Objective. Students will navigate the NEC codebook efficiently and correctly classify a described PV system by type (stand-alone, grid-tied, multimode) and identify which Article 690 parts apply.
This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
Every electrical installation in the United States, including solar photovoltaic (PV) systems, must comply with the National Electrical Code (NEC), formally known as NFPA 70. The NEC is published by the National Fire Protection Association and is adopted into law by most states and local jurisdictions. When an authority having jurisdiction (AHJ) — typically a building or electrical inspector — approves your permit and signs off on your inspection, they are confirming that your work meets the NEC. Failing inspection costs time, money, and reputation. More importantly, a non-compliant installation can cause fires, electric shock, or electrocution. The NEC is a safety document first.
Understanding the structure of the NEC lets you find answers quickly rather than guessing.
Article 690 is titled Solar Photovoltaic (PV) Systems. It covers the installation of PV systems, including the source circuits, output circuits, disconnecting means, ground-fault and arc-fault protection, system grounding, and marking requirements. The article is divided into numbered parts, each addressing a specific area of the system:
When you are working on a job, always start with the definitions in 690.2 to confirm you are using terms the same way the code does.
Not all PV systems are the same, and Article 690 applies differently depending on system type. The definitions in 690.2 are authoritative.
Stand-Alone (Off-Grid) Systems supply loads that are not connected to an electric utility. Power comes only from PV modules and, usually, battery storage. There is no grid connection. A remote cabin is a classic example. Stand-alone systems must still meet Article 690 requirements, but Article 705 (interconnection) does not apply.
Interactive (Grid-Tied) Systems are connected to the electric utility in parallel. Excess power can flow back to the grid. These systems require inverters that meet anti-islanding requirements — meaning they automatically shut down if the grid loses power so that utility workers are not endangered by a back-fed line they think is de-energized. Article 705 governs the interconnection. Residential rooftop solar is almost always an interactive system.
Multimode Systems can operate both in parallel with the utility and as stand-alone systems when the grid is unavailable. They use a special multimode inverter or inverter-charger. When grid-tied, Article 705 applies; when operating off-grid, the stand-alone provisions govern. Article 706 applies if battery storage is included.
Direct-Coupled Systems connect a PV source directly to a load (such as a PV water pump) with no battery or inverter. These are simple systems but must still meet applicable sections of Article 690.
Before you open the codebook on a real job, remember that PV systems present two serious electrical hazards:
1. PV source circuits are energized by sunlight and cannot be turned off by a switch alone. Always follow lockout/tagout (LOTO) procedures and use appropriate PPE, including arc-rated clothing and insulated gloves rated for the system voltage, before working on any circuit.
2. Back-fed utility voltage is present at the utility-side terminals of an interactive inverter even when the inverter is off. Treat those terminals as always live.
The NEC's marking requirements in Part VI of Article 690 exist precisely so that anyone working on or near the system — including firefighters — can identify energized conductors and disconnecting means quickly. Correct labeling is not optional; it is a life-safety requirement.
Practice a simple three-step routine: (1) Identify the topic — is this a wiring method question, a disconnect question, or a definitions question? (2) Go to the Table of Contents or Index to find the article and part. (3) Read the section and any referenced sections it points to. Many sections cross-reference other articles; follow those references before reaching a conclusion. Speed comes with repetition, which is why locating sections quickly is a skill tested on the NABCEP PV Associate exam.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.