BLD-MASO04-07 · Lesson 3 · 10 clock hours · theory

Anchor and Tie Systems for Full-Thickness Brick Veneer

Objective. Students will calculate required tie spacing for a given wall area, select the correct corrosion-resistant tie type, and explain the function of each component in the veneer cavity system.

⚠ Pending professional review

This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.

VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.

What Is Full-Thickness Brick Veneer?

Full-thickness brick veneer is a single wythe of standard-size brick (nominally 3-5/8 in. thick) attached to a structural backup wall — typically wood studs, steel studs, or concrete masonry — with a clear cavity between them. The brick carries no structural floor or roof load; it is a weather screen and finished face. All lateral loads (wind pressure and suction) are transferred to the backup through metal ties and anchors. Because those ties are the only mechanical connection between the veneer and the structure, selecting the right type, spacing them correctly, and ensuring they will not corrode are life-safety issues.

The Veneer Cavity System — Components You Must Know

Weather-Resistive Barrier (WRB). A code-required membrane (housewrap, building paper, or fluid-applied) covers the backup wall. It is the last line of defense against water that penetrates the brick.

Cavity. The air space between the back face of the brick and the face of the WRB. Industry best practice is a minimum 1-inch clear cavity; many specifications call for 2 inches. The cavity allows water that enters the veneer to drain down and exit through weep holes at the base rather than soaking the backup.

Drainage plane. The continuous surface — formed by the WRB — that channels water downward to the flashing and weeps. Mortar droppings that fill the cavity block the drainage plane; keeping it clear is a quality-control responsibility on every job.

Collar joint. The space between two wythes when they are built close together, often filled with mortar. In true veneer construction the cavity is not a collar joint and must not be mortar-filled.

Ties and anchors. The metal fasteners connecting the veneer wythe to the backup. They resist the lateral loads described above.

Corrugated Strip Ties vs. Adjustable Two-Piece Ties

Corrugated strip ties are stamped from sheet metal into a corrugated (ridged) strip. One end is nailed or screwed to the stud; the other end is embedded in a mortar bed joint of the brick. They are simple and inexpensive but require that the mortar bed joint line up reasonably close to the stud fastening point — typically within one brick course. If the mortar joint does not align with the fastener, the tie must be bent, which reduces its load capacity significantly.

Adjustable two-piece ties consist of a wall anchor (a plate or pin fastened to the backup) and a separate wire or rod eye that slides or hooks onto the anchor. The sliding action gives vertical adjustment — often ±1-1/4 inches or more — so the tie can engage any mortar joint regardless of where the stud falls. Two-piece ties are preferred on steel-stud backup walls and in applications where coursing alignment is difficult to guarantee.

Spacing Requirements

NCCER and industry references derived from building codes establish maximum spacing limits. Horizontal spacing is typically one tie per stud bay, with studs at 16 in. or 24 in. on center. Vertical spacing is typically no more than 18 in. on center (every third course of standard brick, which courses at 2-2/3 in. per course — 8 courses = approximately 21-1/3 in., so ties must be placed more frequently than every 8 courses). Always verify the project specification; some high-wind or seismic zones require tighter spacing.

The rule of thumb for calculating tie quantity: one tie is required for every 2.67 sq ft of wall area, though project specs or local codes may be more conservative. Use this formula:

> Number of ties = Total wall area (sq ft) ÷ 2.67

Round up to the next whole number — never down.

Corrosion Resistance — Why It Matters

Ties are buried inside a wall where moisture is always present. A corroded tie loses cross-section and can fail without warning, allowing the veneer to detach. Acceptable corrosion protection includes:

Always reject ties that show red rust, pitting, or coating that flakes off when flexed. Stainless and hot-dipped galvanized ties look different — learn to tell them apart by markings, color, and surface texture.

Safety Points

Quality-Control Checks

Before the scaffold is moved and the wall section becomes inaccessible, verify: correct tie type is installed, mortar fully embeds the tie (minimum 5/8 in. cover to the exterior face of the joint), ties are not bent more than the manufacturer allows, and the cavity is free of mortar bridging the drainage plane.

Key terms9

Veneer wytheA single thickness of brick used as a non-load-bearing exterior face attached to a structural backup wall.
CavityThe clear air space between the back of the brick veneer and the face of the backup wall; allows water to drain and must not be filled with mortar.
Weather-Resistive Barrier (WRB)A membrane (housewrap, building paper, or fluid-applied product) installed over the backup wall to prevent water infiltration into the structure.
Corrugated strip tieA stamped, ridged metal strip fastened at one end to the backup stud and embedded at the other end in a brick mortar bed joint.
Adjustable two-piece tieA veneer anchor system with a separate wall anchor and adjustable wire or rod element that allows vertical adjustment to align with any mortar joint.
Hot-dipped galvanizedA corrosion-protection process in which the metal tie is immersed in molten zinc, producing a thick, durable coating suitable for exterior masonry applications.
Drainage planeThe continuous sloped surface formed by the WRB that channels water downward through the cavity to flashing and weep holes.
Collar jointThe vertical space between two adjacent masonry wythes; distinct from a veneer cavity and typically filled with mortar in multi-wythe construction.
Lateral load transferThe process by which wind pressure or suction acting on the veneer face is carried through the ties to the structural backup wall.

Worked examples4

1. A wall section is 20 ft wide and 9 ft tall. How many ties are required at the standard rate of one tie per 2.67 sq ft?
  1. Step 1 — Find total wall area: 20 ft × 9 ft = 180 sq ft.
  2. Step 2 — Divide by the coverage rate: 180 ÷ 2.67 = 67.42.
  3. Step 3 — Round up to the next whole number because a partial tie position still requires a full tie: 68 ties.
Answer: 68 ties required.
2. A gable-end veneer panel is 14 ft wide and 12 ft tall. How many ties are required at the standard rate of one tie per 2.67 sq ft?
  1. Step 1 — Find total wall area: 14 ft × 12 ft = 168 sq ft.
  2. Step 2 — Divide by the coverage rate: 168 ÷ 2.67 = 62.92.
  3. Step 3 — Round up: 63 ties required.
Answer: 63 ties required.
3. An exterior wall is 30 ft wide and 8 ft tall but contains two window openings each 3 ft wide by 4 ft tall. How many ties are required at the standard rate of one tie per 2.67 sq ft?
  1. Step 1 — Find gross wall area: 30 ft × 8 ft = 240 sq ft.
  2. Step 2 — Find total window area: 2 openings × (3 ft × 4 ft) = 2 × 12 = 24 sq ft.
  3. Step 3 — Find net brick area: 240 − 24 = 216 sq ft.
  4. Step 4 — Divide by coverage rate: 216 ÷ 2.67 = 80.90.
  5. Step 5 — Round up: 81 ties required.
Answer: 81 ties required.
4. Studs are at 16 in. on center and brick courses at 2-2/3 in. per course. If ties must be placed at maximum 18 in. vertical spacing, at which course numbers (counting up from the foundation) should ties be set for the first three tie rows?
  1. Step 1 — Determine how many courses equal 18 in.: 18 in. ÷ 2.667 in. per course = 6.75 courses. Because you cannot place a tie between courses, round down to 6 complete courses (6 × 2.667 = 16 in., which is within the 18-in. limit).
  2. Step 2 — First tie row: course 6 (at 16 in. above the base).
  3. Step 3 — Second tie row: course 6 + 6 = course 12 (at 32 in.).
  4. Step 4 — Third tie row: course 12 + 6 = course 18 (at 48 in.).
Answer: Ties at course 6, course 12, and course 18 — every 6 courses (approximately 16 in.) to stay within the 18-in. maximum vertical spacing requirement.

The math in this lesson2

Learners compute net wall area less openings and divide by 2.67 sq ft per tie, then place ties every 18 in of coursing.
6.RP.3G-MG.1
Brush up in the math halls at newSchoolWorks.com:
In class: Lecture and diagram exercise: instructor explains corrugated strip ties versus adjustable two-piece ties, maximum horizontal and vertical spacing requirements, and the importance of corrosion-resistant coatings; students label a wall-section diagram identifying tie, WRB, cavity, collar joint, and drainage plane. · Math drill: students calculate the number of ties needed for three different wall-area scenarios (given stud spacing and brick coursing height), checking their answers against an instructor key and correcting errors—minimum passing score 80%. · Hands-on identification station: students examine eight tie samples (various coatings, configurations, and some intentionally defective or wrong material) and sort them into 'acceptable' and 'reject' piles with written justification for each reject.
Materials: Assorted metal tie samples (corrugated strip, adjustable two-piece, veneer anchors, intentionally rusted or inadequate samples); tie-spacing reference table from NCCER trainee guide; wall-section diagram handouts; calculators; pencils; answer key.
Check: Tie-spacing calculation drill scored 80% or higher; tie-identification station judged correct by instructor with written justification accepted for all eight samples—any misidentified tie must be retested verbally before moving on.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

NCCER Masonry — Veneer Systems and Wall Assemblies
1. What is the primary structural purpose of ties and anchors in a full-thickness brick veneer wall?
NCCER Masonry — Veneer Systems and Wall Assemblies
2. Which of the following makes an adjustable two-piece tie preferable to a corrugated strip tie on a steel-stud backup wall?
NCCER Masonry — Math and Measurement
3. A wall section is 24 ft wide and 10 ft tall. Using the standard rate of one tie per 2.67 sq ft of wall area, how many ties are required?
NCCER Masonry — Materials and Material Properties
4. Which corrosion protection is most suitable for brick veneer ties in a coastal marine environment?
NCCER Masonry — Quality Control and Materials Inspection
5. During a tie-inspection station, a student finds a corrugated strip tie with visible red rust pitting on both faces. The correct action is to:
NCCER Masonry — Veneer Systems and Wall Assemblies
6. What is the maximum recommended vertical spacing between tie rows for standard full-thickness brick veneer, according to industry references?
NCCER Masonry — Veneer Systems and Wall Assemblies
7. Mortar droppings that accumulate at the base of the veneer cavity are a problem primarily because they:
OSHA 10 — Construction Safety and Health
8. A student is about to use a powder-actuated tool to fasten anchor plates to a concrete backup wall. Which OSHA-related safety requirement applies?
Record this lesson on my transcript. Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.