC contractor; the contractor must explain and defend a load report for the case study building using their completed worksheets and equipment selection memo.
Current IECC (instructor-provided relevant sections), ASHRAE 90.1 overview summary (instructor handout), sample permit application packet, students' own load reports and equipment memosGuided reading questions graded; pass = 80% correct, plus satisfactory participation in role-play as evaluated on a simple rubric (correct code citations, accurate explanation of load report, professional communication).
12Field Measurement Safety, Attic and Crawlspace Entry, and Course Synthesis14fieldStudents safely perform a complete building envelope measurement on an actual or mock residential structure, applying PPE and fall/confined-space awareness protocols, and deliver a completed load calculation input data package ready for software entry.
  1. Pre-field safety briefing: students identify PPE requirements for attic entry (hard hat, safety glasses, dust mask/N95 respirator, long sleeves, gloves) and review fall hazard awareness for working around attic openings and on roofs; each student signs a pre-task safety plan.
  2. Field measurement exercise: student pairs measure all envelope surfaces of the training facility wing or mock residential structure, noting construction types, window labels (for SHGC), insulation access points, and HVAC access; instructor supervises and grades field technique in real time.
  3. Students consolidate all field measurements into a clean, organized load calculation input data package (envelope summary, window schedule, infiltration classification, climate data lookup) and submit it as the final deliverable of the lesson, ready for software entry.
Tape measures, laser distance meters, N95 respirators, safety glasses, hard hats, gloves, printed blank Manual J input data forms, clipboard, pencils, camera or smartphone for documentation photos, instructor field evaluation rubricField evaluation rubric completed by instructor during measurement exercise (pass = all PPE worn correctly, safe attic/crawlspace entry demonstrated if applicable, measurements within 5% of reference) plus submitted input data package rated complete and organized.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
Load Calculation Knowledge ExamWritten exam25%75% or higher (30 of 40 questions correct)A 40-question closed-book written exam covering heat transfer principles, ASHRAE design conditions, Manual J infiltration and solar gain methodology, Manual S equipment selection criteria, and energy code requirements for load calculation documentation. Questions are mapped to NATE Core exam knowledge areas (heat transfer, psychrometrics, load calculation) and NCCER HVAC Level 3 load calculation objectives.
Standard met · Safety · Time · Quality/finish · Documentation
Manual J and Manual S Skills DemonstrationSkills demonstration45%Whole-building totals within 8% of instructor key; Manual S equipment selection within allowable sizing band; memo professionally formatted and completeStudents receive a previously unseen single-family residential drawing set and, within a timed four-hour session, complete a full room-by-room Manual J load calculation by hand and produce a Manual S equipment selection memo; the instructor evaluates accuracy, completeness, and professional presentation against a graded rubric.
Standard met · Safety · Time · Quality/finish · Documentation
Load Calculation Lab LogLog15%All twelve lesson activities documented; no entry missing; accuracy notes on any discrepancy exceeding 10%; instructor initials on each entryStudents maintain a running lab log throughout the course documenting every worksheet, software run, field measurement sheet, and design exercise with date, activity description, key results, and a brief reflection; the log is collected at course end and graded for completeness, accuracy of recorded data, and evidence of self-correction.
Standard met · Safety · Time · Quality/finish · Documentation
Field Measurement Safety CheckSafety audit15%Pass/Fail — all six safety behaviors must be observed; any failure to wear required PPE or any unsafe action near an attic opening is an automatic fail requiring remediation before the student may complete field activitiesDuring the Lesson 12 field exercise the instructor uses a six-item behavioral checklist to verify that each student correctly selects and wears PPE, completes the pre-task safety plan before entering any attic or crawlspace, maintains safe footing near openings, and follows lockout/tagout awareness protocols when near any energized HVAC equipment in the field structure.
Standard met · Safety · Time · Quality/finish · Documentation
BLD-HVAC07-07 Trade course

Commercial Refrigeration

170 hr · $2,345 COMPLIMENTARY

Students apply refrigeration cycle principles to commercial systems including walk-in coolers, reach-in cases, and display cases, covering system components, electrical controls, troubleshooting, and service procedures. Emphasis is placed on proper refrigerant handling under EPA Section 608, safe work practices, and documentation required in commercial settings. Lessons align with EPA 608 Universal, NATE, HVAC Excellence, and NCCER HVAC credential exam content areas.

Outcomes
Course text

Students apply refrigeration cycle principles to commercial systems including walk-in coolers, reach-in cases, and display cases, covering system components, electrical controls, troubleshooting, and service procedures. Emphasis is placed on proper refrigerant handling under EPA Section 608, safe work practices, and documentation required in commercial settings. Lessons align with EPA 608 Universal, NATE, HVAC Excellence, and NCCER HVAC credential exam content areas.

How the course runs. 12 blocks: Commercial Refrigeration Systems Overview and Industry Applications; OSHA and Trade-Specific Safety for Commercial Refrigeration; Refrigerants Used in Commercial Systems: Properties, Regulations, and Handling; Commercial Compressors: Types, Operation, and Service; Condensers and Condenser Controls in Commercial Applications; Evaporators, Defrost Systems, and Display Case Service; Metering Devices: TXV and EEV Selection, Installation, and Adjustment; Refrigerant Recovery, Recycling, and Recharge Procedures; Electrical Controls and Safety Devices in Commercial Refrigeration; Walk-in Cooler and Freezer Systems: Installation Principles and Commissioning; Systematic Troubleshooting of Commercial Refrigeration Systems; Commercial Refrigeration Service Documentation, Energy Efficiency, and Career Readiness.

What competent looks like. Identify and explain the function of major components in commercial refrigeration systems, including compressors, condensers, evaporators, metering devices, and controls. Safely recover, recycle, and recharge refrigerants in compliance with EPA Section 608 regulations using certified recovery equipment. Perform a systematic electrical and mechanical troubleshooting sequence on a commercial refrigeration system and document findings using industry-standard service records. Install and adjust common metering devices—including thermostatic expansion valves and electronic expansion valves—and verify correct superheat and subcooling. Inspect, test, and service defrost systems, door gaskets, evaporator fans, and condensate management components on walk-in and reach-in equipment. Apply OSHA lockout/tagout procedures, appropriate PPE, and cold-environment safety practices when working on commercial refrigeration equipment.

Lessons · 12 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1Commercial Refrigeration Systems Overview and Industry Applications10theoryStudents will classify commercial refrigeration system types—self-contained, remote condensing, and multiplex rack—and match each to its common application and refrigerant.
  1. Instructor-led slideshow walk-through of a grocery store refrigeration layout diagram; students label system types and refrigerant lines on a printed schematic.
  2. Small-group sorting exercise: students match laminated system-type cards (self-contained, remote, rack) to scenario cards describing supermarket, convenience store, and cold-storage warehouse applications.
  3. Class discussion comparing low-temperature versus medium-temperature applications, with students recording temperature ranges and typical refrigerants in a course notebook.
Whiteboard, commercial refrigeration layout diagrams, laminated sort cards, ASHRAE Refrigeration Handbook (current edition), NCCER HVAC Trainee Guide Level 3, student notebooks10-question multiple-choice quiz on system types, temperature ranges, and refrigerant families; pass mark 70%.
2OSHA and Trade-Specific Safety for Commercial Refrigeration10theoryStudents will demonstrate knowledge of lockout/tagout procedures, PPE selection, cold-environment hazards, and refrigerant safety rules applicable to commercial refrigeration worksites.
  1. Instructor demonstration of a complete lockout/tagout sequence on a de-energized training panel; students practice the sequence in pairs and self-evaluate against a printed LOTO checklist.
  2. Scenario-based PPE selection drill: instructor reads five worksite scenarios (leak in an ammonia secondary system, replacing a compressor contactor, entering a walk-in freezer) and students write correct PPE on whiteboards and hold up for review.
  3. Refrigerant safety worksheet: students look up ASHRAE safety classification groups for R-404A, R-448A, R-744 (CO₂), and R-290, list first-aid responses for exposure, and identify the required ventilation provisions.
Lockout/tagout training panel, LOTO locks and tags, PPE samples (safety glasses, face shield, chemical gloves, hearing protection, insulated gloves), ASHRAE Standard 15 safety overview, SDS sheets for common refrigerants, whiteboardsInstructor observes each student complete a solo LOTO demonstration on the training panel; all six LOTO steps must be executed in correct order with zero omissions to pass.
3Refrigerants Used in Commercial Systems: Properties, Regulations, and Handling14theoryStudents will explain the regulatory requirements of EPA Section 608, identify HFC and HFO blends common in commercial refrigeration, and describe correct refrigerant cylinder handling and storage.
  1. Instructor-led reading and annotation of the EPA Section 608 technician certification requirements document; students highlight recovery requirements, venting prohibitions, and recordkeeping obligations.
  2. Refrigerant identification lab: students examine color-coded cylinders (noting that cylinder color is a guideline, not a standard) and read pressure-temperature charts for R-404A, R-448A, R-407A, and R-744; they record boiling points and critical pressures in a data table.
  3. Role-play: one student acts as new technician, another as inspector; they audit a staged refrigerant storage area for violations (missing labels, cylinders not secured, valve caps missing) and write a corrective action list.
EPA Section 608 technician certification overview document, refrigerant cylinders (empty, capped, secured in training rack), pressure-temperature charts, refrigerant properties reference cards, SDS binders20-question written quiz covering EPA 608 venting prohibitions, refrigerant classification, and cylinder handling rules; pass mark 70%. Aligns with EPA 608 Universal core exam content area.
4Commercial Compressors: Types, Operation, and Service16demoStudents will identify reciprocating, scroll, and semi-hermetic compressors used in commercial refrigeration, explain the function of each internal component, and perform an oil-level and crankcase-heater check.
  1. Instructor teardown demonstration of a semi-hermetic reciprocating compressor cutaway: students sketch and label pistons, valves, crankshaft, and oil pump in their notebooks.
  2. Guided inspection activity: in groups of three, students visually inspect operating scroll and reciprocating compressors on training rigs, record suction and discharge pressures, amperage draw, and oil sight-glass level on a service record form.
  3. Fault-finding drill: instructor introduces one simulated fault per group (flooded start, tight suction service valve, overheating) and students diagnose using pressure gauges and clamp ammeter, then document diagnosis and corrective action.
Semi-hermetic compressor cutaway, training rigs with scroll and reciprocating compressors, manifold gauge sets, clamp ammeters, service record forms, NCCER HVAC Trainee Guide Level 3, compressor service manualsStudents submit completed service record form for their compressor inspection; instructor checks that all data fields are accurately recorded and fault diagnosis is correctly supported by measured values. Pass requires all data fields complete and correct diagnosis.
5Condensers and Condenser Controls in Commercial Applications12demoStudents will describe air-cooled and evaporative condenser operation, measure condenser leaving air temperature and approach temperature, and explain head-pressure control strategies used in cold ambient conditions.
  1. Field walk to school's rooftop or parking-lot condensing unit; students measure ambient air temperature, condenser inlet and outlet air temperatures, and discharge pressure, then calculate approach temperature and record on a data sheet.
  2. Instructor demonstration of fan cycling control and fan speed control (VFD) on a training rig; students adjust thermostat setpoints and observe effect on head pressure, recording data at each setpoint.
  3. Group problem-solving exercise using a case study of a condensing unit short-cycling in cold weather; students identify the cause and select the correct head-pressure control remedy from a provided list of options.
Rooftop or remote condensing unit, digital thermometers, manifold gauge sets, clamp ammeter, head-pressure controller training rig, data recording sheets, ASHRAE Refrigeration Handbook condenser chapterData sheet reviewed by instructor; approach temperature calculation must be within ±2°F of instructor's measured value, and head-pressure control answer must be correctly justified. Pass requires both elements correct.
6Evaporators, Defrost Systems, and Display Case Service18labStudents will service a commercial display-case evaporator coil by inspecting fin condition, testing defrost heaters with a multimeter, verifying defrost termination and fan delay operation, and documenting results on a service form.
  1. Students remove an evaporator fan assembly from a training reach-in case, inspect blades and motor bearings, measure motor winding resistance, reassemble, and record findings on a service form.
  2. Defrost system testing: using a multimeter, students test continuity and resistance of electric defrost heaters, check the defrost termination thermostat, and verify the defrost timer or electronic control initiates and terminates a defrost cycle correctly.
  3. Ice-blockage scenario: instructor introduces simulated ice build-up (foam prop) on an evaporator coil; students photograph, diagnose root cause from a symptom list (door gasket failure, defrost timer malfunction, drain line blockage), and write a corrective action summary.
Reach-in training cases with electric defrost, digital multimeters, manifold gauge sets, clamp ammeter, defrost timer (mechanical and electronic), thermocouples, service forms, screwdrivers, nut drivers, NCCER HVAC Trainee Guide Level 3Instructor evaluates service form: all measured values recorded, defrost cycle verification documented, and root-cause diagnosis correct. Pass requires accurate data and a defensible written corrective action.
7Metering Devices: TXV and EEV Selection, Installation, and Adjustment16labStudents will install a thermostatic expansion valve on a training rig, set the superheat to the manufacturer's specification, and compare performance with an electronic expansion valve controlled by a digital controller.
  1. Students follow a written procedure to braze a TXV into a training rig, attach the sensing bulb with the correct orientation and insulation wrap, then commission the system and measure suction superheat using a pressure-temperature chart and a thermocouple at the suction line.
  2. TXV superheat adjustment: students turn the valve stem in measured increments, wait for system stabilization, record superheat after each adjustment, and plot a data table to demonstrate the effect of adjustment direction on superheat.
  3. EEV comparison: on a second training rig equipped with an EEV and digital controller, students read the controller's superheat setpoint, compare actual measured superheat to setpoint, and adjust the setpoint to observe system response, documenting each step.
Training refrigeration rigs (one TXV, one EEV), TXV with external equalizer, EEV with digital controller, brazing torch and fittings, manifold gauge sets, thermocouples and clamp-on probes, pressure-temperature charts, safety glasses, gloves, brazing PPE, service formsInstructor verifies TXV installation brazes are leak-free (electronic leak detector), sensing bulb is correctly located and insulated, and measured superheat is within ±2°F of specified target. Pass requires leak-free joints and superheat within tolerance.
8Refrigerant Recovery, Recycling, and Recharge Procedures16labStudents will perform a complete refrigerant recovery from a training system to the required level, evacuate the system to the trade-accepted vacuum level, and recharge by weight using a refrigerant scale, in full compliance with EPA Section 608.
  1. Pre-recovery setup: students connect recovery machine per manufacturer instructions, don appropriate PPE (safety glasses, chemical-resistant gloves), open service valves in correct sequence, and recover refrigerant from a training rig to a recovery cylinder; they weigh the cylinder before and after to confirm the amount recovered.
  2. Triple evacuation and deep vacuum: students connect a two-stage vacuum pump and micron gauge, evacuate the system, break vacuum with dry nitrogen, re-evacuate twice more, and record micron readings at each stage until the system holds at the trade-accepted level.
  3. Refrigerant recharge by weight: using a digital refrigerant scale, students charge the system with the nameplate-specified charge weight, record pre- and post-charge pressures, verify superheat and subcooling against specifications, and complete an EPA-style service record.
Training refrigeration rigs, certified refrigerant recovery machine, recovery cylinders (color-coded, labeled), two-stage vacuum pump, micron gauge, digital refrigerant scale, manifold gauge sets, safety glasses, chemical-resistant gloves, EPA Section 608 service record forms, NCCER HVAC Trainee Guide Level 3Instructor checks: recovery cylinder weight gain matches expected charge (±0.2 lb), vacuum held at trade-accepted level before recharge, final charge weight within ±0.5 oz of nameplate, service record fully completed. All four criteria must be met to pass. Aligns with EPA 608 Universal exam content area.
9Electrical Controls and Safety Devices in Commercial Refrigeration14theoryStudents will read a commercial refrigeration wiring diagram, identify the function of high-pressure cutouts, low-pressure cutouts, oil pressure safety switches, and anti-recycle timers, and trace a control circuit from thermostat through contactor to compressor.
  1. Wiring diagram annotation exercise: students receive a printed three-phase condensing unit wiring diagram and use colored pencils to trace the line voltage circuit, control circuit, and safety circuit, labeling each device and its function.
  2. Instructor demonstration on a live training panel: each safety device is manually tripped (simulated) in turn; students observe the compressor response, record which control opened, and write the reset procedure for each device.
  3. Control circuit fault simulation: instructor inserts a wiring fault (open wire in control circuit) in the training panel; students use a multimeter to perform a systematic voltage-drop test, locate the open, and document the diagnosis on a wiring diagram mark-up.
Commercial refrigeration wiring diagrams (three-phase), colored pencils, training electrical control panel, digital multimeters, clamp ammeter, high-pressure/low-pressure cutout training components, NCCER HVAC Trainee Guide Level 3Fault diagnosis documentation reviewed by instructor; student must correctly identify the open circuit location, show the voltage readings that led to the diagnosis, and write the correct corrective action. Pass requires correct fault location with supporting measurements.
10Walk-in Cooler and Freezer Systems: Installation Principles and Commissioning14demoStudents will explain the installation sequence for a walk-in cooler unit cooler and remote condensing unit, verify refrigerant piping sizing principles, and perform a commissioning checklist on a training walk-in system.
  1. Instructor-led walkthrough of a school walk-in cooler or training mock-up; students complete an installation-sequence checklist, identifying line set routing, mounting of unit cooler, electrical connections, and condensate drain requirements.
  2. Piping sizing exercise: using a manufacturer's application guide and a given load and line-set length, students select the correct suction and liquid line sizes from a sizing table and justify their selection in writing.
  3. Commissioning check: in pairs, students work through a printed commissioning checklist—checking refrigerant charge, superheat, subcooling, evaporator fan operation, door heater wire function, and box temperature pull-down—and record all readings.
Walk-in cooler training system or mock-up, unit cooler, remote condensing unit, manifold gauge sets, thermocouples, clamp ammeter, digital thermometer, manufacturer's application guide, piping sizing tables, commissioning checklist formsCommissioning checklist submitted to instructor; all measured values must be within manufacturer's specified ranges and all checklist items signed off. Pass requires a fully completed checklist with no unresolved items.
11Systematic Troubleshooting of Commercial Refrigeration Systems18practiceStudents will apply a structured diagnostic process—symptom, probable cause, test, confirm, correct—to at least four seeded faults on commercial refrigeration training rigs, documenting each step on a service ticket.
  1. Instructor models the complete diagnostic sequence live on a training rig with a seeded fault (restricted liquid line filter-drier); students observe and annotate a blank service ticket following the instructor's verbal narration.
  2. Fault rotation drill: four training rigs each have a different seeded fault (overcharged system, failed TXV power element, defrost timer stuck in defrost, condenser fan motor open winding); student pairs rotate through rigs, diagnose each fault, and complete a service ticket for each.
  3. Debrief and correction: after rotation, the class reconvenes; each group presents one diagnosis, instructor corrects misconceptions, and students update their service tickets with any revised findings.
Four commercial refrigeration training rigs with seeded faults, manifold gauge sets, digital multimeters, clamp ammeters, thermocouples, electronic leak detector, service ticket forms, pressure-temperature charts, NCCER HVAC Trainee Guide Level 3Instructor evaluates each service ticket: diagnostic steps must be in sequence, measured data must support the stated probable cause, and corrective action must be appropriate to the fault. Pass requires correct diagnosis on at least three of four faults. Aligns with NATE and HVAC Excellence troubleshooting exam content areas.
12Commercial Refrigeration Service Documentation, Energy Efficiency, and Career Readiness12theoryStudents will complete a commercial refrigeration service report that meets EPA recordkeeping requirements, calculate the Energy Efficiency Ratio for a condensing unit from measured data, and identify key professional practices expected by commercial refrigeration employers.
  1. Documentation workshop: students receive a scenario packet (customer complaint, measured system data, refrigerant added) and complete a full EPA-compliant service record form, including refrigerant type, amount recovered, amount added, and technician certification number field.
  2. EER calculation exercise: using data from a previous lab (measured capacity and wattage), students calculate EER using the standard formula and compare their result to the equipment's rated EER, then write a one-paragraph explanation of what a lower-than-rated EER indicates.
  3. Employer-panel Q&A simulation: instructor plays the role of a commercial refrigeration service manager and asks students about customer communication, call-back procedures, and time-management on a multi-stop service route; students respond and receive peer and instructor feedback.
EPA-compliant service record forms, scenario packets with system data, calculators, EER reference chart, ASHRAE Refrigeration Handbook energy chapter, employer expectations handout, student notebooksService record form reviewed by instructor; all EPA-required fields must be correctly completed and EER calculation must be within ±0.1 of the instructor's calculated value. Pass requires a fully compliant service record and a correct EER result.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
Commercial Refrigeration Knowledge ExamWritten exam25%70% or higher (minimum 35 of 50 questions correct)A 50-question multiple-choice written exam covering refrigerant types and EPA 608 regulations, compressor and component operation, electrical controls and safety devices, metering device operation, and defrost system theory. Questions are mapped to EPA 608 Universal, NATE, HVAC Excellence, and NCCER HVAC commercial refrigeration exam content areas.
Standard met · Safety · Time · Quality/finish · Documentation
Refrigerant Handling and System Service Skills DemonstrationSkills demonstration45%All critical safety steps correct; at least 80% of scored performance rubric items rated as meets standardEach student independently performs a refrigerant recovery, deep vacuum, and refrigerant recharge by weight on a training rig, followed by a superheat measurement and documentation of results on a service record. The evaluator uses a scored rubric; any unsafe act—venting refrigerant, incorrect PPE, skipping LOTO—results in an automatic fail requiring remediation and retest.
Standard met · Safety · Time · Quality/finish · Documentation
Lab Log PortfolioLog15%All 8 required lab session logs submitted; average score of 75% or higher across all logsStudents maintain a running lab log throughout the course, recording measured data, observations, equipment identifiers, and conclusions for each lab session in Lessons 4 through 11. Each entry is scored on accuracy of recorded data, completeness, and quality of written conclusions; the portfolio is submitted at the end of the course.
Standard met · Safety · Time · Quality/finish · Documentation
Safety Compliance CheckSafety audit15%100% compliance; any single critical safety violation requires immediate remediation and a full re-observationDuring Lessons 7 and 8 (metering device lab and refrigerant recovery lab), the instructor or a designated evaluator uses a binary safety observation checklist to verify that each student correctly executes LOTO, selects and dons appropriate PPE, handles refrigerant cylinders safely, and follows all site safety rules without prompting.
Standard met · Safety · Time · Quality/finish · Documentation
BLD-HVAC07-08 Capstone

Capstone Project: Integrated HVAC/R System Installation and Commissioning

216 hr · $2,160 COMPLIMENTARY

Students design, install, commission, and document a complete residential or light-commercial HVAC/R system from load calculation through final startup, integrating skills from every prior course. Each student produces a technical package—drawings, equipment selections, wiring diagrams, refrigerant records, and service log—and defends the completed project before an industry panel. This capstone validates job-readiness and directly exercises knowledge domains assessed by EPA 608, NATE, HVAC Excellence, and NCCER HVAC credentials.

Outcomes
Course text

Students design, install, commission, and document a complete residential or light-commercial HVAC/R system from load calculation through final startup, integrating skills from every prior course. Each student produces a technical package—drawings, equipment selections, wiring diagrams, refrigerant records, and service log—and defends the completed project before an industry panel. This capstone validates job-readiness and directly exercises knowledge domains assessed by EPA 608, NATE, HVAC Excellence, and NCCER HVAC credentials.

How the course runs. 4 blocks: Project Scoping, System Design, and Documentation Planning; Rough-In Installation: Mechanical, Electrical, and Refrigerant Piping; System Commissioning: Evacuation, Charging, Airflow, and Performance Verification; Project Package Completion and Panel Defense.

What competent looks like. Design a complete HVAC/R system for an assigned structure, selecting equipment whose capacity matches a Manual J-based load calculation and documenting all selections with manufacturer data sheets. Install and wire an air-handling unit, condensing unit or heat pump, thermostat, and associated controls in accordance with applicable mechanical and electrical codes, verified by a passing instructor inspection. Perform an EPA 608-compliant refrigerant handling procedure—evacuation to 500 microns or lower, leak check, and a documented charge using a weigh-in or subcooling/superheat method—on the installed system. Commission the completed system by measuring and recording airflow (static pressure and CFM at each register), electrical measurements (voltage, amperage, resistance), and refrigerant-side operating parameters (suction and discharge pressures, superheat, subcooling) within manufacturer specifications. Produce a complete project technical package including as-built drawings, equipment schedules, EPA refrigerant transaction log, commissioning data sheet, and a maintenance checklist, meeting trade documentation standards. Present and verbally defend all design decisions, installation methods, commissioning results, and safety practices to an industry-panel audience, answering technical questions to a satisfactory standard.

Lessons · 4 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1Project Scoping, System Design, and Documentation Planning48theoryStudents will produce a complete pre-installation design package—load calculation, equipment selection, duct layout, single-line electrical diagram, and refrigerant piping plan—for their assigned project structure that an instructor verifies as code-compliant and constructible.
  1. Each student receives a project brief (floor plan, building envelope data, geographic location) and independently performs a Manual J residential load calculation using an approved software tool or manual worksheet, then selects a matched split system or heat pump from actual manufacturer catalogs, justifying the selection in writing.
  2. Students draft a duct layout on graph paper or CAD software showing supply and return trunk lines, branch runs, register locations, and static-pressure calculations for the longest duct run, then peer-review each other's drawings against a provided checklist before submitting for instructor markup.
  3. Students create a single-line wiring diagram for the control circuit and power circuit of their chosen system, identify all disconnect, overcurrent protection, and grounding requirements, and compile an equipment schedule listing model numbers, electrical data, refrigerant type and charge, and AHRI-certified efficiency ratings.
Assigned project brief packets, Manual J worksheets or approved load-calculation software, manufacturer equipment catalogs and data sheets, graph paper and rulers, drafting triangles or CAD workstation, ACCA Manual J reference, NEC code book (current adopted edition), project technical-package binder template, ASHRAE Fundamentals Handbook (chapter on load calculations), instructor markup rubricInstructor scores the submitted design package against a 20-point rubric covering load-calculation accuracy (±10% of instructor reference answer), equipment match, duct layout completeness, wiring diagram accuracy, and documentation format; students must score 16/20 (80%) to advance. Students who score below 80% revise and resubmit within one week.
2Rough-In Installation: Mechanical, Electrical, and Refrigerant Piping72labStudents will install the air-handling unit, condensing or heat pump unit, lineset, electrical disconnects and wiring, low-voltage control wiring, and ductwork for their assigned project system in the lab installation bay, passing an instructor rough-in inspection before proceeding.
  1. Following their approved drawings, students set the air-handling unit on a properly leveled platform or hanging brackets, fabricate and attach a supply plenum and return-air box, install vibration isolators, make the condensate drain with correct trap dimensions and slope to drain, and seal all duct connections with mastic and mesh tape—confirming work at each step against the project checklist before moving on.
  2. Students run the lineset (pre-charged line set or field-brazed copper tubing) between the indoor and outdoor units, flaring or brazing fittings as required, then pull the electrical circuit from the designated panel location, install a properly sized disconnect, connect power wiring to the condensing unit and air handler per the wiring diagram, and run low-voltage thermostat cable—all with LOTO applied whenever working in the panel.
  3. Students complete duct branch runs and register boxes, connect the supply and return ducts to the plenum and air handler, install the thermostat on a mock wall assembly at the correct height and location, label all circuits and components per their equipment schedule, and submit the system for a structured rough-in inspection where the instructor checks each item on a 30-point punch list.
Residential or light-commercial split system or heat pump units (matched sets, lab inventory), copper refrigerant tubing (various sizes), flaring tools and flare-nut wrenches, brazing torch set and nitrogen purge equipment, duct sections (sheet metal and flex), sheet-metal screws, mastic sealant and mesh tape, duct hangers and strapping, electrical wire (appropriate gauges), conduit and fittings, disconnect switches, low-voltage thermostat wire, digital multimeter, torpedo and spirit levels, reciprocating saw and hole saw set, PPE (safety glasses, gloves, hearing protection), LOTO kit, condensate drain materials (PVC pipe, fittings, primer, cement), project wiring diagrams, manufacturer installation manualsInstructor completes a 30-point rough-in punch list covering mechanical mounting, refrigerant piping quality, electrical wiring correctness, duct connections, and condensate drain slope; students must have no more than 3 minor deficiencies (items requiring correction but not posing a safety or code violation) and zero major deficiencies (safety or code violations) to proceed. All major deficiencies must be corrected and re-inspected before the next lesson begins.
3System Commissioning: Evacuation, Charging, Airflow, and Performance Verification60practiceStudents will commission their installed system by performing a nitrogen pressure test, evacuation to at least 500 microns, a documented refrigerant charge, and a full set of airflow and electrical measurements, recording all data on the project commissioning sheet within manufacturer-specified ranges.
  1. Students pressure-test the refrigerant circuit with dry nitrogen to the lower of 150 psig or the system low-side test pressure specified by the manufacturer, hold for a minimum of 15 minutes, verify no pressure drop, then connect a calibrated electronic micron gauge and two-stage vacuum pump and evacuate the system to 500 microns or lower, confirming with a triple-evacuation or standing-vacuum decay test per industry best practice, and documenting all readings with timestamps on the EPA refrigerant log.
  2. Students recover any existing refrigerant (on previously charged trainer units) using a UL-listed recovery machine and approved recovery cylinder logged by weight, then charge the system using the manufacturer-specified method—weigh-in for systems with a factory charge adjustment for lineset length, or target subcooling and superheat values—connecting manifold gauges or a digital manifold, recording suction pressure, discharge pressure, suction-line temperature, liquid-line temperature, outdoor ambient, and indoor wet-bulb and dry-bulb temperatures on the commissioning data sheet.
  3. Students measure system airflow by recording static pressure at the supply plenum and return plenum with a digital manometer, compare to the design external static pressure, adjust the blower speed tap or ECM setting if needed, then use an air-balancing hood or flow grid at each supply register to record CFM, sum total system CFM, compare to nameplate and design airflow, measure compressor RLA versus FLA, outdoor fan and indoor blower amperage, and supply and return air dry-bulb temperatures to verify temperature rise or drop within the equipment specification, recording all data on the commissioning sheet.
Two-stage vacuum pump, calibrated electronic micron (vacuum) gauge, manifold gauge set or digital manifold with Bluetooth logging, refrigerant scale (electronic, 0.1 oz resolution), recovery machine and approved recovery cylinders, refrigerant cylinders (type matching installed units—lab stock, student does not purchase), nitrogen cylinder with regulator and charging hose, leak detector (electronic), thermometer or thermocouple kit, digital multimeter and clamp ammeter, digital manometer with Pitot tube and static pressure tips, airflow hood or flow grid, psychrometric chart or app, EPA refrigerant transaction log forms, commissioning data sheet, manufacturer startup checklist, PPE (safety glasses, refrigerant gloves)Instructor verifies the completed commissioning data sheet: vacuum must reach 500 microns or below with passing decay test; all measured operating parameters (pressures, superheat, subcooling, airflow CFM, amperage) must fall within manufacturer published acceptable ranges; EPA refrigerant log must be complete with weights, refrigerant type, cylinder ID, and technician signature. Any out-of-range parameter triggers a documented corrective action before the sheet is signed off. Students must achieve a complete, signed commissioning sheet to submit the project package.
4Project Package Completion and Panel Defense36fieldStudents will assemble and submit a complete technical project package and deliver an oral defense to an industry panel, demonstrating the ability to explain every design decision, installation method, commissioning result, and safety practice at a professional standard.
  1. Students compile all project deliverables into a final binder or organized digital folder in the prescribed order: cover sheet with project summary, Manual J load calculation, equipment selection justification with data sheets, as-built drawings (mechanical, electrical, duct layout), equipment schedule, EPA refrigerant transaction log, completed commissioning data sheet with all measurements, a manufacturer-format preventive-maintenance checklist for the installed system, and a one-page written reflection on problems encountered and solutions applied during installation.
  2. Students prepare and deliver a 10-minute structured oral presentation to a panel of at least two industry-connected evaluators (local HVAC contractors, program advisory committee members, or senior instructors), using the as-built drawings and commissioning data sheet as visual aids, explaining the load calculation rationale, equipment selection, installation sequence, refrigerant handling procedure, and commissioning results, followed by a 10-minute question-and-answer session in which panelists probe technical understanding.
  3. After the defense, students complete a guided self-evaluation form rating their own performance in seven categories (design accuracy, installation quality, refrigerant handling compliance, commissioning accuracy, documentation completeness, communication clarity, safety practices), then meet individually with the lead instructor for a feedback conference comparing the self-evaluation to the panel scoring rubric, identifying credential exam topic areas where additional study is needed before the Exam Prep course.
Project binder or digital submission folder, as-built drawings and equipment schedules (produced in prior lessons), commissioning data sheets and EPA refrigerant logs, preventive-maintenance checklist template, panel evaluation rubric (25-point scale), student self-evaluation form, projector or large monitor for presentation display, program advisory committee contact list, feedback conference notes template, EPA 608 and NATE/HVAC Excellence/NCCER exam domain outlines (for gap identification during feedback conference)Panel evaluates the oral defense on a 25-point rubric: technical accuracy of explanations (10 pts), quality and completeness of the project package (8 pts), professional communication (4 pts), and demonstrated safety knowledge (3 pts). Students must score at least 20/25 (80%) on the panel rubric AND receive an instructor sign-off that the project package is complete and the commissioning data sheet is within spec. Students scoring below 80% on the defense may request one re-defense within two weeks after targeted remediation.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
Installed and Commissioned System ProjectProject60%Passing rough-in inspection (zero major deficiencies), a fully signed commissioning data sheet with all parameters within manufacturer specifications, and a panel rubric score of at least 20/25 (80%).The physical system the student installs and commissions in the lab serves as the primary project artifact, evaluated at three checkpoints: the rough-in punch-list inspection, the commissioning data sign-off, and the panel review of the completed project. All three checkpoints must be passed for the project assessment to be considered complete.
Meets specification · Within estimate · Workmanship · Safety · Documentation
Technical Project PortfolioPortfolio20%All seven required documents present and complete; instructor scores the portfolio at least 32/40 (80%) on the portfolio rubric covering accuracy, completeness, professional format, and EPA compliance.The bound or digital project package containing the load calculation, as-built drawings, equipment schedule, wiring diagram, EPA refrigerant log, commissioning data sheet, and preventive-maintenance checklist is evaluated as a standalone portfolio artifact representing the student's ability to produce trade-standard technical documentation.
Completeness · Organization · Evidence quality
Oral Project DefenseOral / panel20%Panel rubric score of at least 20/25 (80%), with no individual category score of zero, and satisfactory responses to at least 80% of panel technical questions as noted by panel consensus.Students present their completed project to an industry panel and respond to technical questions covering all major topic domains of the program—load calculations, refrigerant handling, electrical controls, heat pumps, ductwork, and commissioning—demonstrating integrated, job-ready technical knowledge at a professional communication standard.
Explains decisions · Answers technical questions · Professional communication
BLD-HVAC07-09 Externship / clinical

Externship / Worksite Placement

324 hr · $1,295 COMPLIMENTARY

Students complete 324 supervised hours at an approved HVAC/R employer site, applying installation, service, diagnostic, and customer-interaction skills learned in the classroom and lab under the direct oversight of a licensed journeyman or master technician. Competence is evaluated through employer progress reviews, a daily field log, and a structured mid-term and final employer evaluation rubric. This experience bridges academic preparation and entry-level employment, reinforcing EPA 608 refrigerant-handling compliance, NCCER craft standards, and NATE service-area knowledge in live job conditions.

Outcomes
Course text

Students complete 324 supervised hours at an approved HVAC/R employer site, applying installation, service, diagnostic, and customer-interaction skills learned in the classroom and lab under the direct oversight of a licensed journeyman or master technician. Competence is evaluated through employer progress reviews, a daily field log, and a structured mid-term and final employer evaluation rubric. This experience bridges academic preparation and entry-level employment, reinforcing EPA 608 refrigerant-handling compliance, NCCER craft standards, and NATE service-area knowledge in live job conditions.

How the course runs. 4 blocks: Worksite Orientation and Safety Compliance; Installation and Rough-In Field Tasks; Service, Diagnostic, and Refrigerant-Handling Field Tasks; Professional Skills, Final Evaluation, and Hour Documentation.

What competent looks like. Perform assigned HVAC/R installation and service tasks safely and correctly under journeyman supervision, following OSHA lockout/tagout, PPE, and confined-space protocols applicable to real worksites. Handle, recover, and document refrigerants in full compliance with EPA Section 608 requirements, using employer-supplied recovery equipment and completing required service records. Demonstrate systematic diagnostic procedures on residential and light-commercial heating, cooling, and refrigeration equipment, recording findings and corrective actions in a field log. Communicate professionally with supervisors, co-workers, and customers, including scheduling access, explaining work performed, and documenting warranty or callback information. Complete all assigned tasks within employer time standards, demonstrating the productivity expectations of an entry-level HVAC/R technician. Accumulate and document all 324 worksite hours with employer-verified time records acceptable for submission toward NCCER craft-hour requirements and NATE experience documentation.

Lessons · 4 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1Worksite Orientation and Safety Compliance40fieldThe student will complete the employer's site-specific safety orientation, identify all site hazards, and demonstrate correct use of PPE, lockout/tagout, and emergency procedures before performing any unsupervised task.
  1. Shadow the journeyman supervisor through the employer's safety induction: review the site emergency action plan, identify eyewash stations, first-aid kits, fire extinguisher locations, and muster points, then sign and file the site hazard-acknowledgment form.
  2. Demonstrate a full lockout/tagout procedure on at least two different energy types (electrical and refrigerant pressure) under direct journeyman observation using the employer's LOTO station hardware and tags.
  3. Complete a written site-hazard checklist for two different job addresses (e.g., a residential attic and a rooftop commercial unit), noting electrical, fall, heat-stress, and refrigerant hazards, and review it with the supervisor.
Employer site-specific safety manual, OSHA 10 wallet card, personal PPE kit (safety glasses, gloves, steel-toed boots, hard hat where required), LOTO locks and tags, site hazard-acknowledgment form, field log binderSupervisor signs off on the employer's safety-orientation checklist; student performs a complete LOTO sequence without prompting, scoring 100% on each of the two observed attempts; hazard checklists are reviewed and approved by the journeyman — all three items must be complete before the student advances to independent task assignments.
2Installation and Rough-In Field Tasks100fieldThe student will assist with or lead, as assigned, the installation and rough-in of residential and light-commercial HVAC/R systems — including equipment placement, electrical connections, refrigerant line sets, and ductwork connections — meeting the employer's quality and schedule standards.
  1. Assist the journeyman on a minimum of four complete split-system or package-unit installations: set the condensing unit, mount the air handler or furnace, run and insulate the refrigerant line set, make electrical connections at the disconnect and control board, and verify refrigerant line integrity with a nitrogen pressure test before evacuation.
  2. Fabricate and hang duct transitions, flex-duct runs, and register boots under journeyman direction, then record measurements, materials used, and any field modifications in the daily field log.
  3. Document each installation job in the field log: equipment model and serial numbers, measured supply and return static pressures after startup, outdoor ambient and indoor return temperatures, suction and discharge pressures at startup, and the name of the journeyman who verified the readings.
Employer-issued hand tools and power tools, manifold gauge set, vacuum pump, nitrogen cylinder and regulator, leak detector (electronic), refrigerant recovery machine, duct installation kit (tin snips, sheet-metal screws, mastic, foil tape), field log binder, manufacturer installation manualsJourneyman supervisor scores each installation task on the employer evaluation rubric (minimum 3 out of 4 on every category: safety, technique, documentation, and professionalism); field log entries are complete and legible for every job day — any score below 3 triggers a documented corrective-action discussion within 48 hours.
3Service, Diagnostic, and Refrigerant-Handling Field Tasks144fieldThe student will perform systematic diagnostic calls and routine maintenance services on heating, cooling, and refrigeration equipment under journeyman supervision, documenting all refrigerant transactions in compliance with EPA Section 608 and recording findings and repairs in employer service records.
  1. Conduct a minimum of eight diagnostic service calls covering at least three equipment categories (e.g., split-system AC, gas furnace, and commercial reach-in refrigeration): follow a logical diagnostic sequence — customer complaint, visual inspection, electrical measurement, refrigerant-circuit measurement, identify root cause, repair or recommend repair — and present findings to the journeyman before any repair action.
  2. Perform refrigerant recovery, system evacuation to the required vacuum level, and refrigerant recharge on at least three systems, completing the employer's refrigerant-transaction log for each event including technician EPA certification number, refrigerant type, pounds recovered, and pounds added — in full compliance with EPA Section 608 recordkeeping requirements.
  3. Complete at least six preventive-maintenance agreements (residential or commercial): clean or replace filters, inspect and clean coils, check electrical connections and contactors, measure motor amperage, record system operating pressures and temperatures on the employer's PM checklist, and obtain customer signature.
Manifold gauge set, digital multimeter, clamp-on ammeter, refrigerant recovery machine, certified recovery cylinder, vacuum pump with micron gauge, electronic leak detector, combustion analyzer (for furnace calls), PM checklist forms, EPA 608 certification card, employer service-record software or paper forms, field log binderSupervisor verifies and co-signs each refrigerant-transaction log entry; journeyman evaluates diagnostic reasoning on at least four calls using the employer rubric (minimum 3 out of 4 in each category); refrigerant logs must show zero unresolved discrepancies — any EPA documentation error is corrected the same business day and flagged in the field log.
4Professional Skills, Final Evaluation, and Hour Documentation40fieldThe student will demonstrate professional workplace behavior — communication, time management, and work-order completion — and compile a complete, employer-verified record of all 324 externship hours for submission to the program coordinator.
  1. Take the lead on customer interaction for at least three service calls: introduce yourself and your role, explain the diagnostic process in plain language, review findings and recommended repairs with the customer, collect a signature on the completed work order, and debrief with the journeyman on communication effectiveness immediately after each call.
  2. Complete the employer's mid-externship self-evaluation form at the halfway point (approximately hour 162), review it jointly with the journeyman supervisor, set two measurable improvement goals in writing, and revisit those goals at the final evaluation meeting.
  3. Compile the externship portfolio for program submission: employer-verified daily time log totaling 324 hours, completed employer mid-term and final evaluation rubrics, refrigerant-transaction log copies, at least eight field log entries covering different equipment types, and a one-page personal reflection on skills gained and areas for continued growth.
Employer time-verification forms, mid-term and final employer evaluation rubric (program-issued), daily field log binder, work-order forms, self-evaluation form, externship portfolio folder or digital upload templateProgram coordinator confirms 324 employer-verified hours with no gaps; final employer evaluation rubric averages at least 3 out of 4 across all categories with no individual category below 2; externship portfolio contains all required documents and is submitted by the program deadline — missing documents or an overall rubric average below 3 requires a remediation plan signed by employer and program coordinator before the credential exam preparation course begins.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
Employer Skills Demonstration EvaluationSkills demonstration70%Average score of 3.0 or higher out of 4.0 across all rubric categories on the final employer evaluation form, with no individual category scored below 2.0The journeyman supervisor or employer designee completes the program-issued final evaluation rubric covering safety compliance, technical skill, diagnostic reasoning, refrigerant-handling documentation, productivity, communication, and professionalism, based on direct observation across the full externship period. This rubric functions as the capstone skills demonstration for the externship, replacing a classroom skills demo, and its results are retained in the student's program file for NCCER craft-hour and NATE experience verification.
Competency · Safety · Attendance · Conduct · Initiative
Field Log and Externship Portfolio ReviewLog30%All 324 hours employer-verified; field log contains complete entries for every worksite day; refrigerant-transaction logs show no unresolved documentation errors; all required portfolio documents present and legible — any deficiency must be corrected within five business days of the coordinator's reviewThe program coordinator reviews the student's complete externship portfolio — daily field log, employer time-verification sheets, refrigerant-transaction records, mid-term and final evaluation rubrics, and the personal reflection — to confirm hours, documentation accuracy, and EPA 608 recordkeeping compliance. This log-based assessment validates the student's readiness to enter the Certification Exam Preparation course and provides the hour-documentation evidence required for NCCER Registry submission and NATE eligibility verification.
Complete · Verified
BLD-HVAC07-10 Exam prep

Certification Exam Preparation: EPA 608, NATE, HVAC Excellence & NCCER HVAC

90 hr · $900 COMPLIMENTARY

This course systematically reviews every major content domain tested on the EPA 608 Universal, NATE, HVAC Excellence, and NCCER HVAC credentials through targeted instruction, timed practice sets, and full-length mock exams. Students identify personal knowledge gaps from prior coursework, drill weak areas with exam-aligned questions, and develop test-taking strategies that translate classroom and shop competency into passing scores. Successful completion positions students to sit all four credentials with confidence before program completion.

Outcomes
Course text

This course systematically reviews every major content domain tested on the EPA 608 Universal, NATE, HVAC Excellence, and NCCER HVAC credentials through targeted instruction, timed practice sets, and full-length mock exams. Students identify personal knowledge gaps from prior coursework, drill weak areas with exam-aligned questions, and develop test-taking strategies that translate classroom and shop competency into passing scores. Successful completion positions students to sit all four credentials with confidence before program completion.

How the course runs. 4 blocks: EPA 608 Universal Deep Review: Core, Types I–III & Refrigerant Regulations; NATE & HVAC Excellence Domain Review: Refrigeration, Electrical, Heat Pumps & System Performance; NCCER HVAC Domain Review & Personalized Gap-Analysis Study Sessions; Full-Length Timed Mock Certification Exams & Targeted Debrief.

What competent looks like. Correctly answer questions across all EPA 608 Universal exam domains—Core, Type I, Type II, and Type III—at a rate consistent with passing the proctored exam. Demonstrate command of NATE exam content areas including refrigeration fundamentals, electrical diagnosis, system performance, and heat pumps at or above NATE's published passing threshold. Apply HVAC Excellence knowledge across installation, service, and theory domains to achieve a passing score on HVAC Excellence employment-ready exams. Answer NCCER HVAC knowledge-check and module-test style questions covering safety, tools, refrigeration, electrical, and sheet-metal topics at the NCCER mastery level. Use a structured gap-analysis process to identify and prioritize weak content areas, then allocate self-study time to close those gaps before sitting credentialing exams. Complete timed, full-length mock exams for each credential under realistic conditions and achieve a passing score on every mock before exam registration.

Lessons · 4 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1EPA 608 Universal Deep Review: Core, Types I–III & Refrigerant Regulations20theoryStudents will correctly answer EPA 608 Universal practice questions across all four sections—Core, Type I (small appliances), Type II (high-pressure), and Type III (low-pressure)—at a level consistent with the published passing threshold for each section.
  1. Instructor-led content walk-through of the four exam sections using EPA-published study materials and the ESCO Institute or similar approved preparatory guide; students annotate a personal 'weak-topic' tracking sheet as each domain is covered—refrigerant properties and global-warming potential, Section 608 regulatory requirements, recovery and recycling procedures, leak detection and repair obligations, and reclamation standards.
  2. Timed 25-question section drills (one per exam type plus Core) administered on paper bubble sheets to simulate actual exam format; students grade their own drills immediately using the provided answer key, then flag every missed question and look up the rationale in the reference before moving on.
  3. Small-group case-study discussion: instructor presents three realistic field scenarios (a leaking reach-in cooler, a large centrifugal chiller low-charge situation, and a residential split system recovery before compressor replacement) and groups must identify the correct regulatory actions, required equipment certification levels, and proper refrigerant handling steps for each, then defend answers to the class.
EPA Section 608 regulations summary handout, ESCO Institute EPA 608 Certification Study Guide (current edition) or equivalent approved preparatory text, refrigerant properties reference card, bubble-sheet answer forms, dry-erase whiteboards for group work, projector for scenario displayEach student completes a 100-question cumulative EPA 608 practice exam covering all four sections proportionally; passing mark is 70% overall with no individual section below 70%, matching the structure of the actual EPA 608 exam. Students who do not meet 70% on any section receive a targeted remediation assignment before the next lesson.
2NATE & HVAC Excellence Domain Review: Refrigeration, Electrical, Heat Pumps & System Performance25theoryStudents will correctly answer NATE and HVAC Excellence practice questions mapped to published exam content outlines—covering refrigeration cycle, electrical fundamentals and controls, heat pump operation, system performance and diagnosis, and installation practices—at or above each credential's published passing standard.
  1. Instructor presents a side-by-side comparison of the NATE Ready-to-Work and Core content outline alongside the HVAC Excellence employment-ready exam blueprint; students map each major topic (refrigerant flow, electrical circuits, psychrometrics, load fundamentals, commissioning) back to the specific program courses where they learned it, building a personal content-coverage matrix they will use for targeted self-study throughout the unit.
  2. Rotating laboratory station review: six stations are set up around the shop—PT chart calculations, electrical troubleshooting on a wired training panel, refrigerant identification and safety, heat pump reversing-valve operation, duct static-pressure measurement interpretation, and load-calculation scenario—students spend approximately 20 minutes at each station completing a 10-question practice set and one hands-on quick task, then rotate; the hands-on element reinforces that NATE and HVAC Excellence test applied knowledge, not just recall.
  3. Instructor-facilitated whole-class debrief using a projected answer-reveal format: for each station set, one student reads their answer and reasoning aloud, the class votes agree or disagree with hand signals, and the instructor clarifies misconceptions immediately; common wrong-answer patterns are recorded on a shared 'class gap board' visible for the rest of the unit.
NATE Ready-to-Work and Core exam content outlines (downloaded from nate.com), HVAC Excellence exam blueprint (from hvacexcellence.org), refrigerant PT chart, clamp-meter, manifold gauge set, electrical training panel with faults pre-installed, psychrometric chart, residential load-calculation worksheet, duct pressure gauge (magnehelic or digital manometer), practice question bank (minimum 200 questions mapped to NATE/HVAC Excellence domains)Each student completes separate 60-question timed practice exams—one NATE-mapped and one HVAC Excellence-mapped—drawn from the domain-weighted question bank; passing mark is 70% on each exam. Results are recorded on the student's personal gap-analysis matrix, and any domain below 70% is flagged for additional self-study in Lesson 3.
3NCCER HVAC Domain Review & Personalized Gap-Analysis Study Sessions20practiceStudents will answer NCCER HVAC knowledge-check questions across all major module areas—safety and tools, refrigeration systems, electrical and controls, heating systems, air distribution, and sheet-metal fundamentals—at the NCCER mastery level, and will complete a structured gap-analysis plan that directs their remaining self-study time.
  1. Instructor leads a module-by-module NCCER HVAC content review using the NCCER Contren HVAC Trainee Guide as the reference; for each module area, students answer a 10-question rapid-fire oral quiz (instructor calls on volunteers, class confirms or corrects), and the instructor pauses on every missed item to re-teach the concept using the actual NCCER module language and illustrations students will see on the credential assessment.
  2. Students complete a formal written gap-analysis: using their scores from Lessons 1 and 2 and the NCCER oral quiz results, each student creates a ranked list of their five weakest content areas across all four credentials, writes one paragraph explaining why each area is a gap (confusion about concept, lack of hands-on reps, math difficulty, etc.), and identifies the specific program course notes, textbook chapters, and practice-question sets they will use to close each gap during the open self-study blocks in this lesson and at home before the mock exams.
  3. Structured self-study and peer tutoring: the remainder of the lesson is divided into 30-minute self-study blocks; students work independently on their identified gap areas using approved references while the instructor circulates for individual coaching; students who have demonstrated strength in a topic are paired as peer tutors with students who listed that topic as a gap, reinforcing both parties' retention; instructor checks that every student is actively working a specific weak area rather than reviewing already-mastered content.
NCCER Contren HVAC Trainee Guide (current level set), NCCER module review questions, student gap-analysis worksheet template, personal score logs from Lessons 1 and 2, program course notes and textbooks from Courses 2–7, access to approved online practice-question platforms if available, highlighters and index cards for self-studyEach student submits their completed written gap-analysis plan with a minimum of five specific, actionable study tasks listed per credential; instructor reviews each plan and approves it or requires revision before the student proceeds to Lesson 4. A 40-question NCCER-mapped practice quiz is graded at 70% minimum; students below that threshold must complete an additional NCCER-focused remediation assignment before the full mock exams.
4Full-Length Timed Mock Certification Exams & Targeted Debrief25labStudents will complete one full-length timed mock exam for each of the four credentials under realistic proctored conditions and achieve a passing score on every mock, demonstrating readiness to sit the actual credentialing exams.
  1. Proctored mock exam administration: over two extended sessions, students sit four sequentially administered mock exams—EPA 608 Universal (proportional to the actual four-section structure), NATE Ready-to-Work or Core (per the published exam length), HVAC Excellence employment-ready exam (per blueprint length), and NCCER HVAC knowledge assessment (per module-set scope)—each exam is timed according to its real-world allotment, all notes and references are closed, phones are away, and the instructor acts as a proctor following standard test-security protocols to give students authentic exam-day experience.
  2. Individual score analysis session: immediately after each mock exam is graded, students receive a domain-level breakdown showing their percentage correct per content area (not just a total score); they compare these results to their gap-analysis plan from Lesson 3, note which targeted study areas improved and which remain below threshold, and write a one-page reflection identifying what they will study in the 24–48 hours before scheduling each actual exam.
  3. Whole-class debrief and exam-logistics briefing: instructor leads a group review of the 10 most frequently missed questions across all four mock exams, explaining the correct reasoning for each; instructor then walks students through the practical logistics of registering for and sitting each actual credential—approved testing providers for EPA 608, NATE's online and in-person options, HVAC Excellence's school-based and independent pathways, and NCCER's Registry and assessment scheduling—so that every student leaves with a clear, actionable exam registration plan.
Full-length mock exam packets for all four credentials (sourced from approved preparatory publishers or instructor-developed to match published blueprints), bubble-sheet answer documents, pencils, timers visible to all students, domain-score breakdown rubric, score-analysis and reflection worksheet, credential registration reference sheet (URLs and contact information for EPA 608 approved testing organizations, NATE, HVAC Excellence, and NCCER), proctor sign-in logEach student must achieve a minimum score of 70% on each of the four full-length mock exams; this is recorded as the course completion standard. Any student who does not pass a mock exam for a specific credential receives an individualized remediation plan with targeted practice questions and a second attempt on an alternate mock before the course end date. Instructor records all four mock scores on the student's credential-readiness checklist, which is submitted to the program director as evidence of exam readiness.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
Four-Credential Full Mock Examination SuiteMock certification exam100%Minimum 70% on each of the four credential-specific mock exams (EPA 608 Universal, NATE, HVAC Excellence, NCCER HVAC); a student must meet the threshold on every credential mock, not just an average across all four. Students who miss the threshold on any single mock receive one remediation attempt on an alternate form before the course concludes.Students sit four sequentially proctored, full-length, closed-book mock exams—one for each credential the program prepares them to earn—under timed, exam-day conditions that replicate the format, length, and domain weighting of the actual credentialing assessments. Scores are analyzed at the domain level so that any remaining gaps can be addressed through targeted self-study before students register for and sit their actual EPA 608, NATE, HVAC Excellence, and NCCER HVAC credentialing exams.
Score · Time management
Program completion

External credential: EPA 608 Universal; HVAC Excellence; NATE; NCCER HVAC

Students sit the EPA Section 608 Universal certification exam administered by an EPA-approved certifying organization, and may also sit NATE, HVAC Excellence, and NCCER HVAC credential exams administered by those respective independent bodies. Pass standard: Credential issued by the body.

Back to HVAC/R · How the school gets authority to award these credentials