BLD-PLUM06-10 · Lesson 2 · 108 clock hours · field

Supervised Jobsite Hours – Phase 1: Roughing-In and Underground Work

Objective. Under direct journeyman supervision, students will execute assigned roughing-in tasks—including layout, pipe cutting and joining, DWV slope and support installation, and underground work—while maintaining a daily field log that accurately records each task, material, and relevant code reference.

Supervised Jobsite Hours – Phase 1: Roughing-In and Underground Work

Your externship placement puts you on a real construction site under the direct supervision of a licensed journeyman plumber. Phase 1 focuses on roughing-in and underground work—the foundation of every plumbing system. Nothing is hidden yet by walls or concrete, so this is the best time to learn correct layout, slope, support, and joining technique. Your performance here, and the field log you keep, are graded components of your credential pathway.

What Roughing-In Means

Roughing-in is the installation of all piping before walls are closed, slabs are poured, or fixtures are set. At this stage you will work on drain-waste-vent (DWV) systems, supply rough-in lines, and underground work. The inspecting authority will examine this work before it is concealed, so accuracy and code compliance are not optional—they are the whole point.

Layout and Measurement

Your journeyman or foreman will provide layout marks: pencil lines, chalk lines, laser references, or hub marks on the slab or framing. Your job is to translate those marks into cut-and-joined pipe that lands exactly where the plan requires. Measure twice, cut once. Use a torpedo level or digital level to confirm slope before every hanger is set. A small error in layout compounds over a long run and can force a costly re-do or, worse, trap water in a drain.

DWV Slope and Support

Horizontal drain pipes must maintain a continuous slope toward the direction of flow so waste moves by gravity. The minimum slope requirement for most pipe sizes is stated in the adopted plumbing code for your jurisdiction—either the International Plumbing Code (IPC) or the Uniform Plumbing Code (UPC). Know which code your jurisdiction uses and keep a copy accessible on your phone app or in your binder. Beyond slope, every horizontal run must be supported at intervals the code specifies, which vary by pipe material and diameter. Cast-iron, PVC, ABS, and copper each have different support spacing rules. Check the applicable table before you set hangers.

Pipe Cutting and Joining

During Phase 1 you will cut and join pipe using methods appropriate to the material:

Always follow the pipe or fitting manufacturer's instructions in addition to code requirements.

Underground Work

Underground supply and drain lines require proper bedding material—typically compacted sand or pea gravel to a depth specified by the authority having jurisdiction—so the pipe is uniformly supported and protected from point loads. Trench walls must be safe: follow your employer's competent-person evaluation for soil type and required sloping, shoring, or trench-box protection. Never enter an unsupported trench deeper than five feet without a protective system in place.

Cleanouts

The code requires cleanouts at specific locations: at the base of each stack, at changes of direction beyond a certain angle, and at intervals along long horizontal runs. Confirm cleanout locations with your journeyman and the approved plan before you join pipe past that point.

Safety on the Rough-In Site

Personal protective equipment (PPE): Hard hat, safety glasses, and steel-toed boots are the minimum on any active construction site. Add cut-resistant gloves when using a snap cutter or angle grinder, and a face shield for grinding. Use hearing protection around power saws and generators.

Lockout/tagout (LOTO): If you are working near any energized equipment—pumps, compressors, or mechanical systems—follow the employer's LOTO program. Never assume a circuit is de-energized; verify.

Solvent cement and primers: These products produce flammable vapors. Work in ventilated areas, keep ignition sources away, and dispose of rags per the safety data sheet (SDS).

Lifting and ergonomics: Cast-iron pipe and full sticks of PVC are heavy. Use two-person lifts, pipe rollers, or mechanical assists. Keep your back straight and lift with your legs.

Housekeeping: A clean worksite prevents tripping over offcuts and fitting bags. Deposit scrap in designated bins at the end of each shift.

The Daily Field Log

Your field log is a professional document and a graded deliverable. At the end of every shift, record:

1. Date, site address, supervising journeyman's name.

2. Each task you performed and the pipe material, size, and fitting types used.

3. Any measurement or slope you set, and how you verified it.

4. At least twice per week, a code reference: state the subject matter of the applicable code provision (e.g., minimum slope for a given pipe size, hanger spacing for a given material) and describe how it affected your work that day.

5. Any safety observation or near-miss.

Legibility matters. Your externship coordinator reads these entries weekly. Missing entries or vague descriptions count against your pass/fail threshold.

Mid-Phase Check-In (Week 4)

At the midpoint of Phase 1, sit down with your supervising journeyman and review your log together. Listen carefully to feedback on work quality and safety behavior. Immediately after that meeting, write a one-paragraph self-assessment in your log: what you are doing well, one specific skill you need to improve, and what you will do differently in Phase 2.

Key terms10

Roughing-inThe installation of all piping, hangers, and sleeves before walls are closed or slabs are poured, completed prior to fixture setting and concealment.
DWV (Drain-Waste-Vent) systemThe network of pipes that carries liquid waste and sewage away from fixtures and admits air through vent pipes to prevent siphoning of trap seals.
Slope (grade)The downward pitch of a horizontal drain pipe, expressed as a fraction of an inch of drop per foot of run, required to move waste by gravity without clogging.
Hanger (pipe support)A device—strap, clevis, riser clamp, or roller—that carries the weight of a pipe and keeps it at the correct elevation and slope; code specifies maximum spacing by material and size.
No-hub couplingA banded neoprene sleeve with stainless-steel shield and clamps used to join hubless cast-iron soil pipe and fittings without heat or adhesive.
CleanoutA capped opening in a DWV system that provides access for rodding or inspection; required by code at specified locations including the base of stacks and direction changes.
BeddingThe layer of compacted granular material—typically sand or pea gravel—placed under and around underground pipe to provide uniform support and protect the pipe from point loads.
Lockout/tagout (LOTO)An OSHA-required procedure that isolates and de-energizes equipment—electrical, pneumatic, or hydraulic—before workers perform maintenance or work nearby, preventing accidental startup.
Authority Having Jurisdiction (AHJ)The organization, office, or individual—typically the local building or plumbing inspection department—responsible for enforcing the adopted plumbing code.
Field logA daily written record kept by the student/apprentice documenting tasks performed, materials used, measurements set, code provisions applied, and safety observations during each shift.

Worked examples4

1. A horizontal 3-inch PVC drain must run from a water closet rough-in to the stack, a horizontal distance of 14 feet. The code adopted by your jurisdiction requires a minimum slope of 1/4 inch per foot for a pipe of this size. How much total drop in elevation must exist between the starting end and the stack connection?
  1. Identify the required slope: 1/4 inch of drop for every 1 foot of horizontal run.
  2. Identify the total horizontal run: 14 feet.
  3. Multiply: 14 ft × 0.25 in/ft = 3.5 inches of total drop.
  4. Confirm direction: the stack connection (downstream end) must be 3.5 inches lower than the water closet horn (upstream end).
Answer: The drain must drop 3.5 inches over the 14-foot run to meet the minimum 1/4-inch-per-foot slope requirement.
2. You are setting no-hub cast-iron hangers on a horizontal 4-inch soil pipe. Your journeyman tells you the maximum hanger spacing for this material and size is 5 feet. The run is 32 feet long, starting with a hanger at the 0-foot mark. How many total hangers are needed, and at what locations are they placed?
  1. Start with the first hanger at 0 ft (the beginning of the run).
  2. Add a hanger every 5 feet: 0, 5, 10, 15, 20, 25, 30 ft.
  3. Check the remaining distance after the last hanger: 32 ft − 30 ft = 2 ft, which is less than the 5-ft maximum, so a hanger is required at the 32-ft endpoint as well.
  4. Count total hanger locations: 0, 5, 10, 15, 20, 25, 30, 32 ft = 8 hangers.
Answer: 8 hangers are required, placed at 0, 5, 10, 15, 20, 25, 30, and 32 feet.
3. You are cutting a stick of 4-inch PVC DWV pipe. The full stick is 10 feet (120 inches) long. You need a piece that is 6 feet 9 inches long. After the saw cut, the kerf (blade thickness) removes approximately 1/8 inch of material. What is the length of the remaining piece after the cut?
  1. Convert all measurements to inches: full stick = 120 in; needed piece = (6 × 12) + 9 = 81 in.
  2. Account for the kerf: 1/8 in = 0.125 in of material is lost to the blade.
  3. Subtract the needed piece and the kerf from the full stick: 120 − 81 − 0.125 = 38.875 in.
  4. Convert to feet and inches: 38.875 in ÷ 12 = 3 ft with a remainder of 2.875 in, which rounds to 3 ft 2-7/8 in.
Answer: The remaining piece is 3 feet 2-7/8 inches long (38-7/8 inches).
4. You need to verify the slope of a 10-foot horizontal drain run using a 4-foot level and a tape measure. You place the level on top of the pipe at the high end, hold it level, and measure the gap between the bottom of the level and the pipe surface at the low end of the level. The gap measures 1 inch over the 4-foot level length. What is the slope in inches per foot, and does it meet a minimum code requirement of 1/4 inch per foot?
  1. The measured drop is 1 inch over 4 feet of level length.
  2. Calculate slope: 1 in ÷ 4 ft = 0.25 in/ft.
  3. Compare to the minimum: 0.25 in/ft equals exactly 1/4 in/ft.
  4. Conclusion: the run meets the minimum slope requirement, but there is no margin for error; confirm the slope is consistent along the entire run, not just at this one point.
Answer: The slope is 1/4 inch per foot, which exactly meets the stated minimum code requirement. Verify slope consistently along the full run.

The math in this lesson2

Learners compute drain fall over 14 feet and hanger counts from maximum spacing.
6.RP.37.NS.3
In class: Perform assigned rough-in tasks each shift (examples: cut and join PVC or ABS DWV runs to foreman's layout marks, set cast-iron pipe with correct hangers and slope, dig and bed underground supply lines) and document every task in the daily field log by end of shift. · At least twice per week, identify one applicable code provision (IPC or UPC, whichever the jurisdiction uses) governing that day's work—such as minimum slope for a horizontal drain, support spacing, or cleanout location—and record the provision's subject matter and practical effect in the log. · At the midpoint of Phase 1 (approximately week 4 on site), meet with the supervising journeyman for a structured mid-phase check-in: review field log entries together, receive verbal feedback on work quality and safety behavior, and write a one-paragraph self-assessment.
Materials: Employer-provided hand tools, power tools, pipe-joining equipment, measuring and leveling tools; student-supplied field log binder; applicable adopted plumbing code (IPC or UPC) on phone app or printed reference; PPE
Check: Field log entries are complete, legible, and submitted weekly to the externship coordinator. Pass = no more than one missing daily entry per two-week period and at least one code reference documented per week. Supervising journeyman confirms tasks were performed safely and at acceptable quality during the mid-phase check-in.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

NCCER Plumbing – Pipe and Fittings / Joining Methods
1. When solvent-cementing PVC DWV fittings, why must the connection be completed in a single push-and-quarter-turn motion without repositioning?
Safety / OSHA Excavation Standards
2. A student is about to enter a trench that is 6 feet deep to lay underground supply pipe. No shoring or trench box is present. What is the correct action?
Field Documentation / Code Literacy
3. Your jurisdiction has adopted the IPC. When documenting a code reference in your field log for the minimum slope of a 2-inch horizontal drain, what information should you record?
Safety / PPE Selection
4. Which of the following PPE combinations is the minimum required when using an angle grinder to cut no-hub cast-iron pipe?
NCCER Plumbing – DWV Systems / Applied Math
5. A horizontal 3-inch drain run is 8 feet long and must slope at 1/4 inch per foot. What is the required total drop from the high end to the low end?
Field Documentation / Professional Practice
6. During the mid-phase check-in at approximately week 4, the supervising journeyman reviews your field log and gives verbal feedback. What action must you take immediately after the meeting?
Safety / Hazardous Materials – Solvents
7. When priming and cementing a PVC joint in a confined mechanical room with limited air movement, what is the most important safety precaution beyond wearing gloves and safety glasses?
NCCER Plumbing – Underground and Site Utilities
8. What is the purpose of bedding material—such as compacted sand or pea gravel—placed under and around an underground water service pipe?
Record this lesson on my transcript. Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.