Objective. Students configure a data collector, create a job file, and collect point data with feature codes that will be correctly interpreted during office download.
This lesson, its worked examples and its practice questions has not yet been verified by an industry-certified professional or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
A data collector (also called a field controller) is a ruggedized handheld computer that runs field survey software and communicates with a total station. Instead of writing angles and distances in a field book by hand, the collector stores every observation digitally, attaches a feature code to each point, and organizes everything into a structured job file that the office software can read without re-entry. Common units you will use in this program are the Trimble TSC series running Trimble Access and the Leica CS series running Leica Captivate. The principles are the same across brands.
Most modern total stations communicate over Bluetooth or a direct USB/serial cable. Bluetooth is preferred in the field because a cable creates a trip hazard when the instrument is on a tripod.
Bluetooth pairing procedure (general):
1. Enable Bluetooth on both the total station and the collector.
2. On the collector, search for available devices and select the instrument by its serial number or assigned name.
3. Enter the PIN if prompted (check the quick-start guide for the default).
4. Confirm two-way communication by triggering a test measurement from the collector screen — the instrument should rotate or measure and the result should appear on the collector display.
Cable pairing: Connect the manufacturer cable to the correct port on each device, match the baud rate in both devices' communication settings, and test the same way.
Safety note: When working near the total station on a tripod, keep the instrument tribrach locked and stand clear of the rotating telescope. Do not place the cable where co-workers or you might trip — route it or tape it down. On elevated or unstable ground, use a hard-hat and high-visibility vest.
Field software stores data in a job file (the exact file extension varies by platform). Inside every job file, records are organized by type:
Understanding record types lets you audit the raw file on the collector screen and catch errors before you leave the field.
1. Open the field software and select New Job.
2. Enter a descriptive name (e.g., `SMITH_TOPO_2025-06-10`). Avoid spaces; use underscores.
3. Set units (US Survey Feet or meters), coordinate order, and angular units (degrees-minutes-seconds).
4. Save and enter the Station Setup routine.
5. Key in the instrument point number and its known Northing, Easting, and Elevation (control coordinates from your project data).
6. Measure and enter the instrument height (HI) — measured vertically from the control nail or monument to the trunion axis mark on the instrument.
7. Enter the backsight point number (with its known coordinates) or a direct backsight azimuth.
8. Sight the backsight, confirm the angular difference between measured and computed azimuth is within your allowable tolerance, and accept the setup.
A feature code (also called an attribute code or description code) tags each point with what it represents: `EP` for edge of pavement, `TBC` for top-back of curb, `BLD` for building corner, `TREE` for tree center, and so on. Your office CAD or GIS software reads these codes to draw linework automatically or populate attribute tables. A misspelled or blank feature code means manual cleanup later — or a completely wrong map. Use only codes from the project's code library, and verify spelling before you accept each observation.
Once the setup is accepted:
1. Start the Survey or Measure Points routine.
2. For each point: aim at the prism, enter the target height, enter the feature code, confirm the point number is sequential, and press Measure (or equivalent).
3. After the instrument measures, review the displayed coordinates on screen — do the values look reasonable given the site geometry?
4. Accept and move to the next point.
5. After all 10 points, perform a backsight check: re-sight the backsight and record the closing angular error. Note this value in your field notes.
Open the job's raw data view (sometimes called the Raw File or Job Data viewer). Scroll through and verify:
Common errors that cause office processing failures: a target height left at zero when it was not actually zero; a duplicate point number; a feature code that is blank or uses a character the office software cannot parse (such as a slash or comma); or a backsight azimuth entered in decimal degrees when the software expected degrees-minutes-seconds. Flag any suspect record with a note before you download.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.