BLD-ELEC05-07 · Lesson 10 · 18.5 clock hours · theory

Reading and Creating PLC I/O Wiring Diagrams and Program Documentation

Objective. Students will interpret a multi-page PLC control drawing set and produce a correctly formatted one-page I/O wiring diagram and address table for a simple control application.

Why PLC Documentation Matters

Every PLC installation produces paperwork as important as the wiring itself. When a motor fails at 2 a.m., the technician on call must trace the fault quickly. Without accurate drawings, that job becomes dangerous guesswork. Precise, standardized documentation protects workers, speeds troubleshooting, and is required by the National Electrical Code (NEC) and most facility standards. As an electrician working on PLC-controlled systems, you must be able to read the documentation others created and produce documentation that others can rely on.

The Multi-Page PLC Drawing Set

A complete PLC control drawing set typically contains several coordinated sheets. Understanding each page is the first step toward reading the whole set.

Title Block — Found in the lower-right corner of every sheet, the title block records the project name, drawing number, revision level, date, and the name of the person who drew and checked the sheet. Always confirm you are reading the current revision before using any drawing for work.

I/O Wiring Diagram — This is the central document for the electrician. It shows every physical wire connection between field devices (sensors, switches, pushbuttons) and the PLC input and output terminals. Each terminal is labeled with its address and a wire number. Input devices appear on the left side of the PLC module; output devices (contactors, indicator lights, solenoids) appear on the right.

Terminal Strip Schedule — A table listing every terminal block on a panel, its terminal number, the wire connected to it, and where that wire goes. It acts as a map between the I/O diagram and the physical panel.

Address Table (I/O Address List) — A spreadsheet-style table assigning a unique PLC address to every input and output. A typical entry includes the address tag (for example, I:0/0 or X0 depending on PLC brand), a plain-language description ("Start Pushbutton"), the device type, and the terminal number. This table is the bridge between the wiring diagram and the PLC program.

NEMA Symbols and Labeling Conventions

The National Electrical Manufacturers Association (NEMA) and IEEE publish standard schematic symbols. Using recognized symbols ensures that any qualified electrician can read your drawing without special training. Common symbols used in PLC I/O diagrams include:

Wire numbers are assigned sequentially or by system (DC common wires may carry a designated number such as 0 V COM). Every wire segment that connects two unique points gets a unique number; segments that are electrically the same point share one number.

Building a One-Page I/O Wiring Diagram

To create a compliant drawing for a simple application, follow these steps:

1. Define the application. List every input and output device before drawing anything. For a pump control system with one start pushbutton, one float switch (high-level shutdown), and one motor contactor, you have two inputs and one output.

2. Assign addresses. Use the PLC manufacturer's addressing format consistently. Input 1 might be I:0/0, Input 2 might be I:0/1, and Output 1 might be O:0/0. Record these in your address table first.

3. Draw the PLC module outline. A rectangle represents the module. Label input terminals on the left and output terminals on the right. Show the common (COM) terminal and the DC or AC supply connections.

4. Add field devices. Draw each input device using the correct NEMA symbol, connected by a line to its input terminal. Draw each output device connected to its output terminal. Route wires to terminal blocks before they leave the panel, and number each wire segment.

5. Label everything. Every device gets a tag (PB1, FS1, M1). Every terminal gets its number. Every address is noted next to its terminal. The PLC module itself is labeled with its model reference.

6. Complete the title block. Fill in the project name, drawing number, revision (start at Rev. 0 or A), your name, and the date. A drawing without a complete title block is not finished.

Safety Considerations

PLC panels operate at voltages that can cause electrocution and arc flash. The following safety practices apply every time you work on or near control panels:

Reading and Peer-Checking a Drawing

When reviewing someone else's drawing, work through a checklist systematically: title block complete, revision current, all addresses matching the address table, correct NEMA symbols, wire numbers present on every segment, and COM connections shown. Written peer review comments should be specific ("Wire between PB1 and terminal 3 has no wire number") rather than general ("labeling is wrong"). Clear documentation is a professional obligation in this trade.

Key terms10

I/O Wiring DiagramA drawing showing the physical wire connections between field devices and the input and output terminals of a PLC, including addresses, wire numbers, and terminal labels.
Address TableA table that assigns a unique PLC program address to every physical input and output device, linking the wiring diagram to the PLC program.
Title BlockThe standardized information block in the corner of a technical drawing that records the project name, drawing number, revision, date, and responsible parties.
Terminal Strip ScheduleA table listing each terminal block number, the wire connected to it, and the source and destination of that wire, used to verify panel wiring.
NEMA SymbolA standardized schematic symbol defined by the National Electrical Manufacturers Association for use on electrical and control diagrams so any qualified electrician can interpret them.
Wire NumberA unique identifier assigned to each electrically distinct wire segment on a drawing; all conductors that are the same electrical node share one wire number.
Normally Open (NO) ContactA switch contact that is open (circuit broken) when the device is at rest and closes when the device is actuated.
Normally Closed (NC) ContactA switch contact that is closed (circuit complete) when the device is at rest and opens when the device is actuated.
Revision LevelA letter or number in the title block indicating how many times a drawing has been officially updated; always use the highest revision available.
Lockout/Tagout (LOTO)An OSHA-required safety procedure that de-energizes equipment and prevents re-energization with a physical lock and warning tag before any work is performed on it.
In class: Instructor distributes a real-world (or realistic) PLC panel drawing set including a title block, I/O wiring diagram, terminal strip schedule, and address table; students answer a guided reading worksheet identifying each device, its address, and its function. · Students create an original I/O wiring diagram for a three-device application (one push button, one float switch as inputs; one contactor as output) using pencil and ruler or a free drafting tool, following NEMA and industry conventions for symbol use and labeling. · Peer review: students exchange drawings and check each other's work against a documentation checklist (title block complete, addresses labeled, wire numbers assigned, symbols correct); written comments are provided and original student corrects any items flagged.
Materials: Sample PLC control drawing set (multi-page, printed), blank drafting paper or computer with CAD or drawing software, NEMA symbol reference chart, documentation checklist handout, ruler, pencils
Check: Student-created I/O wiring diagram is evaluated against the documentation checklist; all required elements (title block, correct symbols, addresses, wire labels) must be present and accurate; pass mark is 80% of checklist items correct with no safety-critical labeling errors.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

NCCER Electrical - Industrial Controls and PLC Systems
1. What is the primary purpose of an I/O wiring diagram in a PLC installation?
OSHA 10 - Electrical Safety and Hazard Control
2. Before making any wiring changes inside a PLC control panel, which safety procedure must be performed first?
NCCER Electrical - Industrial Controls and PLC Systems
3. A float switch is wired as Input 2 on a PLC module. The I/O wiring diagram shows it with a normally open symbol and the note 'High Level.' What does this mean for the process?
NCCER Electrical - Technical Drawing and Documentation
4. Which of the following items is required in a drawing title block?
NCCER Electrical - Technical Drawing and Documentation
5. Two separate wire segments in a control panel are connected to the same terminal block point. According to wire-numbering conventions, these two segments should have:
NCCER Electrical - Industrial Controls and PLC Systems
6. A peer reviewer finds that a student's I/O wiring diagram shows a contactor coil using a pushbutton symbol. What is the correct action?
NCCER Electrical - Industrial Controls and PLC Systems
7. On an I/O wiring diagram, the address 'O:0/0' is most likely associated with which type of device?
NCCER Electrical - Technical Drawing and Documentation
8. A student receives a multi-page PLC drawing set but notices the I/O diagram is marked 'Rev. B' while the address table is marked 'Rev. C.' What should the student do before using these documents?
Record this lesson on my transcript. Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.