BLD-ELEV10-01 · Lesson 5 · 28 clock hours · demo
Technical Reading: Blueprints, Schematics & Code Tables
Objective. Students will locate specific information in elevator construction drawings, single-line electrical schematics, hydraulic circuit diagrams, and ASME A17.1 code tables using standard industry symbols and drawing conventions.
⚠ Pending professional review
This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
Why Technical Reading Matters in Elevator Work
Every elevator installation, modernization, and inspection begins with paper—or its digital equivalent. Before a single bolt is turned, a mechanic must read and understand construction drawings, electrical schematics, hydraulic circuit diagrams, and code tables. Misreading a drawing can mean installing equipment in the wrong location, wiring a circuit incorrectly, or violating ASME A17.1 clearance requirements. Any of those errors can injure workers or passengers. Accurate technical reading is therefore a core safety skill, not just an academic one.
Types of Documents You Will Use
Construction drawings show the physical layout of an elevator system. A hoistway plan is a top-down view showing the shaft dimensions, guide rail positions, car platform size, and clearances. A pit detail shows the depth of the pit, the location of buffers, the pit ladder, the pit stop switch, and lighting. A machine room layout shows the equipment footprint, ventilation, and emergency disconnect location. Every drawing has a title block—a box in the lower-right corner that lists the project name, drawing number, revision level, scale, and the engineer of record. Always read the title block first to confirm you have the correct drawing and the current revision.
Single-line electrical schematics show the power distribution path using a simplified one-conductor-per-phase convention. They are not wiring diagrams; they show what is connected to what in terms of system logic and protection, not the physical wire routing. Standard symbols follow ANSI/IEEE conventions. A fused disconnect switch, a transformer, and a motor controller each have specific symbols you must recognize instantly.
Hydraulic circuit diagrams show the fluid path in a hydraulic elevator: pump, motor, relief valve, lowering valve, check valve, cylinder, and associated piping. NFPA 79 and industry-standard hydraulic symbols are used. Arrows on lines indicate flow direction. Understanding the diagram lets you trace a fault—for example, if the car drifts down, you can follow the circuit to identify which valve is most likely leaking.
ASME A17.1 code tables provide the legally required minimums and maximums for dimensions such as pit depth, overhead clearance, and car platform area. The tables are organized by elevator type (electric traction, hydraulic, limited-use/limited-application) and by rated speed or capacity. To use a table correctly, you must (1) identify the elevator type, (2) find the correct rated speed or load column, and (3) read the intersecting cell. Never guess at a code value; always look it up.
Reading Standard Symbols
Symbols are a shared language. When everyone on a job site uses the same symbol for a normally-open contact or a pressure-relief valve, errors drop and work speeds up. The four symbol families you must know are:
- Electrical (ANSI/IEEE): lines for conductors, circles for motors and lights, rectangles for transformers, standard marks for contacts (normally open vs. normally closed), fuses, and circuit breakers.
- Hydraulic (ISO/ANSI): squares for valves, diamonds for flow meters, a triangle for a pump, arrows inside symbols to show variable adjustment.
- Elevator-specific: symbols for guide rails (paired lines with cross-hatching), buffers, pit stop switches, car safeties, and governor rope.
- General drawing: section cut lines, centerlines (alternating long-short dash), hidden lines (dashed), and dimension lines with arrowheads.
When you encounter an unfamiliar symbol, go to the legend on the same drawing sheet before guessing. If no legend exists, consult the applicable reference standard.
Using Scale and Dimensions
Drawings are produced at a stated scale (for example, 1/4" = 1 foot). To find an actual measurement that is not already dimensioned, use an architect's scale rule. Lay the correct scale edge along the feature and read the value. Always check: the scale printed in the title block must match the scale rule you choose. If a drawing is marked NOT TO SCALE (NTS) or has been photocopied and may have changed size, use only the printed dimensions—never scale directly from the paper.
Safety Points for Document Use on the Job
- Confirm the revision. Working from a superseded drawing is a leading cause of installation errors. Check the revision block every time you pull a drawing.
- Drawings do not replace lockout/tagout. A schematic shows you where energy sources are located, but before any work on live circuits or moving machinery, follow your site's written LOTO procedure and verify zero-energy state.
- Code tables set minimums. A pit depth shown on a drawing must meet or exceed the ASME A17.1 minimum for that elevator type. If the drawing shows less, stop and notify the supervising mechanic or engineer before proceeding.
- Handle drawings carefully. Torn or unreadable drawings must be replaced before work continues. A smudged dimension can be as dangerous as a missing one.
Practical Workflow
1. Read the title block—confirm project, drawing number, and revision.
2. Identify the drawing type (plan, elevation, schematic, detail).
3. Note the scale and units.
4. Read the legend or symbol key.
5. Locate what you need using the grid coordinates or leader lines.
6. Cross-reference dimensions against applicable ASME A17.1 code table values before accepting them as compliant.
Key terms9
Title blockThe standardized information box on a drawing, typically in the lower-right corner, listing project name, drawing number, revision level, scale, and engineer of record.
Single-line schematicAn electrical diagram that represents a three-phase system with one line per phase to show system logic, protection, and connections without showing physical wire routing.
Legend (drawing)A key on a drawing sheet that defines every symbol used on that sheet; the first reference when an unfamiliar symbol is encountered.
Revision blockA section of the title block or a separate table that records each change made to a drawing, identified by letter or number and date; used to confirm you have the current version.
Pit depthThe vertical distance from the finished floor of the elevator pit to the lowest level the car platform can reach; governed by ASME A17.1 minimum values based on elevator type and speed.
Overhead clearanceThe minimum vertical distance required above the fully raised elevator car to protect personnel working on top of the car; a safety-critical dimension specified in ASME A17.1.
Normally open (NO) contactAn electrical contact symbol showing a gap between two parallel lines; the circuit is open (not conducting) in its resting state and closes when the device is energized or actuated.
Hydraulic circuit diagramA schematic using standardized symbols (ISO/ANSI) to show the fluid path, components, and flow direction in a hydraulic elevator system.
Scale (drawing)The stated ratio between a measurement on the drawing and the actual measurement it represents; for example, 1/4" = 1 foot. Used only when the drawing is confirmed to be printed at the original size.
In class: Symbol library exercise: using a set of 40 flashcards showing standard electrical, hydraulic, and elevator drawing symbols (per ANSI/IEEE and NFPA 79 conventions), students match symbol to name and application in a timed drill; repeated until each student achieves 35/40 correct. · Blueprint scavenger hunt: working from a full-size (or large-format printed) elevator hoistway layout drawing, students answer a 15-question worksheet (e.g., 'What is the pit depth shown?', 'Where is the main line disconnect located?', 'What is the travel distance?') using only the drawing and its title block. · Code table navigation: using a reproduction of relevant ASME A17.1 tables (pit depth, overhead clearance, car platform area minimums), students answer a 10-question worksheet referencing the table; instructor models the search process for the first two questions using a document camera.
Materials: Set of standard elevator construction drawings (hoistway plan, pit detail, machine room layout) from a public or educational source; ANSI/IEEE electrical symbol reference; NFPA 79 symbol reference; ASME A17.1 Safety Code for Elevators and Escalators (current edition, library copy or instructor reproduction of non-copyrighted tables); document camera; symbol flashcard sets.
Check: Symbol drill: 35 of 40 correct for pass. Blueprint scavenger hunt: 12 of 15 correct. Code table worksheet: 8 of 10 correct. All three checks must be passed before the student advances; one re-attempt is allowed per check.