BLD-PLUM06-06 · Lesson 7 · 12 clock hours · demo
CSST Installation and Bonding Requirements
Objective. The student will install a section of corrugated stainless steel tubing using manufacturer fittings and describe the bonding and grounding requirements mandated by IFGC and the CSST manufacturer.
What Is CSST?
Corrugated stainless steel tubing (CSST) is a flexible, yellow-jacketed gas piping product used to distribute natural gas and propane inside buildings. Its corrugated stainless steel core makes it bendable, which reduces the number of fittings needed and speeds installation. CSST is listed to ANSI LC 1 / CSA 6.26, the standard governing flexible gas piping. Every manufacturer publishes an installation guide that is part of the code compliance package; you must follow that guide exactly, because the International Fuel Gas Code (IFGC) adopts manufacturer instructions by reference.
Safety First
Before you touch any gas piping material, review these non-negotiable rules:
- Safety glasses are required whenever you are cutting, threading, or assembling piping.
- CSST shears produce sharp metal slivers — keep fingers clear of the blade path and dispose of cut ends in a puncture-resistant container.
- Work in the de-energized, depressurized state. The system must be shut off and the line verified free of pressure before you modify any piping. Lock out and tag out the gas supply valve following your employer's lockout/tagout (LOTO) procedure.
- Never use an open flame to test for leaks during or after assembly. Use an approved leak-detection solution or listed electronic detector.
- The yellow jacket is not the bonding conductor — the jacket is a dielectric coating. Do not rely on it for electrical continuity.
Measuring and Cutting CSST
Accurate measurement prevents waste and avoids joints in concealed spaces. Measure from the end of the fitting body on one end to the end of the fitting body on the other end, then add the manufacturer's specified insertion depth for each fitting (check your installation guide — this value varies by brand and tubing size). Mark the tubing with a felt-tip pen.
Cut with CSST shears only — never a hacksaw, pipe cutter, or angle grinder. A hacksaw leaves metal fragments inside the corrugations that contaminate the system and can damage regulators or appliance valves. CSST shears make a clean, square cut through the corrugations. After cutting, inspect the end: the cut must be square, not angled, and free of jagged peaks. A jagged edge prevents the fitting from seating correctly and can cause a leak.
Fitting Assembly
CSst end fittings use a mechanical connection that compresses a sleeve around the tubing end. The exact design varies by manufacturer, so follow the installation guide step by step:
1. Slide the nut and any required components (sleeve, O-ring, etc.) onto the tubing in the correct order and orientation before inserting the tubing end.
2. Push the tubing end fully onto the fitting body until it bottoms out. An under-inserted tube is the most common installation error and will fail a pressure test.
3. Hand-tighten the nut, then apply the manufacturer's specified wrench torque or wrench-turn count. Over-tightening can crack the fitting body; under-tightening leaks.
4. Do not use pipe dope or thread tape on CSST fittings — only on the male NPT thread at the transition to rigid pipe.
Routing, Bending, and Strike Protection
CSst can be bent by hand to change direction. Observe the manufacturer's minimum bend radius (shown in the installation guide for each tubing size) — overbending kinks the corrugations and restricts flow.
When CSST passes through or alongside a framing member where a nail or screw could penetrate it, strike protection is required. The IFGC and every major manufacturer require a listed steel striker plate (also called a nail plate) over any framing member within the protection zone specified in the guide. The plate must be of sufficient gauge and must cover the full width of the member. Failure to install strike protection is a leading cause of CSST puncture fires.
Additional routing rules:
- CSST must not be in contact with masonry, concrete, or soil without protection.
- Secure the tubing with listed hangers at the manufacturer's maximum spacing.
- Keep CSST away from heat sources and sharp edges.
Bonding and Grounding Requirements
This is the most critical code topic for CSST. All CSST systems must be bonded. The requirement exists because lightning or electrical fault current that enters the gas system can arc through the thin corrugated wall, causing a pinhole leak and fire.
The IFGC and CSST manufacturer installation guides require that a bonding conductor connect the CSST system to the building's grounding electrode system (GES) or to the electrical service grounding means. Key points:
- Where to connect: Attach a listed bonding clamp directly to the CSST jacket or to an accessible metallic fitting on the CSST system. The clamp must be listed for use with CSST — do not use generic pipe clamps.
- Wire size: The minimum conductor size is specified in the manufacturer's guide and references the IFGC. A common minimum is No. 6 AWG copper, but always verify with the specific manufacturer's guide for the brand you are installing, because some brands specify larger conductors for longer runs.
- Path to ground: Run the bonding conductor to a grounding electrode, the electrical panel ground bus, or another approved point in the GES using the shortest practical path.
- One connection per system: A single bonding connection to an accessible metallic component bonds the entire continuous CSST system, because the corrugated metal core is electrically continuous.
- Jacket conductivity: The yellow polyethylene jacket is non-conductive. The bonding clamp must make contact with the metal of the tubing or fitting, not just the jacket.
After installation, document the bonding location on the as-built sketch you provide to the customer or general contractor.
Pressure Testing
After assembly and before concealment, pressure-test the system per the IFGC and local AHJ requirements. Apply leak-detection solution to every fitting and inspect visually. No bubbles equals a passing test at that joint. Record test pressure and duration per your jurisdiction's requirements.
Key terms10
CSSTCorrugated stainless steel tubing — flexible, yellow-jacketed gas piping listed to ANSI LC 1 / CSA 6.26 and used to distribute natural gas or propane inside buildings.
IFGCInternational Fuel Gas Code — the model code governing the design, installation, and inspection of fuel gas piping systems, adopted by reference in most US jurisdictions.
Bonding conductorA copper wire connecting the CSST metallic core to the building's grounding electrode system to equalize electrical potential and prevent arc damage from lightning or fault current.
Grounding electrode system (GES)The network of conductors and electrodes (ground rods, water pipe, etc.) that connects the electrical system to the earth, to which the CSST bonding conductor is attached.
Strike protectionA listed steel nail plate installed over a framing member to prevent fasteners such as nails or screws from puncturing CSST during or after construction.
Insertion depthThe manufacturer-specified length of CSST end that must be pushed fully onto the fitting body to achieve a leak-free mechanical connection.
CSST shearsThe only approved cutting tool for CSST; produces a clean, square cut through the corrugations without leaving metal fragments inside the tubing.
Listed bonding clampA clamp tested and approved specifically for use with CSST that makes reliable electrical contact with the metal core or fitting body of the tubing system.
Minimum bend radiusThe smallest radius to which a specific size of CSST may be bent by hand without kinking or restricting flow, as specified in the manufacturer's installation guide.
AHJAuthority Having Jurisdiction — the local inspector or agency with legal authority to approve or reject a plumbing or gas piping installation.
Worked examples4
1. You are running a CSST section between two fittings mounted 36 inches apart (center of fitting body to center of fitting body). The manufacturer specifies an insertion depth of 1.5 inches at each end. How long do you cut the CSST?
- Identify the face-to-face distance: 36 inches (center to center equals face to face when measuring between fitting body ends in this context, but confirm with the installation guide).
- Add the insertion depth for the first fitting end: 36 + 1.5 = 37.5 inches.
- Add the insertion depth for the second fitting end: 37.5 + 1.5 = 39 inches.
- Mark the tubing at 39 inches and cut squarely with CSST shears.
Answer: Cut the CSST to 39 inches.
2. A framing stud is 1.5 inches wide (the narrow face of a 2×4). The manufacturer's installation guide requires a strike plate to cover the full width of the framing member plus 1 inch on each side. What is the minimum length of strike plate required?
- Identify the stud face width: 1.5 inches.
- Add 1 inch on the left side: 1.5 + 1 = 2.5 inches.
- Add 1 inch on the right side: 2.5 + 1 = 3.5 inches.
- The minimum strike plate length along the stud face is 3.5 inches.
Answer: The strike plate must be at least 3.5 inches long to cover the stud plus 1 inch on each side.
3. You have 4 CSST fittings to assemble. Each fitting requires the nut to be wrench-tightened exactly 1.25 turns after hand-tight. If each full turn takes approximately 6 seconds of wrench work, how many seconds of total wrench time do the 4 fittings require?
- Calculate wrench time per fitting: 1.25 turns × 6 seconds/turn = 7.5 seconds per fitting.
- Multiply by the number of fittings: 7.5 × 4 = 30 seconds.
- This is an estimate for planning purposes; always verify tightness by feel and manufacturer specification, not by time alone.
Answer: Approximately 30 seconds of wrench time for all 4 fittings.
4. The homeowner's gas riser enters at one end of the building. You install CSST running 42 feet to a furnace. The manufacturer's installation guide states that hangers are required at a maximum spacing of 4 feet for this tubing size. What is the minimum number of hangers needed for this run? (The first hanger is within 1 foot of the first fitting, and the last hanger is within 1 foot of the last fitting.)
- Determine the number of 4-foot spans: 42 ÷ 4 = 10.5, which means at least 10 full spans plus a partial span.
- The number of intermediate support points for n spans is n + 1 when both ends need a hanger. For 10 full spans you would place hangers at 0, 4, 8, 12, 16, 20, 24, 28, 32, 36, 40, and at or before 42 feet — that is 11 hanger positions for 10 full spans.
- The partial span (40 to 42 feet, which is 2 feet) still requires a hanger at the far end (within 1 foot of the last fitting), so place a hanger at or near 41 feet.
- Count total hangers: positions at approximately 0 (within 1 ft of start fitting), 4, 8, 12, 16, 20, 24, 28, 32, 36, 40, and 41 ft = 12 hangers minimum.
Answer: A minimum of 12 hangers for a 42-foot run at 4-foot maximum spacing with hangers within 1 foot of each end fitting.
The math in this lesson1
Learners compute CSST length and support count from run length and hanger spacing.
6.RP.3
In class: Instructor demonstrates measuring, cutting with CSST shears, fitting preparation, and assembly of manufacturer end fittings; students complete each step immediately after the demonstration on their own 3-foot section. · Instructor explains CSST bonding requirements using the manufacturer installation guide and an IFGC reference; students locate and highlight the applicable sections and complete a short written response identifying where and how the bonding conductor connects. · Students route their assembled CSST section through a framed wall mockup, select and install appropriate strike protection where code requires it, and attach the bonding clamp at the correct location; instructor evaluates each installation.
Materials: CSST tubing (instructor-selected manufacturer), CSST shears, manufacturer end fittings and assembly tools, CSST manufacturer installation guide, IFGC code book, framed wall mockup, bonding clamps, bond wire, electrical tape, safety glasses
Check: Instructor checklist: correct cut (no jagged edge), fitting fully seated, bonding clamp at correct location, strike protection installed where required. All four items must be marked satisfactory to pass.
Practice check8
Answer each question, then check it. Nothing is recorded; this is your own practice.
Record this lesson on my transcript. Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.