Change Orders and Constructive Changes
Objective. Students will prepare a complete change order request package—including written description of changed work, detailed cost breakdown, and time-impact analysis—that satisfies the requirements of a standard AIA A201 contract.
⚠ Pending professional review
This lesson, its worked examples and its practice questions has not yet been verified by a credentialed professional in the field or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
What Is a Change Order?
A change order is a written agreement between the owner, contractor, and architect that modifies the original construction contract. It adjusts the contract sum, the contract time, or both. Under the AIA A201 General Conditions of the Contract for Construction, no change to the work is valid unless it is properly authorized in writing. Performing extra work without a signed change order is one of the most common ways contractors lose money on a project.
Change orders arise from many sources: design errors or omissions, owner-requested additions, unforeseen site conditions, code changes issued after contract execution, or work that overlaps between subcontractors. The paper trail that captures how a change was discovered and priced is called the change order request package.
The AIA G701 Form
The AIA G701 Change Order form is the standard document used to record the final agreement on a change. It identifies the project and parties, states the description of the change, shows the adjustment to the contract sum, shows the adjustment to the contract time in calendar days, and carries signature lines for the architect, owner, and contractor. A G701 that is missing any of these elements is incomplete and may not be enforceable.
Before the G701 is signed, the contractor typically submits a Change Order Request (COR) or Proposed Change Order (PCO) package to the architect for review. That package is what this lesson focuses on building.
Components of a Complete Change Order Request Package
1. RFI or Directive Origin. Every change starts somewhere. Document the triggering event: the Request for Information number, the architect's supplemental instruction, or the owner's written directive. This creates an unbroken paper trail from discovery to payment.
2. Written Scope Description. Describe clearly what work is being added, deleted, or changed. Avoid vague language. Identify the drawing or specification section that applies, state what the original scope was, and state exactly how it differs from the changed scope.
3. Detailed Cost Breakdown. The cost breakdown organizes all costs into standard line items:
- Direct labor — hours by trade classification multiplied by fully burdened wage rate (base wage plus taxes, insurance, and fringe benefits).
- Material — quantity times unit cost, supported by supplier quotes where possible.
- Equipment — hours times ownership or rental rate.
- Subcontractor costs — attach the sub's own backup; prime contractor then applies its markup to that subtotal.
- Overhead and profit — a percentage markup applied to the subtotals above. The allowable markup percentage is often specified in the contract. AIA A201 does not set a specific percentage; the parties negotiate it. A common industry range is 10–15% overhead and 5–10% profit, but always check the contract.
4. Time-Impact Analysis (TIA). If the change adds duration to the project, the contractor must demonstrate how many compensable delay days result. A TIA compares the baseline schedule to a modified schedule that includes the new activity. The analyst inserts the changed work as a new activity, links it to predecessor and successor activities, and recalculates the critical path. The difference in project completion date is the number of compensable delay days. Document this on a TIA worksheet and attach a marked-up bar chart or CPM fragment.
Constructive Changes
A constructive change occurs when the owner or its representatives direct the contractor to perform work differently—without issuing a formal written change order—and that direction results in extra cost or time. Common examples include an architect insisting on a higher-quality finish than the specifications require, or an owner restricting site access in a way not contemplated by the contract schedule.
Constructive changes are legally treated as if a formal change order had been issued, but the contractor must take prompt action to preserve its rights. Under AIA A201, the contractor must provide written notice of a claim within the time period specified in the contract. Missing that notice deadline can waive the right to additional compensation. Always read the notice provisions in the contract before work begins.
Safety Considerations in Change Order Work
Changed work often introduces new hazards that were not addressed in the original site safety plan. Before any new scope of work begins:
- Update the Job Hazard Analysis (JHA) to reflect new tasks, tools, and materials.
- Verify lockout/tagout (LOTO) procedures if the change involves electrical, mechanical, or hydraulic energy sources. Follow OSHA 29 CFR 1910.147 for general industry or 29 CFR 1926 Subpart K for construction electrical work.
- Confirm PPE requirements for new materials (for example, a chemical grout versus standard concrete requires different respiratory and skin protection).
- Brief all affected workers before the changed work starts. A toolbox talk specific to the new scope is good practice and may be required by your site safety plan.
Documenting safety precautions taken during changed work also protects the contractor if a dispute arises later about whether the work was performed professionally.
Submitting and Tracking the Package
Organize the package in this order: (1) cover letter referencing the PCO number, (2) G701 draft, (3) scope narrative, (4) cost backup worksheets, (5) TIA worksheet and schedule fragment, (6) supporting quotes or invoices. Number every page. Keep a log of all PCOs by number, date submitted, date responded, and status. Unresolved PCOs accumulate quickly and can affect cash flow and the final payment application on the G702/G703.
Key terms8
Change OrderA written, signed agreement modifying the contract sum, contract time, or both, agreed to by the owner, contractor, and architect.
Constructive ChangeA direction or action by the owner or architect that effectively changes the contractor's work without a formal written change order, entitling the contractor to additional compensation if proper notice is given.
AIA G701The standard American Institute of Architects form used to record an executed change order, including description, contract sum adjustment, and contract time adjustment.
Time-Impact Analysis (TIA)A schedule analysis that inserts a change event into the baseline schedule to identify its effect on the critical path and calculate the number of compensable delay days.
Fully Burdened Labor RateA worker's base wage plus the employer's cost of payroll taxes, workers' compensation insurance, general liability insurance, and fringe benefits, used to price labor in cost breakdowns.
Critical PathThe longest sequence of dependent activities in a project schedule; any delay to a critical path activity delays the project completion date by the same amount.
Notice of ClaimA written notification the contractor must send to the owner or architect within a specified contractual time limit when extra cost or time is anticipated, preserving the right to seek compensation.
Overhead and Profit MarkupA percentage added to the direct cost of changed work to recover the contractor's indirect costs of doing business and provide a return; the allowable percentage is set by the contract.
Worked examples4
1. Calculate the direct labor cost for changed work involving a carpenter and a laborer working 8 hours each. The carpenter's fully burdened rate is $58.00/hr and the laborer's fully burdened rate is $42.00/hr.
- Step 1 — Carpenter cost: 8 hours × $58.00/hr = $464.00
- Step 2 — Laborer cost: 8 hours × $42.00/hr = $336.00
- Step 3 — Total direct labor: $464.00 + $336.00 = $800.00
Answer: Total direct labor cost = $800.00
2. A contractor's cost breakdown for a change shows: direct labor $800.00, materials $1,200.00, equipment $300.00, and a subcontractor quote of $600.00. The contract allows 10% overhead and 5% profit on all costs. Calculate the total change order price.
- Step 1 — Sum all direct costs: $800.00 + $1,200.00 + $300.00 + $600.00 = $2,900.00
- Step 2 — Apply 10% overhead markup: $2,900.00 × 0.10 = $290.00
- Step 3 — Subtotal after overhead: $2,900.00 + $290.00 = $3,190.00
- Step 4 — Apply 5% profit markup: $3,190.00 × 0.05 = $159.50
- Step 5 — Total change order price: $3,190.00 + $159.50 = $3,349.50
Answer: Total change order price = $3,349.50
3. A baseline schedule shows project completion on Day 120. A change event adds a new activity with a 9-calendar-day duration on the critical path. After inserting the activity, the new critical path is recalculated. What is the number of compensable delay days, and what is the new project completion day?
- Step 1 — Identify the delay: the new critical path activity adds 9 calendar days to the longest path.
- Step 2 — Calculate new completion date: Day 120 + 9 days = Day 129.
- Step 3 — Compensable delay days = new completion − original completion = 129 − 120 = 9 days.
Answer: Compensable delay = 9 calendar days; new project completion = Day 129.
4. A subcontractor submits a quote of $4,500.00 for changed work. The general contractor's contract allows 5% markup on subcontractor costs. What dollar amount does the GC add, and what is the total cost passed to the owner for this subcontractor item?
- Step 1 — Calculate GC markup on sub cost: $4,500.00 × 0.05 = $225.00
- Step 2 — Total to owner for this line item: $4,500.00 + $225.00 = $4,725.00
Answer: GC adds $225.00; total billed to owner = $4,725.00.
In class: Instructor demonstration: using a projected sample project, the instructor walks through preparing a change order request step by step, narrating each required element (RFI origin, scope description, labor and material cost backup, schedule impact days, markup calculation). · Cost breakdown practice: students receive a set of changed-work field notes and a cost code structure; they organize costs into direct labor, material, equipment, subcontractor, and overhead-and-profit line items using a standard change order form. · Time-impact analysis exercise: students receive a simplified baseline schedule and a change event; they insert the new activity, identify the critical path impact, and calculate the number of compensable delay days, documenting their analysis on a TIA worksheet.
Materials: AIA G701 Change Order form, AIA G702/G703 Application for Payment forms, instructor-prepared cost backup worksheets, printed baseline schedule bar chart, TIA worksheet template
Check: Instructor review of completed change order package: the package must include a properly filled G701, an itemized cost breakdown with correct markup, and a written TIA narrative; passing requires all three components to be present and arithmetically correct with no material omissions.
Practice check8
Answer each question, then check it. Nothing is recorded; this is your own practice.