BLD-NUCL84-09 · Lesson 2 · 192 clock hours · lab
Technical Analysis: Systems, Radiation Protection, and Maintenance Package Development
Objective. The student will complete the full technical body of the capstone—system functional analysis, ALARA dose planning, and a compliant LOTO/work-order package—to a standard that could serve as a training document in a licensed nuclear facility.
⚠ Pending professional review
This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
Lesson Overview
This lab session is the technical heart of your capstone project. You will produce three interconnected work products—a system functional analysis, an ALARA radiation work permit (RWP) analog, and a lockout/tagout (LOTO) package—written to the professional standard expected of a nuclear plant training document. Each product must stand on its own, yet all three must describe the same scenario and the same system. That integration is what makes this capstone meaningful.
Section 3: System Functional Analysis
A system functional analysis answers four questions: What does this system do under normal conditions? What safety function does it perform when something goes wrong? What are its major components and their relationships? How does it interact with other plant systems?
Begin by reading your assigned Piping and Instrumentation Diagram (P&ID) carefully. Identify the system boundary—the outermost isolation valves that separate your system from adjacent systems. Mark every pump, heat exchanger, major valve, and instrument. Copy the instrument tag numbers exactly; tag numbers are how operators and engineers reference physical equipment in the field, and errors create confusion that can affect safety.
Document normal operating parameters: flow rates, pressures, temperatures, and fluid inventory levels that operators expect to see during steady-state power operation. These are your baseline. If a parameter leaves its normal band, an operator must know why. Your write-up should explain the consequence of each major parameter deviation.
Describe the safety function last, because it depends on understanding normal operation first. For example, a residual heat removal (RHR) system may run in standby during power operation, but its safety function—removing decay heat after shutdown—is critical to fuel integrity. Reference the specific design-basis event that activates the system.
Format Section 3 using the NEI NUCP Uniform Curriculum document conventions. Every figure must be labeled with a figure number and caption. A minimum of eight pages is required, but completeness and accuracy matter more than page count.
Section 4: ALARA Radiation Work Permit Analog
The principle of ALARA—As Low As Reasonably Achievable—requires that radiation exposure be reduced below regulatory limits wherever practical, not merely kept within them. The NRC dose limits in 10 CFR Part 20 set the legal ceiling; ALARA planning sets the practical target, typically a small fraction of that ceiling.
Your RWP analog documents the radiological conditions workers will encounter, the controls that will protect them, and the dose budget for the job. Use the radiological survey data provided with your scenario. Survey data typically gives dose rates in millirem per hour (mrem/hr) or microsievert per hour (µSv/hr) at specific measurement points. Apply the point-source or buildup-factor calculation methods you practiced in Course 5 to estimate dose rates at worker locations.
Specify dosimetry: at minimum, a passive whole-body dosimeter (TLD or OSL badge) is required for any work in a radiologically controlled area. A self-reading dosimeter or electronic personal dosimeter (EPD) allows real-time monitoring. If surface contamination levels exceed action levels, anti-contamination (anti-C) clothing is required. If airborne radioactivity is present above established limits, specify respiratory protection consistent with plant procedures and 10 CFR Part 20 requirements.
Calculate a stay time: divide your ALARA dose goal for the task by the expected dose rate at the work location. That quotient gives the maximum minutes a worker should spend in the area without exceeding the dose goal. Build in margin—radiation work rarely goes exactly as planned.
After your peer review using the instructor checklist, revise and finalize. Peer review is not a formality; it mirrors how licensed nuclear facilities use independent verification to catch errors before work begins.
Section 5: LOTO Package
Lockout/tagout protects workers from unexpected release of hazardous energy. In a nuclear plant, hazardous energy sources include electrical (motor-operated valves, pump motors), mechanical (rotating equipment), thermal (high-temperature piping), pneumatic (air-operated valves), and hydraulic (pressurized systems). Your scenario will involve more than one of these categories.
The OSHA standard at 29 CFR 1910.147 governs LOTO in general industry, and nuclear plants apply it alongside plant-specific procedures. The required steps are: notify affected employees; shut down the equipment using normal stopping procedures; isolate every energy source; apply locks and danger tags to each isolation point; release or restrain stored energy (bleed pressure, block valves against gravity, discharge capacitors); verify that the equipment cannot be energized by attempting to start it.
Your package must list every energy source—omitting even one is an automatic return-for-correction in this course, because a missed energy source in the field can kill a worker. Write step-by-step isolation procedures using the actual valve numbers from the P&ID. Include a verification checklist that a second qualified person signs. Include a danger tag log recording tag number, location, installed-by, and date.
After drafting, audit the package against the instructor-supplied 1910.147 audit form. Correct every deficiency before submission.
Safety Reminders
Through this lab you are writing documents that could guide real workers near radioactive systems and energized equipment. Treat accuracy as a life-safety matter, because in practice it is. When in doubt about a regulatory requirement, look it up in the primary source—10 CFR Part 20 or 29 CFR 1910.147—rather than relying on memory. Flag any uncertainty to your instructor before submission, not after.
Key terms10
System Functional AnalysisA structured written description of a plant system covering its normal operating parameters, safety function, major components, and interactions with adjacent systems, used as a training and reference document.
P&ID (Piping and Instrumentation Diagram)An engineering drawing that shows all process piping, equipment, instrumentation, and control devices for a system, including instrument tag numbers and system boundaries.
ALARA (As Low As Reasonably Achievable)The regulatory and ethical principle requiring that radiation doses to workers be kept as far below legal limits as practicable, considering economic and practical factors.
Radiation Work Permit (RWP)A plant authorization document that describes radiological conditions at a work location, specifies required dosimetry and PPE, sets dose goals and stay times, and defines posting and contamination controls.
Stay TimeThe calculated maximum duration a worker may remain in a radiation area without exceeding the ALARA dose goal for the task, found by dividing the dose goal by the dose rate.
Lockout/Tagout (LOTO)A safety procedure governed by OSHA 29 CFR 1910.147 that controls all hazardous energy sources—electrical, mechanical, thermal, pneumatic, and hydraulic—before maintenance work begins, protecting workers from unexpected equipment startup or energy release.
Hazardous Energy SourceAny electrical, mechanical, hydraulic, pneumatic, thermal, or other energy that could harm workers if not controlled during equipment servicing; must be identified and isolated in every LOTO package.
10 CFR Part 20The NRC regulation titled 'Standards for Protection Against Radiation,' which establishes occupational and public dose limits and the framework within which ALARA planning takes place at licensed nuclear facilities.
Instrument Tag NumberThe unique alphanumeric identifier assigned to each instrument, valve, or device on a P&ID, used by operators and maintenance workers to reference specific physical equipment in procedures and work orders.
Danger Tag LogA written record within a LOTO package that lists each danger tag by number, its installed location, the name of the person who installed it, and the date, providing accountability and traceability during restoration.
Worked examples4
1. A radiological survey shows a dose rate of 120 mrem/hr at the worker location inside a pump room. The ALARA dose goal for the maintenance task is 20 mrem. What is the maximum stay time in minutes?
- Write the stay time formula: Stay Time (hours) = Dose Goal (mrem) ÷ Dose Rate (mrem/hr).
- Substitute values: Stay Time = 20 mrem ÷ 120 mrem/hr = 0.1667 hours.
- Convert to minutes: 0.1667 hours × 60 min/hr = 10.0 minutes.
- Apply practical margin: nuclear facilities typically reduce calculated stay times by 20% or more. At 20% margin: 10.0 min × 0.80 = 8.0 minutes maximum worker stay time.
Answer: The calculated stay time is 10 minutes; with a 20% margin applied, the administrative stay time is 8 minutes.
2. Using a simplified point-source model, a source of known activity produces a dose rate of 80 mrem/hr at 1 meter. Estimate the dose rate at 2 meters using the inverse-square law.
- State the inverse-square law: Dose Rate₂ = Dose Rate₁ × (Distance₁ / Distance₂)².
- Identify values: Dose Rate₁ = 80 mrem/hr, Distance₁ = 1 m, Distance₂ = 2 m.
- Calculate the ratio: (1 m / 2 m)² = (0.5)² = 0.25.
- Multiply: Dose Rate₂ = 80 mrem/hr × 0.25 = 20 mrem/hr.
Answer: The estimated dose rate at 2 meters is 20 mrem/hr, one-quarter of the dose rate at 1 meter.
3. A worker will receive a dose rate of 20 mrem/hr for 8 minutes at Position A, then 50 mrem/hr for 5 minutes at Position B. What is the total estimated dose received?
- Convert each stay time to hours: Position A = 8 min ÷ 60 = 0.1333 hr; Position B = 5 min ÷ 60 = 0.0833 hr.
- Calculate dose at each position: Dose A = 20 mrem/hr × 0.1333 hr = 2.67 mrem; Dose B = 50 mrem/hr × 0.0833 hr = 4.17 mrem.
- Sum the doses: Total dose = 2.67 mrem + 4.17 mrem = 6.84 mrem.
- Round to appropriate significant figures: approximately 6.8 mrem.
Answer: The worker's total estimated dose for the task is approximately 6.8 mrem.
4. A LOTO package audit finds that the package lists electrical and mechanical energy sources but the scenario P&ID shows a pneumatic air-operated valve (AOV) in the isolation boundary. How many energy source categories are documented, and what correction is required?
- Count documented energy source categories: electrical (1) and mechanical (1) = 2 categories listed.
- Identify the missing category from the P&ID: pneumatic (air supply to the AOV) = 1 category missing.
- State the regulatory requirement: OSHA 29 CFR 1910.147 requires all energy sources to be identified and controlled; omission of any source is a deficiency.
- Describe the correction: add a step to the LOTO procedure to close and lock the air supply isolation valve to the AOV, bleed residual air pressure from the actuator, and record that isolation point in the danger tag log.
Answer: Only 2 of the required 3 energy source categories were documented. The package must be revised to include pneumatic energy isolation of the air-operated valve before it can be approved.
The math in this lesson1
Learners compute stay time from dose goal and dose rate, convert to minutes and apply a 20% margin.
6.RP.3
In class: Perform a system functional analysis for the primary assigned system: describe normal operating parameters, safety function, major components (pumps, valves, heat exchangers, instrumentation), and system interactions; mark up a provided P&ID to show system boundaries, isolation points, and instrument tag numbers; write this up as Section 3 of the technical report using the NEI NUCP document format, minimum eight pages with labeled figures. · Develop an ALARA radiation work permit (RWP) analog for the maintenance task embedded in the scenario: calculate estimated dose rates using provided radiological survey data and simple point-source or buildup-factor methods taught in Course 5; specify dosimetry requirements, PPE (anti-contamination clothing, respiratory protection if warranted), stay times, dose goals, and posting requirements consistent with 10 CFR Part 20 dose limits; have a peer review the RWP analog using an instructor-supplied checklist, then revise and finalize as Section 4 of the report. · Produce a complete LOTO package for the maintenance isolation required by the scenario: list every energy source (electrical, mechanical, thermal, pneumatic, hydraulic) to be controlled; write step-by-step isolation and restoration procedures referencing specific system valve numbers from the P&ID; include a verification checklist and a danger tag log; review the package against OSHA 29 CFR 1910.147 requirements using an instructor-supplied audit form and correct any deficiencies before submission.
Materials: Scenario P&IDs (instructor-prepared, generic plant-model based), radiological survey data sheets, 10 CFR Part 20 dose limit tables, NEI NUCP Uniform Curriculum reference binder, OSHA 29 CFR 1910.147 standard (publicly available), sample RWP and LOTO forms, scientific calculator, dose-rate calculation worksheets from Course 5, peer-review checklist, word-processing and spreadsheet software
Check: Instructor grades each subsection using a rubric with three domains—technical accuracy, regulatory compliance, and professional formatting—each scored 0–4; a total score of 30 out of 36 (83%) or higher is required to proceed. LOTO packages missing any energy source or lacking a verification step are automatically returned for correction regardless of overall score. ALARA dose calculations must be within ±20% of the instructor's reference solution.
Practice check8
Answer each question, then check it. Nothing is recorded; this is your own practice.
Record this lesson on my transcript. Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.