MFG-COMP18-04 · Lesson 3 · 15 clock hours · demo
Tooling, Consumables, and Infusion Stack Setup
Objective. Students will correctly identify each consumable layer in an infusion stack by function and install a complete stack — release coat, peel ply, reinforcement, flow media, spiral wrap feed lines, vacuum bag film, and sealant tape — on a flat demonstration mold with no missed steps.
⚠ Pending professional review
This lesson, its worked examples and its practice questions has not yet been verified by a licensed engineer or certified journey-level tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
What Is an Infusion Stack?
Vacuum infusion (also called vacuum-assisted resin transfer molding, or VARTM) pulls liquid resin through dry reinforcement using atmospheric pressure and a sealed vacuum bag. The resin inlet and vacuum outlet are both inside the bag, and every layer between the mold surface and the bag film has a specific job. Understanding that job is why the order of layers matters — a stack installed out of sequence will produce voids, bonding failures, or an unacceptable surface finish.
The term infusion stack refers to the complete assembly of consumable layers placed on top of the mold laminate before the bag is sealed. You will install this stack before any resin is introduced.
Layer-by-Layer Breakdown
1. Release Coat (Mold Preparation)
Before any consumable touches the mold, the mold surface must carry a fully cured release agent — typically a wax, semi-permanent release, or a combination of both. Without adequate release, the cured laminate bonds permanently to the mold. On the demonstration mold used in class, this step is already completed: the aluminum surface has been waxed and buffed. Never skip verifying that the mold is properly released before the stack goes down.
2. Peel Ply
Peel ply is a tightly woven nylon or polyester fabric placed directly on top of the laminate (or, in a demonstration setup, directly on the mold surface representing the laminate face). Because it does not bond chemically to most thermoset resins, it peels away after cure and leaves a textured, bondable surface ready for secondary lamination or fairing. In an infusion stack it also acts as a controlled resin break between the laminate and the flow media above it.
3. Reinforcement
The structural layers — typically fiberglass woven roving, biaxial stitched fabric, or chopped strand mat — are placed according to the laminate schedule card. Each ply must be oriented as specified. Dry reinforcement in a VARTM process carries no resin until infusion begins, so handling is clean but fabric edges must be managed carefully to prevent fraying into the flow path.
4. Flow Media
Flow media (also called distribution media or infusion mesh) is an open-weave biaxial mesh placed above the reinforcement. Its high permeability lets resin travel quickly across the surface and then bleed downward through the laminate thickness. Correct placement of the flow media is the primary tool you have for controlling infusion speed and uniformity. Flow media is a consumable — it is removed with the rest of the bag after cure.
5. Spiral Wrap Feed Lines
Spiral wrap tubing is a flexible, ribbed plastic conduit threaded onto the supply (resin inlet) and vacuum (outlet) lines where they pass through or under the bag. The ribs prevent the tubing from collapsing under vacuum and create a high-flow channel. Resin inlet lines are typically positioned on one edge or at the center; the vacuum line is positioned at the opposite side. Placement follows the laminate schedule card or the resin manufacturer's technical data sheet (TDS).
6. Vacuum Bag Film
Vacuum bag film is a thin, flexible nylon or polyethylene film that drapes over the entire stack and is sealed to the mold flange. The film must overlap corners without bridging — a bridged corner creates a void that air leaks through or that the laminate cannot fill with resin. Press the film into corners gently and pleat excess film rather than stretching it.
7. Sealant (Tacky) Tape
Tacky tape is a soft, pressure-sensitive mastic tape applied to the mold flange before the bag film is laid down. When the bag film is pressed onto the tape, it forms the airtight perimeter seal. Continuity of this seal is critical: any gap, fold, or missed section is a leak point. Run the tape in one continuous piece around the perimeter whenever possible, and butt-join ends cleanly if a second piece is needed.
Connecting the Vacuum System
Once the bag is sealed, connect the vacuum pump through a vacuum gauge and a catch pot (resin trap). The catch pot prevents liquid resin from entering the pump during infusion. Draw the system down to the vacuum level specified in the resin manufacturer's TDS — do not assume a standard value because different resin systems have different requirements. After reaching target vacuum, isolate the pump by closing the valve and monitor the gauge for three minutes. A drop beyond the allowable rate stated in the TDS indicates a leak; find and fix it before infusing resin.
Safety
- PPE required throughout: safety glasses, nitrile gloves, and where resin vapors are present, a respirator rated for organic vapors (NIOSH-approved).
- Tacky tape contains solvents; keep away from ignition sources and ensure adequate ventilation.
- Vacuum pumps generate heat. Do not block the exhaust or leave the pump unattended for extended periods.
- Do not use damaged bag film or cracked sealant tape — a bag failure during infusion releases resin quickly and creates a slip and inhalation hazard.
- Dispose of resin-contaminated consumables as directed by your facility's hazardous-waste procedures.
The Six-Point Checklist
Your instructor will use the following six checkpoints to sign off your stack:
1. Layer sequence is correct per the laminate schedule card.
2. Sealant tape is continuous with no gaps around the full perimeter.
3. Resin supply and vacuum lines are positioned as specified.
4. Vacuum gauge is correctly connected between the pump and the bag.
5. Target vacuum (per resin TDS) is achieved.
6. Vacuum holds within the allowable drop rate for three minutes after pump isolation.
All six must be correct before you advance to a live infusion.
Key terms10
Infusion stackThe ordered assembly of consumable layers — peel ply, reinforcement, flow media, feed lines, bag film, and sealant tape — placed on the mold before vacuum infusion begins.
Peel plyA tightly woven nylon or polyester fabric placed against the laminate that releases cleanly after cure, leaving a textured, bondable surface and acting as a resin break in the stack.
Flow mediaAn open-weave mesh consumable placed above the reinforcement to promote rapid lateral resin distribution across the laminate surface during infusion.
Spiral wrap tubingRibbed flexible conduit used on resin inlet and vacuum outlet lines to maintain an open flow channel under vacuum without collapsing.
Sealant (tacky) tapeA soft, pressure-sensitive mastic tape applied to the mold flange to form the airtight perimeter seal between the mold and the vacuum bag film.
Vacuum bag filmThin, flexible nylon or polyethylene film draped over the entire stack and sealed to the mold flange to create the evacuated envelope needed for vacuum infusion.
Catch pot (resin trap)A container installed in the vacuum line between the bag outlet and the pump to capture any liquid resin drawn through the system, protecting the pump from contamination.
Laminate schedule cardA document specifying the exact ply sequence, fiber orientation, and layer count required for a given part, used as the authoritative reference during stack setup.
Vacuum integrity testA procedure in which the pump is isolated after reaching target vacuum and the gauge is monitored for a set period to confirm the bag assembly holds vacuum within the allowable leak rate before resin is introduced.
VARTM (Vacuum-Assisted Resin Transfer Molding)A closed-mold composite process that uses atmospheric pressure, acting on a sealed evacuated bag, to drive liquid resin through dry reinforcement layers placed in or on a mold.
Worked examples4
1. Your vacuum gauge reads 22 in-Hg at pump isolation. Three minutes later it reads 20.5 in-Hg. The resin TDS states the allowable drop is no more than 1 in-Hg over three minutes. Does the bag pass or fail the integrity test, and by how much?
- Calculate the actual drop: 22 in-Hg − 20.5 in-Hg = 1.5 in-Hg drop over three minutes.
- Compare to the allowable drop stated in the TDS: 1.0 in-Hg over three minutes.
- Determine pass or fail: 1.5 in-Hg > 1.0 in-Hg, so the bag fails.
- Calculate how much the drop exceeds the allowable rate: 1.5 − 1.0 = 0.5 in-Hg over the limit.
Answer: The bag fails the vacuum integrity test by 0.5 in-Hg. Troubleshoot the sealant tape perimeter and all fittings before proceeding to infusion.
2. You are cutting peel ply for a 2 ft × 2 ft mold. The peel ply must extend 2 inches past every edge of the dry reinforcement to ensure complete coverage with no exposed laminate. The dry reinforcement measures exactly 18 in × 18 in. What are the minimum dimensions of the peel ply piece you should cut?
- The reinforcement is 18 in × 18 in.
- Add 2 in overhang on each side for width: 18 in + 2 in + 2 in = 22 in.
- Add 2 in overhang on each side for length: 18 in + 2 in + 2 in = 22 in.
Answer: Cut the peel ply to a minimum of 22 in × 22 in.
3. A laminate schedule calls for four plies of fabric. Each ply is 0.014 in thick dry. Flow media adds 0.060 in. The bag film adds 0.002 in. Approximately how thick is the complete infusion stack (dry reinforcement + flow media + bag film) before resin is introduced?
- Calculate the total reinforcement thickness: 4 plies × 0.014 in = 0.056 in.
- Add flow media: 0.056 in + 0.060 in = 0.116 in.
- Add bag film: 0.116 in + 0.002 in = 0.118 in.
Answer: The dry stack is approximately 0.118 in (roughly 3 mm) thick before infusion.
4. Your sealant tape roll is 15 ft long. The rectangular mold flange perimeter measures 48 in × 48 in. Can you seal the entire perimeter with one continuous piece, and how many inches of tape will remain on the roll?
- Convert the roll length to inches: 15 ft × 12 in/ft = 180 in.
- Calculate the perimeter: 2 × (48 in + 48 in) = 2 × 96 in = 192 in.
- Compare: 180 in available < 192 in needed.
- Determine remainder if you could complete it: the tape is 12 in short, so one continuous piece is not possible without a second piece.
Answer: No — the 15 ft roll provides 180 in, which is 12 in short of the 192 in perimeter. You will need a second piece of tape; butt-join the ends cleanly and overlap the joint slightly to maintain seal continuity.
The math in this lesson3
Learners total ply, flow media and bag thicknesses to estimate stack height.
7.EE.3G-MG.1N-Q.3
In class: Instructor live demonstration on a 2 ft × 2 ft waxed aluminum mold, naming and explaining each layer as it is applied; students annotate a blank exploded-stack diagram in real time. · Hands-on partner exercise: each pair of students installs a complete infusion stack on an identical flat mold, referencing a laminate schedule card; instructor observes bag-film overlap at corners and sealant-tape continuity. · Vacuum-integrity test: students connect the vacuum pump, draw down to target vacuum level specified by the resin manufacturer's technical data sheet, isolate the pump, and monitor the gauge for three minutes; any drop beyond the allowable rate triggers troubleshooting before proceeding.
Materials: Waxed aluminum or fiberglass flat molds, peel ply (nylon), flow media (biaxial mesh), spiral wrap tubing, vacuum bag film, sealant (tacky) tape, T-fittings, vacuum gauge, rotary vane vacuum pump, laminate schedule cards, resin TDS for vacuum-level specification
Check: Instructor uses a six-point stack-setup checklist; all six points must be correct (layer sequence, sealant tape continuity, line placement, gauge connection, target vacuum achieved and held within allowable drop rate). Students who fail one or more points re-setup before advancing. ACMA CCT closed-mold process domain mapped here.
Practice check8
Answer each question, then check it. Nothing is recorded; this is your own practice.
Record this lesson on my transcript. Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.