Objective. Students hang a run of three wall cabinets and set two base cabinets so that every unit is plumb and level within 1/8 inch over its full height and width, all gaps between adjacent cabinets are filled with filler strips or scribed to the wall.
Installing cabinets correctly means every box must be plumb (perfectly vertical) and level (perfectly horizontal) within 1/8 inch over its full height and width. Walls and floors are rarely flat or square, so shimming, scribing, and careful layout are what separate a professional installation from a callback.
Wear safety glasses at all times during drilling and nailing. Wear hearing protection when using the finish nailer or any power tool in an enclosed space. Wall cabinets are heavy — a full run can exceed 150 pounds — so never attempt to hold a cabinet overhead alone. Use a cabinet jack or a temporary ledger board to support the cabinet while both hands are free to drive screws. Keep the work area clear of debris that could cause a trip or fall while you are carrying or lifting. If you are drilling into an existing wall, verify there are no hidden wires or pipes by checking both sides of the wall before drilling.
Before any cabinet goes up, you need a level reference line on the wall. In the previous lesson you found the high point of the floor. From that point, measure up the standard base-cabinet height (typically 34-1/2 inches for the cabinet box, which puts the finished countertop at about 36 inches with a 1-1/2-inch countertop). Mark this as your base-cabinet top line. For wall cabinets, add the countertop thickness, then the required clearance (commonly 18 inches above countertop), and snap a chalk line at the bottom of the wall-cabinet run. This horizontal line is your ledger line — every wall cabinet bottom aligns to it.
Step 1 — Locate and mark studs. Use a stud finder and mark stud centers with a pencil above and below where the cabinet rail will land. Studs are typically 16 inches on center. Your screws must hit solid framing, not just drywall.
Step 2 — Set up support. Attach a temporary ledger board — a straight piece of scrap lumber — along the chalk line with drywall screws into studs. The ledger carries the weight of the cabinet while you fasten it. Alternatively, use a cabinet jack adjusted to the ledger height.
Step 3 — Hang the first cabinet. Set the first cabinet (usually the corner unit or the cabinet that starts the run) on the ledger. Pre-drill through the hanging rail inside the cabinet into the studs. Drive 3-inch cabinet screws — long enough to penetrate the stud at least 1-1/2 inches after passing through the rail and wall material. Check plumb side-to-side with your 4-foot level. Shim behind the hanging rail if the wall is out of plumb.
Step 4 — Hang adjacent cabinets. Rest the second cabinet on the ledger beside the first. Clamp the two stiles (vertical face-frame members) tightly together so the faces are flush. Drill a pilot hole and drive cabinet screws through the stile of one cabinet into the stile of the next — this is called face-frame fastening. Check level across both cabinet bottoms; shim the hanging rail if needed. Hang the third cabinet the same way. Only after all three are clamped, aligned, and level should you fully tighten every screw.
Step 5 — Remove the ledger. Once all wall cabinets are secured, remove the ledger board and patch the screw holes.
Base cabinets sit on the floor, so any variation in floor height must be corrected with shims.
Step 1 — Start from the high point. Set the first base cabinet at the floor's high point identified in your layout lesson. This cabinet needs the least shimming and becomes the reference for all others.
Step 2 — Check plumb and level. Place your 4-foot level on the top of the cabinet, checking front-to-back and side-to-side. Slide wood or composite shims under the cabinet base until both readings show level. Then hold the level against the face frame and check plumb. Shims can also go between the cabinet and the wall at the back if the wall pushes the top out of plumb.
Step 3 — Fasten to the wall. Once level and plumb, drive cabinet screws through the hanging rail at the back of the cabinet into wall studs.
Step 4 — Set the adjacent base cabinet. Slide the next cabinet into position, shim as needed so its top is level with the first, clamp the stiles, and fasten them together. Repeat for all base units.
When the end of a cabinet run meets a wall, there is often a gap because walls are not perfectly flat or the run length does not divide evenly into standard cabinet widths. A filler strip — a solid-wood piece milled to match the face-frame species, commonly poplar or select pine — fills this gap. Measure the gap at the top and bottom (it may not be equal). Rip the filler strip to the widest measurement, then use a compass or scribe tool to transfer the wall's irregular profile onto the strip. Cut along the scribed line with a jigsaw or coping saw. The scribed edge fits tightly against the wall; the factory edge aligns with the cabinet stile. Secure with finish nails or clamps and wood glue. From the front of the run, no gap should be visible.
Use your 4-foot level at four points on each cabinet: top left, top right, bottom left, bottom right. Deviation must not exceed 1/8 inch across the full height or width of the unit. Run your fingertip along every joint between adjacent cabinets — you should feel no step and see no gap wider than 1/32 inch. A well-installed run looks like one continuous piece of furniture.
Answer each question, then check it. Nothing is recorded; this is your own practice.