BLD-HVAC07-08 · Lesson 2 · 72 clock hours · lab

Rough-In Installation: Mechanical, Electrical, and Refrigerant Piping

Objective. Students will install the air-handling unit, condensing or heat pump unit, lineset, electrical disconnects and wiring, low-voltage control wiring, and ductwork for their assigned project system in the lab installation bay, passing an instructor rough-in inspection before proceeding.

Rough-In Installation: Mechanical, Electrical, and Refrigerant Piping

The rough-in phase is where your approved drawings become a real system. Every measurement, connection, and label you make now determines whether commissioning goes smoothly or turns into a troubleshooting marathon. Work methodically through the project checklist—never skip a step to save time.

Safety Before You Touch Anything

Lockout/tagout (LOTO) is mandatory any time you open a panel, connect or disconnect wiring, or work near energized conductors. Verify the circuit is de-energized with a multimeter before touching any terminal. Wear safety glasses throughout the lab—brazing, drilling, and cutting all create projectile hazards. Add leather gloves when handling sheet metal edges and brazing equipment. Use hearing protection when running reciprocating saws or hole saws. When brazing, ensure adequate ventilation and keep a fire extinguisher within reach. Nitrogen purge gas is non-toxic but displaces oxygen in confined spaces; keep the area ventilated.

Setting the Air-Handling Unit

Begin with the air-handling unit (AHU). If the unit is floor-mounted, build or verify a level platform—check level in two directions with a spirit level. If the unit hangs from structure, install the manufacturer-specified hanging brackets and vibration isolators so the unit sits plumb and level. An out-of-level AHU causes condensate to drain toward the blower instead of the drain pan outlet, leading to overflow and water damage.

Fabricate the supply plenum and return-air box to the dimensions on your drawings. Use sheet-metal screws on every joint, then seal every seam with mastic sealant and mesh tape—never use duct tape alone for final sealing. Connect branch duct runs and register boxes, maintaining the duct sizes shown on your drawings to preserve the design airflow.

For the condensate drain, install a trap sized to the manufacturer's specification. A properly dimensioned trap prevents air from being drawn back through the drain line, which would break the seal and allow drain pan overflow. Slope the horizontal drain line at least one-quarter inch per foot toward the discharge point. Glue all PVC fittings with the appropriate primer and cement, following the product's cure time before testing.

Refrigerant Piping (Lineset)

The lineset connects the indoor and outdoor units. Use only clean, dry refrigerant-grade copper tubing. Before brazing, flow dry nitrogen through the line at low pressure to purge oxygen; this prevents copper oxide scale from forming inside the tubing, which would contaminate the refrigeration system.

For flared connections, cut the tubing square, deburr the end, slide the flare nut on before flaring, and make the flare with the correct flaring tool for the tubing size. Inspect each flare for cracks or uneven thickness before assembling. Torque flare nuts to the manufacturer's specification using a flare-nut wrench, not an open-end wrench.

For brazed joints, clean the tubing with emery cloth, apply the appropriate flux if required, heat the joint evenly, and let the braze alloy flow by capillary action—do not push the rod into the flame. Overheating burns flux and weakens joints. All braze joints must be visually inspected for full penetration and smooth fillets.

Support the lineset with hangers or strapping at intervals required by the manufacturer or applicable mechanical code, and insulate the suction line continuously from indoor to outdoor unit to prevent condensation and heat gain.

Electrical Rough-In

With LOTO applied at the panel, pull the power circuit for the condensing unit and for the AHU. Use the wire gauge and breaker size specified on the equipment nameplate and your wiring diagram—never upsize a breaker beyond what the equipment requires. Install a properly rated disconnect within sight of the condensing unit as required by the National Electrical Code. Connect power wiring to the unit terminals per the manufacturer's wiring diagram, confirming wire colors and terminal labels match.

Run low-voltage thermostat cable between the AHU control board, the outdoor unit, and the thermostat. Most residential and light-commercial systems use 18-gauge, multi-conductor thermostat wire. Label each conductor at both ends using the letter designations shown on the wiring diagram (R, C, Y, G, W, etc.) before making connections.

Install the thermostat on the mock wall assembly at approximately 5 feet from the floor, away from direct sunlight, supply registers, and exterior walls—locations that cause false temperature readings.

Labeling and Final Checks Before Inspection

Label every circuit breaker, disconnect, and major component with a durable label that matches your equipment schedule. Label thermostat wire conductors at both the AHU board and the thermostat sub-base. Use your project checklist to verify each item before calling for the rough-in inspection.

The instructor will evaluate your work against a 30-point punch list covering mechanical mounting, refrigerant piping quality, electrical wiring, duct connections, and condensate drain slope. You may have no more than three minor deficiencies and zero major deficiencies (safety or code violations) to proceed. Correct all major deficiencies and request re-inspection before the next lesson.

Key terms10

Rough-inThe installation phase in which equipment is mounted and piping, wiring, and ductwork are run before the system is commissioned or tested under operating conditions.
Lockout/tagout (LOTO)An OSHA-required procedure that isolates and de-energizes hazardous energy sources (electrical, mechanical, pneumatic) and locks them in the safe state before work begins.
Vibration isolatorA resilient mount (rubber pad, spring, or flexible hanger) placed between equipment and its support structure to reduce transmission of operating vibration to the building.
Condensate trapA dip in the condensate drain line, sized per manufacturer specifications, that holds a water seal preventing conditioned air from being drawn back through the drain and breaking the drain.
Nitrogen purgeThe practice of flowing dry nitrogen through copper refrigerant tubing during brazing to displace oxygen and prevent the formation of copper oxide scale inside the line.
LinesetThe pair of refrigerant copper tubes (suction line and liquid line) that connect the indoor air-handling unit to the outdoor condensing or heat pump unit.
Mastic sealantA thick, paste-type duct sealant applied with mesh tape to duct joints and seams to create an airtight, durable seal that meets mechanical code requirements.
Disconnect switchAn NEC-required safety device installed within sight of the condensing unit that allows the circuit to be de-energized locally for service without returning to the main panel.
Low-voltage thermostat wireMulti-conductor cable (typically 18-gauge) carrying 24 V AC control signals between the thermostat, air-handling unit control board, and outdoor unit contactor or control board.
Punch listA structured inspection checklist used to identify deficiencies—items that are incomplete, incorrect, or non-compliant—that must be corrected before work proceeds to the next phase.

Worked examples4

1. Your condensate drain must slope at least 1/4 inch per foot. The horizontal drain run from the AHU drain pan outlet to the floor drain is 8 feet long. What is the minimum total drop in elevation across that run?
  1. Identify the required slope: 1/4 inch of drop for every 1 foot of horizontal run.
  2. Multiply the run length by the required slope rate: 8 ft × 0.25 in/ft = 2.0 inches.
  3. Confirm the answer makes sense: 8 feet of pipe dropping 2 inches gives a clear, gravity-fed slope toward the drain.
Answer: The drain must drop a minimum of 2 inches over the 8-foot horizontal run.
2. A hanging AHU must be supported so the unit is level. After setting the brackets, you place a 48-inch level on the unit and read a bubble offset of 1/4 inch to the right (the right side is low). The right-side hanger rod has an adjustable nut. How many turns of the nut do you need if the threaded rod has 8 threads per inch and you need to raise the right side exactly 1/4 inch?
  1. Determine the pitch (rise per turn): with 8 threads per inch, each full turn of the nut moves the rod 1/8 inch (1 ÷ 8 = 0.125 inch per turn).
  2. Divide the required rise by the rise per turn: 0.25 in ÷ 0.125 in/turn = 2 turns.
  3. Turn the hanger nut 2 full turns in the direction that raises the right side, then re-check level.
Answer: 2 full turns of the adjustable hanger nut will raise the right side 1/4 inch and level the unit.
3. The lineset suction line is 3/4-inch OD copper. You need to support it with hangers. The mechanical code in effect for your lab requires hangers no more than 6 feet apart for tubing up to 7/8-inch OD. Your lineset run from the AHU to the outdoor unit is 25 feet. What is the minimum number of hangers required?
  1. Divide the total run by the maximum hanger spacing: 25 ft ÷ 6 ft = 4.17 intervals.
  2. Round up to the next whole number of intervals: 5 intervals.
  3. The number of hangers equals the number of intervals when both ends are already mechanically supported by the equipment connections: 5 hangers are needed along the run. (If neither end counts as a support, add one more; follow the specific lab or code guidance for end conditions.)
  4. Using the conservative approach (interior span supports only): 5 hangers placed no more than 6 feet apart across the 25-foot run.
Answer: A minimum of 5 hangers are required along the 25-foot lineset run at no more than 6-foot spacing.
4. Your wiring diagram shows the condensing unit requires a 240 V, single-phase circuit. The nameplate lists a Minimum Circuit Ampacity (MCA) of 18 A and a Maximum Overcurrent Protection (MOP) of 30 A. What is the minimum wire gauge you should pull, and what is the largest breaker you may install? (Use NEC Table 310 general copper conductor ampacity as your reference basis.)
  1. MCA = 18 A means the circuit conductors must be rated for at least 18 A continuous. From standard NEC ampacity tables, 12 AWG copper (rated 20 A at 60 °C) satisfies 18 A; 14 AWG (rated 15 A) does not—use 12 AWG minimum.
  2. MOP = 30 A is the largest overcurrent device permitted by the equipment manufacturer. Install a breaker rated no larger than 30 A; a standard 30 A two-pole breaker is appropriate here.
  3. Confirm: 12 AWG wire is protected by the 30 A breaker only because equipment nameplate MOP permits it—this is a recognized exception for motor-compressor circuits under the NEC.
Answer: Minimum wire gauge: 12 AWG copper. Maximum breaker size: 30 A two-pole (as permitted by the nameplate MOP).

The math in this lesson1

Learners compute condensate drain drop from ¼ inch per foot over an 8-foot run and count hangers.
6.RP.3
In class: Following their approved drawings, students set the air-handling unit on a properly leveled platform or hanging brackets, fabricate and attach a supply plenum and return-air box, install vibration isolators, make the condensate drain with correct trap dimensions and slope to drain, and seal all duct connections with mastic and mesh tape—confirming work at each step against the project checklist before moving on. · Students run the lineset (pre-charged line set or field-brazed copper tubing) between the indoor and outdoor units, flaring or brazing fittings as required, then pull the electrical circuit from the designated panel location, install a properly sized disconnect, connect power wiring to the condensing unit and air handler per the wiring diagram, and run low-voltage thermostat cable—all with LOTO applied whenever working in the panel. · Students complete duct branch runs and register boxes, connect the supply and return ducts to the plenum and air handler, install the thermostat on a mock wall assembly at the correct height and location, label all circuits and components per their equipment schedule, and submit the system for a structured rough-in inspection where the instructor checks each item on a 30-point punch list.
Materials: Residential or light-commercial split system or heat pump units (matched sets, lab inventory), copper refrigerant tubing (various sizes), flaring tools and flare-nut wrenches, brazing torch set and nitrogen purge equipment, duct sections (sheet metal and flex), sheet-metal screws, mastic sealant and mesh tape, duct hangers and strapping, electrical wire (appropriate gauges), conduit and fittings, disconnect switches, low-voltage thermostat wire, digital multimeter, torpedo and spirit levels, reciprocating saw and hole saw set, PPE (safety glasses, gloves, hearing protection), LOTO kit, condensate drain materials (PVC pipe, fittings, primer, cement), project wiring diagrams, manufacturer installation manuals
Check: Instructor completes a 30-point rough-in punch list covering mechanical mounting, refrigerant piping quality, electrical wiring correctness, duct connections, and condensate drain slope; students must have no more than 3 minor deficiencies (items requiring correction but not posing a safety or code violation) and zero major deficiencies (safety or code violations) to proceed. All major deficiencies must be corrected and re-inspected before the next lesson begins.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

EPA 608 – Refrigerant handling and system integrity
1. Why must dry nitrogen be flowing through copper refrigerant tubing while it is being brazed?
NATE – Air distribution and system installation
2. A condensate drain trap is installed primarily to:
NCCER HVAC – Safety and electrical practices
3. When connecting power wiring to a condensing unit in the lab, which action must be completed FIRST?
HVAC Excellence – Duct systems and air distribution
4. Which sealant method meets standard mechanical code requirements for sealing duct joints in a forced-air system?
NCCER HVAC – Electrical systems
5. The equipment nameplate on a condensing unit shows a Maximum Overcurrent Protection (MOP) of 30 A. The installer puts in a 40 A breaker to avoid nuisance tripping. This is:
EPA 608 – Refrigerant piping and system integrity
6. When installing a flare fitting on a refrigerant line, which step must be completed BEFORE making the flare?
NCCER HVAC – Electrical safety and code compliance
7. The NEC requires that a disconnect switch for a condensing unit be located:
HVAC Excellence – Installation quality and inspection
8. During a rough-in inspection, the instructor finds that the suction line insulation has a 12-inch section left uninsulated where the line passes through a wall chase. How should this deficiency be classified?
Record this lesson on my transcript. Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.