Objective. Students will create a complete pre-inspection plan — including a scoped checklist, safety assessment, equipment list, and client communication template — that satisfies InterNACHI and ASHI Standards of Practice scope requirements.
This lesson, its worked examples and its practice questions has not yet been verified by a credentialed professional in the field or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
The capstone is a full residential inspection performed, documented, and defended as if you were working for a paying client. Before you touch a single outlet cover or set a ladder against a fascia board, you must have a written plan. This lesson covers three pillars of that plan: scope definition, safety assessment, and client communication. Getting these right before you arrive on site is not paperwork for its own sake — it is what separates a professional inspection from a walk-through with a flashlight.
Two organizations publish the authoritative Standards of Practice (SoP) for residential home inspection in the United States: InterNACHI and ASHI. Both documents define what an inspector is required to inspect, what must be reported, and what is excluded from the inspection scope. You will sit credentialing exams from both organizations, so you must be fluent in each.
Both standards require the inspector to evaluate the following nine system categories:
1. Structural components (foundation, framing)
2. Exterior (cladding, grading, drainage, walkways, driveways)
3. Roofing system (covering, drainage, flashing, skylights)
4. Plumbing system
5. Electrical system
6. Heating system
7. Cooling system (central and through-wall)
8. Insulation and ventilation
9. Interior (walls, ceilings, floors, doors, windows, stairs)
Your master scope checklist must list every inspectable component within each category and note the relevant concept from both standards — for example, the requirement to operate a representative number of installed fixtures, or the requirement to inspect visible structural components. Annotating each line item this way does two things: it proves coverage for your defense, and it drills the exam content you need for the InterNACHI CPI and ASHI ACI tests.
Important limitation: Both SoPs also define what is not required. Inspectors are not required to move stored items, perform destructive testing, operate systems that show signs of unsafe conditions, or access areas that pose a risk of personal injury. Knowing these exclusions protects you legally and keeps your scope honest.
Safety planning is not optional — it is an OSHA expectation and a professional obligation. For the sample capstone property (two-story wood-frame, 1970s construction, gas heat, unfinished basement), you must identify hazards in advance and select the correct controls.
Electrical arc and shock risk. Homes built before the mid-1970s may have ungrounded wiring, aluminum branch-circuit wiring, or panels with known deficiencies. Wear rubber-soled footwear, use a non-contact voltage tester before touching any conductor, and never remove a panel cover without confirming the main disconnect is accessible and clearly labeled. Treat every conductor as energized until proven otherwise.
Fall hazards. Roof access and attic access both create fall exposure. Use an ANSI-rated ladder with the correct duty rating for your weight plus tools. On the roof, assess pitch, surface condition, and weather before stepping on. If conditions are unsafe, document the limitation and inspect from the eave or with binoculars — do not take a fall risk to avoid writing a limitation.
Confined spaces. An unfinished basement with limited egress, poor ventilation, or potential accumulation of gases (radon, sewer gas, carbon monoxide from gas appliances) meets the OSHA definition of a permit-required confined space if atmospheric hazards exist. At minimum, use a calibrated multi-gas detector before and during entry. Know your exit route before you go in.
Asbestos and lead-paint potential. A 1970s home may contain asbestos-containing materials (pipe insulation, floor tiles, ceiling texture) and lead-based paint. You are not required to test for these, but you must not disturb suspect materials. Note their presence as a recommendation for specialist evaluation. Wear an N95 respirator when working in areas with disturbed or deteriorating suspect materials.
PPE Minimum for This Property Type:
Lockout/tagout (LOTO) procedures apply if you must de-energize any system component to inspect safely. In residential inspection this is rare, but knowing the concept from your OSHA 10 training is expected.
Professional client communication before the inspection accomplishes four things: it sets accurate expectations, establishes scope limitations in advance, satisfies ethical disclosure requirements, and reduces disputes after the report is delivered.
Both the InterNACHI Code of Ethics and the ASHI Code of Ethics require inspectors to be honest, avoid conflicts of interest, and disclose any relationship with parties to the transaction. The pre-inspection phone call or intake meeting should cover:
A documented pre-inspection agreement protects both parties. Never begin an inspection without one.
Your capstone pre-inspection plan is a living document. Before site day, you will have: a complete nine-category scope checklist annotated to both SoPs, a hazard worksheet with matched PPE and controls, and a client communication template ready for use. These three documents are submitted for instructor review before you conduct the inspection — no plan, no inspection.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.