Objective. Students will build a one-week labor schedule to a specified labor cost budget, calculate total labor cost, and compute labor cost percentage against projected sales.
This lesson, its worked examples and its practice questions has not yet been verified by a certified food-safety manager and industry professional or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
Labor is typically the second-largest cost a restaurant carries, trailing only food cost. In most full-service operations, labor runs between 30 and 35 percent of sales; in quick-service concepts it tends to be lower. A schedule that is even slightly overstaffed across seven days can push a profitable week into a loss. Learning to build a schedule backward from a sales forecast—rather than forward from habit—is one of the most practical skills a restaurant manager can develop.
Three calculations anchor every scheduling decision:
Total Labor Cost
Add together all wages and salaries paid for the period.
> Total Labor Cost = Σ (Hours Worked × Hourly Rate) + Prorated Salary Costs
Labor Cost Percentage
Express labor as a share of sales so you can compare weeks of different volume:
> Labor Cost % = (Total Labor Cost ÷ Total Sales) × 100
Prorating a Salaried Manager
A salaried manager's annual compensation must be converted to a weekly figure before it enters the schedule budget:
> Weekly Salary Cost = Annual Salary ÷ 52
Always include the salaried manager's cost even though their hours do not appear as a variable line on the hourly schedule.
Before writing a single name on a schedule, study the projected sales data. Two figures drive staffing decisions:
Multiplying covers by average check gives projected sales for that period. A Friday dinner forecast of 180 covers at an $18 average check projects $3,240 in dinner sales. That revenue figure tells you how many labor hours the budget can absorb before the percentage climbs too high.
ManageFirst scheduling principles emphasize building staffing levels to match demand curves: ramp up before peak periods, ramp down after them. Overstaffing a slow Tuesday lunch to avoid the discomfort of sending someone home early is a direct cost-control failure.
1. Set the target labor cost percentage. This comes from the operation's budget or from management direction. A common target for a casual full-service concept might be 32 percent.
2. Calculate the labor dollar budget for each day. Multiply each day's projected sales by the target percentage.
> Daily Labor Budget = Projected Daily Sales × Target Labor Cost %
3. Subtract fixed costs first. Divide the salaried manager's weekly cost by 7 to find the daily portion to reserve before scheduling hourly employees.
4. Schedule by station and shift. Assign employees to stations—host, server, line cook, dishwasher—and record their start and end times. Multiply hours per shift by each employee's rate to find that shift's labor dollar cost.
5. Total each day and compare to the daily budget. Adjust shifts if a day runs over. Common adjustments include staggered start times, split shifts, or reducing hours on a slow mid-week day.
6. Verify the weekly total. Sum all daily labor costs (hourly + salaried) and divide by total projected weekly sales to confirm the overall labor cost percentage lands within the target tolerance.
Many operations post a maximum number of labor hours allowed per day. This cap exists for two reasons: cost control and compliance with any applicable overtime rules. Under the federal Fair Labor Standards Act, non-exempt employees who work more than 40 hours in a workweek must be paid at least one and one-half times their regular rate for those overtime hours. Good scheduling prevents unnecessary overtime by distributing hours evenly across the week and tracking each employee's cumulative hours as the schedule is built.
If a peer-review team finds that a single shift or a single employee's daily assignment pushes the day over the posted cap, that overage must be flagged and corrected before the schedule is posted.
A labor schedule is not only a financial document—it is a safety document. Every shift must maintain minimum staffing so that no employee works alone in a situation that requires assistance (for example, receiving large deliveries, operating heavy equipment, or closing the building at night). Fatigue is a known contributor to kitchen injuries; schedules that routinely assign split shifts or very long shifts increase risk. Managers should follow any posted guidelines on maximum consecutive hours and ensure adequate rest between closing and opening shifts. When employees handle cleaning chemicals or operate equipment during setup or breakdown, the schedule must reflect enough people to follow lockout/tagout procedures and use required personal protective equipment correctly—never shortcut those steps to save a labor hour.
Having a second team calculate your labor cost percentage independently catches arithmetic errors and forces both teams to engage deeply with the numbers. When the reviewing team presents findings verbally, they practice the communication skill of delivering constructive feedback—essential for any supervisor role. If the two totals disagree, both teams must reconcile the difference, which reinforces careful reading of wage rates and hours.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.