Screening, Grit Removal, and Preliminary Treatment

Objective. Students will describe the design and operation of bar screens, mechanical screens, and grit chambers at the headworks of a water intake or wastewater plant, and calculate screenings and grit quantities for disposal.

⚠ Pending professional review

This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional in the field or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.

VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.

Overview of Preliminary Treatment

The first stage of any water intake or wastewater treatment plant is called preliminary treatment or the headworks. Its purpose is to remove large objects, rags, grit, and sand before they can damage pumps, clog pipes, or interfere with downstream processes. Operators must understand each unit at the headworks, keep them running reliably, and calculate the quantities of material removed for proper disposal.

Bar Screens

A bar screen is a series of parallel steel bars or rods placed across an incoming channel to capture large solids such as rags, sticks, plastic, and debris. Bars are spaced anywhere from about 1 inch to 3 inches apart depending on the design and the facility's downstream equipment.

Manually cleaned bar screens rely on an operator using a rake to pull accumulated screenings off the bars on a set schedule. These are common at smaller plants or as a backup unit.

Mechanically cleaned bar screens use an automatic raking mechanism—either a front-rake or back-rake design—that travels up the face of the screen on a timed cycle or when a differential pressure (headloss) sensor triggers the rake. The rake deposits screenings into a collection hopper or a compactor/washer unit.

Key parts an operator monitors:

Fine screens (openings smaller than about 6 mm) are sometimes installed in place of or after bar screens to capture smaller particles. They use similar mechanical principles.

Safety at the Bar Screen

Screenings contain pathogens. Always wear nitrile or rubber gloves, safety glasses or a face shield, and rubber boots when handling screenings. Screenings hoppers can generate hydrogen sulfide (H₂S) gas—a colorless, extremely toxic gas that smells like rotten eggs at low concentrations but deadens your sense of smell quickly. Never enter a screenings enclosure without first testing the air with a calibrated multi-gas monitor and following confined space entry procedures if required. Use lockout/tagout (LOTO) on the screen drive before any maintenance or unjamming work.

Grit Chambers

Grit refers to heavy, dense inorganic particles: sand, gravel, coffee grounds, eggshells, and similar materials. Grit must be removed early because it is abrasive and will rapidly wear pump impellers, pipe walls, and aeration diffusers.

Grit chambers slow or spin the flow so that grit settles while lighter organic solids remain suspended and move on for biological treatment.

Types of Grit Chambers

Horizontal-flow (velocity-controlled) grit chambers are rectangular channels designed to maintain a flow velocity of approximately 1 foot per second. At that velocity, grit settles but organic matter stays in suspension.

Aerated grit chambers use diffused air along one side of a long tank to create a spiral roll of flow. The roll keeps organics in suspension while grit settles to a hopper at the bottom.

Vortex grit chambers use either an induced vortex (paddle) or a hydraulic vortex to create a centrifugal motion. Grit is flung to the outside wall and drops to a central or peripheral hopper. Vortex units are compact and widely used in modern plants.

Grit Classifier

Settled grit is pumped as a slurry to a grit classifier (also called a grit washer/classifier). The classifier uses an inclined screw conveyor inside a tank; wash water rinses organic material back out while clean, dewatered grit discharges at the top for disposal. Operators check the classifier's water level, screw wear, and discharge chute during each inspection round.

Calculating Screenings and Grit Quantities

Operators must track the volume or weight of screenings and grit removed for disposal records and regulatory reporting. Common units are cubic feet per million gallons (ft³/MG) for screenings and cubic feet or pounds per day for grit.

Basic approach:

Typical generation rates vary by facility and collection system; use the values given in your plant's operating data or the problem statement—never assume a number.

Headworks Inspection Checklist

During each operating shift, the operator walks the headworks and documents:

1. Bar spacing visually clear of debris (or screenings removed on schedule)

2. Screen drive chain tension and lubrication status

3. Rake operation verified (automatic cycling or manual activation test)

4. Overflow/bypass alarm lamp functional

5. Grit classifier water level within normal range

6. Grit discharge chute clear

7. Odor control system (chemical scrubber or biofilter) operating—check chemical feed levels or fan status

8. Any unusual noise, vibration, or odor noted with time and corrective action taken

All findings are logged on the equipment log form with date, time, and operator initials. A written note on any deficiency—what was observed, what action was taken, and who was notified—is required for regulatory compliance and good plant management.

Key terms10

HeadworksThe first physical structures at a water or wastewater plant where large solids and grit are removed before primary or secondary treatment begins.
Bar screenA set of evenly spaced steel bars placed across an influent channel to intercept and remove large floating and suspended solids from the flow.
Differential headlossThe difference in water surface elevation upstream and downstream of a screen; an increasing headloss indicates the screen is becoming clogged and the rake needs to operate.
ScreeningsThe solids removed by a bar screen or fine screen, including rags, plastics, and other large debris; classified as a solid waste requiring proper disposal.
GritDense, inorganic particles such as sand, gravel, and eggshells that are removed at the headworks to protect downstream equipment from abrasion.
Vortex grit chamberA circular tank that uses a spinning flow pattern to centrifugally separate grit from wastewater, concentrating it in a hopper for removal.
Grit classifierA device, typically an inclined screw conveyor, that washes organic material from collected grit and dewaters it before disposal.
Lockout/tagout (LOTO)An OSHA-required safety procedure that isolates and de-energizes equipment—electrical, hydraulic, or pneumatic—before maintenance to prevent accidental startup and injury.
Shear pinA deliberate mechanical weak link in a screen drive assembly that breaks to protect the motor and gearbox when the rake encounters an obstruction.
Hydrogen sulfide (H₂S)A toxic, colorless gas produced by anaerobic decomposition of organic matter; present at headworks and dangerous because it rapidly paralyzes the olfactory nerve, removing the warning odor at high concentrations.

Worked examples3

1. A wastewater plant processes 4.5 MGD. The screenings generation rate is 2.0 ft³ per million gallons of flow. How many cubic feet of screenings are produced in one week (7 days)?
  1. Identify the given values: flow = 4.5 MGD, generation rate = 2.0 ft³/MG, time = 7 days.
  2. Calculate daily screenings volume: 4.5 MG/day × 2.0 ft³/MG = 9.0 ft³/day.
  3. Multiply by 7 days: 9.0 ft³/day × 7 days = 63.0 ft³.
Answer: 63.0 ft³ of screenings produced in one week.
2. The same 4.5-MGD plant has a grit generation rate of 3.5 ft³ per million gallons. The grit classifier discharges once per day. How many cubic feet of grit are removed per day, and if grit weighs approximately 100 lb/ft³, what is the daily weight in pounds?
  1. Calculate daily grit volume: 4.5 MG/day × 3.5 ft³/MG = 15.75 ft³/day.
  2. Calculate daily weight: 15.75 ft³ × 100 lb/ft³ = 1,575 lb/day.
Answer: 15.75 ft³ of grit removed per day, weighing 1,575 lb.
3. A plant's flow increases from 4.5 MGD to 6.0 MGD during a wet-weather event. Using the same screenings rate of 2.0 ft³/MG and grit rate of 3.5 ft³/MG, how much additional screenings and grit (in ft³/day) will be generated compared to dry-weather conditions?
  1. Calculate dry-weather screenings: 4.5 MG/day × 2.0 ft³/MG = 9.0 ft³/day.
  2. Calculate wet-weather screenings: 6.0 MG/day × 2.0 ft³/MG = 12.0 ft³/day. Additional screenings = 12.0 − 9.0 = 3.0 ft³/day.
  3. Calculate dry-weather grit: 4.5 MG/day × 3.5 ft³/MG = 15.75 ft³/day.
  4. Calculate wet-weather grit: 6.0 MG/day × 3.5 ft³/MG = 21.0 ft³/day. Additional grit = 21.0 − 15.75 = 5.25 ft³/day.
Answer: 3.0 ft³/day more screenings and 5.25 ft³/day more grit during the wet-weather event.

The math in this lesson1

Learners multiply 4.5 MGD × 2.0 ft³/MG × 7 days to estimate 63 ft³ of weekly screenings.
6.RP.3
In class: Examine cutaway diagrams and a physical model (or manufacturer video) of a mechanically cleaned bar screen and a vortex grit chamber; identify wear parts, the screen overflow alarm setpoint, and the grit classifier discharge. · Solve three practice problems calculating screenings volume per million gallons and grit accumulation rates using given influent flow and solids concentration data, applying the operator math formula sheet. · Walk through a simulated headworks inspection checklist—checking bar spacing, drive chain tension, grit classifier level, and odor control system status—documenting findings on an equipment log form.
Materials: Cutaway diagrams of bar screens and grit chambers (manufacturer literature), physical bench-scale screen model if available, operator math formula sheet, equipment inspection log form, calculator.
Check: Correctly solve at least 2 of 3 calculation problems (work shown); complete the inspection checklist with all critical items checked and a brief written note on one observed or simulated deficiency.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

Wastewater Treatment — Preliminary Treatment
1. What is the PRIMARY purpose of a bar screen at the headworks of a wastewater plant?
Wastewater Treatment — Preliminary Treatment
2. An operator notices the differential headloss across the mechanically cleaned bar screen is steadily increasing over a two-hour period. What is the MOST likely cause?
Safety and Health — Lockout/Tagout
3. Before unjamming a mechanically cleaned bar screen drive, the operator MUST first:
Operator Math — Process Calculations
4. A wastewater plant treats 3.0 MGD. If the grit generation rate is 4.0 ft³ per million gallons, how many cubic feet of grit are removed per day?
Wastewater Treatment — Preliminary Treatment
5. Which type of grit chamber uses a spinning flow pattern created by a paddle or hydraulic design to separate grit from the wastewater?
Safety and Health — Atmospheric Hazards
6. Hydrogen sulfide gas is a hazard at headworks locations. Which statement about H₂S is CORRECT?
Wastewater Treatment — Preliminary Treatment
7. The grit classifier at a wastewater plant is used to:
Wastewater Treatment — Equipment Operation and Maintenance
8. During a headworks inspection, an operator finds that the shear pin on the bar screen rake drive has failed. What is the CORRECT immediate action?