🚧 Under construction — VoTechWorks is being built. A free tech program — complimentary, as our commitment to get America working.
voTechWorksGrade 13 · a vocational technology learning center, by urbanicity
newSchoolWorks.com › VoTechWorks › Building & Construction › Electrical Lineworker › Courses
Building & Construction · course plan
⚠ Pending professional review

This course plan, its lessons and its assessments has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.

VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.

Electrical Lineworker

11 courses · 600 clock hours · 3–4 mo full-time. Grading is competency-based: each course requires the written exam, a competent skills demonstration with zero safety faults, a signed log, and a passed safety audit; percentage weights only rank performance above the competency floor.

$6,985 COMPLIMENTARYprogram tuition
11courses
54lessons
600hours
39assessments
Development progressPlanCourses, lessons and assessments written for this tradeLessons54 of 54 lesson pages writtenPractice424 practice questionsResources111 reference entries (study list)Review0 lesson pages reviewed by a licensed professional
Study now: 54 lesson pages are open (lesson titles below are links).
BLD-LINE69-01 Universal core

Universal Core: Safety, Math, Communication & Career for Electrical Lineworkers

148 hr · $1,185 COMPLIMENTARY

This foundational course equips adult learners with the safety knowledge, trade mathematics, technical literacy, digital skills, and career readiness required before entering any hands-on lineworker training. Learners earn OSHA 10 and First Aid/CPR credentials, practice the arithmetic and measurement skills used daily on distribution crews, and build the professional habits expected by utility and construction employers.

Outcomes
Course text

This foundational course equips adult learners with the safety knowledge, trade mathematics, technical literacy, digital skills, and career readiness required before entering any hands-on lineworker training. Learners earn OSHA 10 and First Aid/CPR credentials, practice the arithmetic and measurement skills used daily on distribution crews, and build the professional habits expected by utility and construction employers.

How the course runs. 7 blocks: Hazard Recognition and OSHA 10 for Construction; First Aid, CPR, and Electrical Emergency Response; Trade Math I: Arithmetic, Units, and Electrical Formulas; Trade Math II: Geometry, Measurement, and Pole-Line Calculations; Technical Reading: Drawings, Pole Schedules, NESC, and SDS; Digital Tools, Documentation, and Professional Communication; Career Readiness: Resume, Application, Workplace Culture, and Industry Pathways.

What competent looks like. Pass the OSHA 10 construction outreach training assessment and hold a valid OSHA 10 card by course end. Demonstrate First Aid and CPR skills to the standard required for certification by an accredited provider. Apply trade math—including Ohm's Law, unit conversion, load calculations, and basic trigonometry—accurately enough to solve problems encountered in lineworker coursework and on the job. Read and interpret utility construction drawings, pole schedules, NESC tables, and material safety data sheets at a level sufficient for entry-level crew work. Use standard digital tools—email, job-site apps, electronic timesheets, and safety reporting platforms—to communicate and document work in a professional manner. Construct a resume, complete a utility employer application, and demonstrate interview behavior consistent with entry-level hiring expectations in the electrical line trade.

Lessons · 7 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1Hazard Recognition and OSHA 10 for Construction30theoryLearners will identify the most common construction hazards—with emphasis on electrical, fall, struck-by, and caught-in/between—and explain the OSHA General Duty Clause, inspection rights, and employer/worker responsibilities well enough to pass the OSHA 10 construction outreach assessment.
  1. Instructor-led walk-through of each of the OSHA 10 construction topic modules using OSHA-authorized curriculum; learners complete the in-module quizzes and record answers in a personal safety log.
  2. Hazard hunt exercise: learners examine a set of lineworker jobsite photographs and tag every violation or near-miss using sticky-note codes keyed to the OSHA focus-four categories, then compare findings in small-group debrief.
  3. Mock OSHA 10 final: learners complete a timed 20-question practice exam drawn from the authorized topic areas, review missed items with the instructor, and identify which OSHA standards apply to each wrong answer.
OSHA 10 Construction Outreach authorized trainer curriculum and student workbooks; OSHA 29 CFR Part 1926 pocket guide; jobsite photograph sets (utility-specific); whiteboard; personal safety log notebooks.Learners score 70% or better on the OSHA 10 in-module quizzes and on the mock final; the authorized trainer submits the roster for official OSHA 10 cards. Below 70% triggers mandatory review before the official exam is submitted.
2First Aid, CPR, and Electrical Emergency Response16labLearners will perform hands-only and full CPR, use an AED, control bleeding, treat electrical contact injuries, and activate an emergency action plan on a simulated utility jobsite to the standard required for certification.
  1. Instructor demonstration of CPR compression depth and rate on adult manikins, followed by each learner completing at least three continuous practice rounds, with a metronome used to hold proper rate.
  2. Scenario drill: one learner acts as a downed lineworker who has contacted an energized conductor; team practices approach-safety check, calling for help, verifying the circuit is de-energized before contact, and initiating CPR—repeated until every learner leads once.
  3. AED familiarization and hands-on pad placement drill using a training AED unit; learners narrate each step aloud to demonstrate understanding of the two-minute CPR-then-shock cycle.
Adult CPR manikins (minimum one per two learners); training AED units; latex-free gloves and face shields; bleeding-control kits (tourniquets, pressure bandages); accredited provider's First Aid/CPR student manual; burn dressing supplies for electrical-injury scenarios.Certified instructor from the accredited provider scores each learner on a skills checklist covering CPR quality, AED use, and bleeding control; learners must pass all required skills stations to receive certification. Any failed station is re-attempted on the same day.
3Trade Math I: Arithmetic, Units, and Electrical Formulas24theoryLearners will accurately convert between imperial and metric units, perform percentage calculations, and apply Ohm's Law and the power formula to solve wire-sizing and load problems typical of distribution line work.
  1. Pre-assessment quiz covering fractions, decimals, and unit conversion; instructor uses results to group learners for targeted practice on their specific weak areas before whole-class instruction moves forward.
  2. Ohm's Law triangle drill: learners receive a 15-problem worksheet with voltage, current, and resistance unknowns derived from actual residential transformer secondary values; they solve each problem and check answers using a basic scientific calculator, then verify three answers with a clamp meter on a low-voltage demonstration board.
  3. Load-calculation relay race: teams of three solve a series of distribution-circuit problems (calculating amperage draw, voltage drop over a given wire length, and transformer kVA requirement) posted on the whiteboard; teams must show all unit conversions and formula steps, not just final answers.
Scientific calculators; low-voltage demonstration board with variable resistors; clamp meter; instructor-prepared worksheet sets; NJATC (IBEW/NECA) Mathematics for Electricians reference text or equivalent trade math textbook; whiteboard and markers.Learners score 75% or better on a 20-problem end-of-lesson exam covering unit conversion, percentage, Ohm's Law, and power formula; learners who score below 75% complete a targeted remediation worksheet before the next lesson begins.
4Trade Math II: Geometry, Measurement, and Pole-Line Calculations18labLearners will use basic geometry and right-triangle trigonometry to calculate sag, span length, guy-wire length, and grade percentages as used in overhead distribution line design and staking.
  1. Instructor introduces sag and catenary concepts using a scaled-down rope-and-pole demonstration; learners measure sag at mid-span with a tape measure and compare results to the calculated value using the parabolic sag formula provided in a standard line-design reference.
  2. Guy-wire angle exercise: learners are given a pole height, lead distance, and anchor depth for three scenarios; they sketch the right triangle, label all sides, identify the correct trig ratio, and calculate the required guy-wire length, then peer-check each other's work.
  3. Field measurement lab in the parking lot: learners use 100-foot tape measures, hand levels, and a clinometer to measure the grade percentage of two marked paths and calculate the horizontal distance between two simulated pole positions, recording results on a standard staking-sheet form.
100-foot fiberglass tape measures; hand levels; clinometer; rope-and-pole sag demonstration rig; scientific calculators; instructor-prepared staking-sheet forms; standard line-design reference table for sag and tension (e.g., Rural Utilities Service Bulletin or equivalent).Learners complete a four-problem applied quiz—one sag, one guy-wire, one grade, one span—with all formula steps shown; pass mark is 75%. Learners who miss any problem type complete a targeted drill before the next lesson.
5Technical Reading: Drawings, Pole Schedules, NESC, and SDS22theoryLearners will extract accurate information from utility construction drawings, pole-loading schedules, selected National Electrical Safety Code tables, and Safety Data Sheets to answer questions a crew member would face on a real work order.
  1. Drawing interpretation exercise: each learner receives a set of three utility staking sheets (single-phase tap, three-phase mainline, and underground riser) and answers a 10-question scavenger hunt—locating pole numbers, conductor sizes, guy specifications, and equipment callouts—without instructor help, then compares answers in pairs.
  2. NESC table navigation drill: instructor assigns each learner a specific wire size, voltage level, and geographic loading district; learners locate the applicable clearance and strength requirements in a current NESC table, record the values, and explain in one written sentence why that requirement exists.
  3. SDS station rotation: five chemical products common on lineworker jobsites (transformer oil, hydraulic fluid, cable pulling compound, rust-inhibiting primer, and aerial lift lubricant) are set up at lab stations; learners rotate through and complete a standardized SDS extraction form for each product, recording hazard classification, PPE requirements, and first-aid measures.
Printed utility staking-sheet sets; current edition of the National Electrical Safety Code (NESC) or approved excerpts; Safety Data Sheets for the five listed products; SDS extraction forms; highlighters.Learners score 80% or better on a combined 25-question written quiz covering drawing symbols, NESC table lookups, and SDS interpretation. The higher pass mark reflects the safety-critical nature of misreading a work order.
6Digital Tools, Documentation, and Professional Communication18demoLearners will compose a professional email, complete an electronic timesheet and digital safety report, and navigate at least one jobsite management application to demonstrate the digital literacy expected of entry-level utility crew members.
  1. Email etiquette workshop: instructor presents before-and-after examples of professional versus unprofessional workplace emails; learners draft and send a sample email to the instructor reporting a fictitious near-miss incident, using subject line, greeting, body, and closing conventions reviewed in class—instructor replies with written feedback.
  2. Digital forms lab: using tablets or computer lab stations, learners log into a simulated or actual job-site platform (such as a safety reporting app or electronic timesheet system used by a local utility partner) and complete three entries—a timesheet, a daily tailgate safety report, and a material delivery confirmation—under timed conditions.
  3. Documentation review exercise: learners receive a completed paper as-built sketch and must transfer the information accurately into a standard electronic field record form, then check each other's entries against the original for errors—any discrepancy is circled and corrected with an explanation of why accuracy matters in utility records.
Tablets or desktop computers with internet access; simulated or employer-provided job-site app logins; instructor-designed near-miss scenario cards; sample as-built sketch; electronic form templates; projector for demonstration.Instructor evaluates each learner's email (grammar, completeness, professional tone—must meet all three criteria to pass), digital form completion (zero data-entry errors required on the timesheet), and the as-built transfer (95% field accuracy). Any failed element is corrected and resubmitted within one class session.
7Career Readiness: Resume, Application, Workplace Culture, and Industry Pathways20theoryLearners will produce a trade-specific resume, complete a utility employer application accurately, and demonstrate professional interview behavior in a mock interview evaluated by an industry guest or instructor.
  1. Resume workshop: learners draft a one-page resume using a lineworker-specific template that includes objective statement, relevant skills, education, certifications earned (OSHA 10, First Aid/CPR), and any prior work or military experience; peers exchange drafts and give written feedback using a provided checklist before a final version is submitted to the instructor.
  2. Employer application session: learners complete a real or simulated utility company employment application in full—including the CDL and physical requirements sections—and identify any documents (birth certificate, DD-214, prior employer contact information) they would need to gather before applying for a real position.
  3. Mock interviews: learners are paired; each takes a turn as applicant and interviewer using a provided question set based on actual lineworker hiring interviews (questions about working at heights, physical demands, shift flexibility, and safety attitude); a guest from a local utility or union hall observes and provides feedback on eye contact, answer structure, and professional dress.
Lineworker-specific resume template; sample utility employer application; mock interview question set; professional dress guidelines handout; industry guest speaker (utility HR representative or IBEW/NECA local business agent where available); peer feedback checklist.Resume meets all eight checklist criteria (contact information, objective, certifications, skills, experience, formatting, no spelling errors, one page) to pass. Mock interview is scored by the instructor or guest on a rubric; learners must score Meets Expectations or above on at least four of five categories (appearance, communication, answer relevance, safety attitude, professionalism).
Assessments
AssessmentTypeWeightPass standardMethod & rubric
OSHA 10 Construction Outreach Final AssessmentWritten exam25%70% correct on the authorized OSHA 10 construction outreach final assessment as required by the OSHA Outreach Training Program; learners who do not meet this mark receive targeted review and one additional attempt before the roster is submitted.Administered by the OSHA-authorized trainer using the official outreach program assessment tool covering the OSHA 10 construction topic areas including the focus-four hazards, personal protective equipment, electrical safety, and worker rights. Successful completers are submitted for the official OSHA 10 construction card.
Accuracy · Safety · Communication · Professionalism
Trade Math and Technical Reading ExamWritten exam25%75% or better on each of the two sections (math and technical reading) scored separately; a learner who passes one section but not the other retakes only the failed section within five school days.A 50-item written examination divided equally between trade math problems (unit conversion, Ohm's Law, power formula, sag and guy-wire geometry) and technical reading questions (drawing symbol identification, NESC table lookup, and SDS extraction) drawn from the content of Lessons 3, 4, and 5. All math problems require shown work; answers without supporting steps receive half credit at most.
Accuracy · Safety · Communication · Professionalism
Career Readiness PortfolioProject25%All four portfolio components must individually meet their stated standard: resume passes the eight-point checklist with zero unresolved errors; application is complete with no blank required fields; email sample meets professional tone, completeness, and grammar criteria; digital forms submitted during Lesson 6 have no timesheet errors and 95% field-accuracy on the as-built transfer.Learners compile a physical or electronic folder containing their finalized resume, a completed employer application, their graded near-miss email, and printed confirmation of their digital form submissions from Lesson 6. The portfolio demonstrates that the learner can produce the documentation an entry-level lineworker is expected to handle on day one of employment.
Accuracy · Safety · Communication · Professionalism
Oral Safety and Career DefenseOral / panel25%Learner must score Meets Expectations or above on at least five of six rubric categories: hazard identification accuracy, OSHA standard citation, emergency response sequence, SDS interpretation, career goal articulation, and professional communication; any category scored Does Not Meet triggers a focused follow-up conversation within three school days.A 15-minute individual oral session with the instructor and, where available, an industry guest in which the learner is given a two-minute lineworker jobsite scenario, then must identify hazards and applicable OSHA standards, describe the correct emergency response, locate a specified value in an SDS, and explain their personal plan for advancing in the line trade after this program. The session assesses integration of safety knowledge, technical reading, and career awareness developed across all seven lessons.
Accuracy · Safety · Communication · Professionalism
BLD-LINE69-02 Trade course

Pole Climbing

35 hr · $630 COMPLIMENTARY

Students develop the foundational physical skills and safety knowledge required to climb wood utility poles using gaffs (climbers) and a body belt or fall-arrest system. Lessons progress from equipment inspection and donning through ground-level practice, controlled pole ascent and descent, and working-position tasks at height, all within OSHA and NESC electrical worker safety requirements. Successful completers can safely ascend and descend a class utility pole, establish a secure working position, and rescue a simulated injured climber—skills directly assessed in the NCCER Power Line Worker credential.

Outcomes
Course text

Students develop the foundational physical skills and safety knowledge required to climb wood utility poles using gaffs (climbers) and a body belt or fall-arrest system. Lessons progress from equipment inspection and donning through ground-level practice, controlled pole ascent and descent, and working-position tasks at height, all within OSHA and NESC electrical worker safety requirements. Successful completers can safely ascend and descend a class utility pole, establish a secure working position, and rescue a simulated injured climber—skills directly assessed in the NCCER Power Line Worker credential.

How the course runs. 5 blocks: Climbing Equipment: Selection, Inspection, and Fit; Ground School: Body Mechanics, Gaff Placement, and Hazard Recognition; First Climbs: Ascending, Descending, and Working Position; Pole-Top Rescue and Emergency Procedures; Proficiency Assessment Climbs and Portfolio Completion.

What competent looks like. Inspect, fit, and correctly don pole-climbing gaffs, body belt, and fall-arrest personal protective equipment before each climb in accordance with manufacturer specifications and OSHA general industry/construction standards. Demonstrate proper gaff placement, body lean, and weight transfer to ascend and descend a wood utility pole to a minimum height of 25 feet without a gaff-out. Establish a secure, hands-free working position at height using a body belt work positioning lanyard and perform simulated two-handed work tasks on the pole. Execute a pole-top and mid-pole rescue of a simulated injured or unresponsive climber using controlled-lowering techniques. Maintain a climbing log documenting each ascent, equipment condition, gaff-out incidents, and corrective actions taken. Identify hazardous pole conditions—including decay, woodpecker damage, and foreign attachments—and apply pre-climb inspection procedures before ascending.

Lessons · 5 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1Climbing Equipment: Selection, Inspection, and Fit7labStudents will correctly inspect climbing gaffs, body belts, work positioning lanyards, and fall-arrest equipment and adjust each item to a proper fit, identifying and removing from service any item with a defect.
  1. Instructor-led demonstration of each piece of climbing PPE: steel climbing gaffs (gaff length, shank, strap system), body belt with D-rings, positioning lanyard with snap hooks, and supplemental fall-arrest harness—students handle each item and locate manufacturer labels and inspection dates.
  2. Pair inspection drill: each student cycles through a written inspection checklist (checking gaff points for sharpness and integrity, straps for cuts and UV degradation, snap hooks for latch function, D-rings for distortion, lanyards for core and sheath condition) on five sets of gear—one set intentionally prepared with planted defects—and tags out the defective set with a red danger tag.
  3. Fitting lab: students adjust gaffs to their boot using manufacturer sizing guides, tighten straps to the torque and snugness specification, don the body belt, size the positioning lanyard to working length, and have their setup verified by the instructor against a go/no-go checklist before recording the fit data in their climbing log.
Steel climbing gaffs (multiple sizes), body belts rated for lineworker use, work positioning lanyards, supplemental fall-arrest harnesses, snap hooks, 6-point inspection checklists, red danger tags, manufacturer PPE manuals, OSHA 1910.269 and 1926 Subpart V reference cards, student climbing log booksInstructor evaluates each student's completed inspection checklist against the answer key (minimum 90% accuracy) and physically verifies gaff fit and body belt adjustment; any student whose gear is improperly fitted or who fails to identify a planted defect must repeat the activity before advancing.
2Ground School: Body Mechanics, Gaff Placement, and Hazard Recognition7demoStudents will describe and physically demonstrate on a ground-level practice pole section the correct body lean angle, knee-out technique, and gaff strike angle that prevent gaff-outs, and will identify at least five hazardous pole conditions from photographs and a real pole inspection.
  1. Instructor demonstrates on a horizontal pole mock-up and a short (8-foot) section of pole set at ground level: body lean away from the pole (approximately 10–12 inches from chest to pole), knees out, gaff striking at the correct angle into the wood—then deliberately demonstrates a gaff-out so students can see and hear the failure mode; students watch, then narrate what they observe.
  2. Hazard recognition gallery walk: ten numbered photographs posted around the classroom show poles with varying defects (shell rot, heart rot, woodpecker holes, foreign wire attachments, broken steps, ground-line deterioration, charring, splits, leaning poles, and evidence of insect infestation); students record the defect type and their climb/no-climb decision with a rationale for each, then debrief as a group.
  3. Ground-level repetition drill: with gaffs donned and positioned next to an 8-foot practice pole set vertically in a tire stand, each student performs 20 alternating gaff strikes into the wood at the correct angle while maintaining proper body lean, coached by a partner reading cues from a technique card; instructor circulates and provides real-time correction.
8-foot wood pole sections (set in tire stands or ground brackets), hazard-recognition photograph set, technique cue cards, climbing log books, NCCER Power Line Worker module reference, measuring tape (to verify 10–12-inch body lean), whiteboard for debriefingStudents must complete 20 consecutive gaff strikes on the ground-level pole with zero gaff-outs and maintain correct lean as confirmed by instructor observation using a 4-point technique rubric (lean, knee position, gaff angle, weight transfer); students who gaff out more than twice in any 10-strike set repeat the drill the same day.
3First Climbs: Ascending, Descending, and Working Position10fieldStudents will ascend a full-height utility training pole to a minimum of 25 feet, establish a hands-free working position using the body belt positioning lanyard, perform a simulated task with both hands, and descend without a gaff-out, meeting the NCCER Power Line Worker climbing performance standard.
  1. Supervised first ascent sequence: with an instructor acting as ground observer and a second instructor at mid-height on a parallel pole, each student ascends to 15 feet, pauses on instruction, sets the positioning lanyard around the pole to achieve a hands-free working position, removes and replaces one hand tool from their body belt tool pouch, then ascends to 25 feet and repeats the working-position sequence—ground observer records technique errors on a field observation sheet.
  2. Paired observation and feedback: while one student climbs, a partner on the ground uses the technique cue card to watch for gaff angle, body lean, and smooth weight transfer and records observations; after descent both partners swap roles and then complete a 5-minute structured debrief comparing the field observation sheet to self-assessment.
  3. Progressive repetition climbs: each student completes a minimum of four full ascent-and-descent cycles during the lesson period, with the instructor progressively withdrawing verbal cues after the second climb so students self-monitor; each cycle is logged in the climbing log (date, height reached, gaff-outs if any, equipment condition note).
Full-height OSHA-compliant training pole yard with poles set to 40-plus feet, safety observer vests, full climbing PPE set per student, tool pouches with sample lineworker hand tools, field observation sheets, climbing log books, two-way radios for ground-to-height communication, first-aid kit on siteEach student must complete two consecutive ascent-and-descent cycles to 25 feet with zero gaff-outs and a proper hands-free working position on both cycles, scored by the instructor on a pass/fail performance rubric; students who gaff out on either cycle repeat additional supervised climbs before the next lesson begins.
4Pole-Top Rescue and Emergency Procedures7practiceStudents will execute a pole-top or mid-pole rescue of a simulated incapacitated climber—attaching a rescue line, controlling the descent, and lowering the victim to the ground—within the time and technique standards established by OSHA 1910.269 emergency rescue requirements.
  1. Classroom setup and scenario review: instructor presents the two rescue scenarios required by OSHA 1910.269—rescuer ascends to victim's level on the same or adjacent pole, attaches a controlled-lowering device or rescue line to the victim's D-ring, releases the victim's positioning lanyard, and lowers the victim hand-over-hand to ground personnel—students walk through the steps on a whiteboard flowchart and discuss common errors (dropping tools, incorrect D-ring attachment, failure to communicate with ground crew).
  2. Mannequin rescue drill on training pole: a weighted rescue mannequin is strapped to the pole at 20 feet in a simulated slump; each student dons full climbing PPE, ascends, attaches the rescue descender to the mannequin's body belt D-ring, releases the positioning lanyard on voice command from the ground observer, and lowers the mannequin under control while maintaining their own working position—ground crew receives the mannequin; time and technique are recorded.
  3. Debrief and repeat: after each rescue the student descends, the mannequin is reset, and the group debriefs using the field observation sheet; students who exceed the target time or make a technique error (wrong D-ring, uncontrolled lowering, failure to communicate) perform a second rescue attempt the same session; the event is recorded in the climbing log.
Weighted rescue mannequin with body belt and D-rings, controlled-lowering rescue device, rescue lines sized for the task, full climbing PPE per student, training pole set, stopwatch, field observation sheets, climbing log books, OSHA 1910.269 emergency rescue quick-reference cardStudents must complete the mannequin rescue within the instructor-established time standard (set during course delivery based on OSHA guidance) with all required steps performed in correct sequence and the mannequin lowered under control without slack-drop, scored pass/fail by the instructor on a rescue checklist; a failed attempt requires an immediate second attempt the same day.
5Proficiency Assessment Climbs and Portfolio Completion4labStudents will demonstrate mastery-level climbing proficiency by completing assessed ascent, working-position, and descent cycles that meet NCCER Power Line Worker performance criteria, and will submit a complete climbing log and self-assessment portfolio.
  1. Assessed proficiency climbs: each student completes two formally scored ascent-and-descent cycles to 25-plus feet on the training pole while the instructor scores every element on the NCCER-aligned performance rubric (PPE inspection, ascent technique, working-position setup, hand tool use at height, descent technique, gaff-out count, and communication with ground)—no coaching is provided during assessed climbs.
  2. Climbing log review and portfolio assembly: students compile their climbing log book entries from all lessons, attach field observation sheets and the rescue checklist from Lesson 4, write a one-page self-assessment identifying their two strongest technique elements and one area still requiring development, and staple the package as their lab log portfolio submission.
  3. Group debrief and credential mapping discussion: instructor facilitates a 30-minute discussion connecting the lesson's skills to specific NCCER Power Line Worker performance tasks listed in the module outline, identifying how pole-climbing proficiency is assessed in the credential's practical performance evaluation, and previewing how these skills feed into the bucket truck and rigging courses that follow.
Training pole set, full climbing PPE per student, NCCER Power Line Worker performance rubric, climbing log books, field observation sheets from all prior lessons, rescue checklist copies, blank self-assessment template, pensStudents must score a passing mark of 70% or higher on the NCCER-aligned performance rubric across both assessed climbs (with zero gaff-outs required on at least one of the two cycles) and must submit a complete climbing log with entries for every lesson session; any student below 70% or with an incomplete log completes a remediation climb before the course ends.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
Climbing Safety and Equipment Knowledge ExamWritten exam25%70% or higher (minimum 28 of 40 items correct)A 40-item written exam covering pole-climbing PPE inspection criteria, gaff-out causes and prevention, hazardous pole condition identification, body mechanics and technique, OSHA 1910.269 emergency rescue requirements, and pre-climb inspection procedures. Questions are drawn from NCCER Power Line Worker module content and are mapped to the credential's written assessment domains; students who score below 70% receive targeted review and one retake opportunity.
Standard met · Safety · Time · Quality/finish · Documentation
Pole Climbing Proficiency Skills DemonstrationSkills demonstration45%70% or higher on the NCCER-aligned performance rubric; zero gaff-outs on at least one of two assessed cycles requiredEach student performs two formally observed ascent-and-descent cycles to a minimum of 25 feet on the training pole, demonstrating proper PPE donning, gaff technique, working-position setup, simulated two-handed task completion at height, and controlled descent while being scored by the instructor on the NCCER Power Line Worker practical performance rubric. This demonstration directly mirrors the hands-on performance evaluation component of the NCCER Power Line Worker credential.
Standard met · Safety · Time · Quality/finish · Documentation
Pole Climbing Log and PortfolioLog15%All sessions documented with entries for date, height, gaff-out count, equipment condition, and corrective action; self-assessment narrative present and reflects honest self-evaluation; scored Complete/IncompleteStudents submit a bound climbing log book containing a completed entry for every supervised climb throughout the course, all field observation sheets and the rescue checklist from Lesson 4, and a one-page written self-assessment identifying technique strengths and areas for improvement. The log is evaluated for completeness and the specificity of corrective-action notes, establishing the documentation habit required of credentialed lineworkers.
Standard met · Safety · Time · Quality/finish · Documentation
Pre-Climb Safety Inspection CheckSafety audit15%100% of required inspection steps completed correctly; any planted defect correctly identified and tagged out; any failure = immediate remediation before student may climb againAt the opening of the Lesson 3 field session and again at the Lesson 5 assessment session, each student independently performs a full pre-climb inspection of their assigned PPE set (gaffs, body belt, lanyard, snap hooks) using the written checklist, with the instructor observing and one set containing a planted defect. This unannounced safety check simulates jobsite conditions and aligns with OSHA 1910.269 requirements for personal protective equipment inspection; a score of less than 100% on the required steps or a missed planted defect triggers immediate re-instruction and re-check before the student may ascend.
Standard met · Safety · Time · Quality/finish · Documentation
BLD-LINE69-03 Trade course

Aerial Lift / Bucket Truck Operations

35 hr · $630 COMPLIMENTARY

Students learn to safely operate an aerial lift (bucket truck) in simulated distribution-line conditions, covering pre-trip inspection, boom controls, body positioning, and work-zone setup. Lessons integrate OSHA 1910.67 aerial work platform requirements and ANSI/SIA A92 standards for elevating work platforms alongside live NCCER Power Line Worker knowledge areas. By course end each student can perform a complete pre-operation inspection, set up a safe work zone, and conduct elevated work tasks from the bucket under direct supervision.

Outcomes
Course text

Students learn to safely operate an aerial lift (bucket truck) in simulated distribution-line conditions, covering pre-trip inspection, boom controls, body positioning, and work-zone setup. Lessons integrate OSHA 1910.67 aerial work platform requirements and ANSI/SIA A92 standards for elevating work platforms alongside live NCCER Power Line Worker knowledge areas. By course end each student can perform a complete pre-operation inspection, set up a safe work zone, and conduct elevated work tasks from the bucket under direct supervision.

How the course runs. 5 blocks: Aerial Lift Fundamentals and Regulatory Framework; Pre-Operation Inspection and Equipment Familiarization; Outrigger Setup, Work-Zone Establishment, and Traffic Control; Bucket Truck Control Operation and Body Positioning; Integrated Aerial Work Scenario and Operator Documentation.

What competent looks like. Perform a complete pre-operation inspection of a digger-derrick or aerial lift unit, identifying all deficiencies using a standard checklist before every use. Demonstrate correct setup of outriggers and stabilizers on varied terrain and verify rated load capacity against the planned task. Operate bucket truck boom controls—both from lower and upper control stations—to position the bucket precisely at a simulated work point without exceeding the manufacturer's load chart. Establish a compliant traffic-control and work-zone setup following MUTCD guidelines and OSHA excavation and roadway work requirements. Apply fall-arrest and positioning equipment correctly inside the bucket, including proper donning of a full-body harness and lanyard attachment to the manufacturer-designated anchor point. Complete all required operator documentation—pre-trip inspection forms, load charts, and daily hazard assessments—legibly and accurately.

Lessons · 5 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1Aerial Lift Fundamentals and Regulatory Framework7theoryStudents identify the types of aerial lifts used in distribution line work, state the governing OSHA and ANSI standards, and explain manufacturer load-chart requirements before any hands-on operation.
  1. Instructor-led review of OSHA 1910.67 and ANSI/SIA A92 scope: students annotate a printed summary of key requirements and answer a 10-question comprehension quiz.
  2. Load-chart reading exercise using sample manufacturer data sheets: students calculate whether three given tool-and-worker load scenarios fall within the rated capacity for a specific boom angle.
  3. Small-group discussion of real aerial-lift incident reports (sourced from OSHA fatality investigation summaries): each group identifies the violated standard and proposes a corrective action, then presents findings to the class.
OSHA 1910.67 printed handout, ANSI/SIA A92 standard summary, sample manufacturer operator's manual and load charts, incident-report case studies, whiteboard, calculator10-question written quiz on regulation scope, lift type classifications, and load-chart math; passing score 70% or higher.
2Pre-Operation Inspection and Equipment Familiarization8demoStudents walk through a complete pre-operation inspection of the program's aerial lift unit and correctly identify all fluid levels, structural components, control functions, and safety devices using the manufacturer checklist.
  1. Instructor demonstrates the full walk-around inspection sequence on the parked unit while narrating each checkpoint; students follow along with printed checklist and mark findings.
  2. Students rotate in pairs to repeat the walk-around independently, with instructor observation; each pair must locate and label all hydraulic lines, outrigger pads, upper and lower controls, emergency lowering valve, and boom-rest locking pin.
  3. Instructor introduces three staged deficiencies (low hydraulic fluid, cracked insulating boom sleeve, missing outrigger pad) without announcing them; students re-inspect and document findings on the deficiency report form, then discuss corrective actions.
Aerial lift unit (digger-derrick or single-person bucket truck), manufacturer operator's manual, printed pre-operation inspection checklist, deficiency report forms, hydraulic fluid test strips, measuring tape, PPE (hard hat, safety glasses, high-visibility vest, gloves)Each student completes one solo walk-around inspection and documents at least 95% of all inspection points accurately; all three staged defects must be identified to pass.
3Outrigger Setup, Work-Zone Establishment, and Traffic Control7labStudents set up outriggers on a level and a simulated off-level surface, calculate safe working radius, and configure a MUTCD-compliant work zone with cones, signage, and flagging before any aerial operation begins.
  1. Hands-on outrigger deployment exercise: students level the unit on designated flat and angled pads, verify bubble level indicators, and record measurements; instructor checks each setup before signing off.
  2. Work-zone layout drill using traffic cones, advance-warning signs, and taper spacing formula (speed limit × cone interval factor) for a simulated 25 mph road: students measure, place, and sketch the completed layout on a field diagram.
  3. Tabletop scenario review: students receive three different site sketches (intersection work, highway shoulder, residential driveway) and must produce a compliant work-zone diagram for each, citing the applicable MUTCD section by general topic.
Aerial lift unit, outrigger pads, bubble level, 100 ft tape measure, traffic cones (minimum 10), advance-warning sign set, MUTCD Chapter 6 excerpts, site-sketch worksheets, pen, PPE (hard hat, safety glasses, high-vis vest, steel-toed boots)Outrigger setup is checked by instructor for level within manufacturer tolerance; work-zone layout is measured against MUTCD spacing requirements; students must pass both the flat and angled outrigger setups and correctly lay out at least two of three site scenarios.
4Bucket Truck Control Operation and Body Positioning9practiceStudents operate the lower and upper boom controls to position the bucket accurately through a defined course while maintaining correct harness attachment, three points of contact during entry and exit, and a clear understanding of no-load and loaded boom limits.
  1. Ground-level control orientation: with boom locked in rest position, instructor walks each student through function of every lever and joystick at the lower control station; students label a blank control-panel diagram from memory.
  2. Guided boom-maneuvering course: students at the upper controls navigate the bucket through four marked waypoints (simulating pole-top, crossarm, transformer pad approach, and cable pull position) within set time limits, with instructor grading smoothness and precision.
  3. Entry, positioning, and exit drill: each student dons full-body harness, attaches lanyard to the designated bucket anchor point, enters the bucket from a simulated truck bed, rises to 20 ft, performs a simulated task (attaches a C-clamp to a horizontal pipe), returns to ground, and exits; all steps are performed in correct sequence without prompting.
Aerial lift unit, full-body harness (sized per student), 6 ft shock-absorbing lanyard, hard hat with chin strap, safety glasses, high-vis vest, leather gloves, C-clamps, painted waypoint markers on pipe stands, stopwatch, boom-control diagram worksheetInstructor checklist scores each student on 12 control tasks and 8 body-positioning/PPE steps; student must score satisfactory (no critical errors, no uncontrolled boom movement) on at least 10 of 12 control tasks and all 8 safety steps.
5Integrated Aerial Work Scenario and Operator Documentation4fieldStudents plan, document, set up, and execute a complete simulated distribution-line aerial task from truck arrival through departure, producing all required operator records and passing a final instructor safety check.
  1. Pre-task briefing: student operator receives a written job order, performs the full pre-operation inspection independently, completes the load-chart calculation for the assigned task, fills in the daily hazard assessment form, and briefs the class as if they were a crew.
  2. Full scenario execution: student sets up the work zone, deploys outriggers, rises to the assigned work position, completes a two-minute simulated task (tie-in wire attachment to crossarm), and returns the unit to travel position—evaluated live by instructor on a go/no-go checklist.
  3. Post-task documentation: student completes the post-operation inspection checklist, notes any deficiencies found, and submits the full documentation packet (pre-trip, load chart, hazard assessment, post-trip) for instructor review and signature.
Aerial lift unit, full PPE set, traffic cones and signs, pre-operation and post-operation checklists, load-chart data sheet, hazard assessment form, sample job-order card, tie-in wire and crossarm mock-up, instructor go/no-go evaluation formInstructor go/no-go checklist: zero critical safety violations (unattached lanyard, undeployed outrigger, exceeded load limit) permitted; all documentation must be complete and legible; any critical violation requires full scenario repeat before passing.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
Written Knowledge ExaminationWritten exam25%70% or higher (21 of 30 questions correct)A 30-question multiple-choice and short-answer exam covering OSHA 1910.67 requirements, ANSI/SIA A92 classifications, load-chart interpretation, work-zone layout principles, and aerial-lift component identification; questions are drawn from NCCER Power Line Worker module knowledge objectives and OSHA Outreach topic areas.
Standard met · Safety · Time · Quality/finish · Documentation
Bucket Truck Skills DemonstrationSkills demonstration45%Satisfactory on all critical items; no more than two non-critical deductions out of 20 evaluated stepsEach student performs a complete aerial-lift operation cycle—pre-operation inspection, outrigger setup, work-zone establishment, upper-control maneuvering to two waypoints, and post-operation inspection—evaluated live by the instructor on a standardized go/no-go checklist; any critical safety step failure (unsecured lanyard, unleveled outriggers, exceeding load chart) results in an automatic unsatisfactory requiring remediation and retest.
Standard met · Safety · Time · Quality/finish · Documentation
Operator Documentation LogLog15%All five required forms submitted; each form scored at least 80% complete and accurate by instructor reviewStudents submit a portfolio of five completed operator documents collected across the course: pre-operation inspection checklist, load-chart calculation worksheet, daily hazard assessment, work-zone layout diagram, and post-operation inspection checklist; the log demonstrates consistent, accurate record-keeping habit aligned with utility employer documentation requirements and NCCER registry standards.
Standard met · Safety · Time · Quality/finish · Documentation
Aerial Lift Safety CheckSafety audit15%Zero critical violations; all PPE items correctly donned and verifiedAn unannounced spot check conducted by the instructor during the integrated field scenario in Lesson 5: the student is observed for correct harness donning, lanyard attachment to the designated anchor point, outrigger deployment on the current surface, and boom operation within the load chart—any single critical omission halts the scenario and triggers remediation before the student may continue or be certified as competent in aerial lift operation.
Standard met · Safety · Time · Quality/finish · Documentation
BLD-LINE69-04 Trade course

Rigging for Electrical Linework

35 hr · $630 COMPLIMENTARY

This course develops the knowledge and hands-on skills required to safely select, inspect, and use rigging hardware, slings, blocks, and hoists in overhead distribution and transmission work. Students learn load calculations, rigging geometry, hand signals, and tag-line control to move conductors, poles, transformers, and equipment in line construction settings. All practices are grounded in ASME B30 standards, OSHA general industry and construction rigging requirements, and NCCER Power Line Worker competencies.

Outcomes
Course text

This course develops the knowledge and hands-on skills required to safely select, inspect, and use rigging hardware, slings, blocks, and hoists in overhead distribution and transmission work. Students learn load calculations, rigging geometry, hand signals, and tag-line control to move conductors, poles, transformers, and equipment in line construction settings. All practices are grounded in ASME B30 standards, OSHA general industry and construction rigging requirements, and NCCER Power Line Worker competencies.

How the course runs. 5 blocks: Rigging Fundamentals: Hardware, Terminology, and Standards; Inspection Procedures and Discard Criteria; Load Calculations, Sling Angles, and WLL; Hand Signals, Tag Lines, and Communication During Lifts; Rigging System Setup and Integrated Field Exercise.

What competent looks like. Select the correct sling type, hitch configuration, and rigging hardware for a given load weight and lift geometry, applying sling angle de-rating factors without error. Inspect wire rope, synthetic web slings, chain slings, shackles, hooks, blocks, and come-alongs against discard criteria and document findings on a standard inspection form. Calculate the working load limit (WLL) for a rigging assembly using load weight, sling angle, and number of legs, and identify when the WLL is exceeded. Demonstrate standard ASME B30.3 hand signals and radio communication protocols to direct a crane or derrick operator during a simulated pole or transformer lift. Apply proper tag-line techniques and boom-truck rigging procedures to control suspended loads during line-construction tasks in a field or lab setting. Identify at-risk rigging conditions—shock loading, side-loading, improper choke placement, and damaged hardware—and apply the hierarchy of controls to eliminate or reduce hazards before a lift.

Lessons · 5 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1Rigging Fundamentals: Hardware, Terminology, and Standards7theoryStudents will identify and define the function of wire rope, chain slings, synthetic web and round slings, shackles, hooks, swivels, eye bolts, and rigging blocks, and locate applicable ASME B30 and OSHA standards governing their use in line construction.
  1. Lecture and slideshow covering ASME B30 subpart structure, OSHA construction rigging rules, and utility-industry rigging conventions; students annotate a provided reference sheet with key definitions and standard citations.
  2. Hardware identification stations: students rotate through ten labeled samples (wire rope, alloy chain, web sling, round sling, screw-pin shackle, bolt-type shackle, swivel hook, snatch block, come-along, load binder) and record name, rated capacity markings, and intended use on a worksheet.
  3. Case-study review of two OSHA-investigated rigging incidents in the utility sector; small groups identify the failure mode, violated standard, and corrective action, then present findings to the class.
Physical rigging hardware sample set, ASME B30 volumes (B30.9, B30.10, B30.26 at minimum), OSHA 1926 Subpart CC and Subpart H excerpts, NCCER Power Line Worker module on rigging, identification worksheet, whiteboard.Completed hardware identification worksheet scored against an answer key; students must correctly identify all ten items and state the controlling standard for each—80% correct (8 of 10) to pass.
2Inspection Procedures and Discard Criteria7labStudents will inspect a set of wire rope, chain, synthetic sling, and hardware specimens against published discard criteria and produce a written inspection log that correctly accepts, flags for monitoring, or removes from service each item.
  1. Instructor demonstration of wire rope inspection technique—running the rope slowly through a gloved hand, counting broken wires per lay, measuring diameter loss, checking for kinking, bird-caging, heat damage, and core exposure—using a section of worn rope projected on a document camera.
  2. Students individually inspect a prepared set of ten specimens (some acceptable, some intentionally condemned: kinked wire rope, sling with a cut, chain link with a nick over 10% of cross-section, hook with a twist, shackle with a bent pin) and complete a standardized Rigging Inspection Log form, marking each as 'in service,' 'monitor,' or 'remove from service' with the specific criterion cited.
  3. Debrief and calibration exercise: instructor reveals the pre-determined disposition of each specimen; students self-score, and the class discusses any disagreements, referencing ASME B30.9 and B30.10 tables directly.
Prepared specimen set (condemned and serviceable items), wire rope inspection gauge, calipers, magnifying glass, Rigging Inspection Log forms, ASME B30.9 and B30.10, nitrile gloves, safety glasses.Rigging Inspection Log graded by instructor; students must correctly dispose of 9 of 10 specimens and cite the correct standard criterion for each condemned item—pass requires 90% accuracy on dispositions.
3Load Calculations, Sling Angles, and WLL8theoryStudents will calculate the tension in each leg of a multi-leg sling assembly and the working load limit of the assembly for given load weights and sling angles, and determine whether the configuration is within rated capacity.
  1. Direct instruction on the sling angle de-rating factor (using the D/d ratio for wire rope and angle correction factor table from ASME B30.9); students work through three instructor-led example problems covering vertical hitches, choker hitches, and basket hitches at various angles, converting between pounds and tons.
  2. Problem set of eight rigging math problems—ranging from a single-leg vertical lift of a transformer (approximately 500 lb) to a four-leg bridle sling lifting a steel pole section at a 45-degree sling angle—students solve independently using a calculator and the factor table, then compare answers with a partner.
  3. Applied scenario: given a utility-spec sheet for a 25 kVA single-phase distribution transformer (weight provided on the nameplate handout), students select an appropriate sling from a catalog page, confirm the WLL is not exceeded, and justify their selection in writing.
Scientific calculators, ASME B30.9 sling angle factor table (printed reference), transformer nameplate handout, rigging hardware catalog pages, problem set handout, whiteboard for worked examples.Eight-problem calculation quiz; each problem graded on correct setup, de-rating application, and final answer—passing score is 75% (6 of 8 problems fully correct, partial credit not given for final answer if set-up is wrong).
4Hand Signals, Tag Lines, and Communication During Lifts6demoStudents will correctly perform and interpret all standard ASME B30.3 crane hand signals and demonstrate proper two-person tag-line control of a suspended load during a simulated lift on a training apparatus or boom truck.
  1. Instructor demonstration of all ASME B30.3 standard hand signals (hoist, lower, stop, emergency stop, travel, swing, extend/retract boom, dog everything) using a poster and live demonstration; students practice each signal in unison, then quiz each other in pairs using signal flashcards.
  2. Role-play exercise: students rotate through the roles of signal person and equipment operator (simulated with a training boom truck or a block-and-tackle apparatus) for a series of scripted lift scenarios; the 'operator' may only respond to correct signals—an incorrect or ambiguous signal triggers an immediate stop, and the pair must restart.
  3. Tag-line lab: a weighted mock load (sandbag, approximately 50 lb) is suspended from a boom or overhead frame; two students apply tag lines at appropriate anchor points, then direct the load through a simulated travel path past a mock obstacle (a flag on a post representing an energized conductor clearance zone) without the load contacting the obstacle or either tag line going slack.
ASME B30.3 hand signal poster and flashcard set, training boom truck or overhead block-and-tackle apparatus, 50 lb sandbag mock load, two tag lines (minimum 20 ft each), hard hats, safety glasses, hi-vis vests, cones to mark clearance zones.Instructor observes each student performing the complete ASME B30.3 signal set; student must produce all signals correctly without a prompt—one re-try permitted per signal; plus tag-line lab scored on load control (no contact with obstacle) and proper communication—both tasks must be completed successfully to pass.
5Rigging System Setup and Integrated Field Exercise7fieldStudents will plan, rig, execute, and document a complete multi-component lift (simulated pole or equipment set) using appropriate slings, hardware, hand signals, and tag-line control while maintaining a written lift plan and complying with all applicable safety requirements.
  1. Pre-lift planning exercise: each student team (two to three persons) receives a scenario card (e.g., 'set a 40-ft Class 4 wood distribution pole using the program's digger-derrick trainer; pole weighs approximately 700 lb; working radius 12 ft; identify sling, choker, and shackle requirements, calculate load on each rigging component, identify exclusion zone radius, and complete a written lift plan form before touching any equipment').
  2. Field execution: teams rig and execute the simulated lift under instructor observation, using all required PPE (hard hat, safety glasses, leather gloves, hi-vis vest, steel-toed boots), correct hand signals, and two-person tag-line control; the instructor may inject a stop-work scenario (e.g., 'a sling slips—what do you do?') to test the team's response.
  3. Post-lift debrief and documentation: each student individually completes a post-lift inspection log for all rigging components used and writes a brief (one-page) after-action report identifying one thing the team did well and one improvement, referencing the applicable standard.
Digger-derrick trainer or field boom truck, 40-ft mock pole or equivalent weighted load, wire rope slings (various sizes), shackles, snatch block, tag lines, lift plan forms, post-lift inspection log forms, PPE (hard hats, safety glasses, leather gloves, hi-vis vests, steel-toed boots), NCCER Power Line Worker rigging module.Instructor uses a field competency checklist (lift plan complete before lift, correct hardware selected and inspected, WLL not exceeded, correct signals used, tag lines applied, exclusion zone established, PPE worn by all); each item is pass/fail—student must receive a pass on every checklist item; a single critical safety failure (e.g., load over WLL, no exclusion zone) requires a full repeat of the exercise.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
Rigging Knowledge ExamWritten exam25%75% or higher (30 of 40 questions correct)A 40-question multiple-choice and short-answer exam covering rigging hardware identification, ASME B30 and OSHA standard requirements, sling angle de-rating, WLL calculation, inspection discard criteria, and lift communication protocols, mapped directly to NCCER Power Line Worker rigging module objectives.
Standard met · Safety · Time · Quality/finish · Documentation
Rigging Skills DemonstrationSkills demonstration45%Pass on all critical-safety items; 85% overall on non-critical itemsEach student independently selects rigging hardware for an assigned scenario, inspects all components, calculates load distribution at a stated sling angle, performs the complete ASME B30.3 hand-signal set for an evaluator, and rigs a mock load on the training apparatus while an instructor scores performance on a standardized checklist; any unsafe act or failure to use required PPE is an automatic fail requiring full re-demonstration.
Standard met · Safety · Time · Quality/finish · Documentation
Rigging Inspection Lab LogLog15%Correctly dispositioned 9 of 10 specimens with standard citations; log is legible and completeStudents submit their completed Rigging Inspection Log from Lesson 2 and the post-lift inspection log from Lesson 5; the evaluator checks that each entry includes the component description, condition observed, disposition decision, and the specific ASME B30 criterion or OSHA requirement cited, and that condemned items are clearly marked as removed from service.
Standard met · Safety · Time · Quality/finish · Documentation
Rigging Safety Behavior CheckSafety audit15%100% compliance on all PPE and exclusion-zone items; no unsafe acts observed across all lab and field sessionsThe course instructor maintains a running safety observation record across all lab and field lessons; at course end, this record is reviewed and the student receives a pass only if no unresolved safety violations (improper PPE, entering the exclusion zone, standing under a suspended load, exceeding WLL) were recorded—a single critical violation that was not self-corrected results in a course incomplete until remediation is complete.
Standard met · Safety · Time · Quality/finish · Documentation
BLD-LINE69-05 Trade course

Distribution Transformers: Theory, Installation, and Connections

35 hr · $630 COMPLIMENTARY

This course covers the operating principles, nameplate data, connection configurations, and safe installation practices for single-phase and three-phase distribution transformers used in overhead and underground utility systems. Students learn to interpret transformer ratings, make correct primary and secondary connections, and follow utility switching and grounding procedures. Lessons map to NCCER Power Line Worker core competency areas covering transformers and distribution equipment.

Outcomes
Course text

This course covers the operating principles, nameplate data, connection configurations, and safe installation practices for single-phase and three-phase distribution transformers used in overhead and underground utility systems. Students learn to interpret transformer ratings, make correct primary and secondary connections, and follow utility switching and grounding procedures. Lessons map to NCCER Power Line Worker core competency areas covering transformers and distribution equipment.

How the course runs. 5 blocks: Transformer Principles and Nameplate Data; Transformer Polarity and Single-Phase Connections; Three-Phase Transformer Banks: Delta and Wye Configurations; Pole-Mounted Transformer Installation, Grounding, and Fusing; Transformer Troubleshooting and Load Calculations.

What competent looks like. Interpret transformer nameplate data including kVA rating, voltage ratios, impedance, polarity, and cooling class to verify correct equipment selection for a given load. Explain electromagnetic induction and the turns-ratio relationship to calculate primary and secondary voltages and currents for single-phase transformers. Identify and correctly make additive and subtractive polarity connections for single-phase transformers and standard delta and wye connections for three-phase transformer banks. Demonstrate safe transformer installation on a pole or pad, including proper PPE selection, grounding, switching order, and fusing in accordance with utility switching procedures. Troubleshoot common transformer faults—open windings, incorrect phasing, overloading, and failed fusing—using volt-ohm metering and visual inspection. Complete installation documentation including sketches, as-built notes, and switching orders consistent with utility recordkeeping requirements.

Lessons · 5 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1Transformer Principles and Nameplate Data7theoryGiven a transformer nameplate and reference tables, the student will correctly interpret all rated values—kVA, primary and secondary voltage, BIL, impedance, polarity, and cooling class—and calculate turns ratio, full-load current on each winding, and percent impedance to within ±5%.
  1. Lecture and guided notes on Faraday's law of electromagnetic induction, mutual flux, and the ideal transformer turns-ratio equation; students work five progressively harder nameplate calculation problems in pairs and check answers against an instructor key.
  2. Nameplate reading exercise: each student receives a photocopy of five real utility-grade single-phase transformer nameplates (different kVA, voltage, impedance values) and fills out a structured data sheet identifying every field, flagging any that indicate special installation requirements such as reduced BIL or CSP design.
  3. Guided class discussion comparing ANSI/IEEE standard transformer designations (e.g., OA cooling class versus FA) using the IEEE C57 standard as a reference; students categorize a mixed set of nameplate designations and explain in writing why each matters for field installation.
Photocopied utility transformer nameplates (single-phase, various kVA), IEEE C57 standard reference handout, scientific calculators, NCCER Power Line Worker Core Curriculum textbook, whiteboard, instructor-prepared calculation worksheetCompleted nameplate data sheet with all fields correctly identified and five calculation problems scored; pass = 80% or higher on the calculation worksheet with no errors on voltage or current values that would result in wrong equipment selection.
2Transformer Polarity and Single-Phase Connections7demoThe student will identify additive and subtractive polarity markings on single-phase transformers and correctly make series-aiding and series-opposing secondary connections on a low-voltage demonstration transformer to produce specified output voltages, verified by meter measurement.
  1. Instructor demonstration using a low-voltage (120/240 V secondary) single-phase transformer on a training board: the instructor shows the ANSI dot-polarity convention, performs the additive and subtractive polarity test with a voltmeter while narrating each step, then has students predict meter readings before each measurement.
  2. Hands-on polarity testing in groups of three: each group uses a low-voltage training transformer, a digital multimeter, and jumper leads to perform the standard polarity test, record results on a structured lab sheet, and sketch the terminal diagram confirming additive or subtractive polarity.
  3. Connection lab: groups wire the transformer secondary for 120 V (parallel), 240 V (series subtractive), and then attempt an incorrect series-additive connection under instructor supervision, measuring and recording voltages; students document the results and explain in writing why the wrong connection is hazardous on a utility system.
Low-voltage single-phase training transformers (one per group of three), digital multimeters, color-coded jumper leads, terminal-board wiring panels, instructor-prepared lab sheets, NCCER Power Line Worker textbook, personal protective equipment (safety glasses, rubber gloves rated for training voltage)Completed lab sheet with correct polarity test procedure, measured voltages within ±5 V of calculated values for each connection, and a written explanation of the hazard of incorrect polarity; pass = all three connections wired correctly on first attempt or corrected without prompting after one measurement, and written explanation acceptable to instructor.
3Three-Phase Transformer Banks: Delta and Wye Configurations8labUsing three single-phase training transformers and a three-phase panel board, the student will connect a delta-wye and a wye-delta bank, calculate and verify line and phase voltages using the √3 relationship, and correctly identify the high-leg (wild leg) in a four-wire delta secondary.
  1. Pre-lab theory session: instructor works through the phasor diagrams for delta and wye connections on the whiteboard, derives the line-to-phase voltage and current relationships (VL = √3 × Vphase for wye; IL = √3 × Iphase for delta), and assigns students to calculate expected line voltages for the training bank before wiring begins.
  2. Lab build in groups of four: each group wires a delta-wye bank using three low-voltage single-phase transformers mounted on a three-phase training board; students follow a connection diagram they drew during the pre-lab, energize under instructor authorization, and measure all line-to-line and line-to-neutral voltages, recording results on a structured data sheet.
  3. High-leg identification exercise: instructor reconfigures one bank as a four-wire open-delta (lighting and power) system; students use their meters to locate the high leg, mark it orange per NEC convention, and write a brief report explaining why loads must never be connected line-to-neutral from the high leg in a 120/240 V four-wire delta system.
Three low-voltage single-phase training transformers per group, three-phase training panel boards, digital multimeters, orange tape for high-leg marking, color-coded hook-up wire, phasor diagram handout, NCCER Power Line Worker textbook, safety glasses, instructor-approved connection diagramsData sheet with all measured voltages within ±5% of calculated values, correctly identified high leg with written justification, and connection diagram matching the actual build; pass = all voltages within tolerance, high leg correctly identified, and no unsafe wiring practices observed during the build.
4Pole-Mounted Transformer Installation, Grounding, and Fusing8fieldFollowing a written switching order and utility safety procedures, the student will safely install a single-phase pole-mounted transformer mock-up including hanger hardware, lightning arrester, primary cutout fuse, secondary fusing, and system ground, verifying all connections and grounding resistance with a meter.
  1. Pre-task briefing and job hazard analysis: students as a crew complete a written job hazard analysis (JHA) for the transformer installation task, identifying electrical, fall, and struck-by hazards, listing required PPE (rubber gloves, sleeves, hard hat, safety glasses, FR clothing), and stating the correct switching order (open, test, ground before touching) before any physical work begins.
  2. Hardware installation at a ground-level pole simulator or low training structure: following manufacturer hardware instructions and NESC general clearance principles, students mount the transformer hanger, hang the transformer mock-up, install the primary cutout fuse holder and fuse link, connect the lightning arrester to the primary bushing and ground wire, and make secondary connections to the secondary rack.
  3. Grounding and documentation: students attach the system neutral and equipment ground conductor to the transformer tank ground lug and drive a ground rod (or connect to a pre-installed rod on the training structure), then measure ground resistance with a clamp-on ground tester and record the value; each student completes a mock as-built sketch and a simulated switching order log entry consistent with utility recordkeeping practice.
Ground-level pole simulator or training structure with crossarm, single-phase distribution transformer mock-up (de-energized training unit), cutout fuse holder, fuse links (various ratings), lightning arrester, transformer hanger hardware, secondary rack and insulators, grounding conductor, ground rod, clamp-on ground resistance tester, JHA forms, switching order forms, tape measure, torque wrench, PPE (rubber gloves Class 2 for training use, sleeves, FR coveralls, hard hat, safety glasses), NESC reference handout, NCCER Power Line Worker textbookCompleted JHA with all major hazards identified, hardware installation inspected by instructor against a checklist (all bolts torqued, fuse orientation correct, arrester connected to correct bushing, ground wire continuous from tank to rod), ground resistance recorded, as-built sketch and switching log complete; pass = zero safety violations observed, JHA scored at least 80%, hardware checklist with no critical errors, and ground resistance recorded with documentation complete.
5Transformer Troubleshooting and Load Calculations5practiceGiven a set of fault scenarios on training transformers and a residential load schedule, the student will diagnose open-winding, incorrect-phasing, overload, and blown-fuse faults using a systematic volt-ohm-meter procedure, and will calculate the correct kVA rating needed to serve a described residential or small commercial load without exceeding nameplate capacity.
  1. Fault diagnosis stations: five training-board stations are pre-wired by the instructor with deliberate faults (open primary winding, open secondary winding, reversed polarity secondary connection, blown fuse, and overloaded condition simulated by a resistive load bank pulling 110% of rated current); students rotate through stations in pairs, applying a written diagnostic procedure—test voltage at primary terminals, test secondary terminals, check fuse continuity, check winding resistance—record measurements, identify the fault, and state the corrective action.
  2. Load calculation exercise: using a utility load calculation worksheet, each student works individually through three scenarios—a new residential service, an existing residence adding a central air conditioner, and a small commercial load—applying demand factors and selecting the appropriate standard kVA transformer rating (10, 15, 25, 37.5, 50, 75, 100 kVA series) from a utility equipment table.
  3. Debrief and error analysis: instructor reviews common diagnostic mistakes identified during the rotation (e.g., testing secondary before confirming primary voltage, failing to de-energize before resistance tests), and students correct their worksheets and write a one-paragraph summary for each fault scenario describing the symptom, likely customer complaint, diagnostic steps, and repair.
Five fault-wired low-voltage training transformer boards, resistive load banks, digital multimeters with continuity and resistance functions, load calculation worksheets (instructor-prepared), utility kVA selection table, NCCER Power Line Worker textbook, pencils, notebook paperAll five faults correctly identified with diagnostic steps documented on the worksheet, and all three load calculations resulting in correct kVA selections; pass = at least four of five faults correctly identified with proper diagnostic procedure followed (no unsafe steps), and all three kVA selections within one standard size of the correct answer, with no selection that would result in chronic overloading.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
Transformer Theory Knowledge ExamWritten exam25%70% or higher (28 of 40 questions correct)A 40-question written exam covering electromagnetic induction principles, turns-ratio calculations, nameplate interpretation, polarity conventions, delta and wye voltage and current relationships, fuse sizing, arrester function, and grounding requirements. Questions are multiple-choice and short-answer aligned to NCCER Power Line Worker competency areas for transformers and distribution equipment.
Standard met · Safety · Time · Quality/finish · Documentation
Transformer Connection and Fault Diagnosis Skills DemonstrationSkills demonstration45%Instructor-rated checklist score of 80% or higher with zero critical safety violationsEach student individually wires a specified single-phase or three-phase connection on a training board, measures output voltages, and then diagnoses one pre-set fault scenario using a multimeter while the instructor observes and scores both technical accuracy and procedural safety compliance using a standardized checklist.
Standard met · Safety · Time · Quality/finish · Documentation
Lab Log and Installation Documentation PortfolioLog15%All four required entries submitted; each entry scored at least 75% on accuracy, completeness, and sketch clarityStudents submit a compiled lab log containing completed data sheets, connection diagrams, as-built sketches, JHA forms, and switching order entries from all four hands-on lessons; the log is evaluated for measurement accuracy, legibility of sketches, correct identification of hazards, and completeness of documentation consistent with utility field recordkeeping standards.
Standard met · Safety · Time · Quality/finish · Documentation
Transformer Safety Procedure CheckSafety audit15%100% on all six critical safety behaviors; any critical failure requires immediate remediation and recheck before course completionUsing the field installation station, the instructor observes each student independently perform a de-energize-test-ground sequence before making contact with transformer hardware, verify correct PPE selection and donning, and state the correct switching order aloud; critical behaviors include never bypassing the test-before-touch step, correct rubber glove inspection, and proper grounding sequence.
Standard met · Safety · Time · Quality/finish · Documentation
BLD-LINE69-06 Trade course

Overhead and Underground Distribution Systems

34 hr · $610 COMPLIMENTARY

This course covers the construction, installation, and maintenance of both overhead and underground electrical distribution systems used by utilities and electrical contractors. Students learn conductor types, pole-line hardware, conduit and duct-bank systems, cable installation, and the protective devices that keep distribution circuits safe and reliable. Lessons integrate NCCER Power Line Worker knowledge areas and OSHA electrical safety standards throughout.

Outcomes
Course text

This course covers the construction, installation, and maintenance of both overhead and underground electrical distribution systems used by utilities and electrical contractors. Students learn conductor types, pole-line hardware, conduit and duct-bank systems, cable installation, and the protective devices that keep distribution circuits safe and reliable. Lessons integrate NCCER Power Line Worker knowledge areas and OSHA electrical safety standards throughout.

How the course runs. 5 blocks: Overhead Distribution System Components and Construction Standards; Underground Distribution: URD, Duct Banks, and Direct-Buried Cable Systems; Primary Cable Termination and Splicing — Lab; Protective Devices, Switching, and Distribution Fault Isolation; Field Identification and Safety Verification — Overhead and Underground Distribution Site Walk.

What competent looks like. Identify and select overhead distribution conductors, insulators, crossarms, and protective devices appropriate for a given circuit configuration. Describe the layout, components, and installation sequence of a underground residential distribution (URD) and duct-bank system, including cable pulling calculations. Apply OSHA electrical safety requirements—including minimum approach distances, PPE selection, and grounding—when working on or near energized overhead and underground distribution equipment. Read and interpret utility construction drawings, plan-and-profile sheets, and riser diagrams to locate equipment, determine conductor routing, and identify clearance requirements. Demonstrate correct installation and termination of overhead secondary and underground primary cable using hand tools, hydraulic crimpers, and heat-shrink termination kits. Troubleshoot common distribution faults—including open conductors, failed cutouts, and cable insulation failures—using test equipment and systematic isolation procedures.

Lessons · 5 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1Overhead Distribution System Components and Construction Standards8theoryGiven a set of utility construction drawings and a component inventory, the student will correctly identify and match overhead distribution conductors, insulators, crossarms, pole hardware, and protective devices to their function and applicable NESC clearance requirements.
  1. Instructor-led walkthrough of a full set of utility overhead construction drawings: students label each component on a blank diagram worksheet and verify answers against the NESC table of vertical and horizontal clearances, noting the difference between transmission and distribution voltages.
  2. Small-group card-sort activity using laminated photo cards of ACSR, AAC, ACAR, and covered conductors, pin insulators, suspension insulators, cutout switches, reclosers, and surge arresters — groups sort cards into 'primary,' 'secondary,' and 'service' categories and justify each placement aloud.
  3. Guided reading of the relevant NCCER Power Line Worker module on overhead distribution: students complete a structured note-taking guide identifying conductor sizing conventions (kcmil and AWG), sag and tension concepts, and the purpose of ground wires and static wires, then answer five short-answer comprehension questions checked by peer exchange.
NCCER Power Line Worker Core and advanced modules (current edition), NESC (latest adopted edition) clearance tables, sample utility overhead construction drawings (plan view and staking sheets), laminated component photo cards, blank diagram worksheets, whiteboard, projector.Completed diagram worksheet with component labels and clearance values — minimum 80% correct identification to proceed.
2Underground Distribution: URD, Duct Banks, and Direct-Buried Cable Systems8demoGiven a URD layout drawing and a list of cable specifications, the student will describe the correct excavation, bedding, conduit assembly, pulling-tension calculation, and cable-routing sequence for a single-phase underground residential distribution installation meeting NESC and utility specifications.
  1. Instructor demonstration using a scaled cutaway mock-up: demonstrates proper trench depth and width for direct-buried primary cable versus conduit-enclosed cable, bedding sand placement, warning tape positioning, and backfill compaction requirements, while students record each step on a sequencing checklist.
  2. Students work in pairs to complete a cable-pulling tension worksheet using the Sidewall Bearing Pressure (SWBP) formula and a given conduit route with bends — they calculate maximum allowable pulling force and compare to the cable manufacturer's rating, flagging any route that exceeds limits and proposing a corrective bend reduction.
  3. Tabletop scenario: students examine a URD single-line diagram showing padmount transformers, sectionalizing cabinets, and riser poles, then trace the primary cable route, identify switching points, and mark the location of concentric neutral connections and surge arresters on a blank diagram, discussing why each protective device is placed at that location.
NCCER Power Line Worker underground distribution module, NESC burial depth and clearance tables, scaled cutaway URD mock-up, pulling-tension calculation worksheets, URD single-line diagrams, colored markers, sample cable data sheets (15 kV TR-XLPE URD cable), calculator.Sequencing checklist completed in correct order with no critical steps omitted AND pulling-tension calculation within 5% of instructor answer key — both must meet standard to pass.
3Primary Cable Termination and Splicing — Lab8labWorking on a de-energized cable end in a controlled lab setting, the student will prepare, terminate, and document a 15 kV heat-shrink termination on a section of URD cable following the manufacturer's instruction sheet and utility specification, completing each step within tolerance and recording all work in a lab log.
  1. Pre-lab briefing: instructor reviews the step-by-step manufacturer termination instruction sheet on the projector, emphasizing semi-conducting layer removal lengths, insulation diameter tolerance, and the sequence of heat-shrink components; students annotate their own copy of the instruction sheet with expected dimensions for their cable sample before touching any tools.
  2. Hands-on termination: each student uses a cable-stripping tool to remove the jacket, semi-con, and insulation to specified lengths (verified with a tape measure before proceeding), installs the stress cone and heat-shrink tubing using a propane torch per the manufacturer's sequence, installs the hydraulic compression lug using a calibrated crimper, and photographs each completed stage for the lab log.
  3. Post-termination inspection and documentation: instructor and student jointly inspect the completed termination using the utility acceptance checklist (checking semi-con cut distance, lug crimp count, heat-shrink coverage, and absence of carbon tracking), student records pass/fail for each checkpoint in the lab log and writes a one-paragraph summary of any corrective actions taken.
Sections of 15 kV TR-XLPE URD cable (de-energized, cut to bench-work lengths), heat-shrink termination kit (manufacturer instruction sheet included), cable-stripping tool set, propane torch, hydraulic compression crimper with correct die set, tape measure, utility acceptance checklist, lab log forms, safety glasses, leather gloves, fire extinguisher on bench.Lab log submitted with photographs of each stage AND utility acceptance checklist showing all critical dimensions within tolerance AND no visible carbon tracking or improper semi-con remnants — all three criteria must be satisfied for a passing lab log grade.
4Protective Devices, Switching, and Distribution Fault Isolation6theoryGiven a distribution circuit diagram showing a fault condition, the student will identify the protective devices that will operate, explain the sequence of reclosing and lockout operations, and describe the safe switching steps a lineworker follows to isolate the faulted section and restore service to as many customers as possible.
  1. Instructor-led lecture and Q&A on distribution protective device coordination: covers fuse-to-fuse coordination, recloser-to-fuse coordination, sectionalizer operation, and the time-current curve concept using projected TCC graphs — students use printed blank TCC axes to sketch a representative coordination scheme from the data on the board.
  2. Fault isolation scenario exercise in pairs: each pair receives a printed lateral circuit diagram with a fault marked at a random location, a list of device ratings, and a switching order form; they must write out every switching step (including PPE, minimum approach distance verification, and hold card placement) needed to isolate the fault and restore the unfaulted portion of the circuit, then exchange forms with another pair for peer review.
  3. Guest speaker or recorded utility operations video: a distribution system operator or experienced journeyman lineworker describes a real outage event — students listen and complete a structured listening guide identifying what devices operated, what switching sequence was used, and what safety precautions were applied, then discuss findings as a class.
NCCER Power Line Worker module on distribution protective devices, sample time-current curve graphs, printed lateral circuit diagrams with fault scenarios, blank TCC axes worksheets, switching order forms, projector, whiteboard.Completed switching order form reviewed by instructor — all steps must appear in correct sequence, PPE requirements and minimum approach distances must be referenced at each energized-equipment step, and the unfaulted section must be correctly identified as restorable; minimum score 80% on a 10-point rubric.
5Field Identification and Safety Verification — Overhead and Underground Distribution Site Walk4fieldAt a designated utility or training-yard site, the student will physically identify overhead and underground distribution equipment, verify clearances and signage, complete a job hazard analysis for a simulated line task, and demonstrate correct PPE selection for conditions observed, with zero critical safety errors.
  1. Guided site walk with instructor: students use a printed site map and equipment identification checklist to locate and label each item observed — primary conductors, secondary conductors, insulators, cutout switches, padmount transformers, riser poles, handhole covers, and warning signs — recording the phase configuration and estimated voltage class for each circuit segment.
  2. Job hazard analysis (JHA) exercise at a designated work location on site: working individually, each student fills out a utility JHA form identifying energy sources, minimum approach distances, required PPE, and grounding requirements for a simulated task (e.g., setting a new secondary conductor connection on a de-energized lateral), then reviews it with the instructor before any simulated work begins.
  3. PPE inspection and donning drill: each student selects PPE from an equipment station (rubber insulating gloves with leather protectors, arc-rated FR clothing, hard hat class rated for voltage present, safety glasses, and dielectric footwear) appropriate to the simulated task voltage, performs a visual and air-inflation inspection of rubber goods, dons the ensemble, and states aloud the reason each item is required — instructor uses a go/no-go checklist to evaluate selection and inspection technique.
Printed site map and equipment identification checklist, utility JHA forms, PPE station stocked with rubber insulating gloves (with leather protectors), arc-rated FR clothing, Class E hard hats, safety glasses, dielectric boots, rubber insulating gloves inflation tester, OSHA 29 CFR 1910.269 quick-reference card, NCCER Power Line Worker field identification checklist.Site identification checklist at least 85% correct AND JHA approved by instructor with no uncontrolled energy sources or missing PPE line items AND PPE donning drill completed with zero critical errors (wrong voltage class selection or failure to inspect rubber goods counts as critical) — all three gates must be cleared.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
Overhead and Underground Distribution Knowledge ExamWritten exam25%70% or higher (28 of 40 questions correct)A 40-question multiple-choice and short-answer written exam covering conductor types and sizing, NESC clearance requirements, URD system layout, duct-bank construction, protective device coordination principles, and basic fault-isolation logic. Questions are drawn from NCCER Power Line Worker module content and map directly to the knowledge domains tested on the NCCER Power Line Worker credential exam.
Standard met · Safety · Time · Quality/finish · Documentation
Cable Termination Skills DemonstrationSkills demonstration45%All critical checkpoints marked pass on the utility acceptance checklist; no more than one non-critical deviation allowedThe student prepares and installs a complete heat-shrink termination on a 15 kV URD cable section within a set time, without instructor assistance, while narrating each step. The evaluator scores the termination against the same utility acceptance checklist used in the lab, verifying semi-con removal distance, insulation diameter, lug crimp count, heat-shrink coverage, and absence of contamination.
Standard met · Safety · Time · Quality/finish · Documentation
Lab Log PortfolioLog15%Minimum score of 80% on a 25-point rubric covering completeness, dimensional accuracy of recorded measurements, photograph quality, and quality of corrective-action narrativesThe student submits the lab log maintained throughout Lesson 3, containing annotated photographs of each termination stage, measured dimensions compared to specification tolerances, the completed acceptance checklist, and a written reflection on any steps that required correction. The log is evaluated as a professional trade document and directly supports the NCCER Registry record of hands-on performance.
Standard met · Safety · Time · Quality/finish · Documentation
Field Safety CheckSafety audit15%Zero critical errors; minor deductions may not exceed 2 points on a 10-point checklistConducted during or immediately following the field site walk in Lesson 5, the instructor evaluates each student's JHA form, PPE selection, and rubber goods inspection technique against a go/no-go safety checklist. Any selection of PPE with an incorrect voltage-class rating, any failure to identify a live energy source on the JHA, or any undiscovered defect during rubber goods inspection constitutes a critical error requiring remediation before the student may progress to Course 7: Electrical Safety.
Standard met · Safety · Time · Quality/finish · Documentation
BLD-LINE69-07 Trade course

Electrical Safety for Power Line Workers

34 hr · $610 COMPLIMENTARY

This course develops the electrical safety knowledge and hands-on habits every apprentice lineworker must demonstrate before working on or near energized distribution systems. Learners apply OSHA General Industry and Construction electrical standards, NFPA 70E approach-boundary concepts, and utility-specific minimum approach distances to realistic linework scenarios. Emphasis is placed on lockout/tagout, personal protective equipment selection, and the recognition and control of electrical hazards encountered on overhead and underground distribution systems.

Outcomes
Course text

This course develops the electrical safety knowledge and hands-on habits every apprentice lineworker must demonstrate before working on or near energized distribution systems. Learners apply OSHA General Industry and Construction electrical standards, NFPA 70E approach-boundary concepts, and utility-specific minimum approach distances to realistic linework scenarios. Emphasis is placed on lockout/tagout, personal protective equipment selection, and the recognition and control of electrical hazards encountered on overhead and underground distribution systems.

How the course runs. 5 blocks: Electrical Hazards and the Hierarchy of Controls; Minimum Approach Distances, Approach Boundaries, and Arc-Flash Awareness; Rubber Insulating PPE: Selection, Inspection, and Use; Lockout/Tagout for Distribution Equipment; Emergency Response: Electrical Injuries, Downed Conductors, and Step-Potential Hazards.

What competent looks like. Identify and explain the hierarchy of electrical hazard controls—elimination, substitution, engineering controls, administrative controls, and PPE—and apply them to distribution-line work scenarios. Demonstrate correct lockout/tagout procedures for de-energizing distribution equipment, including isolation, verification with a properly rated voltage tester, and re-energization steps. Select appropriate rubber insulating PPE (gloves, sleeves, blankets, line hose) and dielectric footwear for a given voltage level and task, verify inspection and test dates, and perform a pre-use air test. State the OSHA-mandated minimum approach distances for voltages encountered in distribution work and apply them correctly when establishing approach boundaries for energized conductors. Recognize conditions that create step-potential, touch-potential, and arc-flash hazards and describe the protective actions required for each. Apply OSHA 10 Construction electrical safety principles and first-aid response procedures—including treatment of electrical burns and activation of emergency services—to simulated on-site emergencies.

Lessons · 5 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1Electrical Hazards and the Hierarchy of Controls7theoryGiven a set of distribution-line work scenarios, the learner correctly identifies all electrical hazards present and selects the appropriate control measure from the hierarchy for each, with no critical errors.
  1. Instructor-led presentation on how current, voltage, resistance, and body-path resistance combine to produce injury; learners use Ohm's Law to calculate current through a human body for three sample voltage/resistance pairs and compare results to physiological injury thresholds.
  2. Small-group card-sort activity: learners receive 20 hazard-scenario cards (energized conductor contact, induced voltage, capacitor stored energy, step potential near a downed conductor, etc.) and sort them under the five control levels, then defend their choices to the class.
  3. Case-study review of two publicly available OSHA electrical fatality investigation reports from distribution-line work; learners complete a structured analysis worksheet identifying what hazard was present, what controls were absent, and what controls would have prevented the fatality.
OSHA 29 CFR 1910.269 and 29 CFR 1926 Subpart V reference text; OSHA electrical fatality investigation reports (publicly available on osha.gov); whiteboard; hazard-scenario card sets; injury-threshold reference chart; scientific calculatorExit quiz of 15 multiple-choice and short-answer questions covering hazard identification and control selection; pass mark is 80% (12/15). Instructor reviews incorrect answers individually before advancing.
2Minimum Approach Distances, Approach Boundaries, and Arc-Flash Awareness7demoThe learner correctly states the applicable minimum approach distance for a given distribution voltage level and physically demonstrates proper boundary positioning using rope and cone markers in a simulated work area, with zero boundary violations.
  1. Instructor demonstration using a scaled outdoor (or large indoor) mock work area with numbered conductor placards at common distribution voltages; learners observe correct positioning, flagging, and communication protocols before any hands-on work.
  2. Paired boundary-setup exercise: each pair receives a scenario card specifying system voltage and task; they place cones and barrier tape to mark the restricted, limited, and prohibited approach boundaries, then the instructor measures actual distances with a tape measure and records pass/fail.
  3. Tabletop arc-flash awareness discussion using utility arc-flash incident energy reference examples; learners identify which PPE category would be required and explain why arc-flash PPE is separate from shock PPE, referencing NFPA 70E approach boundary concepts.
Measuring tape (25 ft); traffic cones; barrier tape; scenario cards keyed to OSHA 29 CFR 1910.269 Table R-6 and related tables; NFPA 70E (current edition) arc-flash PPE category table reference; mock work area with conductor placards; instructor distance-recording sheetPractical boundary-setup check: instructor measures each pair's cone placement against correct distances from OSHA tables; all distances must be within 6 inches of the required value, and no cone may be placed inside the prohibited approach boundary. Both partners must verbally state the correct distances before passing.
3Rubber Insulating PPE: Selection, Inspection, and Use8labThe learner selects, visually inspects, air-tests, and properly dons rubber insulating gloves and sleeves appropriate for a specified distribution voltage, identifying any defective item and removing it from service, to 100% accuracy on the critical safety steps.
  1. Instructor demonstration of the complete PPE selection workflow: reading the ASTM class markings on gloves and sleeves, checking color-coded test date tags, performing a visual roll-down inspection for cuts, punctures, and ozone damage, and performing the air-inflation (roll-down) leak test.
  2. Each learner works through a set of six rubber gloves—two serviceable, two with intentionally visible defects (cuts, expired test date, embedded debris), and two borderline items—completing an inspection log sheet for each and marking defective items with red tape before returning them to the discard bin.
  3. Donning drill: learners practice the full donning sequence (leather protectors over gloves, sleeves attached and secured, blanket application to conductor) using a pole-top mock-up fixture at bench height, timed and critiqued by the instructor against a step checklist.
ASTM Class 00, 0, 2, and 4 rubber insulating gloves (serviceable and seeded-defect samples); matching rubber sleeves; leather protector gloves; rubber insulating blankets and line hose; ASTM F496 and F1236 reference cards; inspection log worksheets; red defect-marking tape; bench-height pole-top mock-up fixture; timerLab log entry plus instructor sign-off checklist: learner must correctly classify all six gloves (100% accuracy on defect/pass calls required—a missed defect is an automatic fail); donning sequence must match the instructor checklist with zero skipped steps. Lab log is reviewed for completeness before credit is awarded.
4Lockout/Tagout for Distribution Equipment7practiceThe learner correctly executes a complete LOTO procedure—notify, isolate, apply locks and tags, verify absence of voltage, and re-energize—on a simulated distribution disconnect or recloser mock-up, with zero steps omitted and voltage verified using a properly rated tester.
  1. Instructor walk-through of the OSHA-required LOTO sequence for electrical energy control on distribution equipment, emphasizing that 'try the switch' verification is not sufficient and that an appropriately rated voltage-sensing device must be used; learners follow along with their own LOTO procedure worksheets.
  2. Role-play exercise in three-person crews (crew leader, groundman, safety observer): each crew executes a complete LOTO on the classroom mock distribution panel/disconnect mock-up, with the safety observer using a checklist to flag any omitted step; crews rotate roles and repeat until all members have led a cycle.
  3. Adverse-scenario drill: instructor introduces a complication mid-procedure (simulated recloser that does not positively open, a second unexpected energy source, a missing lock) and learners must verbally describe the correct response before the exercise continues.
Classroom LOTO training board (simulated disconnect switches, recloser mock-up, padlock hasps); LOTO padlocks and tags (one set per learner); non-contact voltage tester rated for distribution voltages (training/demonstration unit); OSHA 29 CFR 1910.147 and 1910.269 LOTO provisions reference; procedure worksheets; safety-observer checklistsInstructor-scored procedure checklist: learner must complete all required LOTO steps in correct sequence with zero omissions; voltage-verification step must be performed with the rated tester and results verbally reported. A single skipped or out-of-order critical step (isolation, lock application, or voltage test) constitutes a fail; learner must repeat the full procedure before progressing.
5Emergency Response: Electrical Injuries, Downed Conductors, and Step-Potential Hazards5fieldThe learner correctly executes the emergency response sequence for a simulated downed-conductor or electrical-contact incident—including safe approach, calling for help, CPR/AED if victim is clear, and reporting—without entering the step-potential hazard zone, achieving all critical steps on the evaluator checklist.
  1. Outdoor scenario setup: learners approach a mock downed-conductor scene (rope on ground simulating energized wire, moulage-makeup victim mannequin); instructor narrates hazard conditions; learners practice the shuffle-step and one-foot-at-a-time exit technique to safely leave the step-potential zone before touching anything.
  2. First aid skills station: each learner performs a full adult CPR/AED cycle on a manikin (30 compressions to 2 breaths, correct AED pad placement and shock delivery) timed by the evaluator; learners also demonstrate burn-wound management—cool water application, covering, no ice—and cervical-spine precaution positioning for an electrical-contact victim.
  3. Tabletop debrief and documentation drill: after the scenario, learners complete an incident-report form (date, time, location, nature of contact, actions taken, witnesses) and identify which OSHA recordkeeping requirements apply, reinforcing the administrative-control and regulatory-compliance aspects covered in OSHA 10.
Rope or colored cord (downed conductor simulation); CPR manikin with AED trainer unit; moulage kit or victim mannequin; incident-report forms; OSHA 300 log reference; evaluator scenario checklist; first-aid supply kit (non-sterile gloves, burn dressings, water source); outdoor or large parking-area spaceEvaluator checklist with two tiers: (1) safety-critical steps—no learner may enter the step-potential zone; 100% compliance required; (2) clinical steps—CPR rate, depth, AED use, and burn care must meet American Heart Association Heartsaver standard; overall pass requires all Tier 1 steps met and 80% of Tier 2 steps correct. Learners who fail Tier 1 immediately repeat the scenario.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
Electrical Safety Written ExaminationWritten exam25%75% (38/50 items correct); any question touching on minimum approach distances, LOTO sequence, or PPE class selection must be answered correctly—three or more errors in these critical categories require a retest of the full exam.A 50-item closed-book examination covering electrical hazard recognition, the hierarchy of controls, OSHA minimum approach distances for distribution voltages, rubber insulating PPE ASTM classes and care, LOTO procedural requirements, arc-flash boundary concepts, and emergency response duties. Questions are drawn from OSHA 29 CFR 1910.269, 29 CFR 1926 Subpart V, and NFPA 70E reference content addressed in the course.
Standard met · Safety · Time · Quality/finish · Documentation
PPE and LOTO Skills DemonstrationSkills demonstration45%Pass requires 100% completion of all safety-critical checklist items (glove inspection, lock application, voltage verification, and boundary placement) with no skipped or reversed steps; up to two non-critical procedural errors are permitted before the skill must be re-demonstrated.The learner performs, without prompting, a full rubber-insulating-glove inspection and donning sequence followed immediately by a complete LOTO procedure on the classroom mock distribution panel, concluding with voltage verification and correct re-energization. An instructor using a standardized 24-item checklist scores each step as correct, incorrect, or omitted.
Standard met · Safety · Time · Quality/finish · Documentation
Electrical Safety Lab LogLog15%All five lesson entries must be present and complete; inspection log sheets for the PPE lab must show correct pass/fail calls on all six glove samples (100% accuracy); LOTO procedure worksheets must include every required step with legible notes; overall completeness score of 90% or higher required.Learners maintain a running lab log throughout the course documenting observations, measurements, inspection findings, LOTO procedural steps, and scenario debrief notes for each lesson. The log is submitted at the end of the course and reviewed by the instructor for accuracy, completeness, and evidence that the learner can transfer safety reasoning to written form.
Standard met · Safety · Time · Quality/finish · Documentation
End-of-Course Safety Compliance CheckSafety audit15%Zero tolerance on the four critical behaviors: PPE worn and inspected before any simulated energized-equipment task; no entry inside the prohibited approach boundary; LOTO lock applied before any mock maintenance task; step-potential zone respected during emergency scenarios. Any single violation results in an immediate stop and mandatory remediation before the check is repeated.During the final field session the instructor conducts an unannounced observation of each learner performing an integrated scenario that combines boundary setup, PPE donning, a LOTO evolution, and initial emergency response; the observer records adherence to the four non-negotiable safety behaviors listed in OSHA 29 CFR 1910.269 and the course safety policy without intervening unless an actual hazard arises.
Standard met · Safety · Time · Quality/finish · Documentation
BLD-LINE69-08 Trade course

CDL Class A Preparation for Electrical Lineworkers

34 hr · $610 COMPLIMENTARY

This course prepares students to obtain a Commercial Driver's License Class A with the skills and knowledge required to safely operate the heavy trucks, aerial lift trucks, and utility vehicles used in power line construction. Instruction covers federal FMCSA regulations, pre-trip inspections, basic vehicle control, backing maneuvers, and the air brakes and combination vehicle endorsements most relevant to lineworker fleets. Students complete classroom knowledge preparation and hands-on range driving so they can pass state CDL knowledge tests and meet employer driving standards.

Outcomes
Course text

This course prepares students to obtain a Commercial Driver's License Class A with the skills and knowledge required to safely operate the heavy trucks, aerial lift trucks, and utility vehicles used in power line construction. Instruction covers federal FMCSA regulations, pre-trip inspections, basic vehicle control, backing maneuvers, and the air brakes and combination vehicle endorsements most relevant to lineworker fleets. Students complete classroom knowledge preparation and hands-on range driving so they can pass state CDL knowledge tests and meet employer driving standards.

How the course runs. 5 blocks: FMCSA Regulations, Driver Qualifications, and Hours of Service; Air Brake Systems and Combination Vehicle Mechanics; Pre-Trip Vehicle Inspection for Utility Fleet Vehicles; Basic Vehicle Control and Backing Maneuvers on the Driving Range; Hazardous Materials Awareness, Driver Documents, and CDL Test Strategy.

What competent looks like. Perform a systematic FMCSA-compliant pre-trip inspection on a Class A combination vehicle and document all defects correctly. Demonstrate safe basic vehicle control including straight-line backing, offset backing, and parallel parking on a driving range. Explain FMCSA hours-of-service rules, driver qualification requirements, and post-accident testing obligations applicable to utility fleet drivers. Identify the function and proper operation of air brake system components and pass a static air brake check to CDL test standards. Correctly complete driver logs, vehicle inspection reports, and hazardous materials shipping papers at the level required for utility line work. Pass all required CDL Class A knowledge tests (general knowledge, air brakes, combination vehicles) at the state-required passing score.

Lessons · 5 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1FMCSA Regulations, Driver Qualifications, and Hours of Service6theoryStudents will accurately explain FMCSA Part 391 driver qualification requirements, Part 395 hours-of-service rules, and post-accident drug and alcohol testing obligations as they apply to utility line-work fleets.
  1. Guided reading of the state CDL manual sections on general knowledge, driver qualifications, and hours of service, followed by a facilitator-led Q&A session highlighting lineworker-specific scenarios such as emergency restoration callouts and multi-day storm dispatch.
  2. Small-group case study: given a sample driver log with deliberate errors (missing start location, incorrect mileage, off-duty vs. sleeper berth confusion), students identify every violation and correct the log on a blank paper log form.
  3. Practice quiz of 30 general-knowledge multiple-choice questions drawn from the state CDL knowledge test item bank; students review every missed item with the instructor before leaving.
State CDL driver's manual, FMCSA regulations summary handout, blank paper driver daily logs, sample completed log with embedded errors, whiteboard, CDL general knowledge practice test bookletStudents score 80% or higher on a 30-question general-knowledge practice quiz; any student below 80% receives targeted review of missed topics before the next lesson.
2Air Brake Systems and Combination Vehicle Mechanics7demoStudents will identify every major air brake component on a parked vehicle, explain the function of each, and correctly perform the FMCSA-required static air brake check sequence to CDL examiner standards.
  1. Instructor-led walk-around of a parked Class A truck with air brakes: instructor names and points to each component (compressor, reservoirs, governor, slack adjusters, S-cams, spring brakes, glad hands, ABS module) while students annotate a blank system diagram.
  2. Paired practice of the CDL air brake check procedure on the parked vehicle: one student performs the seven-step sequence aloud while the partner scores them against a written checklist; roles switch and both complete at least two full runs.
  3. Instructor demonstration of coupling and uncoupling a tractor-semitrailer following the CDL examiner sequence, then students couple and uncouple in supervised pairs, narrating each step to reinforce retention.
Class A tractor-semitrailer with functional air brake system, air brake component diagram (blank and labeled versions), CDL air brake check checklist, coupling/uncoupling procedure card, PPE (safety glasses, gloves, steel-toed boots)Each student completes the seven-step air brake check and the coupling/uncoupling sequence without prompting, with zero safety-critical steps omitted, scored by instructor on a pass/fail checklist; students who omit any safety-critical step repeat until passing.
3Pre-Trip Vehicle Inspection for Utility Fleet Vehicles7labStudents will conduct a complete FMCSA-compliant pre-trip inspection on a Class A utility truck or aerial lift truck, correctly identifying and documenting at least four seeded defects planted by the instructor.
  1. Instructor briefing on the CDL examiner's pre-trip scoring rubric and the additional utility-specific inspection points for aerial lift trucks (boom hoses, outrigger pads, PTO engagement) not found on standard freight vehicles, using a side-by-side comparison handout.
  2. Individual timed pre-trip inspection on a vehicle with four instructor-seeded defects (examples: cracked mirror, low air pressure warning light taped over, loose lug nut marker, frayed safety chain): each student narrates aloud as if speaking to a CDL examiner and completes a Driver Vehicle Inspection Report (DVIR) form.
  3. Debrief: students exchange DVIRs, compare findings against the instructor's answer key, and discuss any missed defects as a group; instructor resets defects and each student performs a second inspection targeting previously missed items.
Class A utility truck or aerial lift truck (with seeded defects), DVIR forms (FMCSA format), CDL pre-trip inspection checklist, utility vehicle inspection supplement handout, pen, clipboard, safety glasses, gloves, steel-toed bootsStudent correctly identifies at least four of the four seeded defects and completes a legible, complete DVIR with no safety-critical item left blank; instructor scores against CDL examiner rubric — any missed seeded defect triggers a repeat inspection on a reset vehicle before the next lesson.
4Basic Vehicle Control and Backing Maneuvers on the Driving Range10practiceStudents will demonstrate straight-line backing, offset backing, and parallel parking of a Class A combination vehicle on a marked driving range within the CDL examiner cone tolerances, with no cone strikes.
  1. Instructor demonstration of each maneuver (straight-line back, 45-degree offset back, parallel park) with running commentary on reference points, mirror use, and pull-up limits; students observe from outside the vehicle, then sketch the path of travel and identify their own visual reference points before driving.
  2. Rotating individual range sessions: each student drives the vehicle through basic forward control (turns, stop-and-go, intersection approach) and then attempts all three backing maneuvers in sequence; instructor rides along for the first attempt and provides real-time coaching, then evaluates subsequent attempts from outside using the CDL scoring sheet.
  3. Peer observation rotation: while one student drives, two others stand at designated observation points and call out cone proximity, documenting observations on scoring sheets; all three debrief together after each run to reinforce visual reference-point vocabulary.
Class A tractor-semitrailer, traffic cones (full set for three maneuver courses laid to CDL examiner dimensions), CDL skills test scoring sheets, high-visibility safety vests for observers, radio or hand signals protocol card, driving range with defined pull-through and backing lanesEach student completes all three backing maneuvers with zero cone strikes and within allowable pull-up limits as scored on the CDL skills test sheet; students who strike a cone or exceed pull-up limits repeat the specific maneuver until passing before the course ends.
5Hazardous Materials Awareness, Driver Documents, and CDL Test Strategy4theoryStudents will correctly complete a shipping paper for a utility load containing a regulated hazardous material, identify the required placards, and demonstrate a test-taking strategy that produces a passing score on timed CDL knowledge practice exams.
  1. Instructor-led review of hazmat tables and placarding requirements relevant to lineworker vehicles (transformer oil classified as environmentally hazardous substance, compressed gas cylinders for acetylene/oxygen carried on service trucks); students complete a sample shipping paper and select the correct placards from a placard chart.
  2. Timed full-length CDL knowledge practice exam (general knowledge + air brakes + combination vehicles, total of 90 questions at state-test pacing); students use elimination and re-read strategies taught in a brief test-taking mini-lesson; instructor grades immediately and returns annotated answer sheets.
  3. Individual study plan session: each student reviews their practice exam score report, flags topics below 80% accuracy, and writes a one-page personal review plan listing three specific topics to study before sitting the state knowledge test; instructor reviews and signs off each plan.
State CDL manual, hazmat table excerpt and placard chart, blank shipping paper forms, 90-question timed practice exam packet, answer keys, individual score report template, pensStudent scores 80% or higher on the full 90-question timed practice exam and completes a correct shipping paper with proper placard selection (no missing required fields, correct hazmat description format); students below 80% on the practice exam receive a targeted item review and may retest on an alternate 90-question form before the course concludes.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
CDL General Knowledge and Endorsement Written ExamWritten exam25%80% or higher on each section (general knowledge, air brakes, combination vehicles), matching or exceeding the minimum passing score set by most state licensing agenciesStudents complete a 90-question timed written exam covering FMCSA general knowledge, air brake systems, and combination vehicle operation, formatted to mirror the actual state CDL knowledge test. Each section is scored separately so that any section below passing requires a targeted retake.
Standard met · Safety · Time · Quality/finish · Documentation
CDL Pre-Trip Inspection and Backing Maneuvers Skills DemonstrationSkills demonstration45%Pass on instructor CDL examiner rubric: no safety-critical item omitted on pre-trip, all four seeded defects identified, zero cone strikes and within pull-up limits on all three backing maneuversEach student performs an individual timed pre-trip inspection on a vehicle with four seeded defects, narrating aloud to the instructor acting as examiner, then completes straight-line backing, offset backing, and parallel parking on the range course. Scoring uses the same sheet a state CDL examiner would use; a failure on any single element requires a focused repeat of that element before the program's Capstone phase.
Standard met · Safety · Time · Quality/finish · Documentation
Driver Log and Vehicle Inspection Report Lab LogLog15%Zero safety-critical omissions; no more than two minor formatting errors across all submitted forms; all defect entries legible and completeStudents submit a portfolio of five completed paper driver daily logs (covering a realistic multi-day lineworker dispatch scenario with mileage, duty status changes, and a 34-hour restart) and three completed DVIRs from their range and lab sessions. The instructor reviews each document against FMCSA formatting requirements and marks any violation as a critical error requiring correction and resubmission.
Standard met · Safety · Time · Quality/finish · Documentation
Pre-Drive Safety Check and Hazmat Placard Safety InspectionSafety audit15%100% on all safety-critical items: no step skipped in the air brake check sequence, correct placard type and placement identified, no vehicle moved without confirming brakes set and outriggers upBefore each range driving session the instructor observes the student performing the static air brake check and a hazmat placard verification (instructor presents a scenario card with a load description and the student selects and places the correct placards on a mock vehicle diagram). Any omission of a safety-critical step stops the session and requires a full repeat of the check; this assessment is evaluated every driving day and must be passed each time to proceed.
Standard met · Safety · Time · Quality/finish · Documentation
BLD-LINE69-09 Capstone

Capstone Project: Overhead Distribution Line Installation

72 hr · $720 COMPLIMENTARY

Students plan, install, and document a complete single-phase overhead distribution line assembly on a training pole yard, integrating climbing, rigging, transformer connections, grounding, and safety practices learned throughout the program. Each student produces a full job package—including a one-line diagram, material takeoff, OSHA hazard analysis, and as-built sketch—and defends their work before a panel of instructors. This capstone verifies entry-level readiness for a journeyman helper role and maps directly to NCCER Power Line Worker core competency areas.

Outcomes
Course text

Students plan, install, and document a complete single-phase overhead distribution line assembly on a training pole yard, integrating climbing, rigging, transformer connections, grounding, and safety practices learned throughout the program. Each student produces a full job package—including a one-line diagram, material takeoff, OSHA hazard analysis, and as-built sketch—and defends their work before a panel of instructors. This capstone verifies entry-level readiness for a journeyman helper role and maps directly to NCCER Power Line Worker core competency areas.

How the course runs. 4 blocks: Job Planning: One-Line Diagram, Bill of Materials, and Job-Hazard Analysis; Integrated Field Installation: Climb, Rig, String, and Hang; Transformer Connections, Grounding, and Closeout Documentation; Project Defense and Reflection.

What competent looks like. Plan a single-phase overhead distribution line job by producing a dimensioned one-line diagram, a bill of materials, and a written job-hazard analysis that meets OSHA General Industry/Construction safety standards. Safely climb a utility pole using climbing hooks and a safety strap, tie off correctly, and perform aloft work within the scope of a helper position while maintaining 100% tie-off. Rig, hoist, and dead-end a conductor segment using correct knots, come-alongs, and stringing blocks without exceeding rated load limits, as verified by instructor observation. Install and connect a single-phase distribution transformer including primary and secondary connections, proper grounding, and correct fusing, following manufacturer specifications and the National Electrical Safety Code (NESC) clearance requirements. Complete a job closeout package that includes an as-built sketch, a completed equipment inspection checklist, and a lockout/tagout log, demonstrating technical writing skills to a passing standard. Verbally defend all installation decisions—material selection, safety controls, code compliance rationale—clearly and accurately before an instructor panel.

Lessons · 4 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1Job Planning: One-Line Diagram, Bill of Materials, and Job-Hazard Analysis18theoryGiven a written project scenario, the student produces a dimensioned single-phase one-line diagram, a complete bill of materials with part descriptions, and a written job-hazard analysis (JHA) that identifies all energy sources, required PPE, and OSHA-referenced controls.
  1. Interpret a utility company standard drawing package and a pole-loading specification sheet; identify every component (pole class, crossarm, insulators, conductor size, transformer kVA, fusing) required for the capstone scenario and enter them on a blank material takeoff form.
  2. Draft a freehand, dimensioned one-line diagram to scale on engineering paper showing pole locations, span lengths, conductor routing, transformer placement, primary disconnect, and neutral run; peer-review a classmate's diagram against a provided checklist and document discrepancies in writing.
  3. Write a JHA for the capstone installation covering each phase of work (climb, rigging, conductor stringing, transformer hang, energize sequence); for each hazard identify the energy type, severity rating, and at least two hierarchy-of-controls measures referencing the applicable OSHA standard by title (not invented section number).
Engineering paper, pencils, ruler, NCCER Power Line Worker module handouts, utility company standard drawing samples (provided by instructor), blank JHA forms, OSHA Construction Standards pocket guide, NESC clearance reference table (instructor-provided excerpt)Instructor scores the one-line diagram, BOM, and JHA against a 30-point rubric; minimum passing score is 24/30 (80%). Diagram must show correct component symbols and at least one NESC clearance dimension labeled accurately. JHA must list every energy source present in the scenario with a control measure; any missing energy source is an automatic resubmit.
2Integrated Field Installation: Climb, Rig, String, and Hang30labWorking in a two-person crew on the pole yard, the student climbs to working height, sets crossarm hardware, rigs and hoists a conductor segment using stringing blocks and a come-along, dead-ends the conductor with the correct sleeve or clamp, and positions a single-phase transformer for connection—all while maintaining 100% tie-off and following the JHA written in Lesson 1.
  1. Don and inspect all required PPE (climbing hooks, safety strap, hard hat, safety glasses, rubber gloves with leather protectors, high-visibility vest); climb a class-H frame training pole to crossarm height, demonstrate a secure working position, install a crossarm and pin insulator, then descend—instructor completes a standardized climb observation checklist for each student in real time.
  2. From the ground position, rig a snatch block at the crossarm, attach a come-along to the anchor, feed conductor through the block, and tension the conductor to the simulated sag table specification provided; apply a preformed dead-end or compression dead-end sleeve (per available tooling) and torque bolted hardware to manufacturer spec using a calibrated torque wrench—record values on the as-built log.
  3. As the aloft worker (second evolution, roles swapped with partner), receive the transformer bail from a ground worker using a hand line and block, position the transformer on the crossarm bracket, verify that the primary bushing faces the correct direction per the standard drawing, and secure all mounting hardware; ground worker simultaneously lays out secondary rack hardware and labels each secondary conductor with phase tape per the project drawing.
Pole yard with minimum two class-H training poles, climbing hooks (gaffs) and safety straps (one set per student, sized and inspected), Class 00 rubber gloves with leather protectors, hard hats, safety glasses, high-visibility vests, crossarm and hardware kit, pin insulators, preformed or compression dead-end sleeves, come-along rated for conductor load, snatch blocks, stringing blocks, hand line, single-phase distribution transformer (de-energized training unit), transformer bracket and mounting hardware, calibrated torque wrench, as-built log forms, NCCER Power Line Worker Levels referenceInstructor uses a 40-point performance observation checklist (adapted from NCCER task sheets) scored in real time; passing is 32/40 (80%). Automatic resubmit triggers: any moment of zero tie-off aloft, use of a tool or hardware outside its rated capacity, or failure to inspect PPE before donning. Students who trigger an automatic resubmit complete remediation during scheduled open-lab time and repeat the observed task the following day.
3Transformer Connections, Grounding, and Closeout Documentation14practiceThe student makes correct primary and secondary conductor connections to the training transformer, installs a continuous equipment ground from transformer tank to ground rod following NESC grounding guidance, performs a visual inspection against a utility company acceptance checklist, and completes the full as-built package including a lockout/tagout log and an equipment inspection record.
  1. On the de-energized training transformer, identify primary and secondary bushings, verify conductor phasing with the project one-line diagram, make mechanical connections (compression lugs or bolted terminals as equipped), verify torque, and apply weather-resistant insulating covers; instructor observes and scores against a terminal connection task sheet.
  2. Measure, cut, and install a copper equipment grounding conductor from the transformer tank ground pad down the pole to a driven ground rod (or training ground plate); use a clamp-type ground fitting at the tank, install staples or standoff brackets at correct intervals down the pole per the NESC-referenced spacing guidance in the instructor handout, and connect to the ground rod with an approved clamp—record conductor size, fitting type, and measured resistance reading (using a clamp-on ground tester if available) on the as-built log.
  3. Conduct a structured walk-down of the completed installation using a utility company-style pre-energization acceptance checklist (provided by instructor); mark each item pass/fail with a written note explaining any deficiency found; then compile all project documents (one-line diagram, BOM, JHA, as-built sketch, LOTO log, equipment inspection record) into a tabbed closeout binder organized per the checklist index.
De-energized single-phase training transformer (same unit from Lesson 2), compression lug kit or bolted terminal hardware, torque wrench, insulating covers, copper grounding conductor (appropriately sized per instructor guidance), ground rod or training ground plate, staples and standoff brackets, clamp-type ground fittings, clamp-on ground resistance tester (or multimeter), pre-energization acceptance checklist (instructor-provided utility sample), LOTO log forms, tabbed project binder, NCCER Power Line Worker module handouts on groundingTerminal connection task sheet and grounding installation are each scored on a 20-point checklist; minimum 16/20 (80%) on each. The completed closeout binder is scored on a 10-point documentation rubric; minimum 8/10. Any missing required document (JHA, LOTO log, or as-built sketch) is a binder resubmit. Ground resistance reading, if measured, must be recorded; a value above the instructor-stated benchmark requires a written explanation.
4Project Defense and Reflection10theoryThe student delivers a structured oral defense of the completed capstone installation to a two-instructor panel, explaining every major decision—material selection, safety controls, code compliance reasoning, and lessons learned—and responds accurately to at least six panel questions covering NCCER Power Line Worker competency areas.
  1. Prepare and deliver a 10-minute structured presentation (without reading directly from notes) using the closeout binder as a visual reference; cover the project scope, one-line diagram, JHA rationale, key installation steps, grounding approach, and at least one problem encountered and how it was resolved—instructors score delivery and technical accuracy on a rubric during the presentation.
  2. Respond to a minimum of six panel questions drawn from NCCER Power Line Worker exam topic areas (electrical theory, pole climbing safety, rigging and load calculation principles, transformer operation, grounding and bonding, OSHA electrical construction safety); each answer is scored immediately for accuracy and completeness on a per-question rubric.
  3. Complete a written individual reflection (minimum one page, submitted at the end of the defense session) identifying two technical skills gained during the capstone, one safety behavior change from the JHA exercise, and one area for continued development—reflection is scored for specificity and honest self-assessment, not graded for opinion.
Student's completed closeout binder, whiteboard or flip chart for diagrams during Q&A, panel scoring rubrics (two copies per instructor), written reflection form, pensPresentation scored on a 20-point rubric (technical accuracy 12 pts, clarity 8 pts); minimum 16/20. Q&A scored at 2 points per question for six questions (12 points total); minimum 10/12, with no single answer on a safety-critical topic rated 0. Written reflection must address all three required elements to receive a pass; missing any element requires a one-page resubmission within 48 hours. A student who does not pass the Q&A section on the first attempt receives one remediation session and one re-examination within the same week.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
Capstone Installation ProjectProject60%Minimum 80% on each of the four lesson-level performance rubrics (planning, field installation, connections/documentation, and defense); no automatic resubmit triggers left open at project closeout.The student's complete physical installation on the pole yard—crossarm, dead-ended conductor, transformer, grounding system—plus the accompanying closeout binder are evaluated as a unified project deliverable. Instructors score the work against NCCER Power Line Worker task-sheet criteria, utility company acceptance checklist standards, and OSHA safety requirements; all deficiencies must be corrected and re-inspected before the project is considered complete.
Meets specification · Within estimate · Workmanship · Safety · Documentation
Capstone PortfolioPortfolio20%All six required documents present and each scored at 80% or above on its individual rubric; binder organization score minimum 8/10.The tabbed closeout binder containing the one-line diagram, bill of materials, job-hazard analysis, as-built sketch, lockout/tagout log, and pre-energization inspection checklist is evaluated as a stand-alone portfolio artifact. The portfolio demonstrates the student's ability to produce job documentation to trade-industry standards and serves as a writing and technical-communication sample that maps to NCCER Registry documentation requirements.
Completeness · Organization · Evidence quality
Oral DefenseOral / panel20%Minimum 16/20 on presentation rubric and minimum 10/12 on Q&A panel scoring; written reflection submitted with all three required elements addressed.A two-instructor panel evaluates the student's ability to explain and justify every installation decision verbally, respond accurately to questions mapped to NCCER Power Line Worker competency areas, and demonstrate professional communication skills required for field crew work and pre-job safety briefings.
Explains decisions · Answers technical questions · Professional communication
BLD-LINE69-10 Externship / clinical

Externship / Worksite Placement

108 hr · $430 COMPLIMENTARY

Students complete 108 supervised hours at an approved electric utility, contractor, or cooperative worksite, applying pole climbing, rigging, transformer work, and distribution skills under journey-level lineworkers and a designated employer supervisor. Daily field activities reinforce NCCER Power Line Worker competencies, OSHA 10 hazard-recognition habits, and professional conduct expected of entry-level apprentices. A structured employer evaluation and a reflective log document demonstrated competency and readiness for permanent employment.

Outcomes
Course text

Students complete 108 supervised hours at an approved electric utility, contractor, or cooperative worksite, applying pole climbing, rigging, transformer work, and distribution skills under journey-level lineworkers and a designated employer supervisor. Daily field activities reinforce NCCER Power Line Worker competencies, OSHA 10 hazard-recognition habits, and professional conduct expected of entry-level apprentices. A structured employer evaluation and a reflective log document demonstrated competency and readiness for permanent employment.

How the course runs. 4 blocks: Worksite Orientation and Safety Integration; Supervised Trade Task Rotations; Independent Task Performance and Crew Contribution; Final Employer Evaluation and Reflective Summary.

What competent looks like. Perform assigned overhead and underground distribution tasks safely under journey-level supervision, meeting worksite quality and safety standards on every shift. Apply lockout/tagout, PPE selection, and approach-distance procedures correctly on live worksite conditions without prompting, as observed by the site supervisor. Use hand tools, climbing gear, rigging hardware, and bucket-truck controls in accordance with manufacturer specifications and crew instructions on at least four distinct job types. Complete a daily field log for each externship shift that accurately records tasks performed, hazards identified, equipment used, and questions resolved. Demonstrate professional reliability—punctuality, communication, and crew cooperation—earning a passing rating on the employer mid-point and final evaluations. Identify at least three connections between externship tasks and specific NCCER Power Line Worker credentialing content areas in the final reflective summary.

Lessons · 4 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1Worksite Orientation and Safety Integration12fieldStudents correctly complete the host employer's new-worker safety orientation and identify site-specific hazards, emergency procedures, and chain-of-command before performing any hands-on tasks.
  1. Attend the employer's formal site safety orientation, complete all required sign-in documentation, and receive or inspect personal PPE issued or verified by the site supervisor.
  2. Walk the active yard or job site with the assigned journey-level mentor, identifying overhead line clearances, underground marking flags, vehicle traffic patterns, and first-aid station locations, then record findings in the field log.
  3. Participate in the crew's morning tailgate safety meeting, contribute one identified hazard to the discussion, and document the meeting agenda and corrective actions taken in the daily log.
Employer new-hire orientation packet, site-specific OSHA compliance binder, hard hat, Class E lineworker gloves, safety glasses, hi-vis vest, rubber insulating sleeves, fall-arrest harness (if climbing assigned), field log notebook, NCCER Power Line Worker module reference cardsSupervisor confirms student completed all orientation sign-offs; field log entry for each of the 12 hours is present, legible, and includes at least one hazard observation per shift; pass = all orientation documents signed and log entries rated 'satisfactory' by supervisor.
2Supervised Trade Task Rotations60fieldStudents perform a minimum of four distinct trade task categories—pole climbing or bucket operation, rigging and material handling, transformer or switching operations, and underground or overhead line work—under direct journey-level supervision, meeting crew quality and safety expectations on each task.
  1. Rotate through assigned crew activities each shift (climbing, rigging, transformer change-outs, conduit or conductor installation, or restoration work), following all verbal and written work orders; document each task type, tools used, and safety controls applied in the daily field log.
  2. At the end of each workday, discuss with the journey-level mentor one task that went well and one area for improvement, then record both in the log along with the mentor's verbal feedback verbatim.
  3. At the midpoint of this lesson block (approximately 30 hours in), meet with the site supervisor for a structured mid-placement check-in using the program's employer mid-point evaluation form; review ratings together and set two specific improvement goals for the remaining hours.
Full lineworker PPE ensemble, climbing hooks and belt or bucket-truck controls (employer-provided), rigging slings and hardware, rubber insulating blankets and cover-up materials, hand tools (crescent wrench, cable cutters, pliers, screwdrivers), voltage testers, work orders and as-built drawings provided by employer, daily field log, employer mid-point evaluation formDaily log entries verified by mentor initials each shift; at least four distinct task categories documented over the 60 hours; mid-point employer evaluation form completed with no category rated below 'needs improvement' requiring a remediation plan; pass = mentor-initialed logs for every shift and mid-point evaluation submitted to school coordinator.
3Independent Task Performance and Crew Contribution24fieldStudents complete assigned tasks with decreasing direct prompting from the mentor, demonstrating independent judgment on hazard recognition and tool selection while contributing productively to crew workflow.
  1. Accept and execute a work assignment from the crew lead with minimal step-by-step instruction; before starting, verbally state the job steps, required PPE, and potential hazards to the mentor for confirmation, then proceed and self-correct as needed.
  2. Assist in planning and staging materials for an upcoming job segment—pulling stock from the yard truck, verifying transformer nameplate data, or laying out rigging equipment—without being told each individual step, and document the planning process in the log.
  3. Conduct a self-assessment at the end of each shift using the program's task competency checklist, rating personal performance on safety compliance, tool use, communication, and quality, then have the mentor confirm or adjust each rating with a brief written comment.
Program task competency self-assessment checklist, full PPE, employer-assigned hand and power tools, transformer or line hardware as assigned, rigging equipment, voltage-detection equipment, daily field logMentor-confirmed self-assessment checklists for each shift show at least 80% of competency items rated 'meets expectations' or above by the journey-level mentor; no unresolved safety violations documented in any shift log; pass = 80% threshold met across all self-assessment forms.
4Final Employer Evaluation and Reflective Summary12fieldStudents receive a formal final employer evaluation covering safety, technical skill, professionalism, and employability, then produce a written reflective summary that maps externship experiences to NCCER Power Line Worker credential content areas.
  1. Schedule and participate in a formal final evaluation meeting with the site supervisor, reviewing the completed employer final evaluation form category by category and discussing specific task examples that support each rating.
  2. Draft a 400–600 word reflective summary identifying at least three externship tasks connected to named NCCER Power Line Worker content areas (e.g., climbing, rigging, transformers, distribution), describing what was learned, what was challenging, and one professional development goal for the apprenticeship.
  3. Present the completed reflective summary and the full field log binder (all daily entries) to the school program coordinator in a brief 10-minute exit interview, answering at least two questions about worksite safety decisions made during the externship.
Employer final evaluation form, program field log binder with all daily entries, NCCER Power Line Worker module list (for mapping), word-processing software or lined paper for reflective summary, program exit interview rubricEmployer final evaluation form returned with all categories completed and no overall rating below 'satisfactory'; reflective summary meets length requirement and correctly names and maps at least three NCCER content areas; exit interview responses demonstrate accurate recall of two or more worksite safety decisions; pass = satisfactory or above on employer final evaluation AND reflective summary approved by coordinator.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
Employer Final Skills Evaluation (Skills Demonstration)Skills demonstration70%All categories on the employer final evaluation form rated 'satisfactory' or above, with no individual safety-related category rated below 'satisfactory'; any category rated 'unsatisfactory' requires a documented remediation plan and supervisor re-rating before credit is awarded.The host employer's designated supervisor completes the program's standardized final evaluation form assessing the student's on-the-job performance across five domains: safety compliance, technical task execution, tool and equipment handling, crew communication, and professional reliability. Ratings are based on direct observation across the full externship placement and constitute the primary pass/fail determination for the externship course.
Competency · Safety · Attendance · Conduct · Initiative
Field Log Binder Review (Lab Log)Log30%A minimum of one complete daily log entry for every scheduled externship shift, with mentor or supervisor initials confirming accuracy on each entry; at least four distinct trade task categories documented; mid-point evaluation form present; self-assessment checklists for all independent-performance shifts included; overall log rated 'complete and satisfactory' by the school program coordinator.The student submits the complete field log binder—containing all daily entries, the mid-point employer evaluation, shift self-assessment checklists, and the final reflective summary—to the school program coordinator for review. The coordinator evaluates the binder for completeness, accuracy of task descriptions, evidence of hazard identification, and the quality of the NCCER content mapping in the reflective summary.
Complete · Verified
BLD-LINE69-11 Exam prep

Certification Exam Preparation: NCCER Power Line Worker, CDL, OSHA 10 & First Aid/CPR

30 hr · $300 COMPLIMENTARY

This capstone review course systematically maps every major exam content area for the NCCER Power Line Worker credential, CDL Class A knowledge tests, OSHA 10 outreach topics, and First Aid/CPR certification to targeted practice sessions. Students complete timed mock exams under realistic conditions, identify knowledge gaps, and receive focused remediation before sitting for their credentials. The course bridges program coursework to credential success by reinforcing trade vocabulary, safety regulations, and practical knowledge in the exact formats used by each certifying body.

Outcomes
Course text

This capstone review course systematically maps every major exam content area for the NCCER Power Line Worker credential, CDL Class A knowledge tests, OSHA 10 outreach topics, and First Aid/CPR certification to targeted practice sessions. Students complete timed mock exams under realistic conditions, identify knowledge gaps, and receive focused remediation before sitting for their credentials. The course bridges program coursework to credential success by reinforcing trade vocabulary, safety regulations, and practical knowledge in the exact formats used by each certifying body.

How the course runs. 4 blocks: NCCER Power Line Worker Credential: Content Mapping and Topic Review; CDL Class A Knowledge Test Review: General Knowledge, Air Brakes, and Combination Vehicles; OSHA 10 and First Aid/CPR: Safety Standards Review and Skills Walkthrough; Full Mock Examination Day and Remediation Debrief.

What competent looks like. Correctly answer practice questions across all NCCER Power Line Worker core module topic areas at a rate consistent with the credential passing standard. Pass a timed CDL Class A general knowledge and air brakes practice test at or above the state passing threshold, demonstrating readiness for the state knowledge exam. Identify and explain OSHA General Industry and Construction Outreach topic areas covered in the OSHA 10-hour curriculum, achieving at least 70% on a comprehensive review quiz. Demonstrate correct First Aid and CPR decision-making sequences on scenario-based written and skills review items to the standard required for certification. Complete a full-length, timed integrated mock exam combining all four credential content areas, scoring at or above passing threshold on each section. Develop and execute a personal remediation plan targeting identified weak areas before the scheduled credential exam dates.

Lessons · 4 blocks
#LessonHrTypeObjectiveActivitiesMaterialsCheck
1NCCER Power Line Worker Credential: Content Mapping and Topic Review10theoryStudents will correctly answer practice items across all NCCER Power Line Worker module topic areas — including electrical theory, overhead and underground distribution, transformers, rigging, climbing safety, and pole-top rescue — at a rate of 70% or higher on a scored practice bank.
  1. Instructor leads a structured content-mapping session using the NCCER Power Line Worker module list; students mark every topic on a self-assessment checklist rating their confidence as strong, moderate, or weak, then prioritize the weak areas for the session.
  2. Small groups rotate through six topic stations (electrical theory and Ohm's law calculations, overhead line hardware and conductor identification, underground cable and termination, transformer connections and polarity, rigging load calculations and hardware, and climbing and pole-top rescue procedures), completing 10 timed practice questions per station and scoring their own answers against the answer key.
  3. Class debriefs each station; instructor works through the three most-missed question types at the board, connecting back to the relevant program course and NCCER module language, then students record corrected answers and rationale in their exam prep notebooks.
NCCER Power Line Worker core curriculum module books (all completed program modules), NCCER practice question sets, student self-assessment checklists, whiteboard, calculators, exam prep notebooksStudents score 70% or higher on a 60-item NCCER topic practice quiz administered at the end of the lesson; any student below 70% receives a targeted remediation reading assignment from the specific NCCER module before the mock exam.
2CDL Class A Knowledge Test Review: General Knowledge, Air Brakes, and Combination Vehicles7theoryStudents will pass a timed, full-length CDL Class A general knowledge practice test and an air brakes practice test at or above the applicable state passing threshold, demonstrating readiness for the state CDL knowledge examination.
  1. Instructor reviews the structure of the state CDL knowledge exam sequence — general knowledge, combination vehicles, and air brakes — using the current edition of the state commercial driver license manual; students complete a 50-question timed general knowledge practice test drawn from the manual's content areas, score it immediately, and flag every missed item.
  2. Students work in pairs to review missed general knowledge questions, then complete a dedicated 25-question air brakes practice test; pairs discuss the brake system inspection sequence step-by-step using a diagram of a dual air brake system, confirming the correct terminology and inspection values referenced in the state CDL manual.
  3. Instructor leads a speed-drill session on high-miss topics — vehicle inspection procedures, hazardous materials general requirements for utility trucks, and coupling and uncoupling combination vehicles — using flashcard sets; students end the lesson with a 30-question combination vehicles practice test and record their score for their personal remediation plan.
Current state commercial driver license manual (FMCSA-aligned), CDL practice test banks (state DMV or approved third-party), dual air brake system diagram, combination vehicle coupling diagram, flashcard sets, timersStudents score at or above the state passing threshold (typically 80%, verify current state standard) on both the general knowledge practice test and the air brakes practice test; students who score below threshold complete a directed rereading of the relevant manual sections and a follow-up 20-question quiz before the mock exam day.
3OSHA 10 and First Aid/CPR: Safety Standards Review and Skills Walkthrough7demoStudents will correctly identify OSHA 10 Construction Outreach topic areas — including electrical safety, fall protection, personal protective equipment, and lockout/tagout — and demonstrate correct First Aid and CPR decision-making sequences on scenario-based items, each at 70% or higher on a scored review.
  1. Instructor presents an OSHA 10 Construction topic outline covering the required focus areas: introduction to OSHA and worker rights, electrical hazards (including the hierarchy of controls for electrical work), fall protection, PPE selection and inspection, lockout/tagout procedures, and struck-by and caught-in hazards relevant to utility line work; students complete a 40-question OSHA 10 practice quiz, self-score, and identify their lowest two topic areas.
  2. Instructor leads a First Aid and CPR scenario review using three utility-worker incident scenarios (electrical contact victim, fall-from-height trauma, and heat illness on a summer line job); for each scenario students write out the correct decision sequence — scene safety, call for help, assessment, intervention — and compare their sequence to the certifying body's established protocol, discussing any deviations as a class.
  3. Students pair up for a CPR and AED decision drill without a manikin: one student narrates the correct hands-only CPR steps and compression rate from memory while the other uses a laminated reference card to check accuracy; pairs switch roles, then the class discusses the specific OSHA electrical safety hierarchy — elimination, substitution, engineering controls, administrative controls, PPE — as it applies to line work, connecting it to the OSHA 10 content.
OSHA 10 Construction Outreach topic outline (OSHA-authorized trainer materials), current First Aid/CPR provider reference card from the certifying organization, OSHA 10 practice question bank, scenario cards, laminated CPR reference cards, student exam prep notebooksStudents score 70% or higher on the 40-question OSHA 10 practice quiz and correctly sequence all three First Aid/CPR scenario responses with no critical steps omitted; students below 70% on OSHA 10 review the two lowest topic handouts and complete a 15-question follow-up quiz before mock exam day.
4Full Mock Examination Day and Remediation Debrief6practiceStudents will complete a full-length, timed mock examination covering all four credential content areas and use their scored results to finalize a written personal remediation plan identifying specific topics requiring further study before the scheduled credential exams.
  1. Students sit a full timed mock exam administered under exam-like conditions (no notes, no phones, seats separated): Section 1 — 60 NCCER Power Line Worker practice items (60 minutes); Section 2 — 50 CDL general knowledge and air brakes items (60 minutes); Section 3 — 40 OSHA 10 Construction items (30 minutes); Section 4 — 20 First Aid/CPR scenario-based items (20 minutes); instructor collects and scores all sections, returning results with item-by-item feedback.
  2. Students receive their scored mock exam and complete a written gap analysis form identifying every missed item by topic area, the correct answer with rationale, and the source reference (NCCER module, CDL manual chapter, OSHA topic, or First Aid protocol); students rank their top five weak topics across all four credentials.
  3. Students write a one-page personal remediation plan specifying the exact resources they will use (NCCER module pages, CDL manual sections, OSHA outreach materials, First Aid reference card), the number of additional practice questions they will complete, and the date they will be ready to sit each credential exam; instructor reviews each plan, provides written feedback, and schedules any needed one-on-one review sessions before exam dates.
Full mock exam packets (all four sections, printed and timed), answer keys with rationale, gap analysis forms, personal remediation plan template, NCCER module books, state CDL manual, OSHA 10 topic outline, First Aid/CPR reference card, pens, scratch paper, timersStudents score at or above 70% on the NCCER section, at or above the applicable state threshold on the CDL section, 70% or higher on the OSHA 10 section, and 70% or higher on the First Aid/CPR section; any student below threshold on any section must submit a completed remediation plan approved by the instructor and complete a follow-up targeted quiz on the deficient section within two business days.
Assessments
AssessmentTypeWeightPass standardMethod & rubric
Full-Length Integrated Mock Credential ExaminationMock certification exam100%70% or higher on the NCCER Power Line Worker section; at or above the applicable state passing threshold on each CDL section (general knowledge and air brakes); 70% or higher on the OSHA 10 Construction section; 70% or higher on the First Aid/CPR section — all four sections must meet their respective thresholds independently.Students complete a comprehensive, timed mock examination covering all four credential content areas in a single proctored sitting, administered under realistic exam conditions with no reference materials permitted. Scored results drive a written personal remediation plan that the instructor approves, ensuring each student has a documented, actionable study path before sitting for the actual NCCER, CDL, OSHA 10, and First Aid/CPR credential exams.
Score · Time management
Program completion

External credential: CDL Class A; First Aid/CPR; NCCER Power Line Worker; OSHA 10

Students sit the NCCER Power Line Worker written and performance assessments administered through an NCCER-accredited program, the state CDL knowledge and skills tests administered by the state driver licensing agency, the OSHA 10-Hour Outreach completion verification delivered by an OSHA-authorized trainer, and a First Aid/CPR skills and written evaluation from the issuing certifying body. Pass standard: Credential issued by the body.

Back to Electrical Lineworker · How the school gets authority to award these credentials