Wire Rope: Construction, Selection, and Inspection

Objective. Students will demonstrate how to inspect a wire rope assembly for broken wires, corrosion, kinking, and worn sections, and will record findings on a standardized inspection form in accordance with ASME A17.1 general rope requirements.

⚠ Pending professional review

This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.

VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.

Wire Rope in Traction Elevators

Traction elevators rely entirely on wire ropes (also called hoisting ropes) to suspend and move the car and counterweight. Unlike hydraulic systems, there is no cylinder to catch a failing component — the ropes are the primary load-carrying members. Keeping them in safe working condition is one of the most critical inspection tasks an elevator mechanic performs, and ASME A17.1 Safety Code for Elevators and Escalators sets the minimum requirements for rope condition and removal from service.

How Wire Rope Is Built

A wire rope is not a single strand of metal. It is assembled in layers:

1. Individual wires — the smallest element, drawn from high-carbon steel.

2. Strands — a group of wires twisted together around a center wire.

3. Core — the central member that the strands are laid around.

4. The rope itself — multiple strands laid helically around the core.

Core types matter for elevator ropes:

Most modern traction elevator ropes use IWRC for its dimensional stability under load.

Lay describes the direction and pattern wires and strands are twisted:

Common Defects and What Causes Them

| Defect | Description | Typical Cause |

|---|---|---|

| Broken wires | Individual wires fractured across their cross-section | Fatigue from repeated bending over sheaves |

| Corrosion | Rust, pitting, or dark discoloration between strands | Moisture, salt air, or insufficient lubrication |

| Kinking | Permanent sharp bend that distorts the rope geometry | Improper uncoiling, overloading, or rope reversal |

| Worn (abraded) sections | Flattened outer wires, reduced diameter | Contact wear against sheave grooves or guide elements |

| Valley breaks | Wire fractures inside the strand, hidden from surface view | Advanced fatigue; more dangerous than surface breaks |

Inspection Procedure

Personal Protective Equipment

Before touching any rope:

Step-by-Step Field Inspection

1. Visual scan the full accessible rope length. Use a magnifying loupe to count broken wires in any section equal to one rope lay length and in any section equal to thirty rope lay lengths (consult ASME A17.1 for the specific numerical limits in the applicable rule).

2. Check rope diameter. Using a 6-inch vernier caliper, measure the rope at three separate locations, measuring across the full rope (not strand to strand). Record all three readings. A reduction in rope diameter beyond the code limit indicates core failure or severe internal wear.

3. Inspect terminations. Examine sockets, shackles, and hitch plates for cracks, corrosion, and secure attachment. Rope ends must be properly socketed or have approved end attachments; no improvised connections are acceptable.

4. Check for kinks and distortion. A kinked rope must be removed from service immediately — no straightening attempt is permitted.

5. Feel for corrosion. Run gloved fingers along the rope; gritty or flaky texture between strands indicates active corrosion.

6. Record all findings on the standardized inspection log: date, rope identification, diameter readings at each point, defect type and location, and your accept/reject determination.

Accept or Reject — The Code Standard

ASME A17.1 specifies removal-from-service criteria for elevator wire ropes. The code addresses: the number of broken wires in a given lay length, the presence of any kink or distortion, diameter reduction beyond specified limits, and evidence of heat damage or corrosion that has caused pitting. When any single criterion is met, the rope must be replaced before the elevator returns to service. Your inspection log must reference the specific requirement in plain language so a supervisor or inspector can verify your judgment without having to locate the code section themselves.

Why Accurate Record-Keeping Matters

An incomplete inspection form is a safety failure, not a paperwork failure. Blank measurement fields mean no baseline exists for the next inspection. Missed defects can allow a rope to remain in service past its safe limit. Both the NEIEP/IUEC apprenticeship program and NAEC CET certification expect candidates to demonstrate that they can apply code requirements to real conditions and document findings clearly. Employers rely on these records for maintenance scheduling, liability protection, and regulatory compliance.

Key terms10

Independent Wire Rope Core (IWRC)A core made from a small wire rope rather than fiber, providing greater crush resistance and dimensional stability under heavy loads — the most common core type for traction elevator ropes.
Fiber Core (FC)A rope core made of natural or synthetic fiber that acts as a lubricant reservoir and adds flexibility, but offers less support than an IWRC under high compressive loads.
LayThe direction and pattern in which wires are twisted into strands and strands are twisted into the rope; regular lay is standard for most elevator ropes.
Valley breakA wire fracture that occurs inside a strand, between wires, and is not visible on the outer surface; a sign of advanced fatigue and more hazardous than surface breaks.
Broken wireAn individual wire within a strand that has fractured across its cross-section; counted over specified lay lengths to determine whether a rope meets ASME A17.1 removal-from-service criteria.
KinkA permanent, sharp bend in a wire rope caused by improper handling or overloading that permanently distorts the rope geometry; any kinked rope must be removed from service immediately.
Rope lay lengthThe distance along the rope over which one strand completes one full helical revolution; used as a reference length when counting broken wires during inspection.
Lockout/Tagout (LOTO)An energy-control procedure that isolates and de-energizes equipment and locks it in a safe state before maintenance or inspection work begins, preventing unexpected startup or movement.
Nominal rope diameterThe specified diameter of a wire rope as manufactured; field measurements of actual diameter are compared to this value to detect wear or core failure that has caused the rope to shrink beyond code limits.
Removal-from-service criteriaThe specific conditions defined in ASME A17.1 under which a wire rope must be taken out of service and replaced before the elevator is returned to operation.

Worked examples4

1. A rope has a nominal (manufacturer-specified) diameter of 0.500 in. You measure the rope at three points along its length with a caliper and obtain readings of 0.487 in, 0.491 in, and 0.483 in. What is the percent diameter reduction at the smallest measurement, and why does that location matter most?
  1. Identify the nominal diameter: 0.500 in.
  2. Identify the smallest measured diameter: 0.483 in.
  3. Calculate the reduction: 0.500 − 0.483 = 0.017 in.
  4. Calculate the percent reduction: (0.017 ÷ 0.500) × 100 = 3.4%.
  5. The smallest measurement matters most because it represents the cross-section with the greatest material loss; compare this figure against the applicable ASME A17.1 limit for diameter reduction to make your accept/reject decision.
Answer: The diameter has decreased by 0.017 in, which is a 3.4% reduction from nominal. The smallest reading at any single location governs the inspection decision, because that point has the least remaining cross-sectional area.
2. During a lay-length broken-wire count, you measure one lay length of the rope and find it equals 4.5 inches. In one 4.5-inch section you count 5 broken wires. In a 30-lay-length section (135 inches) you count 9 broken wires total. ASME A17.1 sets illustrative removal limits of 6 broken wires in one lay length or 12 broken wires in 30 lay lengths. Does this rope pass or fail, and on which criterion?
  1. Check criterion 1 — broken wires in one lay length: 5 broken wires found vs. limit of 6. Result: PASS (5 < 6).
  2. Check criterion 2 — broken wires in 30 lay lengths: 9 broken wires found vs. limit of 12. Result: PASS (9 < 12).
  3. Because both individual criteria are passed, no removal-from-service trigger is met on wire-break count alone.
  4. Note: The inspector must still check all other criteria (diameter reduction, kinks, corrosion) before declaring the rope serviceable.
Answer: The rope passes the broken-wire count on both criteria (5 of 6 allowed in one lay length; 9 of 12 allowed in 30 lay lengths). However, a complete inspection must also assess diameter, corrosion, and physical condition before a final accept decision is recorded.
3. You are measuring a rope at three points along its length. Your caliper readings are: Point A = 0.512 in, Point B = 0.508 in, Point C = 0.510 in. The rope's nominal diameter is 0.500 in. What is the average measured diameter, and what do readings above nominal suggest?
  1. Add all three readings: 0.512 + 0.508 + 0.510 = 1.530 in.
  2. Divide by 3 to find the average: 1.530 ÷ 3 = 0.510 in.
  3. All three readings exceed the 0.500 in nominal diameter.
  4. Readings above nominal can indicate swelling from internal corrosion, a damaged or expanded core, or lubricant accumulation — conditions that warrant closer internal inspection even though the diameter has not decreased.
Answer: The average measured diameter is 0.510 in, which is 0.010 in above nominal. Readings consistently above nominal warrant further investigation for internal swelling, core damage, or lubricant buildup, even though no reduction-from-nominal criterion is triggered.
4. A rope sample is 36 inches long. You measure the lay length by marking where one strand begins at one end and finding where that same strand completes one full revolution. That distance is 4.0 inches. How many complete lay lengths are contained in the 36-inch sample?
  1. Divide the sample length by the lay length: 36 ÷ 4.0 = 9.0.
  2. The 36-inch sample contains exactly 9 complete lay lengths.
  3. This means you can conduct up to nine independent one-lay-length broken-wire counts within this sample, each over a 4.0-inch window, to find the worst-case section.
Answer: The 36-inch sample contains 9 complete lay lengths of 4.0 inches each. Each 4.0-inch window must be inspected separately, and the window with the highest broken-wire count governs the accept/reject decision for that criterion.

The math in this lesson2

Learners compute percent diameter reduction from nominal 0.500 inch to judge rope retirement.
7.RP.3S-ID.2
Brush up in the math halls at newSchoolWorks.com:
In class: Instructor demonstration on sample rope sections showing strand lay, core types (IWRC vs. fiber core), and common defects; students handle samples and locate defects with a magnifying loupe. · Guided inspection walk-through on the program's traction training rig: instructor shows rope attachment sockets, shackles, and hitch plates, and students practice measuring rope diameter with a caliper at three points along the rope. · Students complete a rope inspection log for three pre-staged rope samples (one serviceable, one marginal, one reject condition), determine accept/reject status, and justify decisions citing the relevant code requirement in plain language.
Materials: Sample wire rope sections (various conditions), 6-inch calipers, magnifying loupes, rope inspection log forms, ASME A17.1 Safety Code for Elevators and Escalators (current edition), traction training rig
Check: Instructor evaluates completed rope inspection logs; student must correctly accept/reject all three samples and record accurate measurements — pass requires correct disposition on all three samples and no blank measurement fields.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

Elevator components and materials
1. Which core type provides the greatest crush resistance and is most commonly specified for traction elevator hoisting ropes?
Safety and hazard control
2. Before inspecting rope terminations at the hitch plate in the machine room, what energy-control step must be completed first?
Code compliance and inspection
3. A wire rope shows a permanent sharp bend that cannot be straightened by hand. What is the correct action?
Code compliance and inspection
4. When counting broken wires during a rope inspection, which reference length is used for a single-section broken-wire count?
Measurement and inspection skills
5. You measure a 0.625-inch nominal rope and obtain caliper readings of 0.601 in, 0.598 in, and 0.603 in. What is the diameter reduction at the smallest measurement, rounded to the nearest thousandth of an inch?
Defect recognition
6. Which type of broken wire is most dangerous because it cannot be detected by a standard visual surface inspection?
Professional documentation
7. A rope inspection log has correct accept/reject decisions but all three diameter fields for Sample B are left blank. How should an instructor evaluate this log?
Elevator components and materials
8. During regular-lay rope construction, in what direction are the outer wires twisted relative to the strand lay direction?
Record this lesson on my transcript. Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.