Objective. Students will locate specific information in elevator construction drawings, single-line electrical schematics, hydraulic circuit diagrams, and ASME A17.1 code tables using standard industry symbols and drawing conventions.
This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
Every elevator installation, modernization, and inspection begins with paper—or its digital equivalent. Before a single bolt is turned, a mechanic must read and understand construction drawings, electrical schematics, hydraulic circuit diagrams, and code tables. Misreading a drawing can mean installing equipment in the wrong location, wiring a circuit incorrectly, or violating ASME A17.1 clearance requirements. Any of those errors can injure workers or passengers. Accurate technical reading is therefore a core safety skill, not just an academic one.
Construction drawings show the physical layout of an elevator system. A hoistway plan is a top-down view showing the shaft dimensions, guide rail positions, car platform size, and clearances. A pit detail shows the depth of the pit, the location of buffers, the pit ladder, the pit stop switch, and lighting. A machine room layout shows the equipment footprint, ventilation, and emergency disconnect location. Every drawing has a title block—a box in the lower-right corner that lists the project name, drawing number, revision level, scale, and the engineer of record. Always read the title block first to confirm you have the correct drawing and the current revision.
Single-line electrical schematics show the power distribution path using a simplified one-conductor-per-phase convention. They are not wiring diagrams; they show what is connected to what in terms of system logic and protection, not the physical wire routing. Standard symbols follow ANSI/IEEE conventions. A fused disconnect switch, a transformer, and a motor controller each have specific symbols you must recognize instantly.
Hydraulic circuit diagrams show the fluid path in a hydraulic elevator: pump, motor, relief valve, lowering valve, check valve, cylinder, and associated piping. NFPA 79 and industry-standard hydraulic symbols are used. Arrows on lines indicate flow direction. Understanding the diagram lets you trace a fault—for example, if the car drifts down, you can follow the circuit to identify which valve is most likely leaking.
ASME A17.1 code tables provide the legally required minimums and maximums for dimensions such as pit depth, overhead clearance, and car platform area. The tables are organized by elevator type (electric traction, hydraulic, limited-use/limited-application) and by rated speed or capacity. To use a table correctly, you must (1) identify the elevator type, (2) find the correct rated speed or load column, and (3) read the intersecting cell. Never guess at a code value; always look it up.
Symbols are a shared language. When everyone on a job site uses the same symbol for a normally-open contact or a pressure-relief valve, errors drop and work speeds up. The four symbol families you must know are:
When you encounter an unfamiliar symbol, go to the legend on the same drawing sheet before guessing. If no legend exists, consult the applicable reference standard.
Drawings are produced at a stated scale (for example, 1/4" = 1 foot). To find an actual measurement that is not already dimensioned, use an architect's scale rule. Lay the correct scale edge along the feature and read the value. Always check: the scale printed in the title block must match the scale rule you choose. If a drawing is marked NOT TO SCALE (NTS) or has been photocopied and may have changed size, use only the printed dimensions—never scale directly from the paper.
1. Read the title block—confirm project, drawing number, and revision.
2. Identify the drawing type (plan, elevation, schematic, detail).
3. Note the scale and units.
4. Read the legend or symbol key.
5. Locate what you need using the grid coordinates or leader lines.
6. Cross-reference dimensions against applicable ASME A17.1 code table values before accepting them as compliant.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.
Does the school offer financial aid?
No. We don’t offer financial aid because we’re free. No, really: completely free.
Do you offer industry certification?
No. We are not certified yet, so we can’t offer that to students. What we do offer is knowledge and understanding of a trade.
Enroll first in the trade you’re interested in. You get your key, your program opens, and you begin studying.
Enroll free →