BLD-PLUM06-04 · Lesson 7 · 15 clock hours · lab
Water Supply Rough-In: Layout, Spacing, and Stub-Out Heights
Objective. Students will lay out and rough-in hot and cold water supply to a bathroom group (water closet, lavatory, tub/shower) and a kitchen sink at correct heights, centerline spacing, and stub-out projections per IPC/UPC and local rough-in dimension standards.
Why Rough-In Dimensions Matter
Rough-in work happens before walls are closed. Once drywall or tile goes up, stub-outs must land in exactly the right place for fixtures to connect without modification. An off-center supply to a lavatory faucet, a stub-out that sits too low for a tub spout, or a hot-and-cold pair that is too close together will force costly rework or force the installer to use flexible correctors that inspectors may reject. Getting it right the first time is a core professional skill and a direct requirement for journeyman licensing.
Reading Manufacturer Rough-In Sheets
Every fixture manufacturer publishes a rough-in dimension sheet for each model. These sheets show:
- AFF (above finished floor): the height at which the supply stub-out should emerge from the wall, measured to the centerline of the fitting
- Centerline offset: horizontal distance from a reference point (usually the centerline of the drain or the finished side wall) to the centerline of each supply
- Hot and cold spacing: the distance between hot and cold supply centerlines (commonly 8 inches on center for lavatories and kitchen sinks; tub/shower valves vary by valve model)
- Stub-out projection: how far the threaded or sweat fitting should protrude from the face of the rough framing
Always use the sheet for the exact model being installed. Dimensions differ between manufacturers and even between product lines from the same manufacturer. Before the lab begins, your reference card must be verified by the instructor — working from incorrect dimensions wastes material and time.
Common Rough-In Heights by Fixture
The following ranges reflect typical industry practice. Always confirm against the specific rough-in sheet and local code amendment:
- Water closet: Cold supply only; commonly 6–8 inches AFF to supply centerline, located to the left of the drain centerline (varies by model)
- Lavatory: Hot left, cold right; supplies commonly 20–22 inches AFF; 8 inches on center (4 inches each side of drain centerline) for most widespread faucets
- Tub/shower valve: Height and offset are valve-specific; the rough-in sheet for the valve body — not just the trim — governs; blocking in the stud wall is required to support the valve
- Kitchen sink: Hot left, cold right; commonly 18–22 inches AFF; 8 inches on center at the drain centerline or as specified
These are starting points. The rough-in sheet is the authority.
Layout Sequence in the Stud Wall
1. Snap a level chalk line at the AFF height for each fixture group. Use a laser level or spirit level; a sloped chalk line creates a sloped stub-out.
2. Mark the centerline of the drain or valve on the sole plate and transfer it plumb up the stud bay to the chalk line.
3. Mark hot and cold positions at the specified offset from centerline. Mark clearly: an H for hot (left when facing the wall), C for cold (right).
4. Drill through plates with a hole saw sized for the pipe plus sleeve. Keep holes centered in the plate thickness to preserve structural integrity and meet fire-blocking rules.
5. Install pipe hangers at the intervals required by the applicable code for the pipe material and size. For PEX-B and copper in most codes, horizontal support spacing is specified; vertical runs have their own interval. Never exceed the code maximum unsupported span.
6. Run pipe from the main lines to each stub-out location.
7. Install the drop-ear elbow or stub-out elbow at the chalk-line height, with the face of the fitting flush to or projecting the specified amount beyond the face of the rough framing. Screw the drop-ear ear into a solid blocking member, not just drywall backing.
8. Cap all openings immediately. Caps stay on until fixture connection.
9. Mark stub-out heights on the adjacent stud in permanent marker for the inspector and the finish plumber.
Pipe Support Requirements
The IPC and UPC both specify maximum hanger spacing by pipe material and diameter. For ½-inch copper and PEX in horizontal runs, consult the current edition of the applicable code for your jurisdiction. The key rule is simple: zero unsupported spans may exceed the code maximum. Undersupported pipe sags, stresses fittings, transmits vibration, and can fail at joints over time.
At plates, pipe must pass through holes or notches that are protected by nail plates (strike plates) when the edge of the hole is within the code-specified distance from the face of the framing member.
Safety in the Rough-In Lab
- Safety glasses are required at all times when drilling, cutting, or working overhead. Chips, sawdust, and copper shavings are eye hazards.
- Lockout/tagout (LOTO): In a live shop, confirm that any existing supply lines feeding the mock-up are isolated and de-energized before cutting in. Follow your shop's LOTO procedure.
- Drill safety: Use the correct bit for the material, keep cords clear of the drill path, and never reach around a spinning bit.
- Deburr cut copper immediately with a reamer or file. Copper burrs cause cuts and restrict crimp fittings from seating fully.
- PEX crimp: Inspect every crimp ring with the go/no-go gauge before moving on. An uncrimped ring will leak under pressure.
- Caps: Pressure-test caps must be rated for the test pressure. Confirm before pressurizing.
Self-Inspection Before the Instructor Check
Measure each stub-out height from finished floor level (the top of the subfloor in your mock-up, or the reference line marked by the instructor). Record the measured value and the specified value on your inspection sheet. Calculate the deviation. The pass criterion for this lab is all dimensions within ½ inch of specification. Correct any out-of-tolerance stub-outs before calling for the instructor check. Developing the habit of self-inspection before requesting approval is a professional expectation on every job site.
Key terms8
Rough-in dimensionA measurement — typically height above finished floor, horizontal offset, or stub-out projection — that specifies where a supply or drain fitting must be located before the wall is closed, as published on the fixture manufacturer's rough-in sheet.
AFF (above finished floor)The standard reference datum for plumbing heights; all vertical rough-in measurements are taken from the surface of the finished floor, not the subfloor, unless the rough-in sheet specifies otherwise.
Stub-outA short section of pipe or a fitting that projects from the framed wall at the rough-in location, capped until the fixture is connected during finish plumbing.
Drop-ear elbowA 90-degree elbow fitting with integral mounting ears (flanges) that allow it to be screwed directly to blocking or framing, holding the stub-out rigidly in position for connection to a supply stop or faucet inlet.
Centerline offsetThe horizontal distance from a reference line — usually the drain centerline or a finished side wall — to the centerline of a supply stub-out, as specified on the manufacturer's rough-in sheet.
Nail plate (strike plate)A steel plate fastened over a notch or hole in a framing member to protect pipe or cable from being punctured by fasteners when drywall or sheathing is applied.
Pipe hanger (support)A device — such as a clamp, strap, or clevis — that fastens pipe to the structure at code-specified intervals to prevent sagging, excessive movement, and stress at joints.
Go/no-go gaugeA calibrated inspection tool used after crimping a PEX ring to verify the crimp diameter falls within the acceptable range; a ring that passes through the 'go' slot but not the 'no-go' slot is correctly crimped.
Worked examples4
1. A lavatory rough-in sheet specifies the supply centerlines at 21 inches AFF. Your subfloor is 1 inch below the finish floor reference line marked on the stud. At what height above the subfloor should you snap your chalk line?
- Identify the AFF dimension from the rough-in sheet: 21 inches.
- Determine the difference between finish floor and subfloor: finish floor is 1 inch above subfloor.
- Add the finish floor offset to the AFF dimension: 21 + 1 = 22 inches above subfloor.
Answer: Snap the chalk line 22 inches above the subfloor to place the supply stub-out centerlines at 21 inches AFF.
2. The rough-in sheet for a widespread lavatory faucet calls for supply centerlines 4 inches to each side of the drain centerline. The drain centerline is marked 18 inches from the left side wall. Where are the hot and cold stub-out centerlines measured from the left side wall?
- Identify the drain centerline position: 18 inches from the left side wall.
- Hot supply is on the left (facing the wall), so it is 4 inches to the left of the drain centerline: 18 − 4 = 14 inches from the left side wall.
- Cold supply is on the right, so it is 4 inches to the right of the drain centerline: 18 + 4 = 22 inches from the left side wall.
- Verify the hot-to-cold spacing: 22 − 14 = 8 inches on center, which matches the standard 8-inch faucet spread.
Answer: Hot stub-out: 14 inches from the left side wall. Cold stub-out: 22 inches from the left side wall. Centers are 8 inches apart.
3. After self-inspection, you measure the cold supply stub-out for the water closet at 7¾ inches AFF. The rough-in sheet specifies 6½ inches AFF. What is the deviation, and does it pass the ½-inch tolerance criterion for this lab?
- Calculate the deviation: 7¾ − 6½ = 1¼ inches (the stub-out is 1¼ inches too high).
- Compare to the pass criterion: the stub-out must be within ½ inch (0.5 inch) of specification.
- 1¼ inch deviation exceeds ½ inch tolerance, so the stub-out does not pass.
Answer: Deviation is 1¼ inches. This exceeds the ½-inch tolerance and must be corrected before the instructor check.
4. You are running ½-inch PEX horizontal in a stud wall. Your code requires supports no more than 32 inches apart for ½-inch PEX horizontal runs. You have a horizontal run of 7 feet 4 inches (88 inches). What is the minimum number of hangers needed for that run (not counting the fittings at each end that are already secured)?
- Convert the run to inches: 7 feet 4 inches = 88 inches.
- Determine how many 32-inch intervals fit in 88 inches: 88 ÷ 32 = 2.75 intervals.
- You need a support at least every 32 inches, so round up to determine support locations: supports at 32 inches, 64 inches, and at or before 88 inches (the fitting at the end counts if secured).
- Between the two secured end fittings, interior supports are needed at 32 inches and 64 inches from one end — that is 2 intermediate hangers.
Answer: A minimum of 2 intermediate hangers are required for the 88-inch run, placing them at approximately 32 and 64 inches from one secured end, keeping no unsupported span beyond 32 inches.
In class: Rough-in dimension research: using manufacturer rough-in sheets for three fixture types, students create a reference card listing cold supply height, hot supply height (where applicable), centerline offset from finished wall, and stub-out projection for each fixture; reference cards are verified by instructor before lab begins. · Stud-wall rough-in lab: working in pairs on a framed wall section in the shop, students snap chalk lines, drill through plates, install pipe hangers at code intervals, run PEX or copper supply, install drop-ear elbows or stub-out elbows at correct heights, cap all openings, and mark stub-out heights on the studs. · Self-inspection with tape measure: students measure their own stub-out heights and offsets against their reference cards, record deviations on an inspection sheet, and make corrections before instructor check.
Materials: Framed wall mock-up sections, PEX-B or copper Type L (1/2"), crimp or push-fit fittings, drop-ear elbows, stub-out elbows, pipe hangers, hole saw, drill, tape measure, chalk line, marker, caps for pressure test, manufacturer rough-in sheets (WC, lavatory, tub/shower, kitchen sink), IPC/UPC, safety glasses
Check: Instructor measures all stub-out heights and offsets; all dimensions within 1/2 inch of specification; pipe support spacing compliant with code; zero unsupported spans exceeding code maximum; pass/fail
Practice check8
Answer each question, then check it. Nothing is recorded; this is your own practice.
Record this lesson on my transcript. Sign in with your key and enrollment email to record lessons (enroll free if you have no key). This page stays open to read and practise.