Objective. Student will perform the full mechanical and electrical scope of at least three PV installations—including racking layout, module mounting, DC string wiring, inverter mounting, AC interconnection, and labeling—meeting the supervising installer's quality standard on each task.
This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
Externship days combine everything you have studied—structural principles, electrical theory, code rules, and safety habits—into a single, fast-moving workflow. Each job site is slightly different, but the scope of work on a residential or light-commercial PV installation follows a repeatable sequence: layout and racking, module mounting, DC wiring, inverter and AC disconnect installation, labeling, and commissioning. Your supervising installer sets the quality bar; your job is to meet it on every task, every time.
Before any hardware goes on the roof, study the approved permit set and the engineered racking drawings. Confirm the roof section, orientation, setbacks, and attachment-point spacing shown on the drawing. Racking manufacturers specify the maximum rail span and the required fastener torque for each attachment type—follow those values exactly and record them in your daily field log.
When attaching to a shingle or tile roof, each lag screw or through-bolt is a potential water entry point. Follow the manufacturer's flashing and sealant instructions for every penetration: flash first, set the lag, apply sealant approved for roofing use, and photograph the completed attachment before it is covered by the rail. Document each penetration in the field log with its location (row and column), fastener size, torque value achieved, and waterproofing product used.
Torque fasteners with a calibrated torque wrench, not an impact driver set by feel. Over-torquing crushes flashing and voids the waterproofing warranty; under-torquing allows the rail to move under wind and snow load. After rails are secured, install mid-clamps and end-clamps finger-tight until modules are positioned, then torque to spec in a consistent pattern.
Safety on the roof: Wear slip-resistant footwear and a properly fitted harness connected to an anchor rated for fall arrest whenever you are on a roof with a pitch or height that triggers your employer's fall-protection program. Never set tools on the roof surface where they can slide. Keep your three-point contact on ladders.
Once modules are mechanically secured, route the DC home-run conductors from the array to the inverter or combiner location. Use conduit where required by the design, and maintain the minimum bend radius for the conductor size selected. Use wire management clips or cable trays designed for PV use—never zip-tie conductors to mounting rails without a UV-rated tie.
Before making any connections, verify conductor colors match the design: typically red or positive-marked for the ungrounded conductor and black or negative-marked for the return in a DC system, following your specific design documents. Inspect each MC4 (or listed) connector for pin seating, then pull-test each connection by hand. A properly crimped and locked connector will not pull free.
Before energizing, measure open-circuit voltage (Voc) across each string with a multimeter set to DC voltage. Compare the reading to the calculated Voc at the ambient temperature of the day—a significant deviation indicates a wiring error, a shaded module, or a failed module. Record the measured Voc, string polarity, conductor colors, and connector types in your field log before you report the string ready for connection to the inverter.
Electrical safety: DC circuits cannot be switched off by simply opening a breaker while current is flowing under load. Under sunlight, an energized arc can sustain itself. Work on DC circuits before sunrise, in low-light conditions, or cover modules with opaque material to de-energize the string. Always use properly rated personal protective equipment (PPE) including insulated gloves when working on energized DC conductors. Follow your employer's lockout/tagout (LOTO) procedure for the inverter and AC disconnect before working on the AC side.
Mount the inverter at the height and location shown on the permit set—typically on a shaded exterior wall or in a conditioned space per the manufacturer's clearance requirements. Use hardware rated for the wall material and the inverter weight. Route the DC conduit from the array into the inverter's DC input compartment and the AC conduit from the inverter output to the AC disconnect.
Wire the AC disconnect following the single-line diagram. Verify conductor sizing, breaker rating, and conduit fill against the permit set. Torque all terminal lugs to the manufacturer's specification printed on the device label—under-torqued lugs cause resistance heating and are a fire hazard.
NEC Article 690 and Article 705 require specific labels at the inverter, AC disconnect, service panel, conduit runs, and other locations. These include arc-flash warning labels, rapid-shutdown instructions visible to first responders, and conductor identification labels. Use only labels listed for the application—field-made paper labels are not code-compliant. Apply each label flat, without wrinkles that obscure text, before the system is energized.
Commissioning is performed by or directly supervised by the licensed installer. Your role is to assist and observe. The sequence typically includes: verify all mechanical and electrical connections are complete; confirm rapid-shutdown devices are functional; close the AC disconnect and enable the inverter per the manufacturer's startup sequence; verify AC output voltage, frequency, and power factor on the inverter display or monitoring portal; record all commissioning readings in the field log.
Every field-log entry—torque values, Voc readings, label locations, commissioning data—protects the homeowner, the installing contractor, and you. Inspectors and utility representatives review this documentation. Incomplete logs reflect poorly on the crew. Fill out every field log completely before leaving the site.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.
Does the school offer financial aid?
No. We don’t offer financial aid because we’re free. No, really: completely free.
Do you offer industry certification?
No. We are not certified yet, so we can’t offer that to students. What we do offer is knowledge and understanding of a trade.
Enroll first in the trade you’re interested in. You get your key, your program opens, and you begin studying.
Enroll free →