Underlayment, Drip Edge, and Ice-and-Water Barrier

Objective. Students will install drip edge, ice-and-water barrier at eaves and valleys, and synthetic or felt underlayment in the correct sequence with code-compliant laps.

Why Sequencing Matters

Roofing layers work together as a drainage plane: each layer sheds water onto the layer below and away from the structure. Installing them in the wrong order—or skipping one—creates a path for water to travel backward under a layer and into the sheathing or framing. The correct sequence at the eave is: drip edge first, then ice-and-water barrier, then underlayment. At the rake, the sequence reverses: underlayment goes down first, then rake drip edge on top. Understanding why each step occurs when it does is just as important as performing it correctly.

Drip Edge

Drip edge is a pre-formed metal flashing—typically galvanized steel or aluminum—installed along the eaves and rakes of a roof. Its job is to direct water away from the fascia and into the gutter or away from the wall below. Two common profiles exist: the L-shaped eave drip edge and the T-shaped or hemmed rake drip edge; always follow the manufacturer's specification for the profile required at each location.

At the eave, drip edge is nailed to the decking before any membrane or underlayment is installed. This allows the ice-and-water barrier to lap over the top of the drip edge, so any water that works under the shingles drains over the metal and into the gutter rather than behind it.

At the rake, drip edge is installed after the underlayment. The underlayment tucks under the rake drip edge, so wind-driven rain that gets under the edge drip is caught by the underlayment rather than reaching bare sheathing.

When cutting drip edge at corners, use tin snips to miter the return so pieces nest tightly together. Any gap wider than 1/4 inch at a joint can admit water and debris—keep joints tight. Fasten drip edge with roofing nails or staples per the manufacturer's instructions, typically near the top edge at regular intervals.

Ice-and-Water Barrier

Ice-and-water barrier (also called self-adhering membrane or peel-and-stick) is a rubberized asphalt sheet with a self-sealing surface that bonds around fasteners. It protects against two specific hazards: ice damming at the eave and wind-driven rain at valleys and other vulnerable areas.

An ice dam forms when heat from the conditioned space melts snow on the roof; the meltwater runs down to the cold eave, refreezes, and backs up under shingles. Standard felt or synthetic underlayment is not waterproof—it will shed bulk water but will allow slow-moving backed-up water to wick through. Ice-and-water barrier is fully waterproof and seals around nails, so even if water backs up beneath it, it cannot penetrate to the sheathing.

Local building codes specify the minimum coverage distance up from the eave—commonly to a point at least 24 inches inside the interior wall line, but always verify the requirement in your jurisdiction's adopted code. Valleys are also a required location in most codes. Install barrier by removing the release liner in sections so the membrane does not curl or wrinkle. Press firmly from the center outward to eliminate air pockets.

Underlayment

Underlayment is the secondary weather barrier that covers the rest of the deck above the ice-and-water barrier. Two types are in common use:

Underlayment is installed in horizontal courses, starting at the eave and working up toward the ridge. Each course overlaps the one below it—the horizontal (side) lap sheds bulk water downward. Courses also overlap each other at the ends—the vertical (end) lap—to prevent a straight path for wind-driven water. Mark lap lines with a chalk line before unrolling so you can verify correct overlap before fastening. After fastening, check every lap with a tape measure. Any short lap must be corrected before laying the next course.

Cap staples or roofing nails through plastic caps hold the underlayment flat and resist wind uplift. Space fasteners per the manufacturer's instructions.

Safety

Work on any slope above ground requires fall protection. Before stepping onto any roof section, confirm your personal fall-arrest system (PFAS)—harness, lanyard, and anchor—is rigged to a certified anchor point rated for fall arrest. Inspect the harness for cuts, worn stitching, and damaged hardware before each use; never use a harness that has arrested a fall.

Keep the deck clear of scrap membrane, paper backing, and cut metal to prevent slipping. Tin snips and utility knife blades are sharp—cut away from your body, and replace dull blades before they require extra force. When using a roofing nailer or cap stapler, keep hands clear of the muzzle, and engage the safety mechanism whenever you set the tool down. Wear safety glasses and gloves when cutting metal drip edge, as cut edges are razor-sharp.

The Installation Sequence at a Glance

1. Eave drip edge → nailed to bare decking

2. Ice-and-water barrier → laps over eave drip edge

3. Underlayment → laps over ice-and-water barrier, courses run up the slope

4. Rake drip edge → installed on top of underlayment at rake edges

Key terms9

Drip edgePre-formed metal flashing installed along eaves and rakes to direct water away from the fascia and roof deck edge.
Ice-and-water barrierSelf-adhering rubberized asphalt membrane that is fully waterproof and self-seals around fasteners; used at eaves, valleys, and other leak-prone areas to resist ice damming and wind-driven rain.
Ice damA ridge of ice that forms at the eave when meltwater from higher on the roof refreezes, causing water to back up under shingles.
UnderlaymentThe secondary weather-resistant sheet material (felt or synthetic) installed over the roof deck and under finish shingles or panels.
Horizontal (side) lapThe overlap where a higher course of underlayment covers the top edge of the course below, shedding water downward.
Vertical (end) lapThe overlap where the end of one underlayment sheet covers the beginning of the next sheet in the same course, preventing a straight gap for wind-driven water.
Drainage planeThe layered system of materials that guides water down and away from a structure at every surface; proper sequencing of layers is essential to its function.
Personal fall-arrest system (PFAS)A combination of full-body harness, connecting lanyard or rope grab, and certified anchor point that stops a worker's fall before contact with a lower level.
Cap staple / cap nailA fastener with a broad plastic or metal washer-shaped cap that distributes holding force over a wider area of underlayment, preventing the material from tearing through.

Worked examples4

1. A synthetic underlayment manufacturer requires a minimum 4-inch horizontal (side) lap. Your chalk line marks are spaced 32 inches apart (measuring the exposed face). The roll is 48 inches wide. What is the resulting lap, and does it meet the requirement?
  1. Identify the roll width: 48 inches.
  2. Identify the exposed face (distance between chalk lines): 32 inches.
  3. Lap = roll width − exposed face = 48 − 32 = 16 inches.
  4. Compare to the minimum required lap: 16 inches ≥ 4 inches.
Answer: The lap is 16 inches, which exceeds the 4-inch minimum. The installation passes.
2. You are installing underlayment on a roof with a horizontal run of 22 feet from eave to ridge. Your underlayment rolls are 48 inches (4 feet) wide and require a 4-inch horizontal lap. How many full courses are needed to cover the slope, and how much does the last course extend past the ridge?
  1. Find the net coverage per course: 48 inches − 4 inches = 44 inches = 3.667 feet.
  2. Divide the total run by net coverage: 22 ÷ 3.667 = 5.99, so 6 courses are needed.
  3. Calculate total coverage of 6 courses: 6 × 3.667 = 22.0 feet (the sixth course just reaches and covers the ridge with no significant overhang, meaning you trim flush or wrap slightly over the ridge).
  4. Verify: 5 full net courses cover 5 × 3.667 = 18.33 feet; the sixth course starts at 18.33 feet and its top edge reaches 18.33 + 4 ft = 22.33 feet, extending about 4 inches past the ridge.
Answer: Six courses are required. The sixth course extends approximately 4 inches past the ridge line; trim or fold as directed by the manufacturer or code.
3. Drip edge comes in 10-foot lengths. An eave measures 36 feet 6 inches. How many full lengths are needed, and how many inches of drip edge remain after cutting the last piece to fit?
  1. Convert eave length to inches: 36 feet 6 inches = (36 × 12) + 6 = 432 + 6 = 438 inches.
  2. Convert one drip edge length to inches: 10 feet = 120 inches.
  3. Divide: 438 ÷ 120 = 3.65, so 4 lengths are needed.
  4. Calculate the cut piece length needed: 438 − (3 × 120) = 438 − 360 = 78 inches.
  5. Remainder left over from the fourth piece: 120 − 78 = 42 inches.
Answer: Four 10-foot lengths are needed. After cutting the last piece to 78 inches (6 feet 6 inches), 42 inches (3 feet 6 inches) remain.
4. You are checking a completed underlayment installation. You measure a horizontal lap and find it is 3 inches. The manufacturer requires a minimum 4-inch lap. How much additional underlayment must the upper course be shifted down to achieve exactly the minimum lap?
  1. Required lap: 4 inches.
  2. Existing lap: 3 inches.
  3. Shortfall: 4 − 3 = 1 inch.
  4. The upper course must be pulled down 1 inch so its bottom edge overlaps the lower course by 4 inches.
Answer: The upper course must be shifted down 1 inch. If the course is already fastened, it must be removed and re-installed; a short lap is not acceptable and cannot be patched over with the next course.

The math in this lesson1

Learners count underlayment courses with 4 in laps over a 22 ft run and drip-edge lengths for a 36 ft 6 in eave.
N-Q.1
Brush up in the math halls at newSchoolWorks.com:
In class: Instructor demonstrates the installation sequence (drip edge → ice-and-water → felt/synthetic) on the practice roof section while narrating the reason for each step; students record the sequence in their field notebooks. · Students install drip edge on the eave and rake of an assigned roof section, cutting corners and mitering returns, then staple or nail per manufacturer instructions. · Roll out and fasten underlayment in teams, measuring and marking lap lines (horizontal and vertical) before unrolling, then check laps with a tape measure and correct any short laps before the next course.
Materials: Galvanized drip edge (eave and rake profiles), ice-and-water barrier, synthetic underlayment rolls, cap stapler or roofing nailer, tin snips, tape measure, chalk line, utility knife, fall-arrest equipment; manufacturer installation guide; local building code excerpt on underlayment
Check: Instructor verifies installation sequence is correct; all lap dimensions measured against manufacturer minimums—zero under-lapped joints to pass; drip edge corners inspected for tight fit with no gaps wider than 1/4 inch.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

NCCER Carpentry - Roofing
1. At the eave of a residential roof, which is the correct installation sequence?
NCCER Carpentry - Roofing
2. At the rake edge of a roof, where is the rake drip edge installed relative to the underlayment?
NCCER Carpentry - Roofing
3. What is the PRIMARY purpose of ice-and-water barrier at the eave?
NCCER Carpentry - Roofing
4. A carpenter measures a horizontal (side) lap on a newly installed underlayment course and finds it is 2 inches. The manufacturer requires a minimum 4-inch lap. What is the correct action?
NCCER Carpentry - Roofing
5. Which fastener type is specifically designed to prevent underlayment from tearing through when exposed to wind?
NCCER Carpentry - Roofing
6. What is the maximum allowable gap at a drip edge corner joint according to the lesson's pass/fail check?
OSHA 10 - Fall Protection
7. Before stepping onto a roof deck to install underlayment, a worker must:
NCCER Carpentry - Roofing
8. A synthetic underlayment roll is 48 inches wide and requires a 6-inch horizontal lap. What is the net vertical coverage (exposed face) per course?