BLD-SOLA09-07 · Lesson 6 · 12 clock hours · field

Plan Review, Inspection Simulation, and Article 705/706 Interconnection

Objective. Students will conduct a complete NEC 690 compliance review of a residential PV permit package and simulated installation, document all findings, and explain the Article 705 point-of-connection requirements for interactive systems.

⚠ Pending professional review

This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.

VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.

Why Plan Review and Inspection Matter

Every residential PV system must pass two code checkpoints before it can be energized: a plan review by the Authority Having Jurisdiction (AHJ) before permits are issued, and a field inspection after installation is complete. Both checkpoints use the National Electrical Code (NEC), primarily Article 690 for PV systems and Article 705 for interactive (grid-tied) systems. As an installer, understanding what reviewers look for lets you submit clean permit packages, pass inspections on the first visit, and avoid costly rework.

Reading a Residential Permit Package

A typical residential PV permit package includes a site plan, a one-line electrical diagram, a load calculation, and equipment cut sheets. When you review these documents the way an AHJ does, you are checking that every element on paper matches code requirements before anyone picks up a tool.

Common plan-review deficiencies include:

When you mark a deficiency, follow the AHJ format: circle or cloud the error on the drawing, write the NEC section number violated, and state the required correction in plain language.

Conducting a Field Inspection

A field inspection is a physical walk-through of the completed installation. Use a standardized checklist and move systematically: start at the array, follow the DC conductors to the combiner box or inverter, then continue to the AC disconnect and service entrance.

Safety first during any inspection walk-through. Wear your PPE — hard hat, safety glasses, and gloves — at all times on or near the roof mock-up. Treat all conductors as energized. Never bypass lockout/tagout procedures: if an instructor or lead asks you to trace a live circuit, confirm LOTO status before touching anything. Remember that PV modules generate voltage whenever light hits them; there is no way to de-energize the array by flipping a breaker alone.

Key items on an inspection checklist:

| Category | What to Verify |

|---|---|

| Voltage markings | DC voltage of the system posted at the DC disconnect and service panel per 690.53 and 690.54 |

| Conductor protection | Conduit type appropriate for location; no exposed conductors where required to be protected |

| Grounding | EGC continuity through racking; grounding electrode conductor size and connection |

| Disconnects | Accessible, labeled, correct interrupting rating |

| Rapid shutdown | Device installed and labeled; boundary marked |

| GFPD | Listed device present and rated correctly |

| Labeling | All required NEC 690 warning labels present and legible |

Article 705: Interactive System Interconnection

Article 705 governs the connection of power production equipment — including PV inverters — to the electric utility grid. The two most commonly tested provisions are the 120-percent rule and the distinction between supply-side and load-side connections.

The 120-Percent Rule (NEC 705.12)

When a PV inverter feeds power back into a panelboard through a back-fed breaker, the total of (1) the panel's main breaker rating plus (2) the inverter back-fed breaker rating cannot exceed 120 percent of the busbar rating.

> Formula: Inverter breaker ≤ (Busbar rating × 1.20) − Main breaker rating

For example, a 200 A busbar allows a maximum total of 240 A (200 × 1.20). If the main breaker is 200 A, there is no room for a load-side connection under this rule; the installer must use a supply-side connection or a larger panel. If the main breaker is 175 A, the inverter breaker may be no larger than 65 A (240 − 175).

Back-Fed Breaker Labeling

NEC 705.12 requires the back-fed breaker in a load-side connection to be labeled "Solar" or similar, and it must be positioned at the opposite end of the busbar from the main breaker (the "line end") to reduce the chance of busbar overload at the midpoint.

Supply-Side vs. Load-Side Connections

A load-side connection uses the 120-percent rule and taps into the panelboard busbar. It is the most common approach for residential systems.

A supply-side connection taps the conductors between the utility meter and the main disconnect, upstream of the panel. Because it does not use the busbar, the 120-percent limitation does not apply; however, it requires a listed tap device and must be coordinated with the utility.

Article 706: Energy Storage Systems

Article 706 covers battery energy storage systems (BESS) that may be added to a PV installation. Key compliance points include proper disconnect means, battery area ventilation requirements, and short-circuit current ratings of equipment used with storage. When a BESS is part of the design, the permit package and inspection must address both Article 690 (the PV source) and Article 706 (the storage).

Putting It All Together

A clean permit package, a systematic inspection, and a clear understanding of Articles 705 and 706 interconnection rules are the skills that distinguish a professional installer from one who generates callbacks and failed inspections. Marking deficiencies clearly, citing the exact NEC section, and writing actionable corrections are habits that protect your employer, your customer, and ultimately the public.

Key terms10

Authority Having Jurisdiction (AHJ)The organization, office, or individual responsible for enforcing code requirements, or their designated representative; typically a city or county building department for residential PV.
120-Percent RuleNEC 705.12 provision stating that the sum of the main breaker rating and any back-fed PV breaker rating must not exceed 120 percent of the panelboard busbar rating for a load-side interconnection.
Back-Fed BreakerA circuit breaker installed in a panelboard through which a PV inverter feeds power onto the busbar; it must be listed for back-feeding and properly labeled.
Supply-Side ConnectionAn interconnection point located between the utility meter and the main disconnect, upstream of the main panel busbar; not subject to the 120-percent rule but requires a listed tap device.
Rapid ShutdownNEC 690.12 requirement that PV system conductors on or in a building be de-energized quickly to protect first responders; must be accomplished within defined time and voltage limits at the array boundary.
Ground-Fault Protection Device (GFPD)A listed device required by NEC Article 690 that detects unintended current paths to ground in the DC PV circuit and interrupts the circuit to prevent fire or shock.
Continuous Current RatingFor PV circuits, conductors and overcurrent devices must be sized at 125 percent of the module's rated short-circuit current (Isc) because PV output is considered a continuous load.
Load-Side ConnectionAn interconnection point at the panelboard busbar, downstream of the main disconnect; subject to the 120-percent rule under NEC 705.12.
Article 706NEC article governing energy storage systems (batteries); addresses disconnects, ventilation, short-circuit ratings, and integration with PV sources when storage is part of the installation.
One-Line DiagramA simplified electrical drawing showing major components (modules, combiners, inverter, disconnects, utility connection) and conductor sizes in a single-line format; required in most residential PV permit packages.

Worked examples4

1. A homeowner has a 200 A rated busbar with a 200 A main breaker. The installer wants to add a load-side back-fed breaker for a 7.6 kW inverter that requires a 40 A breaker. Does this meet the 120-percent rule?
  1. Step 1 — Find the maximum allowed total: 200 A busbar × 1.20 = 240 A.
  2. Step 2 — Add the main breaker rating and the proposed back-fed breaker rating: 200 A + 40 A = 240 A.
  3. Step 3 — Compare: 240 A ≤ 240 A. The sum does not exceed the limit.
Answer: Yes, a 40 A back-fed breaker is the maximum allowed; the installation exactly meets the 120-percent rule. A larger breaker (e.g., 50 A) would not comply.
2. A house has a 150 A rated busbar and a 150 A main breaker. What is the largest back-fed breaker the installer may use for a load-side PV interconnection?
  1. Step 1 — Calculate 120 percent of the busbar: 150 A × 1.20 = 180 A.
  2. Step 2 — Subtract the main breaker rating: 180 A − 150 A = 30 A.
  3. Step 3 — The inverter back-fed breaker may be no larger than 30 A.
Answer: The maximum permitted back-fed breaker size is 30 A. If the inverter requires a larger breaker, the installer must use a supply-side connection or upgrade to a larger-rated panel.
3. A PV module has a rated short-circuit current (Isc) of 10.2 A. What is the minimum ampacity the source-circuit conductor must have before any correction factors are applied?
  1. Step 1 — Apply the 125-percent continuous-load multiplier required by NEC 690.8: 10.2 A × 1.25 = 12.75 A.
  2. Step 2 — Round up to the next standard conductor ampacity (per NEC Table 310.16 or equivalent). 12.75 A means the conductor must be rated at least 12.75 A before correction factors; a 14 AWG conductor (rated 15 A at 60 °C) meets the base requirement, but temperature and conduit-fill derating may require a larger size.
Answer: The minimum conductor ampacity before derating is 12.75 A. Additional temperature correction and conduit-fill factors must be applied to determine the final wire size needed on the actual job site.
4. During plan review, an installer notices the one-line diagram shows a 200 A busbar with a 200 A main breaker and a proposed 60 A back-fed PV breaker. Identify and correct the deficiency.
  1. Step 1 — Apply the 120-percent rule: 200 A × 1.20 = 240 A maximum allowed total.
  2. Step 2 — Sum the rated breakers as proposed: 200 A + 60 A = 260 A.
  3. Step 3 — Compare: 260 A > 240 A; the proposed design violates NEC 705.12.
  4. Step 4 — Write the correction note: 'Revise load-side back-fed breaker to no larger than 40 A, or redesign as a supply-side connection per NEC 705.12(B).'
Answer: The 60 A back-fed breaker exceeds the 120-percent rule on a 200 A panel with a 200 A main. The deficiency must be corrected by reducing the back-fed breaker to 40 A maximum or switching to a supply-side connection. Cite NEC 705.12 in the correction note.

The math in this lesson2

Learners apply the 120% busbar rule to find the largest allowed back-fed PV breaker.
7.RP.3A-REI.3
Brush up in the math halls at newSchoolWorks.com:
In class: Plan-review exercise: each student receives a residential PV permit package (site plan, one-line diagram, load calculation, equipment cut sheets) containing eight deliberately embedded code deficiencies; students mark each deficiency on the drawings, cite the NEC section violated, and write a correction note—mirroring the format used by the Authority Having Jurisdiction. · Walk-through inspection simulation: students rotate through a mock installation set up in the lab (roof mock-up with panels, combiner box, conduit runs, inverter, and service entrance) and complete a standardized inspection checklist covering conductor sizing, labeling, grounding, disconnects, and rapid shutdown; instructors act as building inspectors and ask two verbal questions per student. · Article 705 interconnection code review: students use the codebook to answer a structured worksheet on the 120-percent rule for service-entrance interconnection (NEC 705.12), back-fed breaker labeling, and supply-side versus load-side connection options, then compare findings with a partner and reconcile any differences before whole-class debrief.
Materials: NEC codebook, residential permit package with embedded deficiencies (eight copies), standardized inspection checklist, lab mock installation (roof mock-up, combiner box, conduit, inverter, service entrance panel), Article 705/706 worksheet, pencils, clipboard, PPE (hard hat, safety glasses, gloves)
Check: Plan-review: student must identify at least six of eight deficiencies with correct NEC citations—passing score 75 percent; inspection checklist: all safety-critical items (voltage markings, GFPD, rapid shutdown, grounding) must be correctly assessed—passing score 80 percent overall; Article 705 worksheet passing score 80 percent.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

NEC Article 705 / Interconnection
1. Under NEC 705.12, which formula correctly determines the maximum allowed back-fed breaker size for a load-side PV interconnection?
NEC Article 705 / Interconnection
2. A house has a 225 A busbar and a 200 A main breaker. What is the largest back-fed breaker permitted for a load-side PV connection?
NEC Article 690 / System Design
3. Which NEC article section requires conductors in a PV source circuit to be sized at 125 percent of the module's rated short-circuit current?
NEC Article 690 / Safety Systems
4. During an inspection, you find no rapid-shutdown device or compliant inverter feature on a rooftop PV installation. Which NEC section does this violate?
NEC Article 705 / Interconnection
5. What is the primary advantage of a supply-side connection compared with a load-side connection for a PV inverter?
NEC Article 690 / Labeling and Marking
6. During a plan-review exercise, a student finds that the one-line diagram does not show warning labels at the DC disconnect or at the service entrance. Which code citation best covers this deficiency?
Safety / Hazard Recognition
7. A PV installer is about to trace conductors inside a combiner box on a sunny day. What is the correct safety action before touching any conductors?
NEC Article 706 / Energy Storage
8. When an energy storage system (battery) is added to a residential PV installation, which NEC article governs the storage system in addition to Article 690?
Record this lesson on my transcript. Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.