Objective. The learner completes a cross-connection control survey form for a simulated building, identifies required assemblies by location, and explains the annual test and reporting obligations that the local water authority typically requires of the building owner and the licensed tester.
This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
Every public water system is required to protect its distribution water from contamination at the point where it enters private property. Cross-connection control programs—run by local water authorities—carry out that protection by requiring building owners to survey their plumbing systems, install approved backflow prevention assemblies, and have those assemblies tested on a schedule. As a licensed tester, you are the professional who makes the program work in the field. Understanding the legal framework helps you fill out paperwork correctly, communicate with building owners clearly, and avoid liability.
Federal and state safe drinking water rules require local water suppliers to maintain a cross-connection control program. Those suppliers then pass obligations downstream to their customers—the building owners—through service agreements and local ordinances. The International Plumbing Code (IPC) and the Uniform Plumbing Code (UPC) both contain chapters addressing cross-connection control, specifying where protection is required and what degree of protection applies. Local amendments may be stricter than the model codes; always check the authority having jurisdiction (AHJ) before you specify an assembly.
The building owner is responsible for:
The certified tester is responsible for:
A cross-connection control survey is a systematic inspection of a building's plumbing to find every point where non-potable substances could enter the potable water system. The resulting survey report is a written record that documents each hazardous connection and the assembly required to protect it.
A typical survey form contains:
1. Property information – address, owner name and contact, water meter number, account number
2. Survey date and tester credentials – your name, license or certification number, and the certifying body (for example, ASSE International)
3. Hazard inventory table – one row per cross-connection listing: location in the building, connected equipment or system, degree of hazard (high or low), required assembly type, assembly manufacturer/model/serial number, and test interval
4. Installed assembly status – whether a compliant assembly is already present, needs replacement, or needs to be newly installed
5. Tester signature and date – you certify the accuracy of the report
6. Owner acknowledgment – the owner or authorized representative signs to confirm they received the findings
The water authority retains its copy to track compliance. The owner keeps a copy for their records. You keep a copy for yours.
The survey's most important technical judgment is matching each cross-connection to the correct assembly. The two main categories used in most programs are:
Always verify with the AHJ. Some local programs classify all commercial laundry connections as high hazard because chemical concentrations are significant.
Most local programs require each assembly to be tested at initial installation, after any repair or replacement, and at least once every twelve months thereafter. The tester uses field test procedures published by the certifying body and records differential pressure readings at each check valve or relief valve port. Those readings must meet the manufacturer's minimum performance specifications and any code-required minimums.
When an assembly fails a field test, you must:
1. Document the failure on the test report
2. Notify the building owner immediately
3. Notify the water authority promptly—many programs require same-day or next-business-day notification for high-hazard failures
4. Re-test after the assembly is repaired or replaced and submit a passing report before the file is closed
Deadlines matter. Many water authorities set a fixed date by which all reports for a given facility must be on file. Missing the deadline can result in fines to the owner and, in serious cases, termination of water service.
Before entering mechanical rooms or accessing assemblies:
Accurate paperwork protects the public's health. A missed cross-connection on a survey form is not just a compliance failure—it is a potential contamination event.
Answer each question, then check it. Nothing is recorded; this is your own practice.