BLD-SOLA09-02 · Lesson 6 · 11 clock hours · practice

Design Package Compilation and Plan-Check Readiness

Objective. Students assemble a permit-ready residential PV design package—including site plan, single-line diagram, shade report, equipment schedule, and structural attachment notes—and present it in a structured peer review that replicates an AHJ plan-check, identifying and correcting at least 90% of seeded errors introduced by the instructor.

⚠ Pending professional review

This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.

VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.

What a Permit-Ready PV Design Package Is

Before a residential PV system can be installed, the local Authority Having Jurisdiction (AHJ)—usually a city or county building department—must review and approve a design package. This review is called a plan check. A plan check confirms that the proposed system meets applicable electrical codes (primarily the National Electrical Code), building codes, fire codes, and any local amendments. A permit-ready package is one complete enough that the AHJ can approve it without requesting additional information. Incomplete packages are rejected and returned, costing the installer time and delaying the customer's project. Assembling a clean, organized package is therefore a core professional skill.

Standard Contents of a Residential PV Permit Package

Most AHJs expect the following documents, organized so the reviewer can move through them in a logical order:

Cover Sheet — Identifies the project address, property owner, installing contractor, license numbers, and the applicable code editions. Many jurisdictions supply their own cover-sheet form.

Site Plan — A dimensioned overhead drawing showing the property boundary, structure footprint, array location on the roof, required setbacks (fire access pathways), and compass orientation. Setback requirements vary by jurisdiction and are typically based on adopted fire codes; confirm local rules for each project.

Roof Plan / Array Layout — Shows module positions, row spacing, attachment point locations, and roof section dimensions. Labels should identify the modules by model number or reference the equipment schedule.

Single-Line Diagram (SLD) — An electrical schematic showing the complete circuit from modules through combiners (if any), inverter(s), AC disconnect, utility meter, and main service panel. The SLD must show conductor sizes and types, conduit types, overcurrent protection device (OCPD) ratings, grounding and bonding connections, and interconnection point. All labels must match the equipment schedule and datasheets.

Equipment Schedule — A table listing every major component: modules (manufacturer, model, rated power, Voc, Isc, temperature coefficients), inverter(s) (manufacturer, model, rated AC output, MPPT range), racking system, and disconnects. Include listing certifications (UL or equivalent) for each item.

Module and Inverter Datasheets — Manufacturer cut-sheets confirming the specifications used in your calculations. Highlight or annotate the values used on the SLD.

Production Estimate — A PVWatts or equivalent software report showing estimated annual kWh output, used to size the system against the customer's load. Include input assumptions (tilt, azimuth, system losses, location).

Structural Attachment Notes — A drawing or note sheet showing the roof construction type (rafter size and spacing, sheathing thickness), the attachment hardware selected, lag bolt diameter and embedment depth, and how the attachment meets the load requirements. If an engineered letter or stamped drawing is required by the AHJ, that goes here.

Calculations Summary — Shows string sizing math (Voc temperature correction, Vmp temperature correction, string current), conductor ampacity calculations, and OCPD sizing. This allows the plan checker to verify NEC compliance without reconstructing all your work.

Organizing the Package

Organization signals professionalism and speeds approval. Use a cover sheet as page 1, followed by a table of contents with page numbers. Tab dividers in a three-hole binder (or named folders in a digital submission) help reviewers navigate quickly. Number every page and label every drawing with the project address and revision date. If you revise any sheet after submission, update the revision block and resubmit only the changed sheets clearly marked as revisions.

How a Plan Check Works

The AHJ assigns a plans examiner who works through the package against a checklist derived from adopted codes and local amendments. Common deficiency notices include: missing conductor labels on the SLD, an OCPD rating that does not match the calculated value, setbacks not shown or dimensioned, missing or mismatched equipment datasheets, and structural notes that do not specify embedment depth. Each deficiency must be corrected and resubmitted before a permit is issued.

During peer review, you are acting as a plans examiner. Read critically, not charitably. A detail that seems obvious to you may not be documented—if it is not written on the drawing, the AHJ will assume it is absent.

Safety Points Relevant to the Design Package

Errors in a permit package can create real safety hazards in the field. Two areas deserve special attention:

During the debrief, be prepared to explain why you chose each conductor size, OCPD rating, and attachment specification—not just what the value is.

The Peer Review Memo

Write your plan-check memo as a numbered list of deficiencies. For each item, state: (1) where the error appears (sheet number, drawing title, or section), (2) what is wrong or missing, and (3) the applicable requirement that is not met. This format mirrors the official correction notices AHJs issue and gives the other team clear, actionable feedback.

After the Review: Correcting and Submitting

When you receive your peer review memo, work through every noted deficiency before final submission. Prioritize safety-critical errors—incorrect OCPD ratings, missing rapid shutdown notation, structural attachment omissions—above formatting issues. Your final package must contain no remaining safety-critical errors. Minor labeling or formatting issues found after submission can be addressed in a subsequent revision, but safety items cannot be deferred.

Key terms9

Authority Having Jurisdiction (AHJ)The organization, office, or individual responsible for enforcing applicable codes and standards and approving equipment, materials, and installations—typically a city or county building department for residential PV permits.
Plan CheckThe AHJ's formal review of submitted design drawings and calculations to verify code compliance before a building or electrical permit is issued.
Single-Line Diagram (SLD)An electrical schematic that represents a three-phase or single-phase system using single lines and standard symbols, showing all components, conductor sizes, conduit types, overcurrent protection, and interconnection points.
Equipment ScheduleA table in the permit package listing each major system component with manufacturer, model number, key electrical ratings, and listing certification, ensuring the plan checker can verify all specified equipment.
Deficiency NoticeA written correction list issued by a plans examiner identifying items in a submitted package that do not meet code requirements or are missing, which must be resolved before a permit is issued.
Rapid ShutdownAn NEC requirement that PV systems on buildings include a means to reduce conductors inside and on the roof to a safe voltage level within a specified time, protecting first responders; the method must be documented on the SLD.
Structural Attachment NotesDrawing notes or a dedicated sheet specifying roof framing dimensions, hardware type, lag bolt diameter, and embedment depth, demonstrating that the racking attachment can carry the required loads.
Overcurrent Protection Device (OCPD)A fuse or circuit breaker sized to protect conductors and equipment from damage due to overcurrent; proper sizing is a critical NEC compliance item reviewed during plan check.
Revision BlockA table in the title block of a drawing that records each revision date, description, and the initials of the person who made the change, used to track document history during permit review.
In class: Compile all documents produced across previous lessons (site plan with array layout and setbacks, single-line diagram, PVWatts or software production report, module and inverter datasheets, equipment schedule) into a single organized permit package following a standard AHJ cover-sheet format provided by instructor. · Exchange permit packages with another student team; use the AHJ-style plan-check checklist to review the other team's package, marking deficiencies in a written review memo—instructor has seeded at least five deliberate errors in each package for students to find. · Revise own package based on peer and instructor feedback; submit the corrected final package and participate in a 10-minute oral debrief where the instructor asks two or three questions about design decisions to confirm understanding.
Materials: All documents from prior lessons, AHJ cover-sheet template (instructor-prepared based on common municipal format), plan-check checklist, three-hole binder or digital folder structure, oral debrief rubric
Check: Final submitted permit package and oral debrief; pass requires correct identification of at least 90% of seeded plan-check errors in peer package, and own final package free of any remaining safety-critical errors after revision. Oral debrief: student must answer at least 2 of 3 questions correctly to demonstrate design rationale. Pass = both criteria met.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

PV System Design
1. A plans examiner returns a permit package with a deficiency notice stating that the single-line diagram does not show conductor sizes. Which section of the permit package is primarily deficient?
PV System Design
2. During peer review, a student finds that the other team's permit package lists a module model number on the equipment schedule that does not match the model number on the attached manufacturer datasheet. Why is this a plan-check deficiency?
PV System Design
3. Which document in a residential PV permit package demonstrates that the racking attachment can safely transfer roof loads and is required to specify lag bolt embedment depth?
Safety and Health
4. A peer review memo states: 'Sheet E-1, SLD: Rapid shutdown provisions are not documented.' Which safety hazard does this omission most directly create?
PV System Design
5. When organizing a permit package for physical submission, which practice best helps a plans examiner navigate the documents efficiently?
Safety and Health
6. After receiving a peer review memo with seven deficiency items, a student has time to correct only five before the submission deadline. Using a safety-first approach, which items should be corrected first?
PV System Design
7. A permit package's site plan shows the array location but does not include dimension lines for the required fire-access setbacks along the roof ridgeline. What is the most likely outcome when this package is submitted to the AHJ?
PV System Design
8. During the oral debrief, the instructor asks: 'Why did you choose the specific OCPD rating shown on your SLD for the module-level output circuit?' A student who can correctly answer this question demonstrates which competency?