BLD-SOLA09-08 · Lesson 2 · 36 clock hours · lab

Racking, Module Installation, and DC Wiring

Objective. Students will install a racking system, mount and bond PV modules, route and terminate all DC conductors in conduit, and label all equipment correctly on the program's full-scale training structure, following the project's approved single-line diagram and maintaining lockout/tagout and fall-protection protocols throughout.

⚠ Pending professional review

This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.

VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.

Racking, Module Installation, and DC Wiring

This lab brings together structural work, electrical work, and safety discipline in a single, integrated task. By the end of the session your crew will have a mechanically sound, correctly wired, and fully labeled DC array ready for instructor inspection. Every step must be performed in sequence; do not skip ahead.

Lockout/Tagout Before You Touch Anything

Even though the training modules are non-energized or low-voltage simulation panels, you must establish lockout/tagout (LOTO) before the session begins and maintain it until the instructor authorizes energization. Apply a personal lock to every energy-isolating device associated with the training structure. Each crew member applies their own lock — never share a lock. Post the required tagout tags. This is not optional paperwork; LOTO violations result in an automatic restart of the affected task.

Fall Protection on the Roof Mockup

Anytime you are on or near the roof mockup, your fall-arrest harness must be donned, inspected, and connected to an anchor point rated for the load. Inspect the harness for cuts, frayed webbing, and proper buckle function before each use. Hard hat and safety glasses are required at all times on the mockup; gloves are required when handling module edges, conduit ends, and fasteners. A crew member on the ground acts as the safety checker and must visually confirm every fastener point is signed off before the next step proceeds.

Step 1 — Racking Layout and Structural Attachment

Begin with the manufacturer's installation instructions (MII) — they govern every spacing and torque requirement. Locate rafters using a stud finder and confirm each hit by probing with a finish nail before drilling. Mark rafter centers with a chalk line. Install flashing and standoffs (feet) at the spacing the MII specifies; typical residential flush-mount systems require feet on every other rafter or at intervals that keep rail deflection within limits, but always follow the specific product's table. Thread lag bolts through the flashing and standoff base. A properly sized pilot hole reduces split risk and ensures the lag threads fully into solid lumber — the MII will specify pilot-hole diameter. Torque each lag bolt to the value listed in the MII using a calibrated torque wrench; record the torque value and location on your documentation sheet. Have your safety checker initial the sheet before moving to the next foot.

Once all feet are set, snap rails into the mounting feet and secure them with the hardware provided. Rails must be level and co-planar; check with a level and tape measure. Splice rails according to the MII, leaving the required thermal-expansion gap.

Step 2 — Module Mounting and Bonding

Set each module into the rail channel. Mid clamps go between adjacent modules; end clamps secure the outer edge of each row. Torque clamps to the value in the MII — under-torquing allows modules to shift; over-torquing can crack frames. Many listed racking systems provide bonding through the clamp-to-rail contact, but verify using the MII and the clamp's listing. Where separate bonding hardware (such as a listed bonding washer or lug) is required, install it at every module. Bonding ensures all metal parts of the array are at the same electrical potential, which is essential for safety and for passing the bonding continuity check during inspection.

Route module leads carefully; do not allow cables to rest on sharp metal edges or touch the roof surface without a listed cable clip or wire management clip.

Step 3 — DC Conductor Routing and Termination

Plan your conduit run from the array home-run location to the combiner or inverter before cutting anything. Use weatherproof EMT or liquid-tight flexible conduit as appropriate for the segment. Calculate conduit fill before selecting conduit size — you will use the worked examples below for practice. Secure conduit with listed hangers or straps at intervals required by the applicable installation standard; as a general rule, supports are needed within a specified distance of every box and at regular intervals along the run (consult the code-required spacing for the conduit type you are using).

Pull THWN-2 conductors with wire lubricant on pulls of any significant length; do not pull dry on bends. Each student must personally land at least four conductors. Strip insulation to the depth indicated by the terminal's strip-gauge mark — no more, no less. Insert the conductor fully and tighten the terminal screw to the torque value marked on the equipment or given in the manufacturer's instructions, using a calibrated torque screwdriver. Under-torqued connections arc; over-torqued connections strip threads or damage conductors.

After all conductors are landed, use a multimeter set to DC volts to verify polarity at each source circuit before any connection to the inverter or combiner. Positive to positive, negative to negative. Record each reading on the checklist.

Step 4 — Labeling

NEC Article 690 requires specific labels at PV system components. Using the program's NEC 690 labels kit, attach all required labels at the combiner, disconnect, and any other required location. Labels must be legible, durable, and permanently attached. Photograph every labeled component for your documentation package; these photos are part of your deliverable.

Pre-Energization Checklist

Before calling for instructor sign-off, run through the program's DC installation inspection checklist in full: structural attachment verified, bonding continuity confirmed, polarity verified, conduit fill within limits, conduit supports at correct spacing, wire management complete, all labels attached and photographed. Only when every item is checked and signed may you call the instructor for the live walkthrough.

Safety Summary

Key terms10

Lockout/Tagout (LOTO)An OSHA-required safety procedure in which energy-isolating devices are locked in the off or safe position and tagged to prevent unexpected energization while workers perform installation or maintenance tasks; each worker applies their own personal lock.
Flush-mount rackingA rooftop PV mounting system where modules are installed parallel and close to the roof surface using rails attached to structural standoffs (feet) that are lag-bolted through flashing into rafters.
BondingThe permanent joining of metallic parts to form an electrically conductive path that ensures continuity and safe conductivity, keeping all metal components of the array at the same electrical potential.
Torque specificationThe rotational force value, expressed in inch-pounds or foot-pounds, that a fastener or terminal screw must reach as stated by the manufacturer's installation instructions; verified with a calibrated torque wrench or torque screwdriver.
Conduit fillThe percentage of a conduit's interior cross-sectional area occupied by conductors; the applicable standard limits fill to defined maximums depending on the number of conductors to prevent heat buildup and allow safe pulling.
THWN-2A common thermoplastic insulated, heat- and moisture-resistant conductor rated for use in wet and dry locations and at 90 °C; widely specified for PV DC wiring inside conduit.
Source circuitThe conductors and components connecting one or more PV modules in series (a string) to the first overcurrent protection device or combiner point in the system.
MC4 connectorA single-contact, waterproof, locking DC connector widely used to join PV module leads; must be properly crimped with the correct listed tool and only mated with compatible connectors from the same or listed-compatible manufacturer.
Pre-energization checklistA systematic, documented inspection of all mechanical and electrical elements of a PV installation completed before the system is allowed to produce or carry live voltage, confirming safety and code compliance.
NEC Article 690The section of the National Electrical Code that governs the installation of photovoltaic systems, including wiring methods, overcurrent protection, disconnecting means, and required labels.

Worked examples4

1. Conduit fill check: You are pulling three THWN-2 conductors into a 3/4-inch EMT conduit. Each conductor is 10 AWG (approximate cross-sectional area 0.0211 in² each). The allowable fill for three conductors in EMT is 40% of the conduit's interior area. The interior area of 3/4-inch EMT is approximately 0.533 in². Does this combination meet the fill limit?
  1. Step 1 — Find total conductor area: 3 conductors × 0.0211 in² = 0.0633 in².
  2. Step 2 — Find allowable fill area: 0.533 in² × 0.40 = 0.2132 in².
  3. Step 3 — Compare: 0.0633 in² (used) vs. 0.2132 in² (allowed). Used area is less than allowed area.
Answer: Yes, the fill is within limits. The three 10 AWG THWN-2 conductors occupy about 0.0633 in², well under the 0.2132 in² maximum for three conductors in 3/4-inch EMT.
2. Conduit fill — does it fit? You now need to pull six 10 AWG THWN-2 conductors (area 0.0211 in² each) into the same 3/4-inch EMT (interior area 0.533 in²). At 40% fill for three or more conductors, will this work, or do you need a larger conduit?
  1. Step 1 — Total conductor area: 6 × 0.0211 in² = 0.1266 in².
  2. Step 2 — Allowable fill: 0.533 in² × 0.40 = 0.2132 in².
  3. Step 3 — Compare: 0.1266 in² < 0.2132 in². The conductors fit within the 40% limit.
Answer: Six 10 AWG THWN-2 conductors still fit in 3/4-inch EMT because they occupy 0.1266 in², which is less than the 0.2132 in² allowed. No upsizing is needed for this conductor count and gauge.
3. Torque unit conversion: The module clamp manufacturer specifies a torque of 20 N·m. Your torque wrench reads only in foot-pounds (ft·lb). What value do you set on the wrench? (Use the conversion: 1 N·m ≈ 0.7376 ft·lb.)
  1. Step 1 — Multiply: 20 N·m × 0.7376 ft·lb/N·m = 14.752 ft·lb.
  2. Step 2 — Round to practical precision: approximately 14.8 ft·lb.
Answer: Set the torque wrench to approximately 14.8 ft·lb to achieve the manufacturer's required 20 N·m.
4. Polarity check math: Your multimeter reads +38.4 V DC across one string of modules. You expected open-circuit voltage (Voc) close to the sum of each module's rated Voc. The string has 8 modules each rated at 5.1 V Voc (simplified low-voltage training modules). Is the measured voltage consistent with the expected Voc, and is polarity correct?
  1. Step 1 — Calculate expected string Voc: 8 modules × 5.1 V = 40.8 V.
  2. Step 2 — Evaluate measurement: 38.4 V is approximately 94% of the rated string Voc. A slight reduction from rated Voc is normal under typical temperature and irradiance conditions during a lab session.
  3. Step 3 — Polarity check: The multimeter displayed a positive value with the red probe on the string positive lead and the black probe on the string negative lead, confirming correct polarity.
Answer: The 38.4 V reading is consistent with expected Voc under ambient lab conditions (slightly below the 40.8 V STC rating) and confirms correct polarity — positive probe on the positive conductor yielded a positive reading. The string passes the pre-energization polarity check.

The math in this lesson2

Learners compute conduit fill as total conductor area over interior area against 40%.
7.RP.3N-Q.1
Brush up in the math halls at newSchoolWorks.com:
In class: Working in assigned crews of three, students lay out and install a flush-mount racking system on the training roof mockup using manufacturer installation instructions: locate and mark rafters, install flashing and lag bolts at required spacing, attach rails, install mid and end clamps, torque all fasteners to spec with a calibrated torque wrench, and have each fastener point signed off by a partner acting as safety checker before the next step begins. · Crews mount modules, make all module-to-module bonding connections using listed hardware, route DC home-run conductors through weatherproof conduit from the array to the combiner or inverter location, use proper fill-calculation to select conduit size, pull conductors with wire lubricant, and make terminated connections—each student must personally land at least four conductors with a torque screwdriver set to manufacturer spec. · Students conduct a pre-energization checklist: verify polarity at each source circuit with a multimeter, confirm all conduit supports are within code-required spacing, check that all wire management is complete, attach NEC-required labels at the combiner and disconnect, photograph every labeled component for the documentation package, and complete the program's DC installation inspection checklist before calling for instructor sign-off.
Materials: Flush-mount racking kit (rail, feet, clamps, flashing), PV training modules (non-energized or low-voltage simulation panels), MC4 connectors and crimping tool, conduit (EMT and liquid-tight), conduit bender, conduit fittings and hangers, fish tape, THWN-2 wire in appropriate gauges, wire lubricant, torque wrench and torque screwdriver, multimeter, voltage/current clamp meter, permanent markers, NEC 690 labels kit, drill and bits, PPE (hard hat, safety glasses, gloves, fall-arrest harness), OSHA lockout/tagout kit, DC installation checklist handout
Check: Instructor performs a live walkthrough inspection using the program's graded checklist: structural attachment, bonding continuity, polarity, conduit fill, labeling, and torque documentation. Pass = 80% checklist score with zero uncorrected safety deficiencies; any lockout/tagout violation is an automatic restart of that task.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

PV Installation Practices
1. During the racking installation, a crew member is about to drill the third lag-bolt pilot hole without having their safety checker initial the torque documentation for the previous two lag bolts. What is the correct action?
Health and Safety
2. A crew member removes their personal lock from the energy-isolating device so a second crew member can use it while they take a break. What LOTO rule does this violate?
PV System Design and Sizing
3. You are selecting conduit size for a run with four 10 AWG THWN-2 conductors (each 0.0211 in²). You are choosing between 1/2-inch EMT (interior area ≈ 0.304 in²) and 3/4-inch EMT (interior area ≈ 0.533 in²). Applying a 40% fill limit, which conduit is the smallest size that works?
PV Installation Practices
4. After mounting the modules, a student notices the bonding washers specified in the racking MII were not installed on two modules. What is the most appropriate next step?
PV Installation Practices
5. When performing the pre-energization polarity check with a multimeter on a source circuit, the meter displays a negative value with the red probe connected to the conductor labeled positive. What does this indicate?
Electrical Theory and Code
6. NEC Article 690 requires labels at PV system disconnecting means. Which of the following best describes the purpose of these required labels?
PV Installation Practices
7. A torque screwdriver is used when landing conductors in terminals rather than tightening by feel. Why is this important in a PV DC wiring installation?
PV Installation Practices
8. The program's graded inspection checklist requires a minimum score of 80% with zero uncorrected safety deficiencies to pass. A crew scores 85% on the checklist items but the inspector finds one untorqued lag bolt that was not corrected before sign-off was requested. What is the outcome?