Series B · The Chain

From Survey to Skyline

Museum of VoTech · The Chain

From Survey to Skyline

From Survey to Skyline — panel art

A tower is a relay race run by trades. Follow one building from the ground up.

1. Survey. The surveyor recovers the lot lines and sets the control points. Everything else is measured from here.
2. Excavation. Heavy-equipment operators dig to bedrock; drillers set the piles.
3. Foundation. Ironworkers tie the rebar mat; carpenters build the forms; the concrete crew pours the 3 a.m. slab.
4. Structure. Ironworkers raise the steel or the crews jump the concrete core, a floor every four days.
5. Skin. Glaziers hang the curtain wall unit by unit from the tower crane.
6. Systems. Plumbers, electricians, HVAC and fire-sprinkler fitters run the risers; elevator mechanics build the vertical railway.
7. Finish. Drywall, painters, tile, millwork, flooring.
8. Commission. Inspectors, commissioning agents, the fire marshal.
9. Occupancy. The hotel opens; the cleaners, the front desk and the dry cleaner's linen run begin.

Every step is a program in this school. Count the trades on the wall: nineteen.

Scan for the reading · newschoolworks.com/q/225K3YQR code 225K3Y to the reading225K3Y
48 × 36 in landscape · aluminum composite, UV print, matte laminate · 161 words — within the 250-word rule · status reading

The reading behind this panel

From 911 Call to Emergency RoomFrom Drawing to PartFrom Farm to PlateFrom Groundbreaking to First GuestFrom Keel to Sea TrialFrom Ore to I-BeamFrom Survey to SkylineFrom Wire to Light