
Outside, the Student Yard changes every term. Carpentry, masonry, welding, roofing and electrical students build real structures here as capstone projects, inspected like any job site and taken down to make room for the next class.

This term's capstone structure, built and inspected by students.
This room's panels change each term with the student builds.
Tuition is free for the first 150 students who sign up by October 31, 2026 — 150 seats left. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.