Flashing: Valleys, Step Flashing, and Pipe Boots

Objective. Students will cut and install open or closed valley flashing, step flashing at a wall-to-roof intersection, and a pipe boot at a mock penetration so that all laps shed water correctly.

What Flashing Does and Why It Matters

Flashing is sheet metal or formed rubber placed at every point where a roof plane meets a wall, a valley, or a penetration. Water always runs downhill and sideways under wind pressure, so any joint that is not protected by properly lapped flashing will eventually leak. No amount of sealant makes up for a flashing piece that is installed backwards or missing entirely. The goal is to create overlapping layers that force water to stay on the surface of the roof system and drain off the eave.

Valley Flashing

A valley is the internal angle where two sloping roof planes meet. Valleys concentrate large volumes of water, so they require one of two methods.

Open valley uses W-metal (a pre-formed metal strip with a raised center rib) or smooth valley metal laid over the underlayment before shingles are applied. Shingles on each side are cut back several inches from the centerline, leaving the metal exposed. The raised rib prevents water from one plane from shooting across into the other. Metal pieces must be lapped at least 6 inches in the direction of water flow, with the upper piece over the lower piece — never the reverse.

Closed or woven valley uses shingles lapped across the valley; metal or modified-bitumen strip is still installed beneath. Even in a closed valley, the underlayment flashing layer must be correct.

When cutting valley metal, use aviation snips. Wear cut-resistant gloves and safety glasses — fresh-cut sheet metal edges are razor-sharp. Keep fingers curled away from the blade at all times.

Step Flashing at a Wall-to-Roof Intersection

Where a sloping roof meets a vertical wall — such as at a dormer or a second-story wall — step flashing is used. Each piece is an L-shaped rectangle of galvanized steel or aluminum bent to 90 degrees. One leg lies flat on the roof deck; the other turns up against the wall sheathing.

The installation sequence is critical:

1. Apply one shingle course.

2. Slide one step flashing piece on top of that course so its bottom edge aligns with the bottom edge of the shingle, and its uphill edge is hidden under the next course.

3. Nail the flashing to the roof deck only — never nail through both legs, and do not nail it to the wall, because thermal movement and building settling will crack or loosen a rigidly nailed flashing.

4. Apply the next shingle course over the flashing.

5. Repeat, so every shingle has its own flashing piece.

Each piece must overlap the one below it by at least 2 inches so no gap is exposed between pieces. The wall cladding (siding, stucco, or brick) goes on afterward and overlaps the vertical leg, forming a second line of defense. Never substitute a continuous strip of bent metal for individual step flashing pieces — it cannot move with the building and will crack.

Bending step flashing on a hand brake: mark the bend line with a scribe, align the line with the brake's jaw edge, clamp, and push the leaf up firmly to 90 degrees. Check the angle with a small square before releasing. If bending by hand with a seamer, grip the stock tightly, work in short movements, and verify the angle each time.

Pipe Boot Installation

A pipe boot (also called a pipe flashing or pipe collar) seals the gap around a pipe or vent stack that penetrates the roof deck. Most modern boots are pre-formed with a rubber cone that compresses around the pipe and a metal or plastic flange that integrates with the shingles.

Installation steps:

1. Slide the boot over the pipe and press the flange flat onto the roof deck.

2. The downhill flange goes over the shingles below it so water runs onto the shingle — not under it.

3. The uphill and side flanges go under the shingles above and beside it.

4. Cut the field shingles carefully around the pipe with a utility knife or snips. A tight fit is better than a wide gap.

5. Apply roofing sealant only where the manufacturer's instructions specify — typically along the top edge of the uphill flange where it tucks under shingles, and around the pipe collar itself. Do not caulk the entire perimeter of the flange as a substitute for proper lapping; caulk eventually fails and hides an improperly installed boot.

Pipe boots have a maximum pipe diameter rating printed on them. Match the boot size to the pipe — forcing an undersized boot creates gaps, and a boot too large will not seal.

Safety Rules for This Lab

The Spray Test

After installation, your instructor will spray water at every joint with a spray bottle held 6 to 12 inches away. Watch the back side of the mockup for any drips. A passing installation shows zero water intrusion at any flashing joint. If water appears, identify which lap is incorrect before re-doing the affected section.

Key terms8

Open valleyA valley treatment where W-metal or smooth valley flashing is left exposed after shingles are cut back from the centerline, allowing water to run freely down the metal.
W-metalPre-formed valley flashing with a raised center rib that separates water flow from each roof plane and prevents water from shooting across the valley.
Step flashingIndividual L-shaped pieces of sheet metal installed alternately with shingle courses at a wall-to-roof intersection, with one leg on the deck and one leg against the wall.
Pipe bootA pre-formed flashing assembly with a rubber collar that seals around a penetrating pipe and a flange that integrates with surrounding shingles.
LapThe amount by which an upper flashing or shingle piece overlaps the piece below it; correct lap direction always sheds water outward and downhill.
Aviation snipsCutting shears designed for sheet metal, available in straight-cut, left-cut, and right-cut styles; left-cut and right-cut snips are color-coded red and green respectively.
Hand seamerA flat-jawed sheet-metal tool used to grip and bend flashing stock along a marked line when a full bending brake is not available.
Roofing sealantA flexible, weather-resistant compound applied in targeted locations specified by the manufacturer to supplement — not replace — proper mechanical lapping of flashing pieces.

Worked examples4

1. A wall-to-roof intersection is 6 feet long with a roof pitch that places shingle courses every 5 inches of exposure. How many individual step flashing pieces are needed?
  1. Convert the wall length to inches: 6 ft × 12 = 72 inches.
  2. Divide total length by shingle exposure: 72 ÷ 5 = 14.4.
  3. Round up to a whole number because each course must have its own piece: 14.4 → 15 pieces.
  4. Add 1 piece for the starter/bottom position at the eave end: 15 + 1 = 16 pieces.
Answer: 16 step flashing pieces are needed for a 6-foot wall intersection with 5-inch shingle exposure.
2. Valley metal comes in 10-foot lengths. You need to cover a valley that measures 14 feet 6 inches from ridge to eave. Each upper piece must overlap the lower piece by 6 inches. How many pieces do you need, and what length do you cut the second piece?
  1. Convert the valley length to inches: 14 ft 6 in = (14 × 12) + 6 = 174 inches.
  2. First piece: 10 ft = 120 inches, installed at the eave end.
  3. Remaining length after the first piece: 174 − 120 = 54 inches.
  4. The second piece must cover the remaining 54 inches plus extend 6 inches under the first piece for the lap — but the lap is on top of (uphill from) the first piece, so the second piece needs to be 54 + 6 = 60 inches long.
  5. Convert 60 inches back to feet and inches: 60 ÷ 12 = 5 feet 0 inches.
  6. Two pieces total: one full 10-foot piece at the bottom, one 5-foot piece at the top lapping 6 inches over the first piece.
Answer: Two pieces: a full 10-foot piece at the eave and a 5-foot piece at the ridge, lapped 6 inches.
3. Each step flashing piece must be 4 inches wide on the roof deck leg and 4 inches tall on the wall leg, with a minimum 2-inch overlap between pieces along the slope. If you are cutting pieces from a flat sheet that is 48 inches wide, how many pieces can you get from one row across the 48-inch width if each flat blank (before bending) is 8 inches wide?
  1. Each piece requires 4 inches (deck leg) + 4 inches (wall leg) = 8 inches of flat stock width before bending.
  2. Number of pieces per row: 48 ÷ 8 = 6 pieces.
  3. No remainder, so exactly 6 pieces can be cut from one row across the 48-inch sheet width.
Answer: 6 step flashing blanks per row across a 48-inch-wide sheet.
4. A step flashing piece is supposed to be 8 inches long (along the slope). You measured the first five pieces your partner cut and got these lengths in inches: 7.75, 8.0, 8.25, 7.75, 8.0. What is the average length, and are all pieces within a 1/4-inch tolerance of the 8-inch target?
  1. Add all measurements: 7.75 + 8.0 + 8.25 + 7.75 + 8.0 = 39.75 inches.
  2. Divide by the number of pieces: 39.75 ÷ 5 = 7.95 inches average.
  3. Check each piece against the tolerance range: 8.0 − 0.25 = 7.75 inches (minimum); 8.0 + 0.25 = 8.25 inches (maximum).
  4. Piece 1: 7.75 — exactly at minimum, passes. Piece 2: 8.0 — passes. Piece 3: 8.25 — exactly at maximum, passes. Piece 4: 7.75 — passes. Piece 5: 8.0 — passes.
  5. All five pieces fall within the 7.75–8.25 inch tolerance range.
Answer: Average length is 7.95 inches; all five pieces are within the 1/4-inch tolerance and pass inspection.

The math in this lesson2

Learners count step-flashing pieces at 5 in exposure, valley-metal lengths with overlap, and average cut lengths.
N-Q.1S-ID.2
Brush up in the math halls at newSchoolWorks.com:
In class: On a flat bench mockup, practice bending step flashing pieces to a 90-degree angle with sheet-metal benders or by hand on a bending brake, cutting to required length; instructor checks first five pieces before installation begins. · Install step flashing alternating with shingle courses on the practice wall-roof intersection section, verifying that each piece is seated under the shingle above and against the wall sheathing. · Install a pre-formed pipe boot over a mock pipe penetration, cutting the shingle saddle, seating the boot flange under uphill shingles and over downhill shingles, and applying appropriate roofing sealant per manufacturer instructions.
Materials: Galvanized or aluminum step flashing (pre-cut and flat stock), valley flashing (W-metal or modified-bitumen roll), pipe boot (pre-formed rubber), sheet-metal hand seamer, aviation snips, roofing sealant, caulk gun, nails/screws, tape measure, safety glasses; NCCER flashing section; manufacturer specs
Check: Instructor conducts a simulated water test (spray bottle at joints) and checks lap directions; zero water intrusion at any flashing joint to pass; roofing sealant applied only where specified (no over-caulking masking improper laps).

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

Roofing installation — flashing
1. During a spray test, water appears on the back of the mockup at the step flashing section. What is the most likely cause?
Roofing installation — flashing
2. Why must step flashing pieces be nailed to the roof deck only, and NOT also nailed firmly to the wall sheathing?
Roofing installation — penetration flashing
3. When installing a pre-formed pipe boot, which portion of the flange must go OVER (on top of) the shingles?
Roofing systems — valley flashing
4. What is the function of the raised center rib on W-metal valley flashing?
Roofing installation — quality and inspection
5. A carpenter applies a continuous bead of roofing sealant all the way around the perimeter of a pipe boot flange instead of only where the manufacturer specifies. What is the primary problem with this practice?
OSHA safety — PPE
6. Which PPE is most critical when cutting sheet metal valley flashing with aviation snips?
Roofing systems — valley flashing
7. On an open valley, valley metal pieces are lapped at a joint. Which orientation is correct?
NCCER Carpentry — roofing and flashing
8. An NCCER Carpentry module requires that step flashing be installed so each piece is concealed by the shingle course above. A student installs every third course without a flashing piece to save material. Why does this fail the NCCER standard?
Record this lesson on my transcript. Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.