newSchoolWorks.com › VoTechWorks › Building & Construction › HVAC/R › Ductwork: Design, Fabrication, and Installation › Lesson 6
BLD-HVAC07-05 · Lesson 6 · 14 clock hours · demo

Flexible Duct and Duct Board: Materials and Installation Techniques

Objective. Students will install a flexible duct run and a duct-board plenum section using manufacturer-specified connection methods, support spacing, and bend-radius minimums in a mock-up frame.

Flexible Duct and Duct Board: Materials and Installation Techniques

Flexible duct and duct board are two of the most common materials used to distribute conditioned air in residential and light-commercial systems. Used correctly, they deliver efficient, quiet airflow. Used incorrectly, they create pressure drop, condensation problems, and callbacks. This lesson covers both materials from the workbench perspective: what they are, how they connect, and how to install them right the first time.

Flexible Duct: Construction and Classification

Flexible duct (flex duct) is an inner liner — typically a spiral-wound wire helix covered with a plastic film — surrounded by a layer of fiberglass insulation and wrapped in a vapor-barrier outer jacket. Most residential flex is sold as Class 1 duct under UL 181, meaning it has passed flame-spread and smoke-development tests required by the standard. Always verify the UL 181 listing label on the product before installation; unlisted material cannot be used in return-air or supply applications governed by mechanical codes.

Flexible duct comes in nominal diameters from about 4 inches to 20 inches. The inner liner diameter — not the outer jacket — is the dimension that matches the collar on a diffuser, branch takeoff, or plenum boot.

The Two-Step Draw-Band Connection

A secure, airtight connection at each end of a flex run requires three elements: a properly sized collar, a listed draw band (also called a strap clamp or worm-drive clamp rated UL 181B), and an outer-jacket seal.

Step 1 — Inner liner: Pull back the outer jacket and insulation to expose 2–3 inches of the inner liner. Slide the liner fully over the collar so it seats at the bead or stop. Position the draw band over the liner within the distance specified by the manufacturer (commonly within 1 inch of the collar end). Tighten the band until the liner is compressed firmly and evenly around the collar — overtightening can tear the liner.

Step 2 — Outer jacket: Pull the insulation and outer jacket back over the connection point. Secure the outer jacket with a second listed draw band, positioned so the jacket cannot slide back and expose bare insulation. Some manufacturers also require mastic or listed tape at the outer jacket to complete the vapor seal; follow the product instructions.

Never use standard duct tape (cloth-backed) on either connection — it fails over time and is not UL 181B listed.

Support Spacing and Bend Radius

Two installation requirements directly affect airflow performance and are frequently cited by inspectors.

Support spacing: Flex duct must be supported at intervals that prevent sagging. The Sheet Metal and Air Conditioning Contractors' National Association (SMACNA) HVAC Duct Construction Standards and most flex-duct manufacturers specify supports no more than 4 feet apart for horizontal runs. Supports must be at least 1½ inches wide (to avoid cutting into the jacket) and must not compress the duct.

Bend radius: Every bend reduces airflow because the inner liner bunches up on the inside of the curve, reducing the effective cross-sectional area. The minimum bend radius for most flex duct is equal to one duct diameter measured to the centerline of the duct — some manufacturers specify 1.5 times the diameter. Always check the product data sheet and use a bend-radius template card on the job. Never allow a bend tighter than the manufacturer's minimum; a crushed or kinked flex run can increase static pressure dramatically.

Keep runs as short and as straight as practically possible. Every unnecessary foot of flex and every tight bend adds resistance (static pressure) and reduces airflow at the diffuser.

Duct Board: Construction and Classification

Duct board is a rigid fiberglass panel with a foil facing on the air-side surface. It is sold in R-value ratings; R-6 foil-faced duct board is common for supply plenums in conditioned spaces. Like flex duct, duct board must carry a UL 181 listing. The foil facing is the air barrier and must always face inward (toward the airstream).

Score-and-Fold Fabrication

Duct-board panels are fabricated using a utility knife and a straightedge. The score-and-fold method creates a corner joint without a separate piece of material:

1. Lay the panel foil-side down on a clean, flat surface.

2. Measure and mark the fold line. Using a straightedge as a guide, score the back (non-foil) face with a utility knife to a depth of about two-thirds of the panel thickness — do not cut through the foil facing.

3. Fold the panel along the score line. The foil facing acts as a living hinge; the fiberglass opens a V-groove on the outside of the fold.

4. Apply listed duct-board staples ("outward clinch" staples) along the corner at intervals specified by the manufacturer, typically every 4–6 inches, to hold the joint square.

5. Inspect the foil seams at each corner. Any gap greater than 1/8 inch must be closed with listed foil-backed tape or mastic before the section is placed in service — gaps allow moisture and unconditioned air into the insulation core.

Safety

Key terms8

UL 181Underwriters Laboratories standard that establishes flame-spread and smoke-development requirements for factory-made air ducts and connectors, including flexible duct and duct board.
Draw band (UL 181B rated)A listed metal strap clamp used to create an airtight, secure connection between flexible duct and a collar or fitting; must carry a UL 181B listing for use on Class 1 flexible air connectors.
Bend radiusThe minimum radius of curvature — measured to the duct centerline — allowed by the manufacturer for a flexible duct run; violating this minimum restricts airflow by collapsing the inner liner.
Class 1 flexible ductFlexible duct that has passed UL 181 tests for flame spread and smoke development; the class rating required for most residential and light-commercial supply and return applications.
Score-and-foldA duct-board fabrication technique in which the back face of the panel is cut to about two-thirds depth so the panel can be folded at a right angle, using the foil facing as a hinge to form a corner joint.
R-6 duct boardA rigid fiberglass duct panel with a thermal resistance value of R-6; the foil-faced air barrier must be installed facing the interior of the duct (the airstream side).
Static pressureThe resistance to airflow within a duct system, measured in inches of water column (in. w.c.); tight bends, long flex runs, and poor connections all increase static pressure and reduce airflow.
SMACNASheet Metal and Air Conditioning Contractors' National Association; publishes widely adopted duct construction and installation standards, including support-spacing requirements for flexible duct.

Worked examples4

1. A technician is installing a 6-inch-diameter flexible duct. The manufacturer specifies a minimum bend radius of 1.0 times the duct diameter (measured to the centerline). What is the minimum allowable centerline bend radius in inches?
  1. Identify the duct diameter: 6 inches.
  2. Apply the manufacturer's multiplier: 1.0 × 6 inches.
  3. Calculate: 1.0 × 6 = 6 inches.
Answer: The minimum centerline bend radius is 6 inches. Any bend tighter than 6 inches (centerline) violates the manufacturer's specification and must be corrected.
2. A flex-duct run travels 14 feet horizontally between a plenum takeoff and a ceiling diffuser. Using a maximum support spacing of 4 feet, what is the minimum number of supports required (not counting the connections at each end)?
  1. Total run length: 14 feet.
  2. Maximum spacing between supports: 4 feet.
  3. Divide the run into intervals: 14 ÷ 4 = 3.5 intervals.
  4. Round up to the next whole number of intermediate supports: 4 supports are needed to keep every span at or under 4 feet (creating spans of approximately 2.8 ft, 4 ft, 4 ft, and 3.2 ft — all within the 4-foot limit).
  5. Verify: 4 supports divide 14 feet into 5 segments, each under 4 feet.
Answer: A minimum of 4 intermediate supports are required along the 14-foot run, not counting the end connections.
3. A duct-board panel is 1.5 inches thick. When using the score-and-fold method, to what depth (in inches) should the utility knife score the back face of the panel?
  1. Total panel thickness: 1.5 inches.
  2. Target score depth: approximately two-thirds of the panel thickness.
  3. Calculate: (2/3) × 1.5 = 1.0 inch.
  4. The blade should score to approximately 1.0 inch deep, leaving about 0.5 inch of thickness (the foil facing and adjacent fiberglass) intact to act as the hinge.
Answer: Score to approximately 1.0 inch deep (two-thirds of 1.5 inches), leaving the foil-face layer intact as the fold hinge.
4. After folding a duct-board corner joint, an inspector finds a gap of 3/16 inch along the foil seam. The allowable maximum gap is 1/8 inch (0.125 inch). By how much does the gap exceed the limit, and what corrective action is required?
  1. Measured gap: 3/16 inch = 0.1875 inch.
  2. Allowable maximum: 1/8 inch = 0.125 inch.
  3. Excess: 0.1875 − 0.125 = 0.0625 inch (1/16 inch) over the limit.
  4. Because the gap exceeds 1/8 inch, it must be sealed with listed foil-backed tape or mastic before the plenum section is placed in service.
Answer: The gap exceeds the limit by 1/16 inch. It must be sealed with listed foil-backed tape or mastic before the assembly is approved.

The math in this lesson1

Learners divide a 14-foot flex run by 4-foot spacing to count supports and find minimum bend radius.
6.RP.3
In class: Watch instructor demonstrate flexible-duct installation on a wall mock-up: slide flex over collar, use two-step draw-band connection, secure outer jacket, and hang at correct support spacing per manufacturer and SMACNA guidelines. · Each student installs a 6-foot flexible-duct branch on the mock-up frame, verifying minimum bend radius with a radius template card and recording support locations in the lab log. · Fabricate and assemble a simple duct-board supply plenum (score-and-fold method) using a utility knife and straightedge; apply duct-board staples at corner joints and inspect for gaps.
Materials: Class-1 flexible duct (assorted diameters), draw bands (UL 181B rated), duct-board panels (R-6 foil-faced), utility knife, straightedge, duct-board stapler, bend-radius template cards, mock-up framing, lab-log notebooks
Check: Instructor checks flexible-duct bend radius (must meet manufacturer minimum), draw-band position (within specified distance of collar end), and duct-board corner joints for gaps greater than 1/8 inch; all three checks must pass.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

HVAC Excellence — Air Distribution
1. What does the UL 181 listing on a flexible duct product confirm?
NATE — Air Distribution
2. When making a two-step draw-band connection on flexible duct, where must the first draw band (on the inner liner) be positioned?
NCCER HVAC — Duct Systems
3. A flex-duct run has a very tight bend where the inner liner appears kinked and partially collapsed. What is the most likely effect on system performance?
NATE — Air Distribution
4. According to SMACNA guidelines and most flex-duct manufacturers, what is the maximum recommended horizontal support spacing for flexible duct?
HVAC Excellence — Duct Fabrication
5. In the score-and-fold method for duct board, what is the purpose of the utility-knife score on the back face of the panel?
NCCER HVAC — Duct Fabrication
6. After assembling a duct-board plenum corner joint, an inspector finds a gap of 3/16 inch along the foil seam. What is the correct action?
HVAC Excellence — Safety
7. Which personal protective equipment (PPE) is most important when cutting duct-board panels in an enclosed space?
NATE — Air Distribution
8. A technician installs an 8-inch flex-duct run with a centerline bend radius of 5 inches. The manufacturer's specification requires a minimum bend radius of 1.0 times the duct diameter. Is this installation acceptable, and why?