🚧 Under construction — VoTechWorks is being built. A free tech program — complimentary, as our commitment to get America working.
voTechWorksGrade 13 · a vocational technology learning center, by urbanicity
newSchoolWorks.com › VoTechWorks › Building & Construction › Electrical › Programmable Logic Controller (PLC) Introduction for Electricians › Lesson 1
BLD-ELEC05-07 · Lesson 1 · 15 clock hours · theory

Introduction to Automated Control Systems and PLC History

Objective. Students will explain the role of PLCs in modern industrial control, contrast relay-based and PLC-based control, and identify the major PLC families used in US industry.

What Is an Automated Control System?

An automated control system monitors inputs—sensors, switches, pushbuttons—and switches outputs such as motors, valves, and lights according to a set of logical rules, without a person making each decision manually. In commercial buildings and industrial facilities, automated control handles everything from HVAC compressor sequencing to conveyor belt coordination. Understanding how these systems evolved, and why the programmable logic controller (PLC) became the dominant technology, is essential knowledge for any electrician working in modern construction.

Relay-Based Control: Where It Began

Before PLCs existed, control logic was built entirely from electromechanical relays, timers, and contactors wired together on large steel panels. Each relay is a simple device: an electromagnetic coil pulls in a set of contacts, completing or interrupting a circuit. Complex logic—start/stop interlocks, time delays, motor sequencing—required dozens or hundreds of relays wired in precise combinations.

Relay panels work and are still appropriate in some simple, stable applications. Their advantages include straightforward troubleshooting with a voltmeter, no software required, and the ability to function in high-noise electrical environments. However, relay control has real limitations:

The Birth of the PLC

In the late 1960s, the US automotive industry needed a way to retool assembly lines faster without rebuilding entire relay panels each model year. General Motors issued a specification for a solid-state, reprogrammable replacement for relay logic. Dick Morley and his colleagues at Bedford Associates responded with the Modicon 084 in 1969, widely recognized as the first commercial PLC.

Early PLCs simply replaced relays with solid-state logic stored in memory—the program could be changed without rewiring. Through the 1970s and 1980s, microprocessor advances made PLCs faster, smaller, and capable of handling analog signals, data networking, and more sophisticated math functions. By the 1990s, PLCs were standard equipment in virtually every industrial sector and had moved into commercial building systems as well.

How a PLC Works: The Basics

A PLC has three functional sections that work in a continuous loop called a scan cycle:

1. Input section. The processor reads the current state of every connected input device—limit switches, pushbuttons, temperature sensors, current transformers—and stores the states in an input image table in memory.

2. Logic execution. The processor runs through the user program (usually written in ladder diagram language) and determines what outputs should be ON or OFF based on current input states.

3. Output section. The processor updates the output image table and drives physical outputs—motor starters, solenoid valves, indicator lights—accordingly.

This scan cycle repeats continuously, typically completing in a few milliseconds, giving the system a real-time response that relay panels cannot match for complex logic.

Ladder Diagram: A Language Electricians Already Know

The most common PLC programming language is ladder diagram (LD), intentionally designed to resemble relay-logic schematics. Horizontal rungs represent logical conditions; normally-open and normally-closed contacts represent input conditions; coil symbols represent output actions. An electrician who can read a relay schematic can learn to read and write basic ladder diagrams with modest additional training—a key reason PLCs were adopted so readily by the electrical trade.

Major PLC Families in US Industry

Three manufacturers dominate the US market and appear most frequently on construction and industrial job sites:

NCSS standards and NFPA 79 (Electrical Standard for Industrial Machinery) govern the installation and wiring practices for PLC panels; always consult the applicable edition adopted in your jurisdiction.

Safety Considerations When Working Around PLC Panels

PLC enclosures contain live AC and DC voltages. Before opening any panel or making any wiring connection, follow your facility's lockout/tagout (LOTO) procedure in accordance with OSHA 29 CFR 1910.147. Verify absence of voltage with a properly rated meter before touching any conductor. Wear appropriate PPE: safety glasses and insulated gloves rated for the voltage present at minimum. Never assume a PLC output is de-energized just because the program shows it OFF—field wiring faults can impose voltage independently of the controller. When a PLC controls a motor or actuator, coordinate with all affected workers before energizing the system during testing; unexpected machine motion is a leading cause of injury during commissioning.

Key terms8

Programmable Logic Controller (PLC)A ruggedized, industrial digital computer that continuously monitors input signals and controls output devices according to a stored user program, replacing relay-based control logic.
Relay-based controlA control method that uses electromechanical relays, timers, and contactors wired together to implement logic; logic changes require physical rewiring.
Scan cycleThe repetitive three-step loop a PLC executes: read inputs, execute the logic program, and update outputs; typically completes in milliseconds.
Ladder diagram (LD)The most common PLC programming language, using a graphical format that resembles relay-logic schematics with rungs, contacts, and coil symbols.
Input image tableA section of PLC memory that stores a snapshot of the current state of all connected input devices at the start of each scan cycle.
Output image tableA section of PLC memory that holds the desired state of all outputs; the processor writes these states to physical output terminals at the end of each scan.
Lockout/tagout (LOTO)An OSHA-required safety procedure that isolates and de-energizes equipment before maintenance or wiring work, preventing unexpected energization.
Modicon 084The first commercially available PLC, developed by Dick Morley and colleagues at Bedford Associates in 1969 in response to General Motors' need for reprogrammable relay replacement.
In class: Instructor-led lecture and slide presentation tracing control system evolution from relay panels to microprocessor-based PLCs, with photos of real panels from each era. · Small-group comparison activity: given a relay schematic and its equivalent PLC ladder diagram for the same motor starter circuit, students list three advantages of each approach and present findings to the class. · Individual written response: describe a specific application in commercial building or industrial construction where a PLC would be chosen over a simple relay panel, citing at least two technical reasons.
Materials: Whiteboard, projector, NCCER Electrical Level 3 module on instrumentation and control, manufacturer overview literature (Allen-Bradley/Rockwell, Siemens, AutomationDirect), sample relay panel photo set
Check: Exit quiz of 10 multiple-choice questions on PLC history, hardware families, and advantages over relay control; pass mark 70%.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

NCCER Electrical – Instrumentation and Control
1. What was the primary industry need that drove the development of the first commercial PLC in the late 1960s?
NCCER Electrical – Instrumentation and Control
2. Which of the following is recognized as the first commercial PLC?
NCCER Electrical – Instrumentation and Control
3. In the correct order of a PLC scan cycle, what happens immediately after the processor reads all input states?
NCCER Electrical – Instrumentation and Control
4. An electrician needs to change the sequence of a motor starting circuit controlled by a relay panel. Compared to doing the same change on a PLC-based system, the relay panel change will most likely:
NCCER Electrical – Instrumentation and Control
5. Which PLC programming language was intentionally designed to resemble relay-logic schematics so electricians could adapt to it more easily?
NCCER Electrical – Instrumentation and Control
6. Which manufacturer's PLC family uses Studio 5000 Logix Designer as its primary programming software and is among the most widely installed in North America?
OSHA 10 – Electrical Safety / Hazard Control
7. Before opening a PLC control panel to make a wiring connection, an electrician must first:
OSHA 10 – Electrical Safety / Hazard Control
8. A technician observes that a PLC output coil shows OFF in the ladder diagram display but is concerned about touching the wired output terminal. This concern is:
Record this lesson on my transcript. Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.