Objective. The student will assemble the hardware environment, install and configure operating systems, and configure a managed switch and router so that all devices pass connectivity and VLAN tests documented in the verification plan.
This lesson, its worked examples and its practice questions has not yet been verified by an industry-certified professional or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
This lab brings together every skill from the program into one integrated build. You will assemble workstations, install an operating system, and configure a managed switch and router — then verify that everything works using a structured checklist. Work methodically, document as you go, and treat safety as a non-negotiable step, not an afterthought.
Electrostatic discharge (ESD) can permanently damage CPUs, RAM, and storage devices — often without any visible sign of damage. Before touching any component, attach an ESD wrist strap to your wrist and clip it to a grounded metal surface such as the unpainted chassis of the case. Work on an antistatic mat when available. Keep components in their antistatic bags until the moment you install them. Never work inside a powered system; disconnect power and press the power button once to drain residual charge. When racking equipment, use a second person or a rack-lift for heavy chassis to prevent back injury.
Begin with a clean, well-lit work surface. Install the CPU into the motherboard socket using zero-insertion-force (ZIF) technique — align the triangle marker and lower it straight down without pressing. Apply thermal paste only when required (boxed coolers with pre-applied paste need none): a pea-sized dot centered on the CPU die is the standard method; the cooler spreads it under pressure. Seat RAM in the correct slots per the motherboard manual (usually slots 2 and 4 for dual-channel). Install the storage drive, GPU if present, and power supply connections. Route all cables behind the motherboard tray or through cable management channels before closing the case. Use cable ties and a label maker so each cable is identified at both ends — this practice is required for the verification checklist and reflects real-world professional standards.
Take a timestamped photo at each milestone: before power-on, after POST, and after OS installation. Photos become your project log and evidence for instructor verification.
Create a bootable USB with the Windows 11 installation tool from Microsoft. Boot the target machine from USB (adjust BIOS/UEFI boot order), choose a clean install, select the correct partition, and complete setup. Join both machines to a local workgroup rather than a domain — use a consistent naming convention such as WS-01 and WS-02. After installation, install drivers from the motherboard and GPU manufacturer, run Windows Update fully, and enable Windows Defender. Document the hostname, IP address (static or DHCP-assigned), and workgroup name in the project log.
Connect to the switch via console cable and terminal emulator (PuTTY at 9600 baud is standard for Cisco). Enter privileged EXEC mode (`enable`) and then global configuration mode (`configure terminal`). Create at least two VLANs: a data VLAN (commonly VLAN 10) and a voice or management VLAN (commonly VLAN 20). Assign access ports to each VLAN with `switchport mode access` and `switchport access vlan <id>`. Configure the uplink port to the router as a trunk: `switchport mode trunk`. Enable Spanning Tree Protocol (STP) — it is on by default in Cisco IOS as PVST+, but verify with `show spanning-tree`. Confirm your configuration with `show vlan brief` and `show interfaces trunk`, and paste the output into your verification table.
On a Cisco ISR router (or pfSense equivalent), use router-on-a-stick: create subinterfaces on the physical interface connected to the switch trunk. Example for VLAN 10:
```
interface GigabitEthernet0/0.10
encapsulation dot1Q 10
ip address 192.168.10.1 255.255.255.0
```
Repeat for VLAN 20. Enable the parent interface with `no shutdown`. Devices on VLAN 10 will use 192.168.10.1 as their default gateway; devices on VLAN 20 will use 192.168.20.1. Test inter-VLAN connectivity with pings from a host on each VLAN to the gateway and to a host on the other VLAN. Record every ping result — success and failure — in the verification table.
Configure a DHCP scope on the router or on a pfSense/Windows Server VM. Define the pool, default gateway, DNS server, and lease time. Exclude static addresses from the pool. Connect the wireless access point and configure SSID and security: use WPA3-Personal if the hardware supports it; use WPA2-AES if not — never use WEP or TKIP. Install a cloud backup agent on one workstation and verify a successful backup to a free-tier or lab cloud storage account. Screenshot or log the backup completion timestamp.
The checklist covers three categories: physical (cable management, labels, no exposed conductors, cooler seated, chassis closed), logical (VLANs exist, trunk active, DHCP assigns addresses, pings pass, workstations joined to workgroup, backup agent running), and security (WPA3/WPA2 enabled, default switch passwords changed, Windows Defender active, Windows Update current, unnecessary services disabled). Each item is marked PASS or FAIL. You must achieve at least 22 of 24 passing items before moving to documentation. Any failed item must be corrected on the spot.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.