BLD-NUCL84-03 · Lesson 10 · 30 clock hours · lab

Plant System Drawings and P&ID Interpretation Lab

Objective. Students will correctly interpret Piping and Instrumentation Diagrams, one-line electrical diagrams, and system flow diagrams to verify a required system lineup before a simulated evolution, applying lockout/tagout principles to any isolated component.

⚠ Pending professional review

This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.

VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.

Why Drawings Are the Operator's First Tool

Before any valve is touched or any pump is started, nuclear plant technicians and operators must be able to read the drawings that describe the plant. Piping and Instrumentation Diagrams (P&IDs), one-line electrical diagrams, and system flow diagrams are the authoritative record of how components are connected and how energy flows through a system. Regulatory and utility procedures require that every system lineup be verified against approved drawings before an evolution begins. Misreading a drawing can send flow the wrong way, leave a critical valve closed, or expose a worker to an unisolated energy source.

P&ID Fundamentals

A P&ID is a detailed schematic showing all mechanical piping, instrumentation, and control elements for a specific system. P&IDs follow the ISA 5.1 standard for instrument symbols and identification. Key symbol categories you must recognize:

Always use the plant's official ISA symbol legend when reading a P&ID — never guess a symbol from memory alone.

One-Line Electrical Diagrams

A one-line (single-line) diagram represents the electrical power distribution system using a single line for each three-phase or single-phase circuit. Key elements include bus bars, circuit breakers, transformers, and motor loads. For nuclear plant operators, one-line diagrams are used to confirm which bus supplies power to safety-related equipment such as MOVs and pump motors. Before performing lockout/tagout, the operator must identify all electrical energy sources on both the P&ID and the one-line diagram.

System Lineup Verification

A system lineup is an ordered list of required component positions (open, closed, energized, de-energized) that must exist before a system is started or placed in service. For an RHR system startup, a typical checklist specifies that suction valves to the reactor coolant system are in a required position, heat exchanger bypass valves are closed, and pump discharge valves are confirmed open to the correct flow path. The technician traces each checklist item on the P&ID, confirms the drawn normal position, and documents any discrepancy — a valve shown normally closed that the checklist requires open, for instance — before proceeding. Never assume a valve position; verify on the drawing and then verify physically.

Lockout/Tagout (LOTO) Applied to P&ID-Identified Isolation Points

Lockout/tagout is governed by OSHA standard 29 CFR 1910.147, the Control of Hazardous Energy standard. It applies whenever maintenance, servicing, or unjamming of equipment could expose a worker to unexpected energization or release of stored energy (electrical, hydraulic, pneumatic, thermal, gravitational, or chemical).

The LOTO sequence for an isolated pump identified on a P&ID:

1. Notify affected employees that a lockout is to be performed.

2. Identify all energy sources using the P&ID and one-line diagram — electrical supply breakers, upstream and downstream isolation valves, any vent or drain paths needed to release stored pressure.

3. Shut down the equipment using normal stopping procedures.

4. Isolate each identified energy source: open the supply breaker, close isolation valves.

5. Apply lockout devices: Place a lock and a DANGER tag on each isolation point. When more than one technician works on the same equipment, use a hasp so each worker applies a personal lock.

6. Release or restrain stored energy: Vent pressurized lines, drain trapped fluid, block against gravity. Wait for thermal energy to dissipate to a safe level.

7. Verify zero energy state (ZES): Attempt to start the pump using the normal control — it must not start. Verify pressure gauges read zero. Use a calibrated voltage tester on the motor terminals.

8. Complete the LOTO log/permit with the time, isolation points, lock numbers, and names of all workers.

Any energy isolation point missed is a life-safety failure. For that reason, the lab check for this lesson treats any missed isolation point as an automatic fail.

Safety Reminders

Key terms10

P&ID (Piping and Instrumentation Diagram)A detailed engineering drawing showing all piping, valves, instrumentation, and control elements for a plant system, drawn in accordance with ISA 5.1 symbol standards.
ISA 5.1The Instrumentation, Systems, and Automation Society standard that defines the graphical symbols and identification letters used on P&IDs.
Motor-Operated Valve (MOV)A valve whose disc or gate is driven by an electric motor actuator; identified on a P&ID by a motor actuator symbol attached to the valve body.
System LineupA verified list of required component positions (open, closed, energized, de-energized) that must be confirmed on the drawing and in the field before a system evolution begins.
Lockout/Tagout (LOTO)The hazardous energy control procedure required by OSHA 29 CFR 1910.147, using physical locks and danger tags to isolate all energy sources before servicing equipment.
Zero Energy State (ZES)The condition in which all energy sources to isolated equipment have been physically blocked, released, or restrained, and verified so that unexpected startup or energy release cannot occur.
HaspA LOTO device with multiple holes that allows several workers to each apply a personal lock to a single isolation point, so equipment cannot be re-energized until every worker has removed their lock.
Residual Heat Removal (RHR) SystemA nuclear plant safety system that removes decay heat from the reactor core after shutdown, typically consisting of pumps, heat exchangers, and associated valves shown on dedicated P&IDs.
One-Line (Single-Line) Electrical DiagramA simplified electrical schematic using one line per circuit to show the power distribution path from source buses through breakers and transformers to electrical loads such as pump motors.
Instrument BubbleA circle on a P&ID that represents a measurement or control instrument; letter codes inside identify the variable measured (e.g., F = flow, P = pressure) and the function (e.g., T = transmitter, I = indicator).
In class: Using a packet of five generic P&ID segments covering different plant systems, identify and list all hand valves, motor-operated valves, check valves, control valves, instrumentation taps, and pump suctions/discharges on each segment using the correct ISA symbol legend. · Perform a simulated system lineup verification: given a written system lineup checklist for a generic residual heat removal (RHR) system startup, trace each valve position on the P&ID and check it against the checklist, documenting any discrepancy found. · Apply lockout/tagout to a simulated isolated pump using a demonstration lockout station (hasp, locks, tags, LOTO log): students complete the LOTO permit, affix locks and tags to the correct energy isolation points identified on the P&ID, and verify zero energy state per OSHA 29 CFR 1910.147 requirements.
Materials: Generic nuclear plant P&ID packet (five segments), ISA symbol legend, RHR system lineup checklist, LOTO demonstration station (hasp, multiple locks, danger tags, LOTO log), OSHA 29 CFR 1910.147 reference
Check: Students identify all valve and instrument symbols correctly on at least four of five P&ID segments (80% accuracy) and complete the LOTO exercise with zero safety-critical errors; any missed energy isolation point is an automatic fail requiring immediate repeat.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

NUCP Uniform Curriculum — Plant Drawings and Systems
1. On a P&ID drawn to ISA 5.1 standards, which symbol feature distinguishes a motor-operated valve from a hand valve?
NRC Non-Licensed Operator Prep — Procedure Adherence
2. A technician is verifying an RHR system lineup checklist against a P&ID and finds that the checklist requires valve RHR-MOV-101 to be OPEN, but the P&ID's normal-position notation shows it CLOSED. What is the correct action?
OSHA 10 — Hazardous Energy Control
3. According to OSHA 29 CFR 1910.147, which of the following actions is required to verify zero energy state after isolating a pump?
OSHA 10 — Hazardous Energy Control
4. When multiple technicians are performing maintenance on the same isolated pump, which LOTO device ensures the pump cannot be re-energized until every technician has finished?
NUCP Uniform Curriculum — Instrumentation and Control
5. On a P&ID instrument bubble, the letter code 'PT' most likely identifies which type of instrument?
NRC Non-Licensed Operator Prep — System Lineup Verification
6. A check valve on a P&ID is identified on a cooling water supply line. Which statement correctly describes its function and the safety implication for system lineup?
NRRPT Radiation Protection Tech — Radiological Work Planning
7. A radiation protection technician using a P&ID to support maintenance planning identifies an instrumentation tap on the primary coolant system labeled with an FT bubble. What does this tell the technician about radiological hazard at that tap?
OSHA 10 — Hazardous Energy Control
8. During the LOTO lab exercise, a student isolates the pump's electrical supply breaker and closes both isolation valves but forgets to vent the pressurized section of pipe trapped between the closed valves. Why is this an automatic fail of the exercise?