9 courses · 900 clock hours · 6 mo full-time. Grading is competency-based: each course requires the written exam, a competent skills demonstration with zero safety faults, a signed log, and a passed safety audit; percentage weights only rank performance above the competency floor.
Shared first block for every VoTechWorks program. OSHA 10 (30 for construction management), first aid/CPR/AED, applied trade math and measurement, technical reading and writing, digital literacy, and career readiness. Completed before students enter the fabrication bay and machine floor unsupervised.
Outcomes| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| OSHA 10 and first-aid written exams | Written exam | 25% | OSHA card issued; CPR/AED card issued | Authorized outreach trainer exam plus AHA/Red Cross skills check. Accuracy · Safety · Communication · Professionalism |
| Applied math & measurement exam | Written exam | 25% | 70% | Timed exam: conversions, layout math, estimating from a drawing or recipe/order. Accuracy · Safety · Communication · Professionalism |
| Technical report | Project | 25% | Rubric ≥ 3 of 4 on every criterion | A written report on a real task from the trade: problem, standard, method, result. Accuracy · Safety · Communication · Professionalism |
| Employer panel interview | Oral / panel | 25% | Panel pass | Resume, 3-minute portfolio walk-through, and interview with two employer advisors. Accuracy · Safety · Communication · Professionalism |
Competency course in Molds for the Fiberglass / Composites (boatbuilding) program. Instruction moves from demonstration to supervised practice to independent performance in the fabrication bay and machine floor, measured against the print, tolerances and shop standards. Students set up, produce and measure real work in Molds and keep a production log signed off by the instructor.
Outcomes| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Molds: written exam | Written exam | 25% | 75% | Theory, terminology, standards and safety for Molds. Multiple choice plus short calculation/interpretation items drawn from the certification body's task list. Standard met · Safety · Time · Quality/finish · Documentation |
| Molds: skills demonstration | Skills demonstration | 45% | Competent on every critical step; zero safety faults | Observed, timed performance of the core tasks of Molds against a checklist. A critical-step miss or a safety fault stops the assessment; re-attempt after remediation. Standard met · Safety · Time · Quality/finish · Documentation |
| Molds: production log | Log | 15% | Complete, signed, ≥ 90% attendance of lab hours | Daily entries: task, standard, method, result, time; instructor sign-off. Serves as hours evidence for the licensing/certifying body. Standard met · Safety · Time · Quality/finish · Documentation |
| Molds: safety audit | Safety audit | 15% | Pass/fail — must pass | Unannounced audit of PPE, housekeeping, lockout/guarding, and hazard communication while performing Molds work. Standard met · Safety · Time · Quality/finish · Documentation |
Competency course in layup for the Fiberglass / Composites (boatbuilding) program. Instruction moves from demonstration to supervised practice to independent performance in the fabrication bay and machine floor, measured against the print, tolerances and shop standards. Students set up, produce and measure real work in layup and keep a production log signed off by the instructor.
Outcomes| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Layup: written exam | Written exam | 25% | 75% | Theory, terminology, standards and safety for layup. Multiple choice plus short calculation/interpretation items drawn from the certification body's task list. Standard met · Safety · Time · Quality/finish · Documentation |
| Layup: skills demonstration | Skills demonstration | 45% | Competent on every critical step; zero safety faults | Observed, timed performance of the core tasks of layup against a checklist. A critical-step miss or a safety fault stops the assessment; re-attempt after remediation. Standard met · Safety · Time · Quality/finish · Documentation |
| Layup: production log | Log | 15% | Complete, signed, ≥ 90% attendance of lab hours | Daily entries: task, standard, method, result, time; instructor sign-off. Serves as hours evidence for the licensing/certifying body. Standard met · Safety · Time · Quality/finish · Documentation |
| Layup: safety audit | Safety audit | 15% | Pass/fail — must pass | Unannounced audit of PPE, housekeeping, lockout/guarding, and hazard communication while performing layup work. Standard met · Safety · Time · Quality/finish · Documentation |
Competency course in vacuum infusion for the Fiberglass / Composites (boatbuilding) program. Instruction moves from demonstration to supervised practice to independent performance in the fabrication bay and machine floor, measured against the print, tolerances and shop standards. Students set up, produce and measure real work in vacuum infusion and keep a production log signed off by the instructor.
Outcomes| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Vacuum infusion: written exam | Written exam | 25% | 75% | Theory, terminology, standards and safety for vacuum infusion. Multiple choice plus short calculation/interpretation items drawn from the certification body's task list. Standard met · Safety · Time · Quality/finish · Documentation |
| Vacuum infusion: skills demonstration | Skills demonstration | 45% | Competent on every critical step; zero safety faults | Observed, timed performance of the core tasks of vacuum infusion against a checklist. A critical-step miss or a safety fault stops the assessment; re-attempt after remediation. Standard met · Safety · Time · Quality/finish · Documentation |
| Vacuum infusion: production log | Log | 15% | Complete, signed, ≥ 90% attendance of lab hours | Daily entries: task, standard, method, result, time; instructor sign-off. Serves as hours evidence for the licensing/certifying body. Standard met · Safety · Time · Quality/finish · Documentation |
| Vacuum infusion: safety audit | Safety audit | 15% | Pass/fail — must pass | Unannounced audit of PPE, housekeeping, lockout/guarding, and hazard communication while performing vacuum infusion work. Standard met · Safety · Time · Quality/finish · Documentation |
Competency course in gelcoat for the Fiberglass / Composites (boatbuilding) program. Instruction moves from demonstration to supervised practice to independent performance in the fabrication bay and machine floor, measured against the print, tolerances and shop standards. Students set up, produce and measure real work in gelcoat and keep a production log signed off by the instructor.
Outcomes| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Gelcoat: written exam | Written exam | 25% | 75% | Theory, terminology, standards and safety for gelcoat. Multiple choice plus short calculation/interpretation items drawn from the certification body's task list. Standard met · Safety · Time · Quality/finish · Documentation |
| Gelcoat: skills demonstration | Skills demonstration | 45% | Competent on every critical step; zero safety faults | Observed, timed performance of the core tasks of gelcoat against a checklist. A critical-step miss or a safety fault stops the assessment; re-attempt after remediation. Standard met · Safety · Time · Quality/finish · Documentation |
| Gelcoat: production log | Log | 15% | Complete, signed, ≥ 90% attendance of lab hours | Daily entries: task, standard, method, result, time; instructor sign-off. Serves as hours evidence for the licensing/certifying body. Standard met · Safety · Time · Quality/finish · Documentation |
| Gelcoat: safety audit | Safety audit | 15% | Pass/fail — must pass | Unannounced audit of PPE, housekeeping, lockout/guarding, and hazard communication while performing gelcoat work. Standard met · Safety · Time · Quality/finish · Documentation |
Competency course in repair for the Fiberglass / Composites (boatbuilding) program. Instruction moves from demonstration to supervised practice to independent performance in the fabrication bay and machine floor, measured against the print, tolerances and shop standards. Students set up, produce and measure real work in repair and keep a production log signed off by the instructor.
Outcomes| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Repair: written exam | Written exam | 25% | 75% | Theory, terminology, standards and safety for repair. Multiple choice plus short calculation/interpretation items drawn from the certification body's task list. Standard met · Safety · Time · Quality/finish · Documentation |
| Repair: skills demonstration | Skills demonstration | 45% | Competent on every critical step; zero safety faults | Observed, timed performance of the core tasks of repair against a checklist. A critical-step miss or a safety fault stops the assessment; re-attempt after remediation. Standard met · Safety · Time · Quality/finish · Documentation |
| Repair: production log | Log | 15% | Complete, signed, ≥ 90% attendance of lab hours | Daily entries: task, standard, method, result, time; instructor sign-off. Serves as hours evidence for the licensing/certifying body. Standard met · Safety · Time · Quality/finish · Documentation |
| Repair: safety audit | Safety audit | 15% | Pass/fail — must pass | Unannounced audit of PPE, housekeeping, lockout/guarding, and hazard communication while performing repair work. Standard met · Safety · Time · Quality/finish · Documentation |
An integrated, assessed piece of real work that draws on every trade course in Fiberglass / Composites (boatbuilding): planned, estimated, executed and documented by the student, reviewed by an employer advisor. Capstones are shown in the Student Yard or the Museum of VoTech where the work allows.
Outcomes| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Capstone: finished work + documentation | Project | 60% | Rubric ≥ 3 of 4 on every criterion | Employer advisor + instructor score the finished work against the specification, the estimate, and the documentation package. Meets specification · Within estimate · Workmanship · Safety · Documentation |
| Capstone: portfolio | Portfolio | 20% | Complete | Photos/drawings/logs of every course skills demonstration plus the capstone, in the program portfolio format. Completeness · Organization · Evidence quality |
| Capstone: defense | Oral / panel | 20% | Panel pass | 15-minute presentation and questions from the panel. Explains decisions · Answers technical questions · Professional communication |
Supervised placement with an employer partner in Fiberglass / Composites (boatbuilding) work. Hours are logged against the certifying body's task list; the employer evaluates against the same rubric used in the shop.
Outcomes| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Employer evaluation | Skills demonstration | 70% | Satisfactory on every competency | Mid-point and final evaluation by the site supervisor on the program competency list. Competency · Safety · Attendance · Conduct · Initiative |
| Hours & task log | Log | 30% | Required hours complete and verified | Signed log of hours and tasks; verified by the registrar for the board/certifying body. Complete · Verified |
Structured preparation for ABYC Composite Boat Builder; ACMA CCT: content review mapped to the exam blueprint, timed practice exams, practical-exam rehearsal, and registration/eligibility paperwork with the registrar.
Outcomes| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Mock certification exam (×2) | Mock certification exam | 100% | ≥ 80% on both | Full-length timed mocks built from the certifying body's published blueprint; second attempt after targeted review. Score · Time management |
The program completion credential(s). Sat at the school's authorized testing center or the body's test site; results recorded in the student record and reported in the annual outcomes report. Pass standard: Credential issued by the body.
Back to Fiberglass / Composites (boatbuilding) · How the school gets authority to award these credentials