This course plan, its lessons and its assessments has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
11 courses · 1,800 clock hours · 9–12 mo full-time. Grading is competency-based: each course requires the written exam, a competent skills demonstration with zero safety faults, a signed log, and a passed safety audit; percentage weights only rank performance above the competency floor.
This foundational course equips carpentry students with the safety knowledge required for OSHA 10 certification, the trade math and measurement skills used daily on a construction site, and the communication and career-readiness habits expected by employers. Students also learn to read construction documents, use basic digital tools common in the trade, and respond to jobsite emergencies including first aid and CPR.
OutcomesThis foundational course equips carpentry students with the safety knowledge required for OSHA 10 certification, the trade math and measurement skills used daily on a construction site, and the communication and career-readiness habits expected by employers. Students also learn to read construction documents, use basic digital tools common in the trade, and respond to jobsite emergencies including first aid and CPR.
How the course runs. 7 blocks: Carpentry Jobsite Safety and OSHA 10 Foundations; Lockout/Tagout, Fall Protection, and Tool Safety; First Aid, CPR, and Emergency Response on the Jobsite; Trade Math I: Fractions, Decimals, Measurement, and the Tape Measure; Reading Construction Documents and Safety Data Sheets; Digital Tools for the Carpentry Trade; Career Readiness: Resume, Job Search, and Workplace Professionalism.
What competent looks like. Demonstrate compliance with OSHA 10 Outreach Program topics including hazard recognition, personal protective equipment selection, and lockout/tagout procedures on a simulated carpentry worksite. Perform trade math calculations — including fractions, decimals, area, volume, and board-foot measure — accurately enough to support material estimation and layout tasks. Read and extract information from construction drawings, written specifications, and material safety data sheets relevant to carpentry work. Apply first aid and CPR procedures to common construction-site emergencies using current American Heart Association or American Red Cross guidelines. Use industry-standard digital tools — including a construction calculator app, a basic CAD or plan-viewing app, and email — to complete work-related tasks. Produce a professional resume, complete a mock job application, and demonstrate workplace communication expectations specific to the construction industry.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Carpentry Jobsite Safety and OSHA 10 Foundations | 26 | theory | Students will identify the ten primary OSHA 10 Outreach topic areas as they apply to carpentry worksites and correctly classify at least eight jobsite hazards by type and required control measure. |
| OSHA 10 Construction Outreach Program authorized trainer materials, NCCER Core Curriculum module 'Basic Safety', printed jobsite photo cards, PPE samples (hard hats, safety glasses, hearing protection, gloves, fall-arrest harness, dust respirator), OSHA.gov hazard recognition reference sheets | Scored 20-question multiple-choice quiz covering all OSHA 10 topic areas; pass mark is 70% (14/20 correct). Instructor also checks written PPE justification for accuracy on all four scenarios before the lesson is marked complete. |
| 2 | Lockout/Tagout, Fall Protection, and Tool Safety | 18 | demo | Students will perform a lockout/tagout sequence on a de-energized power tool and correctly set up a personal fall-arrest system at a simulated leading edge, meeting the procedural steps in the course checklist without prompting. |
| Table saw with lockout/tagout hasp and padlocks, OSHA lockout/tagout procedure template, full-body fall-arrest harness and shock-absorbing lanyard, anchor-point training rig (floor level for safety), guardrail mock-up, nail gun (pneumatic brad nailer), extension cords, NCCER Core Curriculum module 'Introduction to Hand Tools' and 'Introduction to Power Tools' | Performance checklist with 12 required steps for lockout/tagout and 10 required steps for harness donning and connection; students must complete all steps correctly (100% on safety-critical procedural items) to pass. Any missed step requires immediate remediation and recheck before proceeding. |
| 3 | First Aid, CPR, and Emergency Response on the Jobsite | 16 | lab | Students will perform hands-only CPR and the use of an AED on a training manikin, and will correctly treat a simulated laceration and suspected fracture using standard first-aid procedures, meeting American Red Cross or American Heart Association skills-check criteria. |
| CPR training manikins (adult), training AED unit, first-aid kit (commercial construction grade), tourniquet trainer, splinting materials (board, bandages), American Red Cross First Aid/CPR/AED participant manual or equivalent AHA materials, sample jobsite Emergency Action Plan, eye-wash station | Students must pass the American Red Cross or American Heart Association CPR/AED skills verification performed by the certified instructor. First-aid scenario stations are graded on an instructor checklist; students must complete all critical steps correctly on at least three of four stations to pass this lesson. |
| 4 | Trade Math I: Fractions, Decimals, Measurement, and the Tape Measure | 28 | practice | Students will convert between fractions and decimals, add and subtract mixed-number measurements in feet and inches to the nearest 1/16 inch, and calculate area and volume for rectangular and triangular surfaces using a construction calculator and by hand. |
| 25-foot tape measures (one per student), speed squares, NCCER Core Curriculum module 'Introduction to Construction Math', Calculated Industries construction calculator (or free app equivalent), printed measurement worksheets, lumber-list handout, pencils and graph paper | 20-question math quiz covering fractions, decimals, unit conversion, area, volume, and board feet; pass mark is 80% (16/20). Tape-measure accuracy drill must reach 90% correct before quiz is attempted. |
| 5 | Reading Construction Documents and Safety Data Sheets | 22 | theory | Students will locate specified dimensions, notes, and details on a set of residential construction drawings and extract correct hazard and handling information from two Safety Data Sheets relevant to carpentry materials. |
| Printed sets of a publicly available sample residential construction drawing set (AHJ-approved permit set or NCCER-provided sample), architect's scale rule (one per student), NCCER Core Curriculum module 'Introduction to Construction Drawings', two commercial SDS documents (wood preservative and construction adhesive, downloaded from manufacturer websites), highlighters | Drawing-reading quiz: 25 questions answered from the plan set; pass mark is 80% (20/25 correct). SDS worksheet must have all five scenario questions answered correctly before the lesson is marked complete; any incorrect answer is reviewed one-on-one with the instructor and corrected. |
| 6 | Digital Tools for the Carpentry Trade | 18 | lab | Students will use a construction calculator app, a plan-viewing app, and email to complete three realistic work-related digital tasks with no instructor prompting, meeting task completion criteria on a digital-skills checklist. |
| Lab computers or student smartphones/tablets, free construction calculator app, Adobe Acrobat Reader or equivalent free PDF viewer, sample floor plan PDF, instructor email address for submission, digital-skills checklist rubric, NCCER Core Curriculum module 'Introduction to Basic Communication' | Digital-skills checklist: 15 observable steps across the three tasks; students must complete 13 of 15 steps correctly (87%) to pass. The professional email is graded separately against a 10-point rubric and must score 8/10 or better. |
| 7 | Career Readiness: Resume, Job Search, and Workplace Professionalism | 20 | practice | Students will produce a complete, error-free carpentry-focused resume, submit a mock job application accurately, and demonstrate the workplace communication norms expected on a construction site through a role-play scenario scored at 80% or higher. |
| Carpentry-specific resume template (instructor-prepared), 12-point peer-review checklist, construction-company employment application form, role-play scenario cards, workplace communication rubric, NCCER Core Curriculum module 'Communication Skills', sample union and non-union job postings from a local construction employer or online job board | Resume must pass the 12-point checklist with all 12 items satisfactory (spelling, completeness, relevant skills listed, contact info present, etc.) before it is accepted. Role-play communication rubric must score 80% or higher across the three scenarios combined; any scenario scored below 60% must be repeated. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| OSHA 10 Topic Knowledge Exam | Written exam | 25% | 70% (35 out of 50 questions correct), consistent with OSHA Outreach Program authorized trainer requirements | A 50-question multiple-choice written exam covering all OSHA 10 Construction Outreach Program topic areas as taught in Lessons 1 and 2, including hazard recognition, fall protection, electrical safety, struck-by hazards, caught-in/between hazards, PPE selection, and lockout/tagout. Students who do not pass may retake after mandatory instructor-led remediation of the failed topic areas. Accuracy · Safety · Communication · Professionalism |
| Trade Math and Document Reading Exam | Written exam | 25% | 80% (32 out of 40 questions correct) | A 40-question written exam combining math problems (fractions, decimals, area, volume, board feet, tape-measure reading) from Lesson 4 and construction-document interpretation questions requiring students to read a sample plan set and two SDS documents from Lesson 5. Students who score below 80% must complete targeted remediation exercises and retake the failed section only. Accuracy · Safety · Communication · Professionalism |
| Integrated Jobsite-Readiness Portfolio | Project | 25% | Minimum score of 80% on the portfolio rubric, with all safety-critical items marked 'satisfactory' | Students compile a portfolio containing their completed resume, a written emergency action plan response for a given scenario, a board-foot material estimate for a small deck calculated by hand and verified with a construction calculator, and a correctly annotated page from the course plan set. Each item is scored on a rubric; any safety-critical item (PPE selection in the emergency plan, SDS hazard identification) that is marked 'unsatisfactory' must be corrected and resubmitted before the portfolio is accepted. Accuracy · Safety · Communication · Professionalism |
| Career and Safety Oral Defense | Oral / panel | 25% | 80% overall on the oral defense rubric; no safety question may be answered incorrectly without immediate correction during the session | In a 15-minute one-on-one session with the instructor, each student is asked six questions drawn randomly from a published question bank covering OSHA 10 hazard controls, lockout/tagout steps, first-aid priorities, tape-measure reading, their own resume choices, and one digital-tool task they performed in class. Responses are scored for accuracy, completeness, and professional communication using a published rubric; any incorrect answer on a safety question must be corrected by the student with instructor guidance during the session and documented. Accuracy · Safety · Communication · Professionalism |
This course introduces learners to the full arc of carpentry work from structural rough framing principles through finish trim installation, covering lumber selection, layout, fastening, and surface preparation. Students develop hands-on competency with hand tools, portable power tools, and stationary equipment while reading construction drawings and applying trade math to real layout problems. Lessons are mapped to NCCER Carpentry Level 1 and Level 2 core module knowledge areas and reinforce the safety habits established in OSHA 10 training.
OutcomesThis course introduces learners to the full arc of carpentry work from structural rough framing principles through finish trim installation, covering lumber selection, layout, fastening, and surface preparation. Students develop hands-on competency with hand tools, portable power tools, and stationary equipment while reading construction drawings and applying trade math to real layout problems. Lessons are mapped to NCCER Carpentry Level 1 and Level 2 core module knowledge areas and reinforce the safety habits established in OSHA 10 training.
How the course runs. 12 blocks: Lumber, Sheet Goods, and Engineered Wood Products; Construction Drawings and Plan Reading for Carpentry; Hand Tools: Selection, Safe Use, and Maintenance; Portable Power Tools: Safe Operation and Setup; Stationary Equipment: Table Saw, Miter Saw, and Jointer; Fasteners, Adhesives, and Fastening Schedules; Rough Framing Principles: Wall Layout and Assembly; Sheathing, Housewrap, and Exterior Casing Prep; Interior Finish: Baseboard and Door Casing; Crown Molding: Layout, Cutting, and Installation; Surface Prep, Caulking, and Inspection; Material Takeoff, Job Log, and Trade Math Review.
What competent looks like. Select and grade dimensional lumber and engineered wood products appropriate to a given rough or finish application, citing species, nominal size, and moisture content requirements. Safely set up and operate hand tools, portable power tools, and stationary woodworking equipment, applying lockout/tagout and correct PPE for each hazard. Read and interpret residential construction drawings, including plan views, elevations, and detail sections, to extract dimensions and material quantities. Perform accurate layout and cutting operations to within 1/16 inch tolerance for rough framing members and 1/32 inch for finish trim components. Install interior and exterior finish trim — including baseboard, casing, and crown molding — using proper fastening schedules and coped or mitered joints that meet inspection standards. Document work using a job log, material takeoff sheet, and punch-list, demonstrating readiness for employer expectations on a live worksite.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Lumber, Sheet Goods, and Engineered Wood Products | 10.5 | theory | Students will identify common lumber species, grades, and engineered wood products by name and select the correct product for a described rough or finish application. |
| Assorted dimensional lumber (#2 framing, construction heart, finish pine, LVL scrap), plywood and OSB panels, tape measures, pin-type moisture meter, NCCER Carpentry Level 1 Trainee Guide (current edition), lumber grading reference cards | Written identification quiz: students correctly identify grade and species of 8 of 10 samples and select appropriate material for 4 application scenarios; 80% score required to pass. |
| 2 | Construction Drawings and Plan Reading for Carpentry | 10.5 | theory | Students will read a set of residential construction drawings to locate room dimensions, wall thicknesses, door and window rough openings, and finish schedules. |
| Printed residential plan set (minimum floor plan, elevations, wall sections, door/window schedule), architectural scale rules, highlighters, NCCER Carpentry Level 1 Trainee Guide, calculators | Students complete a plan-reading worksheet with 20 questions derived from the plan set; 16 of 20 correct (80%) required to advance. |
| 3 | Hand Tools: Selection, Safe Use, and Maintenance | 10.5 | demo | Students will demonstrate safe setup, correct grip and technique, and proper storage for the primary hand tools used in rough and finish carpentry. |
| Layout tools (squares, levels, chalk line, marking gauge), crosscut and rip hand saws, claw and finish hammers, set of bench chisels, block and bench planes, sharpening stones and honing guide, safety glasses, hearing protection, NCCER Carpentry Level 1 Trainee Guide | Instructor observes each student performing a crosscut and a chisel paring task using the NCCER performance profile checklist; all critical safety steps must be demonstrated correctly and cut must be within 1/16 inch of line to pass. |
| 4 | Portable Power Tools: Safe Operation and Setup | 15 | demo | Students will set up and operate circular saws, jigsaws, reciprocating saws, and drills safely, applying lockout/tagout procedures and correct guards before and after each use. |
| Circular saws with combination and rip blades, jigsaws, reciprocating saws, cordless drill/drivers, spade bits, countersink bits, sawhorse pairs, clamps, scrap dimensional lumber and plywood, LOTO tags and locks, safety glasses, hearing protection, face shield, NCCER Carpentry Level 1 Trainee Guide | Instructor evaluates each student against a power-tool safety and technique checklist (derived from NCCER performance profile); all safety steps must score satisfactory; cuts must land within 1/16 inch of line on at least 4 of 5 attempts. |
| 5 | Stationary Equipment: Table Saw, Miter Saw, and Jointer | 13 | lab | Students will set up and operate a table saw, compound miter saw, and jointer with guards in place and correct body positioning, producing dimensionally accurate parts. |
| Table saw with rip fence, guard, and splitter; 10-inch compound miter saw with positive stops; 6-inch jointer with guard; dial calipers; combination square; feeler gauge; push sticks; featherboards; pine molding stock; 3/4-inch plywood; safety glasses; face shield; hearing protection; NCCER Carpentry Level 2 Trainee Guide | Instructor observes each student at each machine using a three-machine safety and accuracy checklist; all critical safety behaviors must be satisfactory; ripped width within 1/32 inch, miter joint gap less than 1/32 inch, jointed face flat within 1/32 inch per foot. |
| 6 | Fasteners, Adhesives, and Fastening Schedules | 8.5 | theory | Students will select the correct fastener type, size, and installation method for a described rough or finish carpentry connection, referencing a standard fastening schedule. |
| Mixed fastener assortment (sorted bins), labeled storage organizer, IRC fastening schedule excerpt (handout), manufacturer TDS for construction and panel adhesives, NCCER Carpentry Level 1 Trainee Guide, caulking guns, adhesive samples | 10-question written quiz covering fastener identification, schedule reading, and adhesive selection; 8 of 10 correct (80%) required to pass. |
| 7 | Rough Framing Principles: Wall Layout and Assembly | 15 | lab | Students will lay out and assemble a straight exterior stud wall section with a single top plate, double top plate, king and trimmer studs for a door rough opening, and a built-up header. |
| 2x4 and 2x6 framing lumber, OSB filler strips, 16d and 8d common nails, framing nailer and compressor (with hearing protection and safety glasses), chalk line, 25-foot tape measure, speed square, 4-foot level, kicker braces, NCCER Carpentry Level 1 Trainee Guide, fastening schedule handout | Instructor measures stud spacing (must be within 1/8 inch of 16 inches OC on all bays), checks plumb of wall with level (wall must be plumb within 1/8 inch over 8 feet), and verifies rough-opening width and height within 1/4 inch; all critical safety behaviors during nailing and raising must be satisfactory. |
| 8 | Sheathing, Housewrap, and Exterior Casing Prep | 10.5 | lab | Students will apply structural sheathing and housewrap to a wall mockup and prepare a door or window opening for exterior casing installation, following sequencing that prevents moisture intrusion. |
| Framed wall mockup (from Lesson 7), 7/16-inch OSB sheathing, housewrap roll, flashing tape, sill pan flashing, exterior casing nailer strips, 1-3/4-inch roofing nails, staple gun, utility knife, tape measure, chalk line, safety glasses, NCCER Carpentry Level 2 Trainee Guide | Instructor inspects each student's mockup section for nail spacing within specification, correct lap direction on housewrap, taped seams with no gaps, and level sill pan; all items must be satisfactory to pass. |
| 9 | Interior Finish: Baseboard and Door Casing | 15 | lab | Students will measure, cut, and install baseboard and pre-made door casing with miter and coped joints that close to within 1/32 inch, fastened and filled to a paintable standard. |
| Pre-made base molding (colonial or ranch profile), pre-made door casing, miter saw, jigsaw, coping saw, finish nailer and compressor, 2-inch finish nails, wood filler, 120-grit sandpaper, tape measure, combination square, pencil, safety glasses, hearing protection, NCCER Carpentry Level 2 Trainee Guide | Instructor evaluates each installed joint: miter or cope gap must not exceed 1/32 inch on outside corners and must be tight at wall on inside copes; nails set and filled; no visible mill marks; satisfactory rating required on NCCER performance profile checklist. |
| 10 | Crown Molding: Layout, Cutting, and Installation | 15 | lab | Students will calculate spring angle settings, cut inside and outside corners in crown molding using a compound miter saw, and install a continuous run with joints closing to within 1/32 inch. |
| Crown molding stock (minimum 5/4 x 4 profile), compound miter saw, finish nailer and 2-inch nails, spring-angle reference chart, protractor, feeler gauge, straightedge, wood filler, 120-grit sandpaper, tape measure, safety glasses, hearing protection, NCCER Carpentry Level 2 Trainee Guide | All corner joints must close to within 1/32 inch; run must align within 1/8 inch over the full wall length when checked with a straightedge; nail holes set and filled; satisfactory on NCCER performance profile checklist required. |
| 11 | Surface Prep, Caulking, and Inspection | 8.5 | practice | Students will prepare all installed trim surfaces for painting by sanding, caulking gaps at wall interfaces, and conducting a self-inspection punch list, resolving all items to a paintable standard. |
| Painter's caulk, caulking guns, damp rags, 120-grit and 150-grit sandpaper, sanding sponges, tack cloths, wood filler, putty knives, punch list forms, reference photos, safety glasses | Instructor walk-through using punch list: zero open punch list items; all caulk joints smooth and continuous with no voids; all nail holes filled flush and sanded; surfaces dust-free; all items must be resolved satisfactory to pass. |
| 12 | Material Takeoff, Job Log, and Trade Math Review | 14 | theory | Students will complete a material takeoff for a described finish trim scope, calculate board footage and linear footage quantities, and produce a completed job log documenting all work performed in the course. |
| Graph paper, mock-room plan dimensions sheet, calculator, board-foot formula reference card, binder or folder for job log, NCCER Carpentry Level 1 and Level 2 Trainee Guides, pencils | Material takeoff must account for all trim runs within 5% of instructor's verified quantity; all board-footage calculations must be correct; job log must contain entries for all major tasks with dates, materials, and observations; 80% overall score required to pass. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Written Knowledge Exam | Written exam | 25% | 70% or higher (28 of 40 questions correct) | A 40-question multiple-choice and short-answer exam drawn from NCCER Carpentry Level 1 and Level 2 module content areas covered in this course, including lumber identification, plan reading, fastener selection, tool safety, and finish carpentry terminology. Students who score below 70% may retake once after documented remediation. Standard met · Safety · Time · Quality/finish · Documentation |
| Finish Trim Skills Demonstration | Skills demonstration | 45% | Satisfactory rating on all critical-task items; no more than two non-critical items rated needs improvement, with immediate correction | Each student independently measures, cuts, and installs a full door casing and a 6-foot run of baseboard with one coped inside corner on the course's standard mockup wall, evaluated by the instructor using the NCCER Carpentry Level 2 performance profile checklist. All joints must close within 1/32 inch and all nails must be set and filled before the student calls the work complete. Standard met · Safety · Time · Quality/finish · Documentation |
| Job Log Portfolio | Log | 15% | Meets all required components with a score of 80% or higher on the instructor's rubric | Students submit the job log compiled during Lesson 12, which must include cut lists, material takeoffs, punch lists, and a written narrative for each major lab activity completed in the course. The rubric evaluates completeness, accuracy of quantities, clarity of documentation, and professional presentation as it would appear on an actual worksite. Standard met · Safety · Time · Quality/finish · Documentation |
| Tool and Worksite Safety Check | Safety audit | 15% | 100% on all critical safety behaviors; any critical failure requires immediate remediation and full recheck before the student may continue shop activities | The instructor administers an observed safety evaluation in which each student performs lockout/tagout on a designated power tool, dons correct PPE for a described task, demonstrates safe blade-guard setup on the table saw, and states the emergency stop procedure for the shop. This check is conducted before the skills demonstration and must be passed first. Standard met · Safety · Time · Quality/finish · Documentation |
Students learn to plan, lay out, and build wood-framed walls, floors, and ceilings following current residential and light-commercial construction practices. Lessons integrate building code concepts, structural principles, and safe use of framing tools and equipment. Students complete a full-scale framed section as their final lab, tying together layout, fastening, and inspection skills required for NCCER Carpentry Level 1 and Level 2 framing modules.
OutcomesStudents learn to plan, lay out, and build wood-framed walls, floors, and ceilings following current residential and light-commercial construction practices. Lessons integrate building code concepts, structural principles, and safe use of framing tools and equipment. Students complete a full-scale framed section as their final lab, tying together layout, fastening, and inspection skills required for NCCER Carpentry Level 1 and Level 2 framing modules.
How the course runs. 12 blocks: Framing Safety, PPE, and Tool Lockout/Tagout; Blueprint Reading for Framing; Lumber, Engineered Wood, and Fasteners; Floor System Layout and Sill Plates; Floor Joists, Beams, and Blocking; Subfloor Sheathing; Exterior Wall Framing: Layout and Assembly; Raising, Plumbing, and Bracing Walls; Interior Walls, Partitions, and Rough Openings for Doors; Ceiling Joists and Flat Ceiling Framing; Wall Sheathing and Lateral-Load Fundamentals; Full-Scale Framing Integration Lab and Quality Inspection.
What competent looks like. Read and interpret architectural floor plans and framing plans to determine lumber sizes, spacing, and load paths for floors, walls, and ceilings. Lay out and assemble platform-framed floor systems—including sill plates, beams, joists, blocking, and subfloor sheathing—to within accepted tolerances. Frame, plumb, and brace exterior and interior walls, including door and window rough openings, headers, and corner assemblies, using proper fastening schedules. Construct ceiling joist and flat-ceiling framing assemblies and identify how they tie wall systems together for structural continuity. Apply OSHA fall protection, PPE, and material-handling requirements throughout all framing operations, and demonstrate lockout/tagout procedures for framing tools. Pass written and hands-on assessments aligned to NCCER Carpentry Level 1 (Core through Module 27204) and Level 2 framing competencies.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Framing Safety, PPE, and Tool Lockout/Tagout | 10 | theory | Students will identify OSHA framing-site hazards—including fall protection triggers, struck-by risks, and pneumatic-tool hazards—and demonstrate the lockout/tagout sequence for framing nailers and circular saws to a passing standard. |
| OSHA 29 CFR 1926 Subpart R (steel erection) and Subpart Q awareness handouts; OSHA fall protection pocket guide; pneumatic framing nailer; corded circular saw; lockout/tagout kit (hasp, padlock, tag); PPE (hard hat, safety glasses, hearing protection, steel-toe boots, gloves); NCCER Carpentry Level 1 Core Module safety chapters | Instructor observes each student's LOTO sequence on both tools—no step may be skipped and zero-energy state must be confirmed before pass is recorded; written hazard-ID worksheet scored at 80% or higher. |
| 2 | Blueprint Reading for Framing | 12 | theory | Students will extract framing-relevant information—room dimensions, wall locations, rough opening sizes, lumber species/grade callouts, and fastening notes—from a complete residential plan set. |
| Full residential plan set (instructor-supplied, minimum floor plan + framing plan + wall sections + window/door schedule); architect's scale rule; calculation worksheets; NCCER Carpentry Level 1 Module 27101 (Orientation to the Trade) and Level 2 blueprint reading sections | Data sheet accuracy: all 15 scaled dimensions within 1/8 in. of answer key; takeoff quantities within 5% of instructor answer key; both checks must pass at 80% overall. |
| 3 | Lumber, Engineered Wood, and Fasteners | 8 | theory | Students will identify common framing lumber species, grades, and grade-stamp markings, select appropriate fasteners for each application, and calculate simple board-foot quantities. |
| Assorted lumber samples (2×4, 2×6, 2×10, LVL, I-joist) with visible grade stamps; fastener sample board (16d sinkers, 10d common, framing screws, joist-hanger nails, anchor bolts, post caps); APA grade-stamp reference chart; Simpson Strong-Tie general catalog (current edition); calculation worksheets | Lumber-stamp log: 10 of 12 stamps correctly identified (83%); fastener selection: 9 of 10 correct with written justification; board-foot calculations: all answers within ±0.5 BF of answer key. |
| 4 | Floor System Layout and Sill Plates | 12 | demo | Students will measure, cut, and install pressure-treated sill plates on a simulated foundation model, placing anchor-bolt holes within 1/16 in. of layout and checking for level and square. |
| Tabletop foundation models (CMU block or lumber simulators with threaded rod anchor bolts); pressure-treated 2×6 sill plate material; sill seal foam gasket; tape measure; carpenter's pencil; power drill with spade bits; speed square; 4-ft. level; chalk line; NCCER Carpentry Level 1 Modules on floor systems | Instructor measures drilled holes: each hole within 1/16 in. of correct location; plate seated flush with no gap greater than 1/8 in. under a straightedge; level reading within 1/8 in. over 4 ft. All three criteria must be met for a pass. |
| 5 | Floor Joists, Beams, and Blocking | 14 | lab | Students will lay out, cut, and install floor joists at 16 in. on-center spacing, install blocking at mid-span, and crown-mark and orient each joist correctly in a full-scale floor-deck section. |
| 2×10 dimensional lumber (joists); LVL beam sample for rim; joist hangers and hanger nails; 16d and 10d common nails; pneumatic framing nailer; circular saw; miter saw; tape measure; framing square; 4-ft. level; chalk line; speed square; safety glasses; hearing protection; NCCER Carpentry Level 2 floor-system module | Joist spacing measured at each bay: no bay deviating more than 1/4 in. from 16 in. OC; crown orientation all pointing up; all joist hanger nails driven (no voids); blocking plumb within 1/8 in. Punch-list from peer review must be cleared by the building group before instructor signs off. |
| 6 | Subfloor Sheathing | 8 | lab | Students will install APA-rated tongue-and-groove plywood subfloor sheathing on the framed floor section with correct glue-and-nail fastening, proper panel orientation, and required edge gaps. |
| 3/4 in. APA Rated T&G plywood panels; construction adhesive (subfloor rated); pneumatic framing nailer with 8d ring-shank nails; circular saw with guide; tape measure; chalk line; 1/8 in. feeler gauge; safety glasses; hearing protection; APA panel design and application guide | All panel joints staggered a minimum of 4 ft. from adjacent rows; gaps at panel edges 1/8 in. ± 1/16 in.; nail spacing matches posted schedule with no nails more than 1/2 in. off layout; walk-test shows no audible squeak at any panel joint. All four criteria must be met for pass. |
| 7 | Exterior Wall Framing: Layout and Assembly | 16 | lab | Students will lay out, cut, and assemble a 16-ft. exterior wall section on deck—including king studs, trimmers, cripples, a window rough opening with a built-up header, and corner assemblies—with all members correctly sized and fastened. |
| 2×6 lumber (plates, studs, headers); 1/2 in. plywood or OSB spacer for built-up headers; 16d common nails; pneumatic framing nailer; circular saw; miter saw; tape measure; framing square; chalk line; speed square; wall-framing checklist; IRC span-table reference (instructor-supplied excerpt) | Rough opening width within 1/2 in. of plan dimension; header bearing on trimmers on both sides; stud spacing no bay more than 1/4 in. off 16 in. OC; double top plate laps past corners correctly; checklist score 90% or higher. |
| 8 | Raising, Plumbing, and Bracing Walls | 12 | demo | Students will safely raise framed wall sections, plumb them using a level or plumb bob, and install temporary diagonal bracing that holds walls plumb and in plane until sheathing is applied. |
| Framed wall sections from Lesson 7; 6-ft. level; plumb bob and string; 2×4 brace material; duplex nails for temporary bracing; framing hammer; safety glasses; hard hats; work gloves; NCCER Carpentry Level 2 wall-framing module | Wall plumb within 1/8 in. over the full height as measured by instructor after bracing; kicker braces nailed at both ends with minimum three nails each; no student standing in the fall zone during the raise—any fall-zone violation is an automatic remediation. |
| 9 | Interior Walls, Partitions, and Rough Openings for Doors | 12 | lab | Students will snap layout lines on a deck for interior partition walls, frame a non-load-bearing partition with a door rough opening, and connect it to the exterior wall system with a proper T-intersection or L-corner. |
| 2×4 lumber (plates, studs, trimmers, cripples); 16d common nails; pneumatic nailer; circular saw; tape measure; framing square; 6-ft. level; chalk line; door schedule from plan set; quality-control data sheet | Rough opening width and height within 1/2 in. of schedule dimensions; diagonals equal within 1/4 in. (square); T-intersection backed with minimum one flat nailer; plumb within 1/8 in. after bracing. All four criteria required for pass. |
| 10 | Ceiling Joists and Flat Ceiling Framing | 12 | lab | Students will lay out, cut, and install ceiling joists that lap over a bearing wall and are nailed to opposing rafters or blocking, maintaining consistent spacing and tying the wall tops together. |
| 2×8 ceiling joist lumber; 16d common nails; pneumatic nailer; tape measure; chalk line; speed square; 4-ft. level; span table excerpt (IRC or AF&PA); framing checklist | Joist spacing within 1/4 in. of 16 in. OC at each bay; all joists crowned up; lap over bearing wall minimum 3 in. and nailed per schedule; blocking present at every bay at the top plate. Instructor checklist: all four items must be present for pass. |
| 11 | Wall Sheathing and Lateral-Load Fundamentals | 14 | lab | Students will apply structural wood-panel sheathing to a framed wall section, following a nailing schedule for shear panels, and explain how sheathing transfers lateral wind and seismic loads to the foundation. |
| 7/16 in. or 15/32 in. OSB structural sheathing panels; 8d common or 8d galvanized nails; pneumatic nailer; circular saw with guide; tape measure; chalk line; nail-spacing gauge; straightedge; APA shear-wall nailing schedule reference; safety glasses; hearing protection | Perimeter nailing at correct spacing (per posted schedule) with no nail more than 3/8 in. off panel edge and no nail missing; field nailing at correct spacing; all panel edges blocked or bearing on a framing member; bottom plate nailed to deck through sheathing per schedule. Audit punch-list must show zero uncorrected deficiencies. |
| 12 | Full-Scale Framing Integration Lab and Quality Inspection | 16 | field | Students will integrate all framing skills—floor deck, exterior and interior walls, ceiling joists, and sheathing—into a complete framed room section and pass a structured quality inspection checklist modeled on a building-department framing inspection. |
| Full lumber and hardware package (PT sill, 2×6 exterior plates and studs, 2×10 joists, 2×8 ceiling joists, LVL header material, OSB subfloor, OSB sheathing, all fasteners and hangers); pneumatic framing nailer and compressor; circular saw; miter saw; tape measure; framing square; level; chalk line; build log template; framing inspection checklist; camera or smartphone for photo documentation | Framing inspection checklist: 100% of critical items (anchor bolts, joist hangers, headers, rough openings) must be correct; no more than two minor items (cosmetic, non-structural) outstanding at final sign-off; build log with photos submitted and accepted. Any uncorrected critical item requires full remediation before pass. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Framing Knowledge Exam | Written exam | 25% | 75% correct (38 of 50 questions) | A 50-question multiple-choice and short-answer written exam covering lumber grades, fastener selection, load-path principles, rough-opening sizing, joist and stud layout math, and framing terminology, mapped to NCCER Carpentry Level 1 and Level 2 framing module objectives. Students who score below 75% receive targeted review and one retake opportunity. Standard met · Safety · Time · Quality/finish · Documentation |
| Framing Skills Demonstration | Skills demonstration | 45% | Instructor rates all five performance criteria as 'Satisfactory'; any 'Unsatisfactory' rating requires remediation and re-demonstration within one week. | Each student individually lays out a wall section on a plate pair (including one door rough opening), frames and assembles it flat, raises it, plumbs it, and installs temporary bracing; the instructor uses a five-criterion rubric (layout accuracy, assembly sequence, plumb, fastening, safe tool use) aligned to NCCER Carpentry Level 2 performance tasks. Time limit is set by instructor based on typical journeyman pace for the scope. Standard met · Safety · Time · Quality/finish · Documentation |
| Lab Build Log | Log | 15% | Log accepted when all 12 required entries are present with dated photos, measurements are recorded accurately, and the self-assessment narrative addresses at least one correction made during each major phase; incomplete logs are returned for revision. | Students maintain a chronological build log throughout the course documenting each lab phase—from sill plate through final sheathing—with measurements taken, fasteners used, any deficiencies found during peer inspections, and corrective actions taken. The log is submitted at the end of Lesson 12 and evaluated for completeness, accuracy, and evidence of reflective practice. Standard met · Safety · Time · Quality/finish · Documentation |
| Framing Safety Check | Safety audit | 15% | All seven safety behaviors must be observed as 'Present' on three separate days; any 'Absent' behavior on any observation day results in immediate coaching and a full restart of the three-day observation cycle. | The instructor conducts unannounced behavioral observations on three separate lab days, using a seven-item checklist: correct PPE worn, lockout/tagout performed before blade or bit changes, no one in the fall zone during wall raises, pneumatic nailer pointed safely between uses, material staged to prevent trip hazards, proper manual-lift technique for lumber, and hard hat on at all times in the framing lab. This assessment maps to OSHA 10 Construction outreach training objectives. Standard met · Safety · Time · Quality/finish · Documentation |
Students learn to plan, lay out, and install residential roof systems including structural sheathing, underlayment, asphalt shingles, flashing, and ventilation components using industry-standard tools and methods. Work is grounded in NCCER Carpentry curriculum areas covering roof framing geometry, material takeoff, and weatherproofing details. Safety practices align with OSHA standards for fall protection and hazard recognition on sloped surfaces.
OutcomesStudents learn to plan, lay out, and install residential roof systems including structural sheathing, underlayment, asphalt shingles, flashing, and ventilation components using industry-standard tools and methods. Work is grounded in NCCER Carpentry curriculum areas covering roof framing geometry, material takeoff, and weatherproofing details. Safety practices align with OSHA standards for fall protection and hazard recognition on sloped surfaces.
How the course runs. 12 blocks: Roof Systems Overview and Fall-Protection Safety; Roof Geometry: Slope, Pitch, and the Framing Square; Common Rafter Layout and Cutting; Hip, Valley, and Jack Rafter Principles; Roof Sheathing: Layout, Fastening, and Structural Panel Grades; Underlayment, Drip Edge, and Ice-and-Water Barrier; Asphalt Shingle Installation: Layout, Exposure, and Nailing; Flashing: Valleys, Step Flashing, and Pipe Boots; Ridge, Soffit, and Gable Ventilation; Material Takeoff and Estimating for Roofing; Roofing in Adverse Conditions: Heat, Cold, and Wind Safety; Integrated Roofing Lab: Full Roof System on Practice Structure.
What competent looks like. Calculate roof slope, pitch, and rafter lengths using the unit-rise/unit-run method and a framing square to within 1/8-inch accuracy. Perform a material takeoff for a residential roof system including sheathing, underlayment, drip edge, flashing, and shingles with no more than 5% error in quantity. Install roof sheathing, felt or synthetic underlayment, and asphalt shingles following manufacturer specifications and local building code requirements. Select, cut, and install step flashing, valley flashing, and counter-flashing at penetrations and intersections that pass a simulated water-intrusion inspection. Identify and install ridge, soffit, and gable ventilation components to meet minimum ventilation ratio requirements for a given attic area. Demonstrate proper fall-protection setup, PPE selection, and emergency procedures for rooftop work in compliance with applicable OSHA standards.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Roof Systems Overview and Fall-Protection Safety | 10 | theory | Students will identify the components of a residential roof system and demonstrate correct setup and use of personal fall-arrest systems and slide guards before any rooftop work begins. |
| Full-body harness, shock-absorbing lanyard, roof anchors, roof brackets, 2x10 plank, hard hats, safety glasses, non-slip footwear; NCCER Carpentry Module on Roofing; OSHA 29 CFR 1926 Subpart M reference card; roof anatomy poster | Students correctly identify all labeled roof components (10/10) and pass instructor observation of harness donning and anchor setup with zero critical errors on a 10-point safety checklist; any critical error requires immediate re-demonstration. |
| 2 | Roof Geometry: Slope, Pitch, and the Framing Square | 12 | theory | Students will calculate slope ratio, pitch fraction, and unit rise/unit run relationships for at least five roof configurations and use a framing square to verify those values. |
| Framing square, speed square (rafter angle guide), tape measure, field notebooks, calculator; NCCER Carpentry worksheets on roof geometry; dry-erase board for instructor demonstration | Score of 80% or higher on a 10-question slope/pitch calculation quiz; framing-square readings verified by instructor to within ±1/8 inch on each practice rafter. |
| 3 | Common Rafter Layout and Cutting | 14 | demo | Students will lay out and cut a common rafter—including plumb cut, bird's mouth, and tail cut—for a given span and slope, with each cut verified within 1/8-inch tolerance. |
| 2×8 dimensional lumber (practice stock), framing square, speed square, tape measure, circular saw, hearing protection, safety glasses, pencil, field notebook; NCCER rafter layout reference | Instructor measures plumb cut, bird's mouth depth, seat length, and tail length against the layout plan; all four dimensions must fall within 1/8 inch of specification to pass. |
| 4 | Hip, Valley, and Jack Rafter Principles | 10 | theory | Students will calculate hip and valley rafter lengths using the unit-diagonal method and identify the difference in cheek-cut angles between hip, valley, and jack rafters. |
| Framing square (with rafter tables), foam-board roof models, calculator, worksheets; NCCER Carpentry hip/valley rafter section; dry-erase board | 80% or higher on a five-problem hip/valley length calculation quiz; each group must correctly identify all planted errors in the flawed layout exercise, confirmed by instructor key. |
| 5 | Roof Sheathing: Layout, Fastening, and Structural Panel Grades | 12 | lab | Students will select the correct structural panel grade for a given rafter spacing, cut and install sheathing panels with staggered joints, and fasten them per a nail schedule, leaving no gaps larger than specified. |
| OSB and plywood sheathing panels (assorted grades), circular saw, chalk line, tape measure, framing nailer, pneumatic compressor, safety glasses, hearing protection, fall-arrest system, nail-placement gauge, span table reference; NCCER sheathing section | Instructor checks panel grade selection (correct or incorrect—must be correct), joint stagger (minimum 4-foot offset on alternate rows), and fastener pattern (all nails within ±1/4 inch of schedule spacing); fewer than two fastener deviations per panel to pass. |
| 6 | Underlayment, Drip Edge, and Ice-and-Water Barrier | 12 | demo | Students will install drip edge, ice-and-water barrier at eaves and valleys, and synthetic or felt underlayment in the correct sequence with code-compliant laps. |
| Galvanized drip edge (eave and rake profiles), ice-and-water barrier, synthetic underlayment rolls, cap stapler or roofing nailer, tin snips, tape measure, chalk line, utility knife, fall-arrest equipment; manufacturer installation guide; local building code excerpt on underlayment | Instructor verifies installation sequence is correct; all lap dimensions measured against manufacturer minimums—zero under-lapped joints to pass; drip edge corners inspected for tight fit with no gaps wider than 1/4 inch. |
| 7 | Asphalt Shingle Installation: Layout, Exposure, and Nailing | 18 | practice | Students will install a full field of three-tab or architectural asphalt shingles with correct exposure, offset joints, and fastener placement that meets manufacturer warranty requirements. |
| Architectural asphalt shingles (bundles), coil roofing nailer, pneumatic compressor, chalk line, tape measure, utility knife, hook blade, straight edge, safety glasses, hearing protection, fall-arrest system; shingle manufacturer installation guide; NCCER shingle installation section | Instructor measures exposure on three random courses (must match layout within 1/8 inch), checks joint offset (no aligned joints within required distance), and pulls back one shingle to confirm nail placement within the manufacturer nail zone—all three checks must pass. |
| 8 | Flashing: Valleys, Step Flashing, and Pipe Boots | 14 | lab | Students will cut and install open or closed valley flashing, step flashing at a wall-to-roof intersection, and a pipe boot at a mock penetration so that all laps shed water correctly. |
| Galvanized or aluminum step flashing (pre-cut and flat stock), valley flashing (W-metal or modified-bitumen roll), pipe boot (pre-formed rubber), sheet-metal hand seamer, aviation snips, roofing sealant, caulk gun, nails/screws, tape measure, safety glasses; NCCER flashing section; manufacturer specs | Instructor conducts a simulated water test (spray bottle at joints) and checks lap directions; zero water intrusion at any flashing joint to pass; roofing sealant applied only where specified (no over-caulking masking improper laps). |
| 9 | Ridge, Soffit, and Gable Ventilation | 10 | theory | Students will calculate the net free ventilation area required for a given attic footprint and select and install ridge-cap shingles and a prefabricated ridge vent in the correct location. |
| Ridge vent (prefabricated shingle-over style), circular saw, tape measure, chalk line, ridge cap shingles, roofing nails, calculator; ventilation ratio reference card; manufacturer installation guide; NCCER ventilation section | Ventilation calculation worksheet scored 80% or higher; ridge slot width measured by instructor against manufacturer spec (within ±1/4 inch); ridge vent fastening pattern matches manufacturer nail schedule with no missed fastener locations. |
| 10 | Material Takeoff and Estimating for Roofing | 10 | theory | Students will complete a full material takeoff for a two-slope residential roof, quantifying shingles, underlayment, drip edge, flashing, nails, and ridge vent within 5% of the instructor's reference quantities. |
| Dimensioned roof plan (printed and digital), calculator, laptop or tablet with spreadsheet software, materials-list template; shingle manufacturer coverage data; NCCER estimating section | Every material line item on the student's takeoff must fall within 5% of the reference quantity; any line outside tolerance must be corrected and resubmitted within one class session. |
| 11 | Roofing in Adverse Conditions: Heat, Cold, and Wind Safety | 8 | theory | Students will identify at least four environmental hazards specific to rooftop work and describe the OSHA-recognized controls for each, including when work must stop. |
| OSHA heat-illness prevention resources, OSHA high-wind guidance; shingle manufacturer cold-weather installation guidelines; scenario cards; field notebooks | Students score 80% or higher on a 10-question written quiz covering environmental hazards and controls; toolbox-talk delivery evaluated by instructor on a 5-point rubric (must score 4/5 or higher). |
| 12 | Integrated Roofing Lab: Full Roof System on Practice Structure | 16 | field | Students will complete a full residential roof assembly—sheathing through ridge vent—on the program's practice structure, meeting all dimensional and quality standards established in prior lessons. |
| All materials from Lessons 5–9 (sheathing, drip edge, underlayment, shingles, flashing, ridge vent, fasteners), pneumatic nailer, compressor, circular saw, chalk line, tape measure, speed square, utility knife, full PPE including fall-arrest system; punch-list checklist; field notebooks | Instructor scores the completed roof using the program's 20-point roofing quality rubric (alignment ±1/4 inch, lap dimensions, fastener pattern, flashing water-shedding, ventilation slot width); minimum passing score is 16/20; any safety violation during the lab results in a mandatory safety re-demonstration before the score is recorded. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Roofing Systems Knowledge Exam | Written exam | 25% | 70% or higher (28/40 questions correct) | A 40-question multiple-choice and short-answer exam covering roof geometry calculations, material identification, installation sequences, flashing types, ventilation ratios, and environmental hazard controls, aligned to NCCER Carpentry knowledge-verification areas for roofing. Students who score below 70% may retake one alternate-form exam after documented remediation. Standard met · Safety · Time · Quality/finish · Documentation |
| Roof Installation Skills Demonstration | Skills demonstration | 45% | Score of 16/20 on the roofing quality rubric; zero critical safety violations | Each student independently installs a designated roof section—including underlayment, at least four courses of shingles, step flashing at a wall, and ridge-cap shingles—on the practice structure under timed conditions. The instructor evaluates using the 20-point rubric for alignment, exposure consistency, fastener placement, and flashing lap direction, mirroring NCCER performance-profile task requirements. Standard met · Safety · Time · Quality/finish · Documentation |
| Lab Log and Material Takeoff Portfolio | Log | 15% | All entries present; takeoff quantities within 5% of reference on every line item; field notebook legible and complete | Students submit their field notebooks and completed material-takeoff spreadsheet accumulated across lessons 2 through 11, demonstrating progressive documentation of measurements, calculations, inspection findings, and self-corrections. Entries are reviewed for accuracy, completeness, and evidence of reflection on errors corrected during lab work. Standard met · Safety · Time · Quality/finish · Documentation |
| Rooftop Safety Performance Check | Safety audit | 15% | Zero critical errors on the 12-point safety checklist; all items rated satisfactory | Before the final integrated lab, an instructor conducts a live observation using a structured 12-item safety checklist covering harness inspection and donning, anchor selection and rigging, roof-bracket setup, tool tethering, and emergency action plan recall. Any critical item failure (unsecured anchor, improperly donned harness, unguarded leading edge) requires immediate correction and a full re-check before the student is permitted to work on the roof. Standard met · Safety · Time · Quality/finish · Documentation |
Students learn to plan, lay out, cut, and install wood stair systems—including straight-run, L-shaped, and platform stairs—from subfloor to finish tread and handrail. Instruction covers code-compliant rise-and-run calculations, stringer layout and cutting, framing rough openings, and installing balusters, newel posts, and guardrails. All work is tied to current IRC residential stair provisions and NCCER Carpentry curriculum content areas.
OutcomesStudents learn to plan, lay out, cut, and install wood stair systems—including straight-run, L-shaped, and platform stairs—from subfloor to finish tread and handrail. Instruction covers code-compliant rise-and-run calculations, stringer layout and cutting, framing rough openings, and installing balusters, newel posts, and guardrails. All work is tied to current IRC residential stair provisions and NCCER Carpentry curriculum content areas.
How the course runs. 12 blocks: Stair Terminology, Code Basics & Safety Orientation; Reading Stair Drawings and Producing a Material Takeoff; Rise-and-Run Math: Calculating Stair Geometry; Framing Square Layout: Setting Up and Using Stair Gauges; Cutting Stringers: Circular Saw Technique and Safe Practices; Framing the Rough Opening and Installing the Header; Installing Stringers: Attachment Methods and Plumb-and-Level Procedure; Landings and Platform Framing; Installing Treads and Risers: Finish Carpentry Techniques; Newel Posts, Balusters & Handrails: Layout and Installation; Guardrails on Open Sides: Framing and Code Compliance; Quality Inspection, Punch-Out & Project Documentation.
What competent looks like. Calculate code-compliant unit rise and unit run for any given total rise, verifying that all risers are equal and within accepted IRC dimensional limits. Lay out and cut housed and open stair stringers accurately using a framing square with stair gauges, achieving cuts within 1/16-inch of layout lines. Frame a stair rough opening and install a platform or landing assembly that is level, plumb, and structurally fastened per the job drawings. Install finish treads, risers, newel posts, balusters, and a continuous handrail that meet graspability and baluster-spacing requirements. Identify and control fall, struck-by, and cut hazards specific to stair construction, applying OSHA stairway and ladder safety requirements throughout the unit. Interpret architectural drawings and stair-detail sections to produce a complete cut list and material takeoff for a residential stair system.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Stair Terminology, Code Basics & Safety Orientation | 10.5 | theory | Students will define all major stair components and state the key IRC dimensional requirements for residential stairs—rise, run, headroom, width, and handrail height—with 80% accuracy on a written quiz. |
| IRC residential stair code excerpt (printed), annotated stair-section diagrams, NCCER Carpentry Level 1 & 3 modules on stairs, whiteboard, PPE for each student | 10-question written quiz covering terminology and code limits; 80% (8/10) required to advance. |
| 2 | Reading Stair Drawings and Producing a Material Takeoff | 10.5 | theory | Students will interpret a residential stair detail drawing and produce a complete cut list and board-foot material takeoff accurate within 5% of instructor's key. |
| Sample residential stair drawing set (floor plan + stair section + detail), printed takeoff form, calculators, NCCER Carpentry Level 3 stair module, engineering scales | Completed takeoff graded against instructor key; quantity errors must be within 5% on each line item, and all stringer, tread, and riser dimensions must be correct. Score 80% overall to pass. |
| 3 | Rise-and-Run Math: Calculating Stair Geometry | 15 | theory | Students will calculate unit rise, unit run, total stringer length, and angle of incline for a given total rise, demonstrating equal-riser technique and verifying against IRC limits on five different problem sets without error. |
| Calculators, rise-and-run worksheet packet, IRC code excerpt, framing square reference card, NCCER Carpentry Level 3 stair math section | Graded worksheet: all five problem sets must have correct unit rise, unit run, stringer length, and IRC compliance check. 100% accuracy on compliance flags; overall score 80% to pass. |
| 4 | Framing Square Layout: Setting Up and Using Stair Gauges | 13 | demo | Students will set stair gauges on a framing square to calculated rise and run values and step off a full stringer layout on a 2×12 board, keeping all layout lines within 1/16 inch of correct position. |
| Framing squares, stair gauges (stair buttons), 2×12 practice boards (8-foot minimum), pencils, tape measures, combination squares, chalk line, hearing protection and safety glasses | Instructor inspects each completed stringer layout; all rise and run marks must be within 1/16 inch of the calculated dimension, top and bottom cuts correct. Pass = zero tolerance violations on any single step. |
| 5 | Cutting Stringers: Circular Saw Technique and Safe Practices | 15 | lab | Students will cut a full open stringer using a circular saw and jigsaw, completing all notches cleanly with saw cuts stopping at layout-line intersections and finishing cuts within 1/8 inch of the line. |
| Circular saws, jigsaws, handsaws, sawhorses, 2×12 lumber (two pieces per student), clamps, measuring tapes, safety glasses, hearing protection, push sticks, NCCER Carpentry Level 3 stair module | Instructor checks both stringers: all tread-riser corners must be clean (no over-cut past the intersection), paired stringers must align within 1/8 inch when stacked and clamped. Any over-cut that reduces net stringer depth below minimum must be identified and corrective cutting strategy discussed. Pass = both stringers within tolerance. |
| 6 | Framing the Rough Opening and Installing the Header | 13 | lab | Students will frame a stair rough opening in a prepared floor-framing mock-up—doubling trimmer joists, installing a doubled header, and installing a tail joist—with the opening level, square, and fastened per the instructor's nailing schedule. |
| Pre-built floor-framing platform (shop-built mock-up), LVL or dimensional-lumber header stock, joist hangers, structural screws and nails, framing hammer, drill/driver, 4-foot level, tape measure, chalk line, framing inspection form | Instructor reviews framing inspection form and physically checks the opening: must be within 1/4 inch of specified dimensions, header level within 1/8 inch over its span, all joist hangers fully nailed per manufacturer schedule. Pass = all three criteria met. |
| 7 | Installing Stringers: Attachment Methods and Plumb-and-Level Procedure | 13 | lab | Students will fasten a three-stringer assembly between the header and a bottom plate, verifying that all stringers are plumb, parallel, and equal in height at top and bottom attachment points before final fastening. |
| Pre-cut stringers from Lesson 5, stringer connectors and hurricane ties, structural nails and screws, pressure-treated bottom plate material, shims, 4-foot level, folding rule, tape measure, stringer-inspection checklist, drill/driver, hammer | Stringer-inspection checklist reviewed by instructor: all three stringers within 1/8 inch of equal height at top and bottom, each stringer plumb within 1/8 inch over its length, all connectors fully fastened. Pass = all items on checklist signed off. |
| 8 | Landings and Platform Framing | 10.5 | lab | Students will frame a stair landing platform to specified dimensions, confirm it is level and structurally attached to the wall framing, and verify that the resulting floor-to-landing and landing-to-floor rise values keep all risers equal. |
| Dimensional lumber (2×8 or 2×10 per design), 3/4-inch plywood, structural screws, drill/driver, 4-foot level, tape measure, chalk line, landing inspection form, wall-framing mock-up with studs | Instructor reviews landing inspection form: platform level within 1/8 inch in both directions, height within 1/4 inch of calculated value, all framing connections made with structural fasteners. Pass = all three criteria met. |
| 9 | Installing Treads and Risers: Finish Carpentry Techniques | 13 | lab | Students will cut and install finish treads and riser boards on a completed stringer assembly so that every tread is level, nosing projection is consistent, gaps between riser and stringer are less than 1/8 inch, and no fastener heads are exposed on tread surfaces. |
| Pre-finished or paint-grade tread stock, riser boards, miter saw, construction adhesive, finish nails, trim screws, drill/driver, torpedo level, combination square, tape measure, scribe molding, nail set, safety glasses, hearing protection | Instructor inspects completed tread-and-riser installation: nosing projection consistent within 1/8 inch across all treads, every tread level within 1/8 inch, no exposed fastener heads on tread surfaces, no gap greater than 1/8 inch between riser and stringer. Pass = all criteria met. |
| 10 | Newel Posts, Balusters & Handrails: Layout and Installation | 15 | lab | Students will install a base newel post, a series of square balusters at code-compliant spacing, and a continuous graspable handrail, confirming that no baluster spacing exceeds the IRC 4-inch sphere rule and that handrail height is within the required range. |
| Newel post, balusters, graspable handrail stock (profile per IRC), rail bolts, wall brackets, lag screws or through-bolts, construction adhesive, pin nailer and pins, miter saw, drill/driver, torpedo level, tape measure, 4-inch sphere gauge or 4-inch spacer block, IRC code excerpt | Instructor uses a 4-inch spacer block to check every baluster opening (no opening may pass the block), measures handrail height at both top and bottom landings, and checks newel post plumb with a level. Pass = zero baluster spacing failures, handrail height in code range, newel plumb within 1/8 inch. |
| 11 | Guardrails on Open Sides: Framing and Code Compliance | 8.5 | lab | Students will install a guardrail assembly on the open side of a stair or landing mock-up that meets the required guardrail height and withstands a field-simulated 200-pound horizontal load test at the top rail without visible movement at connections. |
| Guardrail post stock, horizontal rail lumber, balusters, lag screws, structural screws, drill/driver, level, tape measure, 4-inch spacer block, luggage or fish scale for load simulation, IRC guardrail code excerpt | Instructor verifies guardrail height within code range, no 4-inch-sphere failures, and observes the load simulation. Pass = zero sphere failures, no visible connection movement under simulated load, height in code range. |
| 12 | Quality Inspection, Punch-Out & Project Documentation | 9 | field | Students will conduct a self-directed final inspection of their completed stair assembly using a professional punch-list form, identify and correct all deficiencies, and submit a completed project documentation package including as-built measurements and a reflective write-up. |
| Printed punch-list forms, all previous inspection forms, tape measure, combination square, 4-inch spacer block, level, tools for minor corrections (drill/driver, nail set, adhesive), project documentation folder | Instructor reviews completed punch-list: all items must be checked and any deficiency corrected before sign-off. Documentation package must contain all required forms with legible measurements and a complete write-up. Pass = zero open deficiencies on punch-list, complete documentation package submitted. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Stair Code and Calculation Written Exam | Written exam | 25% | 80% (40 of 50 points) | A 50-question written exam covering stair terminology, IRC dimensional requirements, rise-and-run math, material takeoff, stringer-length calculation, baluster spacing math, and handrail graspability rules. Questions are drawn from NCCER Carpentry Level 3 stair module content areas and use multiple-choice, short-answer, and calculation formats. Students must achieve 80% to pass; students below that threshold complete a targeted remediation and retake within five school days. Standard met · Safety · Time · Quality/finish · Documentation |
| Stair Framing and Finish Skills Demonstration | Skills demonstration | 45% | All critical items rated Meets Standard; overall rubric score 80% or higher | Students independently lay out, cut, and install a three-stringer open stair assembly with treads, risers, a newel post, balusters, and a continuous handrail on a provided framing mock-up. An instructor-scored rubric assesses stringer layout accuracy, cut quality, riser equality, tread level, nosing consistency, baluster spacing (4-inch sphere check), handrail height, and connection security. Any item marked Does Not Meet Standard is a mandatory re-do before a passing grade is recorded. This assessment maps directly to NCCER Carpentry Level 3 stair installation performance tasks. Standard met · Safety · Time · Quality/finish · Documentation |
| Lab Log and Project Documentation Portfolio | Log | 15% | 80% of entries rated Complete and Accurate; all required forms present | Students submit a complete portfolio containing daily lab entries (objective, steps performed, measurements taken, problems encountered), all inspection and punch-list forms from Lessons 6 through 12, the original rise-and-run calculation sheet, the material takeoff, and the final reflective write-up. Entries are evaluated for accuracy of recorded measurements, completeness, and evidence of self-correction. A missing required form or an entry with unresolved inaccuracies counts as incomplete. Standard met · Safety · Time · Quality/finish · Documentation |
| Stair Safety Walk and Hazard ID Check | Safety audit | 15% | 100% of critical safety items correct; no unsafe act may go uncorrected | The instructor conducts a 15-minute safety walk with each student through the active stair lab, presenting six to eight staged or observed scenarios (open-side fall hazard without guardrail, circular-saw blade guard removed, no hearing protection during sawing, trip hazard on stair treads, unmarked wet adhesive, and similar). The student must correctly identify every critical hazard and state the appropriate corrective action. A single missed critical hazard (fall from elevation, unguarded power-saw blade) results in an immediate retake; the student may not return to tool use until passed. This check aligns with OSHA 10 stairways and ladders content area. Standard met · Safety · Time · Quality/finish · Documentation |
Students learn to read cabinet shop drawings, build face-frame and frameless cabinet boxes from sheet goods and solid lumber, and install base and wall cabinets to plumb, level, and square tolerances required in residential and light-commercial construction. Lessons integrate NCCER Carpentry Level 2 and Level 3 cabinetry module competencies and reinforce the shop-safety and tool-operation standards assessed on the NCCER written and performance exams.
OutcomesStudents learn to read cabinet shop drawings, build face-frame and frameless cabinet boxes from sheet goods and solid lumber, and install base and wall cabinets to plumb, level, and square tolerances required in residential and light-commercial construction. Lessons integrate NCCER Carpentry Level 2 and Level 3 cabinetry module competencies and reinforce the shop-safety and tool-operation standards assessed on the NCCER written and performance exams.
How the course runs. 12 blocks: Cabinet Types, Terms, and Shop Safety; Reading Cabinet Shop Drawings and Developing a Cut List; Sheet-Goods Handling, Layout, and Efficient Cutting; Joinery Methods: Pocket Screws, Dadoes, and Rabbets; Building a Frameless (European) Base Cabinet Box; Building a Face-Frame Cabinet Box; Edge Banding, Veneer Tape, and Surface Preparation; Cabinet Hardware: Hinges, Drawer Slides, and Pulls; Wall Preparation and Cabinet Layout Lines; Installing Wall and Base Cabinets; Countertop Templating and Scribing; Quality Control, Punch List, and As-Built Documentation.
What competent looks like. Interpret cabinet elevation drawings, cut lists, and material takeoff sheets to plan and sequence a cabinet build without waste exceeding 10% of sheet goods. Safely operate table saw, router, pocket-hole jig, and random-orbital sander while applying all required PPE and OSHA lockout/tagout procedures during every setup and blade change. Build a plywood face-frame cabinet box square to within 1/8 inch and a frameless (European-style) cabinet box square to within 1/16 inch using industry-standard joinery. Hang and align a run of at least three wall cabinets and two base cabinets so that every unit is plumb and level within 1/8 inch over its full height and width. Apply solid-wood edge banding, iron-on veneer tape, and finish-grade trim using correct adhesive and fastener schedules so that all visible surfaces are smooth and gap-free. Complete a written cabinet takeoff, a cut list, and an as-built punch list that accurately reflect the finished work, demonstrating the documentation skills assessed in NCCER Carpentry written modules.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Cabinet Types, Terms, and Shop Safety | 10.5 | theory | Students correctly identify face-frame and frameless cabinet components using industry terminology and demonstrate all required PPE and lockout/tagout procedures before any machine is turned on. |
| NCCER Carpentry Level 2 and Level 3 modules (cabinetry units), sample cabinet shop drawings, PPE kit per student, LOTO hasp and tags, projector for diagram annotation | 10-question identification quiz on component names (80% pass); LOTO checklist completed correctly with zero skipped steps before advancing to any machine lesson |
| 2 | Reading Cabinet Shop Drawings and Developing a Cut List | 10.5 | theory | Students extract all dimensions from a two-page cabinet elevation and floor-plan set and produce a complete, accurate cut list with grain direction and part quantities noted. |
| Two-page cabinet shop drawing set (instructor-prepared, residential kitchen), blank cut-list forms, architect's scale rules, calculators, NCCER Carpentry module on print reading | Cut list graded against an answer key; all dimensions within 1/16 inch and all part quantities correct for 80% pass; any missing part is an automatic re-do |
| 3 | Sheet-Goods Handling, Layout, and Efficient Cutting | 13 | demo | Students lay out and rip a 4×8 sheet of 3/4-inch plywood at the table saw with consistent 1/16-inch dimensional accuracy while maintaining a safe stance and using push sticks throughout. |
| Table saw with rip fence and splitter/anti-kickback pawl, push sticks and featherboards, 4×8 sheets of 3/4-inch AC plywood (practice grade), tape measure, combination square, hearing protection, safety glasses, dust respirator | Each ripped piece measured by instructor; all four faces within 1/16 inch of target dimension; safe stance and push-stick use observed on every pass (any hand within 6 inches of blade = immediate stop and retraining) |
| 4 | Joinery Methods: Pocket Screws, Dadoes, and Rabbets | 15 | lab | Students cut accurate dadoes and rabbets on the router table and drill pocket holes with a jig, then assemble a test corner joint that is square to within 1/16 inch and shows no visible gap. |
| Router table with 3/4-inch straight bit, pocket-hole jig with appropriate drill bit and stop collar, 1-5/8-inch and 2-1/2-inch pocket screws, scrap 3/4-inch plywood, framing square, dial calipers, clamps, safety glasses, hearing protection, dust respirator, shop log notebooks | Lab log entry for each joint with measured dimensions and deflection data; assembled corner square within 1/16 inch and no visible gap exceeding 1/32 inch for pass; instructor signs off before student uses joinery on project cabinet |
| 5 | Building a Frameless (European) Base Cabinet Box | 15 | lab | Students assemble a frameless 18-inch-wide base cabinet box using dado and pocket-screw joinery so that it is square within 1/16 inch, structurally sound, and ready for hardware. |
| 3/4-inch birch plywood, 1/4-inch plywood for back, wood glue, pocket screws, 1-inch brads and brad nailer, clamps, tape measure, framing square, shop log, PPE kit, NCCER Carpentry module (cabinetmaking unit) | Instructor measures both diagonals; difference must not exceed 1/16 inch; all joints glued and fastened with no unfilled gaps; shop log entry with before/after diagonal measurements for pass |
| 6 | Building a Face-Frame Cabinet Box | 15 | lab | Students mill solid-poplar face-frame parts to dimension, assemble the frame with pocket screws so it is square to within 1/8 inch, and attach it flush to a plywood cabinet box with no more than 1/16-inch overhang on any edge. |
| Poplar lumber (1x2 dressed), jointer, table saw, miter saw, pocket-hole jig, wood glue, clamps and clamping cauls, router with flush-trim bit, calipers, tape measure, framing square, safety glasses, hearing protection, push sticks, shop log | Frame diagonal difference within 1/8 inch; no edge overhang exceeding 1/16 inch after trimming; all joints tight with no visible gaps; shop log entry complete for pass |
| 7 | Edge Banding, Veneer Tape, and Surface Preparation | 10.5 | demo | Students apply iron-on veneer edge tape to all exposed plywood edges of a cabinet box and sand all surfaces to 150-grit so that no tape seams, glue squeeze-out, or sanding swirls are visible under a raking light. |
| Iron-on birch edge-banding roll, household iron, edge-banding hand trimmer, random-orbital sander with 120- and 150-grit discs, wood filler, putty knife, shop light, dust mask (N95 minimum), safety glasses, tack cloths | Instructor inspects panel under raking light; no visible tape seams, glue residue, unfilled voids, or sanding swirls for pass; any defect requires re-do before advancing to installation lessons |
| 8 | Cabinet Hardware: Hinges, Drawer Slides, and Pulls | 10.5 | demo | Students install a pair of soft-close European cup hinges and a pair of undermount drawer slides so that the door hangs plumb and the drawer extends fully and closes flush without binding. |
| Soft-close European cup hinges (35 mm) with face-frame adapter plates, drill press with 35 mm Forstner bit, undermount soft-close drawer slides, drawer box (pre-built practice unit), Phillips screwdriver, tape measure, combination square, pencil, shop log | Door gap measured at four points; all gaps within 1/16 inch of 1/8 inch; drawer extends fully without binding and closes flush; instructor observes adjustment process and signs shop log for pass |
| 9 | Wall Preparation and Cabinet Layout Lines | 10.5 | demo | Students find the high point of a floor with a level and straight-edge, establish a level layout line for wall cabinets and a separate line for base cabinets, and locate all wall studs accurately. |
| 4-foot level, 6-foot straight-edge, chalk line reel, stud finder, finish nails, hammer, tape measure, pencil, masking tape, mock kitchen wall (plywood or drywall on framing), safety glasses | Instructor checks chalk line with a 4-foot level at three points; no bubble deviation exceeding one graduation; stud locations verified by driving a finish nail into each marked center for pass |
| 10 | Installing Wall and Base Cabinets | 15 | lab | Students hang a run of three wall cabinets and set two base cabinets so that every unit is plumb and level within 1/8 inch over its full height and width, all gaps between adjacent cabinets are filled with filler strips or scribed to the wall. |
| Pre-built student cabinet boxes from Lessons 5 and 6, 3-inch cabinet screws, shims, clamps, 4-foot level, drill/driver, cabinet jack or ledger board, filler strip stock (poplar or select pine), finish nailer, tape measure, pencil, safety glasses, hearing protection | Instructor checks plumb and level on each cabinet at four points; no deviation exceeding 1/8 inch; no visible gap between adjacent cabinets exceeding 1/32 inch; filler strip tight to wall for pass |
| 11 | Countertop Templating and Scribing | 10.5 | demo | Students create an accurate cardboard template of a base-cabinet run, transfer it to a laminate countertop blank, and scribe and cut the back splash edge so it lies flat against the wall with no gap exceeding 1/16 inch. |
| Cardboard strips, hot-glue gun, laminate countertop blank (post-form or flat-sheet), jigsaw with fine-tooth blade, compass, tape measure, pencil, 4-foot level, clamps, safety glasses, hearing protection, dust respirator | Countertop placed on cabinet run; instructor checks all wall gaps with a feeler gauge; no gap exceeding 1/16 inch for pass; template retained in shop log portfolio |
| 12 | Quality Control, Punch List, and As-Built Documentation | 10 | lab | Students complete a written punch list identifying every defect in a finished cabinet installation, prioritize corrections by severity, correct all critical items, and submit an as-built sketch with final dimensions. |
| Punch-list form (instructor-prepared), tape measure, 4-foot level, combination square, feeler gauges, pencil, graph paper, shop log portfolio, all hand tools used in prior lessons | All critical punch-list items closed and initialed by instructor; as-built sketch dimensions verified by instructor measurement at three points and within 1/4 inch; complete shop log portfolio submitted for pass |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Written Knowledge Exam — Cabinetry Principles | Written exam | 25% | 70% correct (28 of 40 questions) | A 40-question multiple-choice and short-answer exam covering cabinet terminology, sheet-goods layout and yield, joinery selection, hardware specifications, and installation sequence, mapped to NCCER Carpentry Level 2 and Level 3 written module content. Students who score below 70% receive targeted review and one retake opportunity. Standard met · Safety · Time · Quality/finish · Documentation |
| Skills Performance Demonstration — Cabinet Build and Install | Skills demonstration | 45% | All critical items on the NCCER-aligned performance checklist rated Satisfactory; no Unsatisfactory ratings on safety steps | The student builds and installs a single face-frame base cabinet from a provided cut list, hangs one wall cabinet to a layout line, fits one door with European hinges, and installs one drawer with soft-close slides; the instructor evaluates each step on a performance checklist aligned to NCCER Carpentry performance profile criteria for cabinetmaking and installation. Any unsafe act results in an immediate stop and automatic re-do of that task. Standard met · Safety · Time · Quality/finish · Documentation |
| Shop Log Portfolio | Log | 15% | All 12 lesson entries present; dimensions and observations recorded for each lab; instructor sign-offs complete; 80% of entries rated Complete and Accurate | The student's shop log collects cut lists, joint measurement records, installation level readings, punch lists, and the as-built sketch from every lab and demo lesson throughout the course. The portfolio demonstrates the documentation habits assessed in NCCER written modules and provides evidence of consistent safe practice. Standard met · Safety · Time · Quality/finish · Documentation |
| Safety Compliance Check | Safety audit | 15% | 100% compliance on all safety behaviors; any single critical violation (unguarded blade, missing LOTO, no PPE) is an automatic fail requiring full safety review before re-entry | The instructor conducts a cumulative safety observation using a standardized checklist across Lessons 3 through 11, scoring PPE use, LOTO compliance at every machine setup, housekeeping, and correct push-stick and featherboard use; this check maps directly to OSHA 10 General Industry and Construction hazard-recognition competencies and is a graduation prerequisite independent of other assessment scores. Standard met · Safety · Time · Quality/finish · Documentation |
Students learn to select, lay out, and install interior and exterior doors, windows, and associated hardware and trim to manufacturer specifications and applicable building codes. Emphasis is placed on proper rough opening sizing, weathertight sealing, plumb and level installation, and finish quality that meets both functional and aesthetic standards. Lessons integrate NCCER Carpentry Level 2 and Level 3 module content on door and window installation throughout.
OutcomesStudents learn to select, lay out, and install interior and exterior doors, windows, and associated hardware and trim to manufacturer specifications and applicable building codes. Emphasis is placed on proper rough opening sizing, weathertight sealing, plumb and level installation, and finish quality that meets both functional and aesthetic standards. Lessons integrate NCCER Carpentry Level 2 and Level 3 module content on door and window installation throughout.
How the course runs. 12 blocks: Door and Window Types, Components, and Trade Terminology; Rough Opening Layout and Sizing; Safety for Door and Window Work—PPE, Lockout/Tagout, and Ergonomics; Reading Architectural Drawings and Door/Window Schedules; Flashing, Air Barrier, and Moisture Management Principles; Installing Prehung Interior Doors; Installing Prehung Exterior Doors—Weathertight and Secure; Window Installation—Single/Double-Hung and Casement; Interior Casing and Trim: Layout, Fitting, and Fastening; Exterior Trim, Brick Mold, and Sill Extensions; Hardware Installation—Hinges, Locksets, Closers, and Operators; Inspection, Troubleshooting, and Quality Walk-Through.
What competent looks like. Size and prepare rough openings for prehung exterior and interior door units and window units within 1/8-inch tolerance of manufacturer specifications. Install prehung exterior doors, including threshold, weatherstripping, and lockset hardware, achieving plumb, level, and square alignment verified by instrument. Install single and double-hung, casement, and sliding window units with proper shimming, fastening, and continuous sill-pan flashing detail. Apply interior casing and exterior trim using cope-and-stick and mitered joinery with gaps no greater than 1/16 inch. Select and apply appropriate air-barrier, flashing, and sealant systems to prevent water infiltration at door and window rough openings. Identify and correct common installation defects—binding, racking, improper reveal, and failed seals—by using diagnostic methods consistent with NCCER craft knowledge.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Door and Window Types, Components, and Trade Terminology | 10 | theory | Students identify and correctly name the parts, operational types, and material options for residential and light-commercial doors and windows using NCCER Carpentry module terminology. |
| NCCER Carpentry Level 2 and Level 3 core curriculum modules; manufacturer door and window catalogs; cutaway diagrams; sample product labels | Students score 80% or higher on the 30-term vocabulary quiz administered at lesson end. |
| 2 | Rough Opening Layout and Sizing | 12 | demo | Students calculate correct rough opening dimensions for given door and window units and mark framed wall sections for header, king stud, trimmer stud, and sill plate layout. |
| Framed stud-wall mockups (2×4 or 2×6 platform framing); tape measures; framing squares; chalk line; pencils; manufacturer specification sheets; NCCER Carpentry Level 2 module | Each student's marked rough openings are within 1/8 inch of calculated dimensions on both width and height; instructor initials layout before cutting begins. |
| 3 | Safety for Door and Window Work—PPE, Lockout/Tagout, and Ergonomics | 8 | theory | Students select appropriate PPE, apply lockout/tagout procedures for power tools used in door and window installation, and demonstrate safe manual-handling techniques for large door and window units. |
| OSHA 10 outreach materials; lockout/tagout kit with locks and tags; safety data sheets for common sealants; weighted door-unit mockup; PPE samples (safety glasses, gloves, steel-toed boots, hearing protection) | Students correctly sequence all six lockout/tagout steps without prompting and identify at least four of five listed hazards with correct controls; both are pass/fail with 100% required for safety items. |
| 4 | Reading Architectural Drawings and Door/Window Schedules | 10 | theory | Students extract door and window specifications from a set of residential architectural drawings and a door/window schedule to determine quantity, type, size, hand, and hardware requirements. |
| Sample residential architectural drawing set (floor plan, elevations, sections, door and window schedules); drawing scales; architectural scale rule; blank take-off forms; NCCER Technical Math module | Completed take-off form matches instructor answer key with no more than one error; RFI correctly identifies all missing items. |
| 5 | Flashing, Air Barrier, and Moisture Management Principles | 10 | demo | Students describe the sequence of sill-pan flashing, self-adhered membrane, and backer-rod/sealant application required to create a water-resistive barrier at door and window openings, and execute the sequence on a wall mockup. |
| OSB-sheathed wall mockups; sill-pan flashing material; self-adhered flexible flashing tape; utility knife; roller; garden hose; moisture meter; inspection forms; manufacturer installation guides | Instructor inspects each student's mockup: no bridged voids, correct lap sequence on all four sides, and hose test shows no interior moisture penetration; pass requires all three criteria met. |
| 6 | Installing Prehung Interior Doors | 14 | lab | Students install a prehung interior door unit—including shimming, fastening, and hardware—that is plumb, level, and square with a consistent 3/16-inch reveal and smooth latching operation. |
| Prehung interior door units (various sizes); composite shims; 4-foot level; framing square; tape measure; finish nails; nail set; hammer or finish nailer; passage lockset kit; door-lock boring kit; chisel; NCCER Carpentry Level 2 module | Instructor measures reveal at six points (two per jamb, two on head): all within 1/16 inch of 3/16 inch; door swings and latches without force; plumb verified on hinge jamb; pass requires all criteria. |
| 7 | Installing Prehung Exterior Doors—Weathertight and Secure | 16 | lab | Students install a prehung exterior door unit with sill-pan flashing, threshold, and weatherstripping that achieves plumb and level alignment, correct door reveal, and an airtight perimeter seal confirmed by visual inspection. |
| Prehung exterior insulated steel door unit; sill-pan flashing; self-adhered membrane; shims; 4-foot level; framing square; tape measure; screw gun; fasteners per manufacturer spec; adjustable threshold; low-expansion spray foam; backer rod; caulking gun; paintable latex caulk; deadbolt lockset | Door is plumb to within 1/8 inch over full height; reveal is consistent; threshold sweep compresses visibly on a piece of paper pulled under it; foam and caulk perimeter shows no voids; all criteria required to pass. |
| 8 | Window Installation—Single/Double-Hung and Casement | 16 | lab | Students install a single or double-hung window unit and a casement window unit, achieving level sill, plumb jambs, correct rough-opening clearance, and full perimeter flashing integration. |
| Single or double-hung window unit; casement window unit; flashed wall mockups; shims; 4-foot level; framing square; tape measure; screw gun; manufacturer-specified fasteners; self-adhered membrane; head flashing; caulking gun; sealant; cameras or phones for documentation | Sill level within 1/8 inch; jambs plumb within 1/8 inch over full height; diagonal measurements equal within 1/8 inch; flashing sequence correct on all four sides per instructor checklist; all criteria required. |
| 9 | Interior Casing and Trim: Layout, Fitting, and Fastening | 14 | practice | Students lay out, cut, and fasten interior casing on both sides of an installed interior door to achieve consistent 3/16-inch reveal on the jamb, tight mitered corners, and a face-nail pattern that draws the casing flush to the wall without splitting. |
| Miter saw; tape measure; combination square; pencil; 18-gauge brad nailer and compressor; finish nailer; assorted interior casing profiles; wood glue; 1-1/2-inch and 2-inch finish nails; nail set; feeler gauge; sandpaper; NCCER Carpentry Level 3 module | Reveal consistent within 1/16 inch at three measured points per side jamb and head; all miter gaps at or below 1/16 inch measured with feeler gauge; casing flush to wall face; all criteria required to pass. |
| 10 | Exterior Trim, Brick Mold, and Sill Extensions | 12 | practice | Students cut and install exterior door and window trim (brick mold or flat casing), a sloped sill extension, and a drip cap that maintain manufacturer reveal, shed water away from the building, and integrate with the existing flashing system. |
| Miter saw; table saw; tape measure; framing square; corrosion-resistant ring-shank nails; hammer or pneumatic nailer; exterior primer; exterior casing or brick-mold stock; preformed metal drip cap; sealant; caulking gun; back-prime brush | Sill slope confirmed with a digital angle gauge or level and shim; drip cap properly integrated under weather-resistant barrier; all joints sealed without voids; instructor signs off on photo documentation. |
| 11 | Hardware Installation—Hinges, Locksets, Closers, and Operators | 10 | practice | Students install a residential entry lockset with deadbolt, a door closer, and a casement window operator to manufacturer specifications, verifying correct function and security. |
| Entry lockset with deadbolt; door closer; casement window crank operator; manufacturer templates and instruction sheets; door-lock boring kit (face-bore and edge-bore bits); screw gun; chisels; mallet; tape measure; combination square | Deadbolt throw meets manufacturer minimum; door closer brings door to fully latched position in one unassisted swing; casement operator cranks smoothly without binding; all criteria required to pass. |
| 12 | Inspection, Troubleshooting, and Quality Walk-Through | 14 | field | Students conduct a systematic quality inspection of all door and window installations completed during the course, identify defects against a standard punch-list format, and correct at least two documented deficiencies. |
| Completed lab installation space; quality punch-list form; 4-foot level; tape measure; feeler gauge; combination square; moisture meter; flashlight; camera; NCCER Carpentry Level 3 quality-control references | Punch list documents all measurable defects with location and description; at least two repairs are re-inspected and confirmed resolved by instructor; communication during role-play rated satisfactory by instructor rubric. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Written Knowledge Exam | Written exam | 25% | 75% or higher | A 50-question written exam covering door and window terminology, rough-opening calculations, flashing and moisture-management principles, hardware types and functions, and NCCER Carpentry Level 2 and Level 3 module content related to doors and windows. Questions are aligned to NCCER knowledge-check areas to support credential exam readiness. Standard met · Safety · Time · Quality/finish · Documentation |
| Practical Skills Demonstration | Skills demonstration | 45% | All required criteria on the instructor rubric rated 'meets standard'; no safety violations | Each student installs a prehung exterior door unit from rough opening through threshold, weatherstripping, lockset, and exterior casing in a timed lab exercise observed by the instructor; the rubric evaluates plumb and level alignment, reveal consistency, flashing integration, hardware function, and safe work practices, with any single safety violation resulting in an immediate stop and required remediation before re-attempt. Standard met · Safety · Time · Quality/finish · Documentation |
| Lab Log Portfolio | Log | 15% | Complete documentation for all 12 lessons with dated entries and photos; average rating of 'satisfactory' or higher across all rubric categories | Students maintain a running lab log throughout the course documenting measurements, material selections, flashing sequences, hardware specifications, punch-list findings, and photographic evidence of key installation steps; the log is reviewed at the end of the course against a completeness rubric and evaluated for accuracy, organization, and professional presentation consistent with field documentation standards. Standard met · Safety · Time · Quality/finish · Documentation |
| Safety and Hazard Recognition Check | Safety audit | 15% | 100% on all safety-critical items; no partial credit for lockout/tagout sequencing | A pass/fail safety check administered at the midpoint of the course requires each student to correctly identify PPE required for at least four door-and-window installation scenarios, sequence all six lockout/tagout energy-control steps without prompting, and demonstrate proper two-person lifting technique for a prehung door unit; any item rated unsatisfactory requires remediation and a full re-check before the student continues hands-on lab work. Standard met · Safety · Time · Quality/finish · Documentation |
This course develops the skills required to transfer architectural and structural drawings into accurate, full-scale layout on jobsite slabs, subfloors, walls, and finish surfaces. Students learn to use optical and laser levels, transits, story poles, and layout rods alongside traditional hand tools to establish reference lines, locate structural members, set elevations, and lay out openings for doors, windows, stairs, and cabinetry. Lessons are mapped to NCCER Carpentry Levels 1–4 module objectives covering layout, framing geometry, and finish carpentry precision.
OutcomesThis course develops the skills required to transfer architectural and structural drawings into accurate, full-scale layout on jobsite slabs, subfloors, walls, and finish surfaces. Students learn to use optical and laser levels, transits, story poles, and layout rods alongside traditional hand tools to establish reference lines, locate structural members, set elevations, and lay out openings for doors, windows, stairs, and cabinetry. Lessons are mapped to NCCER Carpentry Levels 1–4 module objectives covering layout, framing geometry, and finish carpentry precision.
How the course runs. 12 blocks: Reading Plans for Layout: Extracting Dimensions and Tolerances; Measurement Tools and Precision: Tapes, Rules, and Digital Calipers; Layout Math: Pythagoras, Slope Triangles, and Diagonal Verification; Batter Boards, String Lines, and Establishing a Building Baseline; Levels and Transits: Builder's Level, Laser Level, and Digital Level; Slab and Subfloor Layout: Snapping Lines and Locating Walls; Plate Layout: Stud Spacing, Openings, and Intersections; Story Poles and Layout Rods: Vertical Control Without Accumulated Error; Laying Out Stairs: Stringers, Treads, Risers, and Nosing; Door and Window Layout: Rough Openings, Headers, and Plumb and Square Check; Laser Layout Tools: Line Lasers, Point-Transfer Lasers, and Safety; Integrated Layout Project: Full Interior Layout from Plans to Marked Deck.
What competent looks like. Read and interpret architectural plans, including plan views, sections, and detail drawings, to extract all dimensions required to perform a complete building layout. Establish a building baseline, set batter boards, run string lines, and verify square using the 3-4-5 method and diagonal checks to within accepted tolerances. Set and verify differential elevations across a construction site using a builder's level, laser level, and digital level, recording results in a field log. Lay out wall plates, door and window rough openings, stud spacing, and partition intersections on slab and subfloor in accordance with plan dimensions and applicable code-minimum rough opening requirements. Develop and use story poles and layout rods to transfer repetitive vertical measurements for cabinets, stair stringers, tile, and finish trim without accumulating error. Apply safe work practices—including fall protection awareness, proper use of laser safety eyewear, and housekeeping on layout decks—consistent with OSHA 10 general industry and construction hazard recognition principles.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Reading Plans for Layout: Extracting Dimensions and Tolerances | 10.5 | theory | Given a set of residential construction drawings, students will locate and record every dimension needed to perform a full building layout, identifying scale, grid lines, datum elevations, and general notes with no more than two omissions. |
| Residential plan sets (minimum four sheets each), architectural scales, red/blue pencils, field notes forms, NCCER Carpentry Level 1 Core Module — Introduction to Construction Drawings | Completed dimension checklist with all footprint, partition, and opening dimensions correctly extracted; fewer than two omissions on a provided 30-item answer key constitutes a pass. |
| 2 | Measurement Tools and Precision: Tapes, Rules, and Digital Calipers | 8.5 | demo | Students will correctly read and record measurements using a 25-ft steel tape, folding rule, and digital caliper to within 1/32 inch on a series of ten measured objects, demonstrating proper tensioning and hook-end compensation techniques. |
| 25-ft and 100-ft steel tapes, 6-ft folding rules, digital calipers, pre-marked layout table, measurement data sheets, NCCER Carpentry Level 1 — Core Curriculum Module on Trade Math | Ten measured values recorded; eight of ten within 1/32 inch of master values constitutes a pass; any systematic error (e.g., consistent burn-inch mistake) requires immediate re-demonstration before proceeding. |
| 3 | Layout Math: Pythagoras, Slope Triangles, and Diagonal Verification | 10.5 | theory | Students will calculate missing sides of right triangles using the Pythagorean theorem and apply the 3-4-5 (and scaled multiples) method to verify square on a layout problem set, achieving a score of at least 80 percent. |
| Scientific calculators, graph paper, whiteboard, NCCER Carpentry Level 1 — Applied Construction Math module, printed problem sets | Twelve-problem worksheet graded; 80 percent or higher (ten of twelve correct with work shown) is a pass; any student below 80 percent completes a remedial problem set before the next lesson. |
| 4 | Batter Boards, String Lines, and Establishing a Building Baseline | 15 | lab | Working from a simplified site plan, students will set batter boards, establish a building baseline, run string lines for all four corners, and verify square by diagonal measurement to within 1/4 inch on a 20-ft × 24-ft simulated footprint. |
| 2×4 lumber (batter boards and stakes), duplex nails, 100-ft steel tape, line levels, braided string line, permanent marker, plumb bob, claw hammers, sledgehammer, site plan drawings, field log forms | Field log submitted with all four corner coordinates, two diagonal measurements, and correction notes if any; diagonal difference of 1/4 inch or less and all string lines level to within 1/8 inch per 10 ft constitutes a pass. |
| 5 | Levels and Transits: Builder's Level, Laser Level, and Digital Level | 13 | demo | Students will set up, level, and operate a builder's optical level and a rotating laser level to shoot benchmark elevations to four target points, recording readings within 1/8 inch of the instructor-verified values. |
| Optical builder's level with tripod, Philadelphia rod, rotating laser level with detector, digital torpedo level, 100-ft tape, elevation log sheets, four grade stakes, NCCER Carpentry Level 2 — Surveying module references | Elevation log reviewed by instructor; all four readings within 1/8 inch of verified benchmark values and tripod setup evaluated for stability and correct leveling procedure constitutes a pass. |
| 6 | Slab and Subfloor Layout: Snapping Lines and Locating Walls | 15 | lab | Given a floor plan and a marked datum point on a simulated subfloor deck, students will snap all exterior and interior partition lines, mark plate edges, and confirm all intersections square to within 1/4 inch before any plates are cut. |
| Plywood subfloor deck (16-ft × 20-ft minimum), chalk box with blue and red chalk, 100-ft and 25-ft tapes, speed square, framing square, plumb bob, floor plan drawings, field log forms | All snapped lines measured against plan; no line offset more than 1/4 inch from plan dimension, all intersections square within 1/8 inch per 4-ft diagonal; peer review sheet and student field log submitted as a pass package. |
| 7 | Plate Layout: Stud Spacing, Openings, and Intersections | 13 | practice | Students will mark a full set of top and bottom plates for a 16-ft exterior wall with one door opening and one window opening, placing all stud, king, trimmer, cripple, and header marks in the correct sequence so a crew can cut and assemble without additional measurement. |
| 2×4 and 2×6 lumber (plates), 25-ft tape, speed square, framing square, pencil, plate-marking reference card, rough-opening schedule, NCCER Carpentry Level 2 — Wall and Ceiling Framing module | Completed plate set compared to answer overlay; all stud positions within 1/8 inch, all opening marks correct, no missing marks; six-error identification exercise requires finding five of six errors to pass. |
| 8 | Story Poles and Layout Rods: Vertical Control Without Accumulated Error | 13 | demo | Students will construct a story pole for a kitchen wall-cabinet run and a separate stair-tread story pole, transferring dimensions from drawings to the pole with no single interval error exceeding 1/16 inch. |
| 1×2 and 1×4 clear lumber (story pole stock), 25-ft tape, pencil, combination square, 4-ft level, cabinet elevation drawings, stair calculation worksheet, fine-point marker | Story pole intervals measured by instructor; all intervals within 1/16 inch of drawing dimensions with no cumulative drift; stair pole checked for equal riser spacing; both poles must pass to constitute a complete pass. |
| 9 | Laying Out Stairs: Stringers, Treads, Risers, and Nosing | 15 | lab | Using a stair framing square and a set of stair gauges, students will lay out a closed-stringer stair for a given total rise and run, marking cut lines for all treads and risers within 1/16 inch of calculated positions before any cuts are made. |
| 2×12 lumber (stringer stock), stair framing square, stair gauges (clamp-on buttons), combination square, 25-ft tape, pencil, stair calculation forms, NCCER Carpentry Level 3 — Stairways and Ladders module | Check sheet reviewed by instructor; all tread and riser marks within 1/16 inch of calculated positions; top and bottom plumb cuts correctly oriented; completed check sheet and stringer submitted together as a pass. |
| 10 | Door and Window Layout: Rough Openings, Headers, and Plumb and Square Check | 10.5 | practice | Students will lay out rough openings for three door units and two window units on a pre-framed stud wall, verifying each opening for correct width, height, plumb, and square before any jambs or frames are inserted. |
| Pre-built stud wall mock-up, 2×4 and 2×6 header material, framing nails, pneumatic framing nailer, compressor, 4-ft level, 25-ft tape, door/window schedule, combination square, safety glasses, hearing protection | Punch list completed and reviewed; all five openings within stated tolerances; PPE (safety glasses and hearing protection) worn throughout nailer use — failure to wear PPE requires immediate stop and corrective action before continuing; pass requires all five openings within tolerance. |
| 11 | Laser Layout Tools: Line Lasers, Point-Transfer Lasers, and Safety | 10.5 | demo | Students will set up and use a self-leveling cross-line laser to establish a reference height line around a room perimeter, verify plumb between floors using a plumb-transfer laser, and comply with all Class II and Class IIIA laser safety requirements. |
| Self-leveling cross-line laser with tripod, plumb-transfer laser, laser safety glasses rated for tool wavelength, plumb bob, 25-ft tape, room perimeter mock-up (four walls minimum 8 ft high), laser safety acknowledgment forms | Four perimeter marks measured; all within 1/8 inch of each other; plumb-transfer within 1/8 inch of plumb-bob check; signed laser safety form on file; any student who removes safety glasses while laser is active is required to complete a safety review before continuing — pass requires both dimensional tolerance and safety compliance. |
| 12 | Integrated Layout Project: Full Interior Layout from Plans to Marked Deck | 11.5 | lab | Working individually from a complete plan set, each student will perform and document a full layout sequence—baseline, square check, all partition lines, door and window marks on plates, and a cabinet story pole—for a simulated single-room addition, meeting all dimensional tolerances. |
| Prepared plywood deck (12-ft × 16-ft), chalk box, 100-ft and 25-ft tapes, builder's level or laser level, plates (2×4), stud layout tools, cabinet elevation drawing, 1×2 story-pole stock, field log forms, complete plan set | Ten instructor-measured dimensions; eight of ten within stated tolerances; field log complete with all stages documented; sequence plan submitted; verbal narration must demonstrate understanding of why each step precedes the next — all three components must pass for an overall pass. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Layout Theory Knowledge Exam | Written exam | 25% | 75 percent or higher (38 of 50 questions correct) | A 50-question written exam covering plan reading, layout math (Pythagorean theorem, diagonal checks, rise/run calculations), tool identification and proper use, rough-opening sizing, elevation transfer principles, and laser safety classifications. Questions are drawn from NCCER Carpentry Levels 1–3 module content relevant to layout tasks, reflecting the style and content areas tested in NCCER written assessments. Standard met · Safety · Time · Quality/finish · Documentation |
| Layout Skills Performance Demonstration | Skills demonstration | 45% | All six critical tasks rated Satisfactory; no Unsatisfactory rating on any single task | The instructor observes each student completing six timed layout tasks on the lab deck: (1) set up and read a rotating laser level to four targets within 1/8 inch; (2) establish a 20-ft baseline and verify square with a diagonal check within 1/4 inch; (3) snap a full partition layout from a floor plan within tolerance; (4) mark a full plate set including a door rough opening; (5) step and verify a stair stringer; and (6) build a cabinet story pole. Each task is rated Satisfactory or Unsatisfactory against a rubric tied to NCCER performance profile criteria. Standard met · Safety · Time · Quality/finish · Documentation |
| Field Layout Log Portfolio | Log | 15% | Eight of twelve lab entries rated Complete and Accurate; no entry may contain an unacknowledged safety deviation | Students maintain a field log throughout all lab and practice lessons, recording tool setup steps, measurements taken, variances found, corrections made, and a brief reflection on each session. The portfolio is reviewed for completeness, accuracy of recorded measurements against instructor-verified values, and evidence that the student identified and corrected their own errors — mirroring the jobsite documentation practice reinforced by NCCER craft-level expectations. Standard met · Safety · Time · Quality/finish · Documentation |
| Jobsite Safety and Housekeeping Check | Safety audit | 15% | Zero critical violations; all items on the 20-item checklist rated Compliant | An unannounced walk-through conducted by the instructor during one of the lab lessons assesses the student's work area for trip hazards (loose string lines secured when not in use, chalk boxes stored), correct PPE worn for active tasks (safety glasses during nailer and laser use, hearing protection when operating pneumatic tools), tool storage between uses, and proper laser safety practices. Any critical violation — unguarded eye exposure to a laser, unprotected nailer use, or an unsecured fall hazard — results in immediate task stoppage; the student must correct the condition and complete a written safety reflection before continuing, and must pass a re-check to receive credit for this assessment. Standard met · Safety · Time · Quality/finish · Documentation |
Students design, plan, and construct a full-scale carpentry project that integrates skills from every prior course—framing, roofing, stairs, cabinetry, doors/windows, and finish work—into a single demonstrable structure or assembly. The capstone requires complete written documentation, a job-site safety plan, and a formal oral defense before an instructor panel. Successful completion demonstrates job-entry readiness and provides evidence for the NCCER Carpentry portfolio.
OutcomesStudents design, plan, and construct a full-scale carpentry project that integrates skills from every prior course—framing, roofing, stairs, cabinetry, doors/windows, and finish work—into a single demonstrable structure or assembly. The capstone requires complete written documentation, a job-site safety plan, and a formal oral defense before an instructor panel. Successful completion demonstrates job-entry readiness and provides evidence for the NCCER Carpentry portfolio.
How the course runs. 4 blocks: Project Design, Planning, and Safety Kickoff; Rough Framing, Sheathing, and Roofing Phase; Finish Carpentry, Doors, Windows, Stairs, and Cabinetry Phase; Project Documentation, Portfolio Assembly, and Oral Defense Preparation.
What competent looks like. Produce a complete project package—including a materials takeoff, cut list, schedule, and OSHA-compliant safety plan—before breaking ground on a capstone build. Execute rough framing, sheathing, roofing, stair or ramp construction, and exterior finish work to tolerances and quality standards consistent with NCCER Carpentry Levels 1–4 performance criteria. Install at least one interior finish assembly (cabinetry, door, or window unit) that is plumb, level, square, and within manufacturer's specified tolerances. Maintain a daily project log and photographic portfolio that documents decision-making, problem-solving, and compliance with applicable codes throughout the build. Apply lockout/tagout, fall protection, and PPE protocols consistently across all phases of the capstone build, with zero critical safety violations. Defend design choices, sequencing decisions, and quality outcomes in a structured oral presentation to an instructor panel, using trade vocabulary and supporting documentation.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Project Design, Planning, and Safety Kickoff | 36 | theory | Students produce a complete pre-construction package—scaled drawing or sketch, materials takeoff, cut list, project schedule, and a written OSHA-compliant jobsite safety plan—that is reviewed and approved by the instructor before any material is ordered or cut. |
| Graph paper or CAD/SketchUp Free (school computers), architect's scale or engineer's scale, pencils, materials takeoff worksheet (instructor-prepared), current lumber and hardware pricing sheets from a local supplier, OSHA 10 course reference card, project-schedule template, calculators | Instructor approves the pre-construction package using a scored rubric (drawing dimensioned and to scale, takeoff within 10% of reference, safety plan covers all identified hazards with appropriate controls, schedule has five or more milestones). All sections must reach 'Acceptable' (equivalent to 70%) before the student advances. Safety plan must be complete and accurate with no missing hazard categories—this item is a hard gate. |
| 2 | Rough Framing, Sheathing, and Roofing Phase | 72 | lab | Students construct the floor platform, wall framing, roof framing, and sheathing of their approved capstone structure, meeting dimensional tolerances and structural layout requirements consistent with NCCER Carpentry Level 2 and Level 3 performance tasks. |
| Framing lumber (dimensional lumber per approved takeoff), OSB or plywood sheathing, joist hangers and structural fasteners, circular saw, miter saw, framing nailer, hand nails, hammer, framing square, speed square, tape measures, chalk line, level, fall-protection harness and lanyard (when working at height), safety glasses, hard hat, hearing protection, work gloves, NCCER Carpentry Level 2 and Level 3 modules (reference), daily log notebook or digital log template | Instructor walk-through using NCCER-aligned performance checklist: wall diagonal must be within 1/8 inch, stud spacing within 1/4 inch of plan, roof pitch verified with speed square, sheathing fastener spacing matches plan. Student must score 'Satisfactory' on every structural item to advance. Fall-protection use during elevated work is a binary safety gate—any unprotected work at or above 6 feet stops the build and triggers a documented safety counseling. |
| 3 | Finish Carpentry, Doors, Windows, Stairs, and Cabinetry Phase | 72 | lab | Students install at least three finish assemblies drawn from doors, windows, interior trim, a stair or ramp unit, and a cabinet or shelf assembly, achieving plumb, level, and square tolerances and a finish quality suitable for inspection. |
| Pre-hung door unit or window unit (per project design), finish lumber and sheet goods per cut list, exterior and interior casing stock, baseboard stock, finish nailer and compressor, brad nailer, miter saw, jigsaw, router (optional), chisels, pry bar, shims, levels (2-foot and 4-foot), combination square, tape measure, nail set, wood filler, sandpaper, safety glasses, hearing protection, dust mask (P100 for sanding), NCCER Carpentry Level 1 and Level 4 modules (reference), student daily log | Instructor inspects each finish assembly using a trade-standard tolerance checklist: door/window reveal uniform within 1/8 inch on all sides, unit plumb within 1/8 inch over its full height, stair riser heights uniform within 3/16 inch of each other, cabinet doors/drawers operate without binding, trim joints tight (gap less than 1/16 inch visible at face). Student must pass every assembly before the portfolio is assembled. Daily logs must be complete through this phase. |
| 4 | Project Documentation, Portfolio Assembly, and Oral Defense Preparation | 36 | practice | Students compile a complete project portfolio—including as-built drawings, a finalized daily log, annotated photographs, a self-assessment, and a lessons-learned narrative—and rehearse a structured 20-minute oral defense presenting their work to peers and instructor. |
| Completed capstone structure (the physical build), camera or smartphone for final photographs, measuring tape for as-built documentation, graph paper or computer for as-built drawings, word processor or presentation software, printer or digital submission platform, instructor-provided portfolio guide and oral defense rubric, NCCER Carpentry module guides (Levels 1–4) for standards reference | Portfolio is scored on completeness (all required sections present), accuracy (as-builts match structure within 1/4 inch), and quality of written reflection (lessons-learned narrative addresses a real problem with a clear solution). Oral defense is scored on trade vocabulary, ability to answer panel questions about decisions made, and self-assessment accuracy. Portfolio must score 70% or higher overall; oral defense must score 70% or higher overall; any section of the defense scoring below 50% requires a second defense attempt within two weeks. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Finished Capstone Structure Inspection | Project | 60% | Student must earn 'Satisfactory' on all structural items and 80% or higher overall on the trade-quality inspection rubric, with no uncorrected safety violations present in the finished work. | The instructor conducts a final hands-on inspection of the completed structure, measuring dimensions against the approved plan, checking plumb and level on all finish assemblies, testing door and window operation, inspecting stair or cabinet quality, and confirming that all fastening, sheathing, and trim work meets the tolerances established in Lessons 2 and 3. The inspection directly mirrors the performance-task format used in NCCER Carpentry Level assessments. Meets specification · Within estimate · Workmanship · Safety · Documentation |
| Capstone Project Portfolio | Portfolio | 20% | Portfolio must score 70% or higher on the instructor scoring guide, with all required sections present and the as-built drawings accurate to within 1/4 inch of the physical structure. | The portfolio is a complete record of the student's build process, including the approved pre-construction package, daily logs, annotated sequential photographs, as-built drawings, a self-assessment against NCCER performance standards, and a lessons-learned narrative. It serves as a portable work sample that can be shown to NCCER assessors and prospective employers. Completeness · Organization · Evidence quality |
| Oral Defense Before Instructor Panel | Oral / panel | 20% | Student must score 70% or higher overall on the defense rubric, with no individual required section scoring below 50%; a second attempt is permitted within two weeks if the first attempt falls short. | In a 20-minute structured presentation followed by panel questions, the student explains and justifies every phase of the capstone build—design intent, safety decisions, trade techniques applied, quality outcomes, and professional takeaways—using accurate trade vocabulary and referencing NCCER performance standards and OSHA requirements as appropriate. The panel assesses both the quality of the presentation and the student's ability to respond to unscripted follow-up questions. Explains decisions · Answers technical questions · Professional communication |
Students complete 324 supervised hours at an approved construction employer site, applying carpentry skills learned in the classroom and lab to real production work under a journeyman or foreman mentor. Placement spans rough framing, finish work, or cabinetry/millwork depending on the host employer, giving students broad exposure to trade workflows, jobsite culture, and professional standards. Employer evaluations and a reflective log document growth against NCCER Carpentry competency areas and OSHA 10 safety practices.
OutcomesStudents complete 324 supervised hours at an approved construction employer site, applying carpentry skills learned in the classroom and lab to real production work under a journeyman or foreman mentor. Placement spans rough framing, finish work, or cabinetry/millwork depending on the host employer, giving students broad exposure to trade workflows, jobsite culture, and professional standards. Employer evaluations and a reflective log document growth against NCCER Carpentry competency areas and OSHA 10 safety practices.
How the course runs. 4 blocks: Externship Orientation and Site Induction; Weeks 1–6: Structured Productive Work — Rough and Structural Tasks; Weeks 7–14: Expanded Responsibilities — Finish, Trim, and Specialty Tasks; Week 15–16: Capstone Days, Final Evaluation, and Log Completion.
What competent looks like. Perform assigned carpentry tasks—framing, layout, finish, or cabinetry—to employer quality standards without direct supervision after an orientation period. Apply OSHA 10 hazard-recognition and PPE protocols consistently on a live jobsite, with zero recordable safety violations during the placement. Read and execute work from construction drawings, cut sheets, and verbal instructions provided by a journeyman or foreman mentor. Document daily work activities, materials used, tools operated, and safety observations in a structured worksite log that meets program completeness requirements. Demonstrate professional conduct—punctuality, communication, teamwork, and problem-solving—as rated satisfactory or above on the employer mid-term and final evaluation forms. Connect tasks performed on site to corresponding NCCER Carpentry Level 1–4 module competencies, articulating that connection in written reflections.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Externship Orientation and Site Induction | 16 | field | The student completes the employer's site-specific safety induction and program orientation requirements, confirming understanding of site rules, emergency procedures, mentor expectations, and log-keeping responsibilities before beginning productive work. |
| Employer site safety packet, program externship handbook, NCCER Carpentry Levels 1–4 module competency checklist, personal PPE (student-supplied or employer-issued per site policy), externship daily log forms (paper or approved digital template), pen/pencil. | Program coordinator reviews the completed log setup checklist and signed site induction forms within 48 hours of the first day; all fields must be complete and the employer safety acknowledgment signed before the student begins tool-operating tasks. Pass = 100% of required fields completed and signed. |
| 2 | Weeks 1–6: Structured Productive Work — Rough and Structural Tasks | 120 | field | The student performs assigned rough carpentry tasks—including layout, cutting, and fastening of framing members, sheathing, or formwork—under mentor supervision, meeting the employer's production and quality standards while maintaining consistent OSHA-compliant safety practice. |
| Employer-provided tools and materials appropriate to project scope (framing nailer, circular saw, tape measure, speed square, chalk line, hammer, fasteners, dimensional lumber, sheathing panels as assigned); NCCER Carpentry competency checklist; daily log forms; PPE. | Mentor completes the program's 6-week mid-term evaluation form, rating the student on task quality, safety compliance, communication, and initiative using a 1–4 scale. Pass = a score of 2 (meets expectations) or higher on every rated category, with no category left blank. Program coordinator reviews and countersigns within one week of submission. |
| 3 | Weeks 7–14: Expanded Responsibilities — Finish, Trim, and Specialty Tasks | 148 | field | The student takes on increased responsibility for finish carpentry, door and window installation, trim work, cabinetry, or stair work as available at the placement site, demonstrating improved independence, accuracy to tolerance, and self-correction of errors before mentor inspection. |
| Employer-provided finish tools and materials (miter saw, finish nailer, levels, clamps, shims, trim stock, door/window hardware, cabinet hardware as assigned); measuring and layout tools; daily log forms; NCCER Carpentry Levels 1–4 modules for reference; mid-placement reflection template. | Program coordinator reviews daily log entries weekly for completeness (minimum 5 entries per 5-day work week); any week with fewer than 4 complete entries requires a makeup reflection. Mid-placement written reflection is reviewed and must address both NCCER competency mapping and a self-identified skill gap; pass = reflection is substantive (not bullet points) and submitted on time. Running total of log entries must be on track to meet 324 total hours. |
| 4 | Week 15–16: Capstone Days, Final Evaluation, and Log Completion | 40 | field | The student completes the final hours of productive work, assembles and submits a complete worksite log portfolio, and participates in a final employer evaluation meeting that documents competency growth across the full placement. |
| Complete daily log binder or digital portfolio, program hour-tally and sign-off sheet, employer final evaluation form, student self-evaluation form, NCCER competency checklist (completed version), photo documentation if permitted by employer. | Program coordinator reviews the complete log portfolio for: (1) 324 total hours verified with employer signature, (2) daily logs present for at least 90% of scheduled workdays with substantive entries, (3) final employer evaluation submitted with a passing score (see assessments), (4) capstone task entry present and substantive. All four criteria must be met for the externship to be credited. Any missing hours must be made up before the certificate of completion is issued. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Employer Final Skills Evaluation | Skills demonstration | 70% | A rating of 2 (meets expectations) or higher on every scored category; no category may be left blank or scored below 2. A single category scored 1 (does not meet expectations) requires a documented remediation plan and a follow-up evaluation before the externship is credited. | The placement employer or mentor completes the program's standardized final evaluation form at the end of the placement, rating the student across categories that mirror NCCER Carpentry craft skill areas—layout and measurement, cutting and fastening, finish quality, blueprint/drawing use, tool selection and safe operation, worksite cleanup—as well as professional conduct items including attendance, punctuality, communication, teamwork, and safety compliance. Ratings use a 1–4 scale with defined behavioral anchors; the completed form is signed by the mentor and submitted to the program coordinator. Competency · Safety · Attendance · Conduct · Initiative |
| Worksite Log Portfolio | Log | 30% | Complete portfolio must document the full 324 hours with employer-verified hour tally; daily entries must be present for at least 90% of scheduled workdays; each entry must name tasks, tools, materials, a safety observation, and a mapped NCCER competency; the mid-placement reflection and capstone task entry must be substantive; the student self-evaluation must be completed and submitted. Any gap in hours or missing required sections is not passing until corrected. | The student submits a compiled portfolio of all daily externship log entries, the employer hour-tally sheet with employer signature, the mid-placement written reflection, the capstone task extended entry, the employer mid-term and final evaluation forms, and the completed student self-evaluation. The program coordinator reviews the portfolio against a completeness rubric to confirm that the record is honest, specific, and provides evidence that the student engaged with a genuine range of carpentry tasks and consistently applied OSHA 10 safety practices throughout the placement. Complete · Verified |
This course systematically reviews every domain tested on the NCCER Carpentry Levels 1–4 written assessments and the OSHA 10-Hour Outreach program, using spaced repetition, timed practice sets, and full-length mock exams to close individual knowledge gaps. Students analyze their own diagnostic results to focus study on weak areas, then sit two complete simulated credential exams under timed, proctored conditions. By the final session each student has a documented readiness profile and a clear understanding of the NCCER Registry submission process.
OutcomesThis course systematically reviews every domain tested on the NCCER Carpentry Levels 1–4 written assessments and the OSHA 10-Hour Outreach program, using spaced repetition, timed practice sets, and full-length mock exams to close individual knowledge gaps. Students analyze their own diagnostic results to focus study on weak areas, then sit two complete simulated credential exams under timed, proctored conditions. By the final session each student has a documented readiness profile and a clear understanding of the NCCER Registry submission process.
How the course runs. 4 blocks: Diagnostic Assessment & Domain Mapping; Targeted Domain Review: Trade Knowledge, Math & Blueprint Reading; OSHA 10 & Safety Standards Deep Review; Full-Length Mock Credential Exams & Readiness Debrief.
What competent looks like. Score at least 70% on each NCCER Carpentry module knowledge verification practice set covering Levels 1 through 4 content domains. Correctly answer OSHA 10 outreach program topic questions on hazard recognition, fall protection, electrical safety, struck-by and caught-in hazards, and workers' rights. Interpret blueprint symbols, dimension strings, and specification notes drawn from all four NCCER Carpentry levels without reference materials within exam time limits. Apply trade math—including area, volume, board-foot calculations, stair layout ratios, and roof pitch conversions—accurately on timed problem sets. Complete a full-length NCCER Carpentry mock exam and an OSHA 10 knowledge check under proctored, timed conditions and achieve passing scores. Describe the NCCER Registry credentialing process, including how to access transcripts and present credentials to employers.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Diagnostic Assessment & Domain Mapping | 10 | theory | Students identify their personal knowledge gaps across all NCCER Carpentry L1–4 content domains and the OSHA 10 topic areas by completing and self-scoring a diagnostic inventory, then build a prioritized individual study plan. |
| Printed diagnostic quiz (instructor-authored from NCCER module objectives), NCCER Carpentry Levels 1–4 Trainee Guides, NCCER Core Curriculum Trainee Guide, OSHA 10 outreach topic reference cards, domain tracking spreadsheet, pencils | Each student submits a completed domain tracking sheet and a written study plan; instructor reviews for realistic gap identification — pass requires all domains listed and at least three specific resource references cited. |
| 2 | Targeted Domain Review: Trade Knowledge, Math & Blueprint Reading | 30 | theory | Students accurately recall and apply carpentry trade knowledge, trade math, and blueprint-reading skills from NCCER Carpentry Levels 1–4 content at or above the 70% threshold on end-of-lesson practice sets for each domain reviewed. |
| NCCER Carpentry Levels 1–4 Trainee Guides, printed station practice sets, trade math sprint worksheet, two sample construction drawings (residential floor plan and wall section), architect's scale, pencils, calculators | Score of 70% or higher on each station's 10-question practice set and on the trade math sprint; students who score below 70% on any set complete a targeted re-study assignment and retest before the next lesson. |
| 3 | OSHA 10 & Safety Standards Deep Review | 20 | theory | Students correctly identify the OSHA 10-Hour Outreach topic areas applicable to construction — including fall protection, electrical safety, struck-by and caught-in/between hazards, scaffolding, personal protective equipment, and workers' rights — and select appropriate hazard controls on timed practice questions. |
| OSHA 10-Hour Construction Outreach topic reference cards, OSHA.gov construction eTool printouts, scenario photo cards and tabletop scenario description cards, 50-question OSHA practice set, answer key, pencils | Score of 70% or higher on the 50-question OSHA 10 practice set; students who score below 70% must complete instructor-assigned focused review of missed topic areas and retest before the final mock exam. |
| 4 | Full-Length Mock Credential Exams & Readiness Debrief | 30 | lab | Students complete a full-length simulated NCCER Carpentry written assessment and an OSHA 10 knowledge check under timed, proctored conditions, then analyze results to confirm readiness and complete the NCCER Registry credential process overview. |
| Full-length NCCER Carpentry mock exam packet (L1–4, instructor-authored from module objectives), OSHA 10 mock knowledge-check packet, answer keys, personal debrief form, NCCER Registry access guide, pencils, a clock or timer visible to all students | Achieving 70% or higher on the NCCER Carpentry mock exam overall and on the OSHA 10 mock knowledge check; students who do not meet 70% on either exam receive a written remediation plan specifying topics and resources before sitting the actual credentialing assessments. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Dual Mock Credential Examination | Mock certification exam | 100% | 70% or higher on the NCCER Carpentry Levels 1–4 mock written assessment AND 70% or higher on the OSHA 10 construction knowledge check, both completed under timed, proctored, closed-book conditions | Students sit back-to-back simulated versions of the NCCER Carpentry written assessments (covering all Level 1–4 module content domains) and the OSHA 10-Hour Outreach knowledge check under conditions that replicate the actual credentialing exams; scored results are returned with a domain breakdown so the instructor and student can confirm readiness or assign targeted remediation before the student registers for the official NCCER and OSHA Outreach assessments. Score · Time management |
Students sit the NCCER Carpentry Level 1–4 written knowledge exams and performance profiles administered through an NCCER-accredited training sponsor, and the OSHA 10-Hour Construction Outreach training delivered by an OSHA-authorized trainer, earning a completion card upon finishing that course. Pass standard: Credential issued by the body.
Back to Carpentry · How the school gets authority to award these credentials
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.