Objective. The learner will cut, ream, bend, and install a three-piece conduit run consisting of EMT with at least two 90-degree bends and one offset, secured with proper supports, and pulled with conductors sized per NEC fill tables, meeting a plumb and level standard of within 1/4 inch over 4 feet.
This lesson, its worked examples and its practice questions has not yet been verified by a licensed engineer or certified journey-level tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
Conduit is the mechanical protection system for electrical conductors. In manufacturing plants and marine facilities, wiring runs through areas with heavy vibration, moisture, chemicals, and physical impact. Choosing the right conduit type and installing it correctly keeps conductors safe, meets the National Electrical Code (NEC), and protects workers from shock and fire hazards.
Rigid Metal Conduit (RMC) is heavy-wall threaded steel pipe. It offers the strongest physical protection and is listed for use in all environments, including wet and hazardous locations. Cutting and threading RMC requires a pipe threader and reamer. RMC serves as the equipment grounding conductor when fittings are properly torqued.
Electrical Metallic Tubing (EMT) is thin-wall, unthreaded steel tubing. It is lighter and easier to bend than RMC. EMT uses compression or set-screw fittings rather than threads. It is suitable for most indoor and some outdoor dry locations. EMT is the most common conduit in light commercial and manufacturing interior applications and is the primary material practiced in this lab.
Flexible Metal Conduit (FMC) — often called Greenfield — is spiral-wound interlocked steel. It is used for the final connection to motors, compressors, and other vibrating equipment where a rigid run cannot absorb movement. FMC requires separate grounding conductors because the spiral seam does not provide reliable ground continuity in all conditions. Liquidtight flexible metal conduit (LFMC) adds a plastic jacket for wet or oily locations such as marine bilge areas.
Apply lockout/tagout (LOTO) procedures before working on or near any energized panel or circuit — even a training panel. Verify the circuit is de-energized with a meter rated for the voltage present. Wear safety glasses at all times during cutting and bending; metal chips and swarf are a serious eye hazard. Wear leather gloves when handling cut conduit ends; freshly cut steel is razor-sharp until properly reamed and filed. Steel-toed footwear is required in the lab area. Keep the work area clear of tripping hazards, especially conduit lengths on the floor.
Measure the required length carefully before cutting. Use a tubing cutter for clean square cuts; tighten the cutter wheel gradually and rotate the tool around the tube — forcing the wheel causes deformation. After cutting, use the reamer attached to the cutter or a stand-alone reamer to remove all burrs from the inside edge. Burrs nick conductor insulation during pulling and can cause insulation failures that are invisible after installation. A properly reamed end feels smooth to a gloved finger.
A hand bender is a formed shoe matched to a specific conduit size — never use a 1/2-inch bender on 3/4-inch EMT. Each bender is stamped or labeled with the take-up (also called deduction) for a 90-degree stub-up: the distance you subtract from the desired stub height so the finished bend lands at the right measurement. Common take-up values are stamped on the bender handle.
A stub-up is a single 90-degree bend used to rise from the floor or enter a box from below. Mark the conduit at the measurement equal to the desired stub height minus the take-up, place the bender arrow on that mark, and pull the handle to the 90-degree mark.
A back-to-back 90 makes a U-shape or offset section. Make the first bend, measure the desired distance to the second bend, add the gain (the amount of conduit length saved by the arc of the first bend) to your measurement, mark that point, flip the conduit, and make the second bend.
An offset consists of two equal bends in opposite directions to move the conduit around an obstacle or to change elevation by a set amount. Common offset angles are 22.5°, 30°, and 45°. A 30-degree offset has a multiplier of 2.0, meaning the distance between bend marks equals the desired offset height multiplied by 2.0.
The NEC requires EMT to be supported within a specified distance of every box, fitting, or enclosure and at intervals along the run. Consult the current NEC article for EMT support intervals. Supports must be fastened securely to the structure — use one-hole straps or two-hole straps on steel framing. A run that is not plumb and level looks unprofessional and may prevent box covers from seating correctly. The standard in this lab is within 1/4 inch over any 4-foot section, verified with a torpedo level.
The NEC limits how much of a conduit's cross-sectional area can be occupied by conductors. For three or more conductors, the maximum fill is 40% of the conduit's interior cross-sectional area. This limit prevents overheating and makes pulling and future rewiring practical. Values for conductor cross-sectional area and conduit interior area are found in NEC Chapter 9, Tables 4 and 5. Calculate total conductor area, divide by conduit interior area, multiply by 100, and confirm the result is 40% or below before pulling wire.
Apply wire-pulling lubricant (pulling compound) to conductors before feeding them into the conduit. Lubricant reduces friction dramatically, preventing insulation damage and making the pull possible in longer runs. Never use petroleum-based lubricants on thermoplastic insulation such as THHN — use a listed water-based compound. Feed conductors together and pull steadily; jerking can nick insulation on conduit fittings.
Before calling the instructor for sign-off, verify: all bends within ±2 degrees of the specified angle; run plumb and level within 1/4 inch per 4 feet; supports installed at correct intervals; connectors fully seated and secured; conduit fill calculation recorded and confirmed at 40% or below; and all cut ends properly reamed.
Answer each question, then check it. Nothing is recorded; this is your own practice.