🚧 Under construction — VoTechWorks is being built. Tuition is free for the first 150 students who sign up by October 31, 2026 — 150 seats left.
voTechWorksGrade 13 · a vocational technology learning center, by urbanicity
newSchoolWorks.com › VoTechWorks › Museum › The galleries › G11 · Student Yard (outdoor)
G1G2G3G4G5G6G7G8G9G10G11
Gallery G11 view
Gallery G11

Student Yard (outdoor)

Outside, the Student Yard changes every term. Carpentry, masonry, welding, roofing and electrical students build real structures here as capstone projects, inspected like any job site and taken down to make room for the next class.

8,000 sq ft planned · anchor: Changes each term · 0 panels · 1 objects

Anchor objects & demos1

Student-built structure
VTBMPA · changes each term

Student-built structure

This term's capstone structure, built and inspected by students.

This room's panels change each term with the student builds.

← G10 · Hall of MakersThe museum →