Objective. Students will cut and install finish treads and riser boards on a completed stringer assembly so that every tread is level, nosing projection is consistent, gaps between riser and stringer are less than 1/8 inch, and no fastener heads are exposed on tread surfaces.
Once the stringers are cut and fastened, the visible surfaces of a staircase — the treads you step on and the risers you see beneath each tread — become the work that homeowners and inspectors notice. Gaps, squeaks, uneven nosings, and exposed screw heads are all signs of rushed finish carpentry. This lab holds you to a tight tolerance: no gap greater than 1/8 inch, nosing projection consistent within 1/8 inch, every tread level, and no fastener visible on a tread surface. Meeting all four criteria is what separates a professional installation from a rough one.
Always wear safety glasses and hearing protection when operating the miter saw. Keep your hand at least 6 inches from the blade path. Wait for the blade to reach a full stop before lifting the guard or retrieving a cut piece. When working on the stringer assembly, keep the work area free of offcuts — a curved tread piece on the floor is a trip hazard. Secure tread stock firmly against the miter saw fence before cutting; long boards need an outfeed support. Construction adhesive contains solvents; work in a ventilated area and follow the manufacturer's handling instructions on the label.
Stringers are cut by hand, and even skilled carpenters end up with slight variation in tread depth from notch to notch. If you cut every tread to the same length and the stringers have wandered even a little, you will accumulate gaps at the wall stringer or the open stringer. The correct method is to measure each tread opening at the widest point between the two stringers, then add the nosing overhang specified in your plans (commonly 1 to 1-1/4 inches for a housed nosing detail). Mark and label each tread board with its step number before cutting. Risers are measured similarly — cut each riser to the actual height of that notch, not to a theoretical unit rise.
Use a sharp pencil and a square to mark your cut lines. A miter saw set at exactly 90° produces a clean, square cut that fits tightly against the wall stringer. If the wall stringer is scribed to a finished wall surface, you may need to scribe the tread end to match the wall profile using a compass or scribing tool.
Always install riser boards before treads. The riser goes into the back of the stringer notch and provides solid backing for the rear of the tread above it. Apply a continuous bead of construction adhesive to the notch surface, press the riser into place, and face-nail or screw it to the stringer from the back where the fasteners will be hidden. Check that the riser sits flush with the top edge of its notch — any proud edge will rock the tread.
With the riser secured, apply two parallel beads of construction adhesive along the top surface of the riser and along the tread notch surface of the stringer. Set the tread board in place so the nosing overhangs the riser face by the required dimension. Drive finish nails or trim screws at an angle through the back edge of the tread into the riser (toe-nailing) so no fastener head appears on the walking surface. On an open stringer, finish nails can be driven from the underside of the tread into the stringer rabbet. Set any face nails with a nail set so they are below the surface and fill with wood filler before painting or staining.
When one end of a tread meets a finished wall or a closed stringer, the wall surface is rarely perfectly plumb or straight. Scribing transfers the wall's profile onto the tread end so the fit is tight. Hold the tread in its final position, butted as close to the wall as possible. Open a compass to the widest gap between the tread end and the wall, then drag the metal point along the wall while the pencil traces the profile onto the tread. Cut along this line with a jigsaw, test-fit, and make minor adjustments with a block plane until the gap is less than 1/8 inch along the full length.
After each tread is installed, immediately check two things. First, use a combination square set to your target nosing dimension to verify the overhang at three points across the width of the tread. If the nosing varies more than 1/8 inch from tread to tread, the stair looks and feels uneven. Second, place a torpedo level on the tread surface; it should read level side-to-side. A tread that tips even slightly creates a tripping hazard over time. Correct a low spot by removing the tread, adding a thin shim of wood to the stringer notch, re-gluing, and reinstalling.
If a gap greater than 1/8 inch remains between the riser board and the side of the stringer after installation, scribe molding is the professional remedy. Scribe molding is a thin, flexible strip of wood that is glued and finish-nailed along the junction. It covers the gap without requiring you to remove and recut the riser. Miter scribe molding at outside corners and cope it at inside corners for a clean look.
Before calling the instructor for your check, walk through every tread yourself:
All four criteria must be met for a passing score. Correct any deficiency before requesting inspection.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.
Does the school offer financial aid?
No. We don’t offer financial aid because we’re free. No, really: completely free.
Do you offer industry certification?
No. We are not certified yet, so we can’t offer that to students. What we do offer is knowledge and understanding of a trade.
Enroll first in the trade you’re interested in. You get your key, your program opens, and you begin studying.
Enroll free →