BLD-SOLA09-02 · Lesson 5 · 14 clock hours · practice
Electrical Design, Single-Line Diagrams, and Component Selection
Objective. Students draft a complete single-line diagram for a residential grid-tied PV system that correctly represents all conductors, overcurrent protection devices, disconnects, and grounding/bonding paths in accordance with standard electrical drawing conventions and NEC Article 690 general requirements.
⚠ Pending professional review
This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
What Is a Single-Line Diagram?
A single-line diagram (SLD), sometimes called a one-line diagram, is a simplified electrical drawing that uses a single line to represent each current-carrying conductor or set of conductors between components. It is not a wiring diagram showing every individual wire; instead, it communicates the system's architecture, component ratings, and safety devices in a format that inspectors, engineers, and installers can read quickly. For residential grid-tied PV systems, the SLD is typically the centerpiece of a permit package submitted to the authority having jurisdiction (AHJ).
Why the SLD Matters for PV Work
AHJs use the SLD to verify that the system meets the National Electrical Code (NEC), specifically Article 690 for PV systems, before issuing a permit. Utilities review it before approving interconnection. Field crews use it to confirm wiring sequences and equipment locations. Because safety and code compliance are at stake, every element must be accurate. A missing disconnect or an incorrectly sized overcurrent protection device (OCPD) on a submitted drawing can delay a project and, if built that way, can create a shock or fire hazard.
Required Elements on a Residential Grid-Tied SLD
A complete SLD for a residential grid-tied system must show, at minimum:
- PV modules or array: Indicate the number of modules, series/parallel arrangement (strings), and module model.
- DC conductors: Label each conductor segment with wire gauge (e.g., #10 AWG) and insulation or conduit type (e.g., USE-2 in conduit, or PV Wire).
- DC disconnect: Required to isolate the DC side. Label voltage and current rating.
- Inverter: Show the make and model. For string inverters, indicate the number of MPPT inputs. For microinverters, indicate the AC output arrangement.
- AC conductors: Label gauge and conduit type (e.g., THWN-2 in EMT).
- AC disconnect (PV system AC disconnect): Required between the inverter and the point of interconnection. Label voltage and current rating.
- Overcurrent protection devices (OCPDs): Show each fuse or breaker with its ampere rating. This includes any string fuse in a combiner box, the inverter's output breaker, and the backfed breaker or line-side tap at the service panel.
- Service panel (load center): Show the main breaker rating and the interconnection point. NEC Article 690 contains provisions regarding the sum of breaker ratings relative to the bus bar rating (the "120% rule" is a commonly referenced guideline — always verify the specific NEC edition in use).
- Grounding and bonding path: Show the equipment grounding conductor (EGC) path from the array frames through the inverter to the grounding electrode system. Indicate the grounding electrode conductor (GEC) and grounding electrode (e.g., existing ground rod or water pipe).
- Meter and point of common coupling (PCC): Show the utility meter and the utility side connection point.
Conductor Labeling Conventions
Each conductor segment on the SLD should be labeled with:
1. Wire gauge — AWG or kcmil (e.g., #10 AWG, #6 AWG).
2. Insulation type — relevant to location and temperature rating (e.g., THWN-2, USE-2, PV Wire).
3. Conduit type — EMT (electrical metallic tubing), PVC Schedule 40 or 80, or MC cable where applicable.
4. Number of conductors — often noted as a small hash mark across the line or a numeric notation.
Correct labeling allows the AHJ to verify ampacity and confirm the conductor is appropriate for its environment (wet, sunlight-exposed, or rooftop conditions).
Sizing OCPDs: The Basic Rule
For DC strings, the OCPD must be sized to protect the conductor, not to match the module's short-circuit current (Isc) exactly. The general starting point for PV source circuits is that the OCPD rating must not exceed the conductor's ampacity after all applicable correction and adjustment factors are applied. PV source circuit conductors must be sized at no less than 125% of the module's rated Isc, and the OCPD protecting them must not exceed the conductor's corrected ampacity. Always verify sizing against the applicable NEC edition and AHJ requirements.
For the AC output breaker at the inverter, manufacturers specify a maximum OCPD rating in the inverter's listing; do not exceed it.
Grounding and Bonding: Safety-Critical Paths
Grounding and bonding are among the most safety-critical elements on the SLD. Equipment grounding connects non-current-carrying metal parts (module frames, racking, inverter enclosure) to the grounding system so that a fault current has a low-impedance return path — this trips the OCPD instead of energizing a metal surface that someone might touch. Bonding connects conductive parts to each other to eliminate voltage differences. Always show a continuous grounding path on the SLD from the array to the grounding electrode. A missing ground on a submitted drawing is an automatic AHJ rejection and, in the field, a serious electrocution hazard.
Lockout/Tagout and PPE Reminder
When field work follows an SLD review, remember: both DC and AC sources must be de-energized using proper lockout/tagout (LOTO) procedures before working on any conductors or equipment. PV arrays cannot be fully de-energized by simply opening a disconnect — they produce voltage whenever illuminated. Always wear appropriate PPE (insulated gloves rated for the voltage, safety glasses, arc-flash protection where required) and use a calibrated meter to verify zero energy before touching conductors.
Putting It Together: The Permit Package
The SLD travels with an equipment schedule — a table listing every major component by make, model, quantity, and key rating. Together, the SLD and equipment schedule give the AHJ everything needed to check code compliance on paper before any work begins. Accuracy in this documentation is not a bureaucratic detail; it is the foundation of a safe, inspectable, and interconnectable PV system.
Key terms10
Single-line diagram (SLD)A simplified electrical drawing that represents conductors, components, overcurrent protection, disconnects, and grounding paths using a single line per circuit, used for permit submittal and AHJ review.
Authority having jurisdiction (AHJ)The organization, office, or individual responsible for enforcing code requirements and approving permit applications for electrical installations, typically a local building or electrical department.
Overcurrent protection device (OCPD)A fuse or circuit breaker designed to open a circuit when current exceeds a safe level, protecting conductors and equipment from damage due to overload or fault current.
Equipment grounding conductor (EGC)A conductor that connects non-current-carrying metal parts of equipment (frames, enclosures, racking) to the grounding system to provide a fault-current return path and prevent dangerous voltages on accessible surfaces.
Grounding electrode conductor (GEC)The conductor that connects the grounding system of the electrical installation to the grounding electrode (such as a ground rod or metal water pipe) at the earth.
AmpacityThe maximum current, in amperes, that a conductor can carry continuously under specified conditions of use without exceeding its temperature rating, after applying correction and adjustment factors.
Short-circuit current (Isc)The current a PV module or string produces when its output terminals are short-circuited under standard test conditions; used as the basis for sizing conductors and OCPDs on the DC side.
DC disconnectA listed switch or fused disconnect device installed on the DC side of a PV system that allows the array output to be safely isolated from the inverter; required by NEC Article 690.
Equipment scheduleA table accompanying the SLD in a permit package that lists each major system component by manufacturer, model number, quantity, and key electrical ratings.
Lockout/tagout (LOTO)A formal safety procedure that physically locks energy-isolating devices in the open (de-energized) position and applies a tag, preventing accidental re-energization while personnel work on electrical equipment.
Worked examples4
1. A PV string produces a rated short-circuit current (Isc) of 10.0 A. What is the minimum conductor ampacity required for the PV source circuit conductors, and what is the minimum OCPD rating that can protect a conductor with a corrected ampacity of 15 A?
- Step 1 — Minimum conductor ampacity: PV source circuit conductors must be sized at no less than 125% of the module's rated Isc. Minimum ampacity = 10.0 A × 1.25 = 12.5 A.
- Step 2 — Select a conductor: Choose the next standard conductor size whose ampacity equals or exceeds 12.5 A after correction and adjustment factors. If a #12 AWG THWN-2 conductor has a corrected ampacity of 15 A, it satisfies the requirement.
- Step 3 — Maximum OCPD: The OCPD must not exceed the conductor's corrected ampacity (15 A). Standard fuse/breaker sizes near 15 A are 15 A. A 15 A OCPD is acceptable; a 20 A OCPD would exceed the conductor's 15 A corrected ampacity and is not permitted here.
Answer: Minimum conductor ampacity = 12.5 A; a conductor with a 15 A corrected ampacity is acceptable; maximum OCPD = 15 A.
2. A string inverter is rated for a maximum AC output current of 11.5 A at 240 V single-phase. The inverter listing specifies a maximum OCPD of 20 A. What is the minimum standard breaker size for the backfed breaker at the service panel, and is a 20 A breaker acceptable?
- Step 1 — Minimum breaker size: The backfed breaker must be sized at no less than 125% of the inverter's continuous AC output current. Minimum = 11.5 A × 1.25 = 14.375 A.
- Step 2 — Select next standard size: Standard breaker sizes are 15 A, 20 A, 25 A, etc. The next standard size at or above 14.375 A is 15 A.
- Step 3 — Check against inverter listing: The inverter specifies a maximum OCPD of 20 A. A 15 A breaker is at or below that maximum, so it is acceptable. A 20 A breaker also does not exceed the 20 A maximum listed limit, so it would be acceptable as well, but 15 A is the minimum permissible standard size based on the 125% rule.
Answer: Minimum backfed breaker = 15 A; a 20 A breaker is also acceptable because it does not exceed the inverter's listed maximum OCPD rating of 20 A.
3. A residential service panel has a 200 A main breaker and a 200 A bus bar rating. The homeowner wants to add a PV backfed breaker. Using the commonly referenced guideline that the sum of the main breaker and all backfed breakers must not exceed 120% of the bus bar rating, what is the maximum allowable backfed breaker size?
- Step 1 — Calculate 120% of the bus bar rating: 200 A × 1.20 = 240 A.
- Step 2 — Subtract the main breaker rating: 240 A − 200 A = 40 A.
- Step 3 — The remaining 40 A is the maximum total backfed OCPD rating that can be added.
Answer: Maximum backfed breaker size = 40 A under this guideline. (Always verify the specific NEC edition and AHJ interpretation in effect for the project.)
4. On an SLD, a conductor segment is labeled '#8 AWG THWN-2, EMT.' An inspector flags it because the ampacity table shows #8 AWG THWN-2 has a base ampacity of 50 A at 75 °C, but after a temperature correction factor of 0.87 (for an attic ambient of 41 °C) and a conduit fill adjustment factor of 0.70 (four current-carrying conductors in conduit), the corrected ampacity falls below the OCPD rating of 40 A shown on the SLD. Calculate the corrected ampacity and determine whether the 40 A OCPD is acceptable.
- Step 1 — Apply temperature correction: 50 A × 0.87 = 43.5 A.
- Step 2 — Apply conduit fill adjustment: 43.5 A × 0.70 = 30.45 A.
- Step 3 — Compare to OCPD: The corrected ampacity is approximately 30.45 A. The OCPD is rated 40 A, which exceeds the conductor's corrected ampacity of 30.45 A.
- Step 4 — Conclusion: The 40 A OCPD is not acceptable for this conductor in this condition. The designer must either upsize the conductor (e.g., to #6 AWG) or reduce the OCPD to a rating that does not exceed the corrected ampacity, and revise the SLD accordingly.
Answer: Corrected ampacity ≈ 30.45 A; the 40 A OCPD exceeds this value and is not acceptable. The SLD must be revised.
In class: Using a given system configuration (module count, inverter model, service panel rating), draw a single-line diagram by hand on provided diagram paper, labeling each conductor with wire gauge and conduit type, each OCPD with ampere rating, and each disconnect with voltage/current rating. · Cross-check the diagram against an instructor-provided single-line diagram checklist derived from standard AHJ submittal requirements; revise any items flagged during self-review. · Compile the equipment schedule (module model and quantity, inverter model, AC and DC disconnect ratings, conduit types and lengths) that would accompany the diagram in a permit package, formatting it as a table.
Materials: Engineering diagram paper or CAD/drawing software (instructor choice), single-line diagram template and checklist, conductor ampacity tables (NEC Chapter 9 or instructor-prepared excerpt), equipment datasheets, pencils and rulers or computer workstations
Check: Completed single-line diagram and equipment schedule reviewed by instructor against checklist; pass requires all conductors labeled, all OCPDs sized correctly per ampacity and inverter specs, all disconnects present, and grounding/bonding path shown. Any missing safety-critical element (disconnect, OCPD, ground) is an automatic fail requiring revision before reassessment. Pass = checklist fully complete with no unresolved items.
Practice check8
Answer each question, then check it. Nothing is recorded; this is your own practice.