Buffers, Pit Equipment, and Terminal Stopping Devices

Objective. Students will identify oil and spring buffer types, verify minimum oil level on a hydraulic buffer specimen, and trace the wiring path of upper and lower terminal stopping devices on a training rig drawing.

⚠ Pending professional review

This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.

VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.

Buffers, Pit Equipment, and Terminal Stopping Devices

The Purpose of the Elevator Pit

The pit is the portion of the hoistway that extends below the lowest landing. It is not a storage area or a shortcut to anywhere — it is a safety-critical work zone. Every time you enter a pit, lockout/tagout (LOTO) must be applied to the pit stop switch and any other energy sources before you step off the ladder. Confirm with a co-worker, inspect the pit lighting, and never rush. The pit stop switch is a red, mushroom-head switch located near the pit ladder at the bottom of the hoistway; opening it de-energizes the elevator control circuit so the car cannot move while you are below. ASME A17.1 (the Safety Code for Elevators and Escalators) establishes the minimum pit depth, lighting level, and equipment requirements you will encounter on every job site.

Standard Pit Equipment

During a pit inspection you should locate and verify the condition of the following items:

Record every item on your pit inspection checklist as you confirm it. A missing or non-functional item is a deficiency that must be reported before the elevator is returned to service.

Oil (Hydraulic) Buffers

An oil buffer uses a hollow steel cylinder filled with hydraulic fluid and a plunger. When the car strikes the plunger, fluid is forced through metered orifices, converting kinetic energy into heat gradually — a controlled stop rather than a crash. Oil buffers are required by ASME A17.1 when rated speed exceeds the threshold that permits spring buffers (generally above 200 ft/min; verify with the current code edition).

Checking oil level: Every oil buffer has a sight glass or a dipstick. The oil level must be at or above the minimum mark. If it is low:

1. Obtain the buffer manufacturer's specification for fluid type and viscosity.

2. Use a clean measuring cup to add the correct hydraulic buffer oil — do not substitute brake fluid, motor oil, or any non-specified fluid.

3. Re-check the sight glass after filling. Overfilling is also a deficiency.

4. After a buffer is compressed (struck by the car), it must return to its fully extended position before the elevator is returned to service; the return time is a code-checkable parameter.

Always wear chemical-splash safety glasses and nitrile gloves when handling hydraulic fluid.

Spring Buffers

A spring buffer stores energy in a coil spring and releases it — essentially bouncing the car or counterweight back. ASME A17.1 permits spring buffers for elevators operating at or below the code speed threshold. Spring buffers require no fluid maintenance, but the spring must be inspected for corrosion, cracking, and permanent set (a spring that does not return to its uncompressed height is defective). Measure the free (unloaded) height with a steel tape and compare it to the manufacturer's data plate value.

Terminal Stopping Devices

Terminal stopping devices prevent the car from running past the top or bottom terminal landing. There are two layers of protection:

Normal Terminal Slowdown Switch (NTS) / Normal Terminal Stopping Device (NTSD): These switches are actuated by cams on the car or by the selector system before the car reaches the terminal landing. They interrupt or reduce speed through the normal control circuit, bringing the car to a controlled stop at the landing. If the NTS works correctly, the car stops at the floor — the passenger never knows anything happened.

Final Limit Switch (FLS): If the car passes through the NTS zone without stopping, the final limit switch opens the control and safety circuits, cutting power to the motor and brake. The FLS is a last-resort device and should never be the first thing that stops the car. On a wiring diagram, the FLS contacts appear in series with the control circuit; when open, no current can flow and the car must be manually recovered.

When tracing these circuits on a hoistway wiring diagram:

1. Find the terminal strip or device legend to identify switch designations (e.g., 1LS, 2LS, UNTSD, DNTSD).

2. Trace the wire from the switch contact through the diagram to the load it protects (motor contactor coil, safety relay, etc.).

3. Determine whether the switch is normally closed (NC) — opens on actuation — which is the standard configuration for limit switches.

4. Note that upper and lower terminal devices mirror each other: upper devices act when the car is too high; lower devices act when the car is too low.

Safety Summary

Key terms9

Pit Stop SwitchA red mushroom-head switch in the elevator pit that, when opened, removes power from the control circuit to prevent car movement while workers are in the pit.
Oil (Hydraulic) BufferAn energy-absorbing device that uses hydraulic fluid metered through orifices to decelerate and stop an elevator car or counterweight that has traveled below or above the terminal landing.
Spring BufferAn energy-storing buffer that uses a coil spring to decelerate a car or counterweight; permitted by ASME A17.1 for elevators operating at or below a code-specified rated speed.
Sight GlassA transparent window on an oil buffer that allows a mechanic to visually check the hydraulic fluid level against minimum and maximum marks without disassembling the buffer.
Normal Terminal Slowdown Switch (NTS / NTSD)A switch actuated before the car reaches a terminal landing that reduces or removes speed through the normal control circuit, producing a controlled stop at the terminal floor.
Final Limit Switch (FLS)A last-resort over-travel switch that opens both the control and safety circuits if the car passes beyond the normal terminal stopping zone, cutting motor power and setting the brake.
Permanent SetA condition in which a spring buffer's free (unloaded) height is permanently shorter than the manufacturer's specification, indicating the spring has been overstressed and must be replaced.
Lockout/Tagout (LOTO)An OSHA-required energy-control procedure in which the energy source is physically locked in the off position and tagged to prevent accidental re-energization while workers perform maintenance.
Sump PitA recessed pocket in the elevator pit floor designed to collect water intrusion; may include a sump pump to remove accumulated water and keep the pit dry.

Worked examples3

1. An oil buffer sight glass shows the fluid is 0.75 inches below the minimum mark. The manufacturer specifies a capacity of 2.5 quarts for a full fill from empty, and the sight glass spans 3.0 inches from the minimum to the maximum mark. Assuming a linear relationship, approximately how many fluid ounces must be added to bring the level to the minimum mark?
  1. Step 1 — Find fluid ounces per inch of sight glass. The sight glass spans 3.0 inches and represents the fill range between minimum and maximum. Full capacity is 2.5 quarts. Convert: 2.5 qt × 32 fl oz/qt = 80 fl oz total capacity across 3.0 inches.
  2. Step 2 — Calculate fl oz per inch: 80 fl oz ÷ 3.0 in = 26.67 fl oz per inch.
  3. Step 3 — The level is 0.75 inches below the minimum mark. Multiply: 0.75 in × 26.67 fl oz/in ≈ 20 fl oz.
  4. Step 4 — Round to a practical measurement: approximately 20 fl oz (1.25 pints) must be added to reach the minimum mark. Always re-verify with the sight glass after adding fluid.
Answer: Approximately 20 fluid ounces of the correct hydraulic buffer oil must be added to reach the minimum mark.
2. A spring buffer's data plate lists a free height of 14.0 inches. After measuring, a student records 12.5 inches. By what percentage has the spring's free height decreased, and should the buffer be returned to service?
  1. Step 1 — Find the decrease in height: 14.0 in − 12.5 in = 1.5 in.
  2. Step 2 — Calculate percentage decrease: (1.5 ÷ 14.0) × 100 = 10.71%, approximately 10.7%.
  3. Step 3 — A spring that does not return to its rated free height has permanent set and no longer meets the manufacturer's specification. This is a deficiency regardless of the percentage — any measurable permanent set means the spring has been overstressed.
  4. Step 4 — Document the finding on the inspection checklist and tag the buffer out of service. The buffer must be replaced before the elevator is returned to passenger service.
Answer: The free height has decreased by approximately 10.7%. The buffer must not be returned to service; it has permanent set and must be replaced.
3. A student measures the free height of a spring buffer specimen in three locations around the coil and records 13.8 in, 14.1 in, and 13.9 in. The data plate lists 14.0 in. What is the average measured height, and does it indicate permanent set?
  1. Step 1 — Add the three measurements: 13.8 + 14.1 + 13.9 = 41.8 inches.
  2. Step 2 — Divide by the number of measurements: 41.8 ÷ 3 = 13.93 inches (rounded to two decimal places).
  3. Step 3 — Compare to specification: 13.93 in vs. 14.0 in specified. The average is 0.07 inches below the data plate value.
  4. Step 4 — A difference of 0.07 inches is within typical measurement tolerance for a steel tape (± 1/16 in ≈ 0.0625 in). However, the decision to accept or reject must follow the manufacturer's stated tolerance. If no tolerance is listed, any shortfall must be reported as a potential deficiency and the instructor or journeyman must make the acceptance decision.
Answer: Average measured height is 13.93 inches, which is 0.07 inches below the 14.0-inch specification. Report the finding; acceptance depends on the manufacturer's published tolerance.

The math in this lesson2

Learners scale a 0.75-inch sight-glass shortfall to quarts of buffer oil needed.
6.RP.37.RP.3
Brush up in the math halls at newSchoolWorks.com:
In class: Pit familiarization on training rig (lockout/tagout applied before entry): students locate car and counterweight buffers, pit ladder, pit stop switch, pit lighting, and sump pit, recording each item on a pit inspection checklist. · Buffer lab: students check oil level on a training oil buffer using the sight glass, compare to the minimum mark, and fill to specification using the correct hydraulic fluid; spring buffer compression is measured and compared to manufacturer data. · Drawing trace exercise: using a simplified hoistway wiring diagram, students highlight the normal terminal slowdown switch (NTS) and final limit switch circuits, describe their function, and answer five comprehension questions.
Materials: Training traction rig with pit access, oil buffer specimen with sight glass, hydraulic elevator buffer oil (correct specification), measuring cup, spring buffer specimen, hoistway wiring diagram, pit inspection checklist, ASME A17.1 (current edition)
Check: Completed pit inspection checklist reviewed by instructor; oil fill must be within manufacturer's acceptable range verified by sight glass; drawing trace must correctly identify both circuits — pass requires checklist fully completed, oil level correct, and both circuits correctly identified.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

Safety and Health
1. Before entering the elevator pit, a pre-apprentice must FIRST:
Traction Elevator Components
2. An oil buffer is MOST accurately described as a device that:
Traction Elevator Components
3. During a buffer inspection, a spring buffer's measured free height is less than the value on the manufacturer's data plate. This condition is called:
Traction Elevator Components
4. A student checks an oil buffer and finds the fluid level in the sight glass is below the minimum mark. The correct action is to:
Electrical and Control Systems
5. On a hoistway wiring diagram, the final limit switch contacts are shown as normally closed (NC) and wired in series with the control circuit. If the car over-travels upward and actuates the upper final limit switch, the result is:
Electrical and Control Systems
6. The normal terminal slowdown switch (NTS) is designed to:
Safety and Health
7. Which pit equipment item is specifically required so that a worker descending into the pit can safely reach the pit floor without jumping?
Traction Elevator Components
8. A counterweight buffer is located at the bottom of the hoistway opposite the car buffer. The counterweight buffer is compressed when: