This course plan, its lessons and its assessments has not yet been verified by an industry-certified professional or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
13 courses · 1,350 clock hours · 6–9 mo full-time. Grading is competency-based: each course requires the written exam, a competent skills demonstration with zero safety faults, a signed log, and a passed safety audit; percentage weights only rank performance above the competency floor.
This foundational course prepares adult learners for every downstream course and the worksite by establishing OSHA 10 safety principles, first aid and CPR, the trade math and measurement skills used daily in data centers, and the technical reading, digital communication, and career-readiness habits employers expect. Lessons are sequenced so that safety is non-negotiable before any hands-on work begins, and every skill is practiced in data-center contexts—rack unit calculations, cable-length estimation, reading vendor spec sheets, and writing work-order tickets. Credential exam areas addressed include OSHA 10 (all domains), CompTIA A+ (safety and professionalism), and CompTIA Server+ (safety and documentation).
OutcomesThis foundational course prepares adult learners for every downstream course and the worksite by establishing OSHA 10 safety principles, first aid and CPR, the trade math and measurement skills used daily in data centers, and the technical reading, digital communication, and career-readiness habits employers expect. Lessons are sequenced so that safety is non-negotiable before any hands-on work begins, and every skill is practiced in data-center contexts—rack unit calculations, cable-length estimation, reading vendor spec sheets, and writing work-order tickets. Credential exam areas addressed include OSHA 10 (all domains), CompTIA A+ (safety and professionalism), and CompTIA Server+ (safety and documentation).
How the course runs. 7 blocks: OSHA 10 General Industry: Hazard Recognition and Regulatory Framework; Lockout/Tagout, PPE, and Electrical Safety in the Data Center; First Aid and CPR/AED for the Data Center Environment; Trade Math and Measurement for Data Center Work; Technical Reading: Spec Sheets, Work Orders, and Safety Data Sheets; Digital Workplace Tools: Email, Ticketing, Documentation, and the Digital Multimeter; Career Readiness: Resume, Professional Profile, and Elevator Pitch.
What competent looks like. Complete OSHA 10 General Industry training and demonstrate correct lockout/tagout and PPE selection for at least four data-center hazard scenarios with no critical errors. Perform and document adult CPR and basic first aid to the standard of an approved provider course, achieving a passing score on the provider's skills evaluation. Apply arithmetic, unit conversion, and basic electrical math (Ohms law, power calculations in watts and kilowatts, rack unit measurements) accurately on trade problems with at least 80% correctness. Read and extract key specifications from a vendor data sheet, a safety data sheet, and a structured work order, demonstrating comprehension through written summaries and correctly completed forms. Use standard digital workplace tools—email, ticketing system, cloud-shared documents, and a digital multimeter—to communicate and record work in a professional format acceptable to a supervisor. Construct a career portfolio containing a resume, a LinkedIn-style professional profile, and a 60-second elevator pitch tailored to entry-level data center technician positions.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | OSHA 10 General Industry: Hazard Recognition and Regulatory Framework | 12 | theory | Students will identify OSHA General Industry standards relevant to data centers—including electrical safety, confined spaces, walking/working surfaces, and hazard communication—and explain the rights and responsibilities of workers and employers under the OSH Act. |
| OSHA 10 General Industry authorized trainer materials, OSHA outreach program participant guide, redacted incident summary handouts, OSHA poster (It's the Law), student worksheet set | Completion of all OSHA 10 outreach modules verified by authorized trainer sign-off; written hazard-classification worksheet scored at 80% or higher; OSHA 10 card issued upon successful course completion. |
| 2 | Lockout/Tagout, PPE, and Electrical Safety in the Data Center | 20 | lab | Students will execute a complete lockout/tagout sequence on a simulated data-center power circuit and select correct PPE for at least four distinct data-center hazard categories with zero critical safety errors. |
| LOTO training panel (non-energized, classroom-safe), personal locks and tags (one set per student), non-contact voltage tester, PPE display set (class-II arc-rated PPE, safety glasses, cut-resistant gloves, ESD wrist straps, hard hats, N95 respirators), scenario cards, inspection checklist, NFPA 70E reference (current edition) | Instructor observes each student's LOTO demonstration and scores it on a pass/fail checklist of 12 required steps; any step skipped or performed out of order is a fail requiring immediate re-demonstration; PPE selection exercise scored at 80% or higher. |
| 3 | First Aid and CPR/AED for the Data Center Environment | 16 | lab | Students will perform hands-only and full-cycle adult CPR, use an AED trainer, and apply basic first-aid protocols for the injuries most likely in a data center (electrical shock, lacerations, heat stress, eye injury from chemical splash) to the passing standard of an approved provider. |
| CPR mannequins (one per two students), AED trainer units, first-aid kit (training-grade), scenario cards, blank incident-report forms, facility floor plan, approved CPR/First Aid provider materials (e.g., American Red Cross or American Heart Association curriculum) | Provider skills evaluation sign-off for CPR/AED (pass/fail per provider standard); incident-report forms reviewed by instructor for completeness and accuracy, scored at 80% or higher; facility map graded for correct location of all safety resources. |
| 4 | Trade Math and Measurement for Data Center Work | 30 | practice | Students will solve data-center trade math problems—including rack unit calculations, cable-length estimation with service loops, power load calculations using Ohm's Law and the power formula, unit conversions between imperial and metric, and BTU/kW heat-load estimates—achieving at least 80% accuracy. |
| Printed problem set (40 problems), answer key (instructor copy), tape measure, digital caliper, rack-unit gauge (1U = 1.75 in reference card), five pieces of lab equipment, vendor spec sheets, calculator, laptop with Google Sheets or Excel, graph paper for scaled floor plan exercise | Problem set scored at 80% or higher by instructor; measurement data sheet accepted when all five items are within ±1/16 inch (±1.6 mm) of spec-sheet dimensions; spreadsheet verified by instructor to produce correct totals matching an answer key. |
| 5 | Technical Reading: Spec Sheets, Work Orders, and Safety Data Sheets | 20 | theory | Students will extract and accurately record critical specifications from a vendor data sheet, required safety precautions from a Safety Data Sheet, and all required fields from a structured work order, demonstrating comprehension through correctly completed summary forms. |
| Printed or digital vendor data sheets (publicly available server and PDU datasheets), one SDS for a data-center chemical, blank structured extraction forms, blank work-order forms, answer key (instructor copy), peer-review rubric | Data-sheet extraction form scored at 80% or higher against answer key; SDS summary form scored at 80% or higher; work-order form graded by instructor using a 10-point rubric requiring all mandatory fields completed correctly; peer-review feedback evaluated for constructive specificity. |
| 6 | Digital Workplace Tools: Email, Ticketing, Documentation, and the Digital Multimeter | 30 | demo | Students will compose professional work-related emails and ticket entries, create and share a cloud-based technical document, and use a digital multimeter to measure DC voltage, continuity, and resistance in a practice circuit, recording results in a standard log format. |
| Laptop or desktop with browser access, free-tier ticketing tool (Freshdesk or osTicket), Google Workspace or Microsoft 365 account, email scenario cards, digital multimeter (Fluke 101 or equivalent), 9V battery, resistor set, patch cable segments (one good, one with an open conductor), lab data sheet, DMM user manual | Emails evaluated on a 5-point professional-communication rubric; ticket record reviewed by instructor for completeness of all required fields (pass/fail); DMM lab data sheet accepted when all measurements are within the meter's rated accuracy and readings are correctly labeled with units. |
| 7 | Career Readiness: Resume, Professional Profile, and Elevator Pitch | 20 | practice | Students will produce a complete, error-free resume and LinkedIn-style professional profile targeted to entry-level data center technician roles and deliver a 60-second verbal elevator pitch that accurately represents their skills and goals. |
| Resume template (data-center-industry focused), laptop with internet access, professional profile platform, peer-review checklist, elevator-pitch rubric, optional ring light or phone camera for recorded practice run, instructor feedback form | Final resume accepted when it contains zero spelling or grammar errors, all required sections are present, and skills are accurately represented; professional profile accepted when all five required elements are present and peer-review checklist is marked complete; elevator pitch scored on a 10-point rubric (content 6 points, delivery 4 points), passing score 7/10. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| OSHA 10 and Workplace Safety Knowledge Exam | Written exam | 25% | 70% or higher on the written exam; OSHA 10 card issued by the authorized trainer upon completion of all required outreach modules | A 40-question multiple-choice and short-answer written exam covering OSHA General Industry hazard categories, LOTO procedures, PPE selection, electrical safety, and first-aid response scenarios drawn from data-center contexts. Students who do not reach 70% on the first attempt receive one remediation session and one retake opportunity. Accuracy · Safety · Communication · Professionalism |
| Trade Math and Technical Reading Exam | Written exam | 25% | 80% or higher | A 50-item closed-book exam combining trade math problems (rack unit calculations, power load math, unit conversions, BTU/kW estimates) and technical reading questions (data sheet extraction, SDS interpretation, work-order completion) identical in format and difficulty to the practice problem sets used in lessons. Students who score below 80% must complete a targeted remediation problem set before sitting a parallel-form retake. Accuracy · Safety · Communication · Professionalism |
| Career Portfolio Project | Project | 25% | Rubric total of 80% or higher across all three components; any component scoring below 60% must be revised and resubmitted before overall pass is awarded | Students submit a portfolio containing their final resume, a screenshot or PDF export of their completed professional profile, a written elevator pitch, a completed and instructor-approved work-order form from Lesson 5, and a PDF of a closed ticketing record from Lesson 6. Each component is scored on a published rubric assessing accuracy, completeness, professional presentation, and freedom from errors. Accuracy · Safety · Communication · Professionalism |
| Safety Skills Oral Defense | Oral / panel | 25% | Pass on all three mandatory skills demonstrations (LOTO, PPE selection, CPR) with no critical errors; overall oral questioning scored at 80% or higher | In a 15-minute one-on-one session with the instructor, each student physically demonstrates the LOTO sequence on the training panel, selects and dons correct PPE for one drawn scenario card, and performs a 2-minute CPR cycle on a mannequin; the instructor then asks five verbal questions drawn from across the course to confirm understanding of the rationale behind safety decisions. Any critical safety error in the physical demonstration requires an immediate remediation and same-day re-demonstration before the student may proceed to Course 2. Accuracy · Safety · Communication · Professionalism |
Students learn to safely receive, position, and install server and network equipment into standard 19-inch equipment racks following manufacturer specifications and data center best practices. Topics include rack assembly, equipment mounting, cable management, weight and power planning, and documentation. Lessons map to CompTIA Server+ domain objectives for hardware installation and CNet CDCTP rack and physical infrastructure competencies.
OutcomesStudents learn to safely receive, position, and install server and network equipment into standard 19-inch equipment racks following manufacturer specifications and data center best practices. Topics include rack assembly, equipment mounting, cable management, weight and power planning, and documentation. Lessons map to CompTIA Server+ domain objectives for hardware installation and CNet CDCTP rack and physical infrastructure competencies.
How the course runs. 7 blocks: Rack Standards, Form Factors, and Pre-Installation Planning; Safety for Rack Work: PPE, Manual Handling, and Electrical Awareness; Rack Assembly: Two-Post and Four-Post Frames; Mounting Hardware: Rail Kits, Toolless Slides, and Shelf Installation; Cable Management: Horizontal Managers, Vertical Managers, and Bend Radius; Rack Documentation: Elevations, Asset Tags, and Change Records; Full Rack Build Practical: End-to-End Installation and Audit.
What competent looks like. Assemble and level a two-post and a four-post equipment rack to manufacturer specifications without supervision. Calculate rack unit capacity, weight load limits, and basic power draw for a planned rack layout before installation begins. Mount at least five different hardware form factors—including 1U servers, blade chassis, patch panels, and PDUs—using correct fasteners and torque practices. Apply data center cable management standards, including horizontal and vertical managers, Velcro bundling, and bend-radius rules, producing a tidy, documented installation. Execute and document a pre-installation equipment inspection and a post-installation rack audit using a standardized checklist. Perform all rack and stack tasks in compliance with OSHA general industry standards for manual material handling, PPE, and electrical awareness.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Rack Standards, Form Factors, and Pre-Installation Planning | 10 | theory | Students can identify EIA/ECA-310 rack standards, common rack unit (U) form factors, and produce a rack elevation diagram for a given equipment list. |
| EIA/ECA-310-E standard summary handout, sample rack elevation diagram templates, manufacturer quick-start guides (server and blade chassis), rack planning spreadsheet (instructor-provided), whiteboard | Student completes a rack elevation diagram and planning worksheet for an instructor-supplied equipment list; diagram must correctly place all five devices with accurate U counts and the weight total must be within 5% of instructor key. Pass = 80% accuracy. |
| 2 | Safety for Rack Work: PPE, Manual Handling, and Electrical Awareness | 9 | theory | Students identify the PPE required for rack and stack tasks, demonstrate correct manual lifting technique for heavy equipment, and describe the electrical hazards present in a live data center aisle. |
| Safety-toe boots, anti-static wrist straps, cut-resistant gloves, ESD mats, server lift cart, weighted practice box (approx. 30 lbs), OSHA 29 CFR 1910 general industry safety summary handout, data center floor photograph set | Instructor observes each student don PPE correctly (100% correct items required) and perform the two-person lift with proper technique (no back-bend, verbal call-out confirmed); student scores 80% or higher on written hazard-identification worksheet. Pass = all three sub-tasks met. |
| 3 | Rack Assembly: Two-Post and Four-Post Frames | 12 | lab | Students assemble a two-post open-frame rack and a four-post enclosed rack frame from components, level both units, and anchor them per manufacturer instructions without instructor assistance. |
| Two-post relay rack kit, four-post open-frame rack kit, manufacturer assembly instructions, calibrated torque screwdriver set, bubble level, tape measure, anti-tip hardware, grounding/bonding strap, assembly checklist (instructor-provided) | Instructor physically checks both assembled racks: frame must be level within 1/8 inch over the full height, all fasteners torqued to spec, grounding bond confirmed with a continuity tester, anti-tip hardware installed. Pass = all checklist items marked acceptable. |
| 4 | Mounting Hardware: Rail Kits, Toolless Slides, and Shelf Installation | 12 | lab | Students install at least three types of rack rail systems—fixed rails, sliding rails, and a universal shelf—and mount a 1U and 2U device in each, confirming secure seating and smooth operation. |
| 1U and 2U rail kits (sliding and fixed, from server OEM), universal vented shelf, cage nut insertion tool, cage nuts and M6 screws, torque screwdriver, practice server chassis (empty or weighted), UPS (or practice equivalent), tape measure | Instructor tugs each mounted device with moderate force (approximately 10 lbs lateral) and operates sliding rails three times; device must remain fully seated, rails must not bind, cage nuts must not pull free. Pass = all mounts pass physical test with zero failures. |
| 5 | Cable Management: Horizontal Managers, Vertical Managers, and Bend Radius | 14 | lab | Students route and dress patch cables and power cords through horizontal and vertical cable managers, maintaining correct bend radius and producing a tidy, labeled installation that meets TIA-568 minimum bend-radius guidelines. |
| 1U horizontal cable managers (2), vertical cable managers (2), Cat 6 patch cords (pre-labeled set of 12), power cords (6), Velcro cable straps, cable labels and label printer, patch panel, practice switch, PDU (rack-mount), TIA-568 bend-radius reference card | Instructor measures bend radius at three random points using a bend-radius gauge card; all must meet minimum. Instructor checks Velcro strap tension (not cutting into jacket), spacing (≤12 in), and that all cables are labeled. Pass = zero bend violations, ≤1 minor dressing deficiency, all cables labeled. 80% of snag list items correctly identified in inspection activity. |
| 6 | Rack Documentation: Elevations, Asset Tags, and Change Records | 12 | practice | Students produce an accurate as-built rack elevation diagram, apply asset tags to each device, and complete a change record using a standard data center change-management form for the rack they assembled. |
| Rack elevation diagram template (paper and digital), tape measure, asset tags (pre-printed), label printer, asset register spreadsheet template, sample change-request form, pen, laptop or tablet for digital entry | Instructor compares student's as-built diagram against the physical rack; every device must be in the correct U position with correct model and serial number. Asset register must have 100% of devices tagged and recorded. CR form must have all required fields completed. Pass = as-built diagram 100% accurate, no missing asset tags, CR form complete. |
| 7 | Full Rack Build Practical: End-to-End Installation and Audit | 12 | lab | Working individually from a written work order, students assemble a rack, install a mixed set of equipment, dress all cables, and pass a post-installation audit against an industry-style acceptance checklist within the allotted time. |
| Full rack kit (four-post), 1U server chassis, patch panel, 1U switch, PDU, 2U UPS or practice equivalent, rail kits, cable managers, Cat 6 patch cords, power cords, Velcro straps, asset tags, work order (instructor-provided), acceptance checklist, torque screwdriver, cable-radius gauge, bubble level, server lift cart | Instructor scores the build using the 20-item acceptance checklist (structural, mounting, cable management, documentation, safety); each item is pass/fail. Student must score 17/20 (85%) or higher and answer at least two of three verbal questions correctly. Pass = 85% checklist score and 2/3 verbal questions correct. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Rack & Stack Written Knowledge Exam | Written exam | 25% | 75% correct (30 of 40 questions) | A 40-question multiple-choice and matching exam covering EIA/ECA-310 rack standards, U form factors, weight and power planning calculations, cable management rules (bend radius, separation of power and data), PPE requirements for rack work, and basic documentation terminology. Questions are aligned to CompTIA Server+ Hardware and Storage domain and CNet CDCTP physical infrastructure knowledge areas. Standard met · Safety · Time · Quality/finish · Documentation |
| Rack Mount Skills Demonstration | Skills demonstration | 45% | Instructor marks all five critical steps as satisfactory; overall score 80% or higher on the 10-item rubric | The student receives a rail kit and a 1U server and must install the rails and seat the server in a designated U position within 20 minutes, then demonstrate correct sliding-rail operation and explain the torque spec used. Critical steps include correct cage-nut orientation, meeting torque spec, bend-radius compliance on the power cord, and verbal confirmation of the release-latch test. Standard met · Safety · Time · Quality/finish · Documentation |
| Lab Log Portfolio | Log | 15% | All six lab session logs submitted; each log scores 80% or higher on the four-point rubric (objective stated, steps recorded, measurements documented, reflection complete) | Students maintain a lab log for every hands-on lesson, recording the objective, the steps performed, all measurements taken (torque values, U positions, bend-radius checks), any errors encountered and corrections made, and a one-paragraph reflection. The complete portfolio is submitted at the end of the course and reviewed for accuracy, completeness, and professional documentation style. Standard met · Safety · Time · Quality/finish · Documentation |
| Safety Compliance Check | Safety audit | 15% | Zero critical safety failures; pass all four observable behaviors | The instructor conducts an unannounced observation during one of the lab sessions and scores the student on four behaviors: correct PPE donned before touching equipment, two-person lift technique used for any item over 35 lbs, electrical hazards not bridged or bypassed, and anti-static precautions followed when handling any ESD-sensitive component. A single critical failure (e.g., no wrist strap when handling a server board) results in an automatic incomplete until the behavior is corrected and re-observed. Standard met · Safety · Time · Quality/finish · Documentation |
Students learn to design, install, terminate, and test copper and fiber-optic cabling systems inside a data center environment following ANSI/TIA standards and BICSI best practices. Emphasis is placed on proper cable management, connector termination, and using professional test equipment to certify installed links. This course directly supports the BICSI Installer credential and contributes to CompTIA A+ and Server+ exam objectives covering networking infrastructure.
OutcomesStudents learn to design, install, terminate, and test copper and fiber-optic cabling systems inside a data center environment following ANSI/TIA standards and BICSI best practices. Emphasis is placed on proper cable management, connector termination, and using professional test equipment to certify installed links. This course directly supports the BICSI Installer credential and contributes to CompTIA A+ and Server+ exam objectives covering networking infrastructure.
How the course runs. 7 blocks: Cabling Standards, Pathways, and Data Center Topology; Copper Cable Installation and Cable Management; Copper Termination: Jacks, Patch Panels, and T568 Wiring; Fiber-Optic Safety, Handling, and Connector Termination; Fiber Testing: OLTS, OTDR, and Loss Budgets; Patch Cord Management, Documentation, and Structured Moves/Adds/Changes; End-to-End Cabling System Certification and Reporting.
What competent looks like. Identify and correctly apply ANSI/TIA-568 and BICSI TDMM standards to select and route copper and fiber cabling in a data center environment. Terminate Cat 6A copper cabling to keystone jacks and patch panels using correct T568A/T568B wiring schemes and verify with a cable certifier to a defined pass standard. Splice and terminate single-mode and multimode fiber-optic cable using pre-polished connectors and verify insertion loss with an OLTS to manufacturer-specified tolerances. Perform OTDR testing on installed fiber runs, interpret the trace, and document results in a structured test report. Install and dress patch cables, horizontal runs, and trunk cables using proper bend-radius, Velcro bundling, and cable tray fill practices. Follow all required PPE, lockout/tagout, and fiber-safety protocols during every hands-on activity without a prompted reminder.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Cabling Standards, Pathways, and Data Center Topology | 10 | theory | Students will correctly identify the ANSI/TIA-568, ANSI/TIA-942, and BICSI TDMM requirements that govern data center cabling topology, pathway types, and media selection. |
| ANSI/TIA-942 standard excerpt, BICSI TDMM (current edition) Chapter references, sample data center floor plan drawings, media-specification comparison chart, whiteboard | 10-question written quiz covering zone definitions, media categories, and pathway types; 8/10 correct required to pass |
| 2 | Copper Cable Installation and Cable Management | 14 | lab | Students will pull, route, and dress Cat 6A UTP cable through ladder rack and cable tray sections to within ANSI/TIA-568 bend-radius and fill-ratio specifications. |
| Cat 6A UTP cable (spools), ladder rack section, cable tray section, cable management rings, Velcro straps, fish tape, cable puller, TIA-606 label maker, PPE (safety glasses, gloves), ANSI/TIA-568 standard excerpt | Instructor skills checklist: pull completed without kinks or over-bend (pass/fail), bundle spacing meets standard (pass/fail), all labels match cable schedule with zero errors; all three items must pass |
| 3 | Copper Termination: Jacks, Patch Panels, and T568 Wiring | 14 | lab | Students will terminate Cat 6A cable to 110-punch keystone jacks and a 24-port patch panel using the T568B wiring scheme and verify continuity with a wiremap tester. |
| Cat 6A UTP cable pre-cut to 3 m, Cat 6A keystone jacks, 24-port Cat 6A patch panel, 110 punch-down tool, modular patch panel mount frame, basic wiremap tester (e.g., Fluke MicroMapper or equivalent), termination log template, PPE (safety glasses) | All six links must show PASS on wiremap tester with zero faults; untwisted pair length at termination point must meet the Cat 6A connector manufacturer's specification; termination log complete and accurate — all items required to pass |
| 4 | Fiber-Optic Safety, Handling, and Connector Termination | 14 | lab | Students will safely handle fiber-optic cable, terminate pre-polished LC connectors on OM4 multimode fiber, and clean and inspect each connector end-face to IEC 61300-3-35 cleanliness criteria using a fiber microscope. |
| OM4 multimode fiber patch cable stock, pre-polished LC connector kits, fiber-optic stripping tool, fiber cleaver, one-click fiber cleaner, lint-free IPA wipes, 200× fiber inspection scope (video or optical), sharps disposal container, PPE (safety glasses mandatory), IEC 61300-3-35 reference card, termination log template | All four connectors must achieve IEC 61300-3-35 Grade B or better on final inspection; sharps disposal observed correctly throughout; safety acknowledgment signed before work begins — all required to pass |
| 5 | Fiber Testing: OLTS, OTDR, and Loss Budgets | 15 | lab | Students will measure insertion loss on a two-fiber multimode link using an optical loss test set (OLTS) and capture and interpret an OTDR trace, comparing measured values against a calculated loss budget. |
| OLTS (light source and power meter matched to OM4/850 nm and 1300 nm), OTDR with launch and receive cables, pre-assembled OM4 duplex test link with at least two connector pairs, loss-budget worksheet, ANSI/TIA-526-14 procedure reference card, OTDR trace printout forms, scientific calculator | OLTS measured loss must be correctly compared to the calculated budget (calculation verified by instructor); OTDR trace annotation must correctly identify all major events and connector loss values within ±0.5 dB of instructor-measured reference; written interpretation must be factually accurate — all three required to pass |
| 6 | Patch Cord Management, Documentation, and Structured Moves/Adds/Changes | 9 | demo | Students will execute a simulated move/add/change (MAC) on a live-lab patch panel using a change-control ticket, update as-built documentation, and verify connectivity after every change. |
| Pre-populated lab patch panel (copper, 24-port), patch cords (various lengths), wiremap tester, MAC change-control ticket template, as-built documentation spreadsheet, label maker, projector for debrief photos | MAC executed with zero unintended disruptions (verified by instructor connectivity check on all untouched ports); as-built spreadsheet matches physical port audit with zero discrepancies — both required to pass |
| 7 | End-to-End Cabling System Certification and Reporting | 5 | practice | Students will operate a cable certifier to run a TIA-568 Cat 6A permanent link test on a pre-installed copper channel and produce a professional test report that meets the documentation standard required for a job turn-over package. |
| Cable certifier with permanent link adapters (Cat 6A rated), pre-installed Cat 6A lab links, PC with certifier companion reporting software, USB cable or wireless transfer capability, sample professional turn-over report, cover summary template, printer or PDF export capability | All four links must show PASS on Cat 6A permanent link autotest or faults must be correctly diagnosed and documented; completed turn-over package PDF must contain all required fields with no blank entries and must match the certifier data — both required to pass |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Cabling Standards and Theory Knowledge Exam | Written exam | 25% | 70% or higher (35/50 questions correct) | A 50-question multiple-choice exam covering ANSI/TIA-568 and TIA-942 zone definitions, media categories and distance limits, T568A/B wiring, fiber types, loss-budget calculation, OTDR trace interpretation, and BICSI pathway and space requirements. Questions are aligned to BICSI Installer exam objectives and CompTIA A+ networking domain objectives. Standard met · Safety · Time · Quality/finish · Documentation |
| Termination and Testing Skills Demonstration | Skills demonstration | 45% | All five criteria on the skills checklist rated Satisfactory; zero safety violations | The student independently terminates two Cat 6A copper ends to a patch panel (T568B) and two LC connectors on OM4 fiber within a timed 45-minute window, then tests each with the appropriate instrument (wiremap certifier for copper, OLTS for fiber); an evaluator scores each step against a five-criterion checklist covering technique, results, safety practice, labeling, and documentation accuracy. Standard met · Safety · Time · Quality/finish · Documentation |
| Lab Log and Test Report Portfolio | Log | 15% | All six lab session logs submitted; each log rated Complete on the completeness rubric; final turn-over report PDF contains all required fields with data matching instrument output | Students maintain a cumulative lab log throughout the course recording procedures followed, instrument readings, pass/fail outcomes, faults encountered, and corrective actions for every hands-on session; the log is submitted together with the cable-certifier turn-over report from Lesson 7 as a single portfolio graded against a structured completeness rubric. Standard met · Safety · Time · Quality/finish · Documentation |
| Fiber Safety Observation Check | Safety audit | 15% | No unsatisfactory marks on any of the four mandatory safety behaviors; any single unsatisfactory mark requires a safety re-brief and re-observation before the student may continue lab work | An instructor observes each student during the fiber termination lab (Lesson 4) and scores four non-negotiable behaviors on a pass/fail checklist: safety glasses worn at all times while fiber is exposed, cleaved fiber ends disposed of in the sharps container immediately after cleaving, no food or drink present at the work surface, and fiber inspection scope used before any connector is mated. Standard met · Safety · Time · Quality/finish · Documentation |
This course covers the principles, equipment, and safe work practices used to distribute electrical power from the utility entrance through the data center to individual server loads. Students learn to read single-line diagrams, work safely around energized and de-energized equipment, size and install power distribution units, and verify power paths using industry-standard testing procedures. Lesson content maps directly to CompTIA Server+ domain objectives on power and environmental systems, CNet CDCTP power infrastructure competencies, and OSHA 10 electrical safety requirements.
OutcomesThis course covers the principles, equipment, and safe work practices used to distribute electrical power from the utility entrance through the data center to individual server loads. Students learn to read single-line diagrams, work safely around energized and de-energized equipment, size and install power distribution units, and verify power paths using industry-standard testing procedures. Lesson content maps directly to CompTIA Server+ domain objectives on power and environmental systems, CNet CDCTP power infrastructure competencies, and OSHA 10 electrical safety requirements.
How the course runs. 7 blocks: Data Center Power Fundamentals and the Distribution Path; Electrical Safety: OSHA Standards, PPE, and Lockout/Tagout; UPS Systems: Types, Topologies, and Maintenance Tasks; Reading Single-Line Diagrams and Panel Schedules; Power Distribution Units: Selection, Installation, and Configuration; Measuring and Logging Electrical Load and Power Quality; Commissioning, Documentation, and Handover.
What competent looks like. Explain the complete power distribution path from utility service entrance through transformers, switchgear, UPS systems, PDUs, and rack-level outlets using correct terminology. Read and interpret single-line diagrams, panel schedules, and equipment nameplate data to verify circuit capacity and redundancy configurations. Apply OSHA lockout/tagout procedures and appropriate PPE before performing any work on electrical panels, PDUs, or UPS systems. Measure branch circuit voltage, current draw, and load balance using a clamp meter and digital multimeter, and record findings in a structured log. Calculate power load in watts and volt-amperes, determine phase balance, and identify circuits approaching or exceeding safe loading thresholds. Commission and document a rack-level power installation including dual-corded server connections, outlet-level monitoring PDU configuration, and transfer switch verification.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Data Center Power Fundamentals and the Distribution Path | 10 | theory | Students can trace and label all major stages of the data center power chain—from utility service entrance through UPS, switchgear, RPP, PDU, and rack outlet—and explain the function of each stage using correct terminology. |
| Sample single-line diagrams (instructor-provided), CompTIA Server+ official study guide, Uptime Institute Tier Standard overview (public document), scientific calculators, whiteboard | Five-question written quiz on power path stages and basic AC calculations; students must score 80% or higher to proceed. |
| 2 | Electrical Safety: OSHA Standards, PPE, and Lockout/Tagout | 12 | demo | Students can select correct PPE for a given electrical task, demonstrate a complete OSHA-compliant lockout/tagout sequence on a de-energized panel, and state the key OSHA General Industry electrical safety requirements applicable to data center maintenance work. |
| OSHA lockout/tagout standard reference (29 CFR 1910.147 overview handout), OSHA electrical safety standard overview handout, training panel with lockable breakers, LOTO padlocks and tags (one set per student), PPE assortment (arc-rated gloves, face shields, safety glasses, non-conductive footwear), OSHA incident report excerpts | Instructor observes each student perform a solo LOTO sequence on the training panel using a competency checklist; all eight steps must be performed in correct order with zero errors to pass. Any omission results in immediate remediation before retest. |
| 3 | UPS Systems: Types, Topologies, and Maintenance Tasks | 12 | demo | Students can distinguish between standby, line-interactive, and double-conversion online UPS topologies, explain the function of bypass circuits, and perform a guided battery visual inspection and runtime estimation on a training-grade UPS. |
| Working line-interactive UPS (training unit, low voltage), working double-conversion UPS (training unit), UPS manufacturer maintenance checklist, battery inspection tools (flashlight, torque wrench), multimeter, UPS cutaway diagrams, CompTIA Server+ study guide UPS chapter | Students submit a completed maintenance log for the UPS inspection activity; log must include all required fields with legible, accurate values and be signed off by the instructor. Incomplete or inaccurate logs must be corrected before moving on. |
| 4 | Reading Single-Line Diagrams and Panel Schedules | 10 | theory | Students can extract circuit capacity, breaker rating, phase assignment, and load information from a panel schedule and trace the circuit path on a single-line diagram with no assistance. |
| Printed panel schedule packet (four examples, instructor-created using realistic but fictional facility data), partial single-line diagram with intentional errors, electrical symbol legend (ANSI/IEEE standard symbols reference sheet), scientific calculators, blank panel schedule forms | Students independently complete a panel schedule exercise using a new set of data not seen in class; they must correctly identify all overloaded circuits and calculate phase balance. Score of 80% or higher required. |
| 5 | Power Distribution Units: Selection, Installation, and Configuration | 14 | lab | Students can select an appropriate PDU for a given rack load profile, install a vertical PDU in a standard 42U rack, connect dual-corded loads to separate PDUs, and configure a basic outlet-level monitored PDU via its management interface. |
| Two vertical monitored PDUs (one from each of two different manufacturers), 42U two-post training rack, three dual-power-supply training servers (or equivalent dummy loads), PDU catalog specification sheets, patch cords, cable ties, PDU management laptop, lab log forms | Instructor inspects completed rack: correct PDU model selection verified against worksheet, A+B wiring confirmed by tracing each cord, PDU management interface showing correct outlet labels and threshold settings. All three criteria must be met to pass. |
| 6 | Measuring and Logging Electrical Load and Power Quality | 13 | lab | Students can safely measure branch circuit voltage, phase current, and power factor using a clamp meter and digital multimeter, correctly interpret the readings, and record findings in a structured load measurement log. |
| Clamp meters (one per pair), digital multimeters, power quality meter (instructor demonstration unit), four energized training stations with varying resistive and reactive loads, load measurement log forms, CompTIA Server+ study guide, safety glasses, arc-rated gloves | Students submit completed measurement logs; all voltage and current values must be within ±5% of instructor-verified reference readings, all calculations must be arithmetically correct, and all circuits must be correctly classified as within or over the 80% threshold. Score of 80% on correctness rubric required. |
| 7 | Commissioning, Documentation, and Handover | 10 | practice | Students can execute a structured commissioning checklist for a newly installed rack power system, produce accurate as-built documentation including a circuit labeling scheme and power inventory, and present findings in a format suitable for handover to a facilities team. |
| Commissioning checklist (instructor-developed, aligned to CNet CDCTP competencies), completed lab rack from Lesson 5, as-built document template, laptops for document creation, label maker, panel schedule reference, presentation area | Instructor evaluates the as-built document against a rubric: all required fields present and accurate, circuit IDs match physical labels, measured values recorded. Document must score 80% or higher. Commissioning checklist must show zero items skipped. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Power Distribution Knowledge Exam | Written exam | 25% | 80% correct (40 out of 50 questions) | A 50-question written exam covering AC power theory, UPS topologies, single-line diagram interpretation, panel schedule analysis, PDU selection, and OSHA electrical safety concepts aligned to CompTIA Server+ power and environmental domain objectives and CNet CDCTP power infrastructure knowledge areas. Questions include multiple choice, matching, and short calculation problems drawn from all seven lesson topics. Standard met · Safety · Time · Quality/finish · Documentation |
| PDU Installation and Load Measurement Skills Demonstration | Skills demonstration | 45% | All five critical tasks completed correctly; no safety violations observed | Each student independently installs a vertical PDU into an unloaded rack, connects dual-corded loads to achieve A+B separation, measures live branch circuit current with a clamp meter using correct PPE, calculates load as a percentage of circuit capacity, and configures one outlet alert threshold in the PDU management interface. An instructor evaluates performance live against a five-task competency checklist; any PPE omission or LOTO error results in an automatic fail regardless of technical correctness. Standard met · Safety · Time · Quality/finish · Documentation |
| Lab Log Portfolio | Log | 15% | All six lab log entries submitted; average rubric score of 80% or higher across entries | Students submit the cumulative lab log maintained across all hands-on lessons, containing measurement tables, PDU selection worksheets, commissioning checklists, and the final as-built power inventory document. Each entry is scored on accuracy of recorded values, completeness of required fields, legibility, and correctness of any calculations, using a consistent four-criterion rubric worth 25 points each per entry. Standard met · Safety · Time · Quality/finish · Documentation |
| Electrical Safety Compliance Check | Safety audit | 15% | 100% on all mandatory safety behaviors; any single failure requires full remediation and retest | Conducted twice during the course—once at the start of Lesson 2 and once unannounced during Lesson 6—the instructor uses a binary (yes/no) checklist to verify that each student selects correct PPE for the task, performs LOTO steps in order before touching any panel or PDU breaker, does not bypass or skip any safety step under time pressure, and correctly identifies the hazard before beginning work. This assessment directly supports OSHA 10 competency requirements and must be passed at 100% on every item. Standard met · Safety · Time · Quality/finish · Documentation |
This course covers the thermodynamic principles, equipment, and operational practices used to manage heat in live data center environments. Students learn to configure hot-aisle/cold-aisle containment, commission CRAC/CRAH units, and measure airflow and temperature to maintain equipment within safe operating ranges. Lessons are mapped to CNet CDCTP cooling competencies, CompTIA Server+ environmental domain objectives, and OSHA 10 heat and confined-space awareness requirements.
OutcomesThis course covers the thermodynamic principles, equipment, and operational practices used to manage heat in live data center environments. Students learn to configure hot-aisle/cold-aisle containment, commission CRAC/CRAH units, and measure airflow and temperature to maintain equipment within safe operating ranges. Lessons are mapped to CNet CDCTP cooling competencies, CompTIA Server+ environmental domain objectives, and OSHA 10 heat and confined-space awareness requirements.
How the course runs. 7 blocks: Heat Transfer Fundamentals & the Refrigeration Cycle; Data Center Cooling Architectures & ASHRAE Thermal Classes; Hot-Aisle/Cold-Aisle Containment & Blanking Panels; CRAC/CRAH Unit Operation & Operator-Level Maintenance; Airflow Measurement & Thermal Mapping; Cooling System Monitoring, Alarms & Troubleshooting; Cooling Safety: LOTO, Refrigerants & Confined Spaces.
What competent looks like. Explain the principles of heat transfer, psychrometrics, and the refrigeration cycle as they apply to data center cooling systems. Configure and verify hot-aisle/cold-aisle containment layouts, blanking panels, and raised-floor grommet seals to eliminate bypass airflow. Commission, inspect, and perform operator-level maintenance on CRAC, CRAH, and in-row cooling units following manufacturer procedures and safe work practices. Use a digital manometer, vane anemometer, and data logger to measure airflow volume, differential pressure, and inlet temperatures at rack level, and interpret results against ASHRAE thermal guidelines. Interpret cooling-system monitoring data to identify hot spots, under-cooled zones, and inefficient airflow patterns, and propose corrective actions. Apply lockout/tagout, refrigerant-handling awareness, and confined-space entry protocols specific to mechanical cooling spaces in compliance with OSHA general industry standards.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Heat Transfer Fundamentals & the Refrigeration Cycle | 10 | theory | Given a labeled diagram, the student will correctly explain conduction, convection, and radiation heat-transfer modes and trace refrigerant flow through all four stages of a vapor-compression cycle. |
| ASHRAE Thermal Guidelines for Data Processing Environments (current edition), psychrometric chart (printed and digital), whiteboard, scientific calculator, vendor CRAC unit cut-sheet for reference | Scored worksheet: student correctly labels all four refrigeration-cycle components and completes two of two heat-load calculations within 5% of the answer key; pass = 75% overall. |
| 2 | Data Center Cooling Architectures & ASHRAE Thermal Classes | 11 | theory | The student will compare room-based, row-based, and rack-level cooling topologies and classify a given data center scenario into the correct ASHRAE equipment thermal class, justifying the classification with measured or stated parameters. |
| ASHRAE Thermal Guidelines for Data Processing Environments, floor-plan handouts, projector, whiteboard markers, vendor product datasheets for in-row and rear-door cooling units | Exit quiz of 10 short-answer questions on architecture types and ASHRAE classes; pass = 7 of 10 correct. |
| 3 | Hot-Aisle/Cold-Aisle Containment & Blanking Panels | 12 | lab | The student will set up a compliant hot-aisle/cold-aisle containment layout in the lab data center, install blanking panels in all empty rack spaces, and demonstrate that inlet temperature variance across the cold aisle is within the range expected for proper containment. |
| Lab data center with raised floor, two or more populated racks, 1U blanking panels (assorted), brush grommets, raised-floor perforated tiles, overhead containment panels or curtain kit, probe thermometer, tape measure, floor-plan graph paper | Lab log reviewed by instructor: all empty rack Us are blanked, cable cutouts sealed, temperature measurements recorded before and after; post-installation inlet variance across the cold aisle must be ≤3 °C. Pass = all three criteria met. |
| 4 | CRAC/CRAH Unit Operation & Operator-Level Maintenance | 14 | demo | The student will demonstrate operator-level inspection and filter replacement on a CRAC unit, following the manufacturer's maintenance checklist and all applicable OSHA lockout/tagout procedures before opening the unit. |
| Lab CRAC unit with digital controller (Liebert, Stulz, or equivalent), manufacturer's operation and maintenance manual, LOTO kit (hasp, padlocks, tags), replacement air filters, drain-pan cleaning supplies, maintenance log forms, PPE (safety glasses, gloves) | Instructor observation checklist: correct LOTO sequence performed without prompting, filter replaced with correct media, setpoint adjusted and logged; any skipped LOTO step = immediate retest required. Pass = all checklist items satisfactory. |
| 5 | Airflow Measurement & Thermal Mapping | 14 | practice | The student will use a vane anemometer and digital manometer to measure and record airflow velocity and differential pressure at raised-floor tiles and rack inlets, then produce a thermal map of the lab floor identifying hot spots and bypass airflow zones. |
| Vane anemometer (calibrated), digital manometer with static-pressure tips, probe thermometer, data-logging spreadsheet template (instructor-provided), raised-floor lab environment, measuring tape, PPE (safety glasses for raised-floor access), ASHRAE Thermal Guidelines reference card | Student submits completed measurement log and thermal map: all 18 temperature data points recorded, volumetric flow calculations correct within 10%, at least one corrective action identified and justified. Pass = all three elements present and calculations within tolerance. |
| 6 | Cooling System Monitoring, Alarms & Troubleshooting | 12 | practice | Given simulated alarm conditions in a building management system or DCIM environment, the student will correctly identify the root cause of each cooling alarm and select the appropriate first-response action without escalating a minor setpoint issue to a major outage. |
| DCIM console or BMS workstation (or vendor demo simulator), lab CRAC unit, sanitized incident reports (instructor-supplied), troubleshooting log forms, ASHRAE Thermal Guidelines | Troubleshooting log reviewed: all five alarms correctly categorized, probable cause stated for each, corrective action appropriate (no action that would risk a wider outage). Pass = 4 of 5 alarms correctly handled. |
| 7 | Cooling Safety: LOTO, Refrigerants & Confined Spaces | 8 | field | The student will correctly apply LOTO procedures to a cooling unit, identify refrigerant safety hazards using a Safety Data Sheet, and describe the confined-space entry requirements that apply to a mechanical cooling room or under-floor plenum. |
| SDS for R-410A (or equivalent HFC), LOTO kit, OSHA LOTO verification checklist (29 CFR 1910.147 reference), OSHA permit-required confined-space entry standard reference (29 CFR 1910.146), PPE (gloves, safety glasses), lab CRAC unit | SDS quiz: 4 of 5 questions correct; LOTO checklist: all steps completed correctly with no safety step skipped (any missed energy-isolation step = automatic retest); confined-space discussion: student correctly classifies the plenum scenario. All three elements must pass; overall pass = all three satisfactory. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Cooling Systems Knowledge Exam | Written exam | 25% | 75% or higher (38 of 50 questions correct) | A 50-question closed-book exam covering heat-transfer principles, refrigeration-cycle components, ASHRAE thermal classes, cooling architectures, and alarm interpretation, mapped to CNet CDCTP cooling objectives and CompTIA Server+ environmental/infrastructure domain. Students have 90 minutes; any student scoring below 75% receives one remediation session and one retest opportunity. Standard met · Safety · Time · Quality/finish · Documentation |
| Cooling Equipment Skills Demonstration | Skills demonstration | 45% | All critical items marked satisfactory; overall score 80% or higher on the rubric | The student performs a complete LOTO sequence on the lab CRAC unit, replaces the air filter, measures supply-air temperature and returns the unit to normal operation within 30 minutes, evaluated by the instructor against a 20-item rubric. Any skipped LOTO step or unsafe act results in an immediate stop and mandatory retest after additional remediation. Standard met · Safety · Time · Quality/finish · Documentation |
| Thermal Mapping Lab Log | Log | 15% | All required data fields completed; calculations within 10% of instructor key; corrective-action memo receives a 3 of 4 or higher on the analytical rubric | The student submits the completed measurement log, color-coded thermal map, and corrective-action memo produced during Lesson 5, evaluated for data completeness, calculation accuracy, and quality of engineering reasoning. Incomplete logs or memos that recommend actions that would introduce a safety risk are returned for revision before a passing grade is awarded. Standard met · Safety · Time · Quality/finish · Documentation |
| Cooling Safety Compliance Check | Safety audit | 15% | Pass on all three components: SDS quiz ≥ 4/5, LOTO checklist all steps satisfactory, confined-space classification correct | The instructor verifies, using the structured checklist from Lesson 7, that each student can correctly use an SDS, independently execute a LOTO sequence without prompting, and accurately classify confined spaces in a cooling environment. This checkpoint must be passed before the student is permitted to participate in any subsequent lab or externship activity involving cooling equipment. Standard met · Safety · Time · Quality/finish · Documentation |
Students learn to identify, install, configure, and troubleshoot server hardware components and network devices found in production data center environments. Emphasis is placed on safe handling, proper component selection, hardware diagnostics, and documentation practices that align with CompTIA A+, CompTIA Server+, and CNet CDCTP exam objectives. By the end of the course students can build and verify a functional server and connect it to data center switching infrastructure.
OutcomesStudents learn to identify, install, configure, and troubleshoot server hardware components and network devices found in production data center environments. Emphasis is placed on safe handling, proper component selection, hardware diagnostics, and documentation practices that align with CompTIA A+, CompTIA Server+, and CNet CDCTP exam objectives. By the end of the course students can build and verify a functional server and connect it to data center switching infrastructure.
How the course runs. 7 blocks: Server Anatomy and Component Identification; ESD Safety and Physical Component Installation; BIOS/UEFI Configuration and Out-of-Band Management; RAID Configuration and Storage Subsystems; Network Switch Installation and Data Center Cabling; Hardware Diagnostics and Fault Isolation; Integrated Server Build and Documentation Review.
What competent looks like. Identify and describe the function of server components—CPU, RAM, storage, NIC, HBA, PSU, and expansion cards—and select appropriate components based on workload specifications. Install, seat, and secure server hardware components following manufacturer torque, ESD, and thermal-interface procedures without damage to equipment. Configure BIOS/UEFI settings including boot order, RAID levels, and out-of-band management (IPMI/iDRAC/iLO) for initial server bring-up. Install and cable network switches and patch panels, apply consistent labeling, and verify connectivity using a cable tester and ping/traceroute tools. Perform hardware diagnostics using built-in POST codes, manufacturer diagnostic utilities, and event logs to isolate and document faults. Complete accurate hardware change records and cable/port documentation in a ticketing system consistent with data center change-management practice.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Server Anatomy and Component Identification | 10 | theory | Students will identify and state the function of every major server hardware component—socket, DIMM slot, PCIe slot, NIC, HBA, PSU, and backplane—by referencing a manufacturer spec sheet and physical hardware. |
| Decommissioned 1U and 2U rack servers (Dell PowerEdge or HPE ProLiant or equivalent), manufacturer service manuals, component diagram worksheets, CompTIA Server+ study guide (hardware domain), ESD wrist straps, anti-static mats | Completed labeled diagram with 100% of major components correctly identified; component-function card sort scored 80% or higher. |
| 2 | ESD Safety and Physical Component Installation | 14 | lab | Students will install CPU(s), DIMMs, PCIe cards, and hot-swap drives into a server chassis following ESD protection procedures and manufacturer torque/insertion specifications, verified by a POST with no hardware errors. |
| Server chassis with empty sockets/slots, CPUs, DIMMs, PCIe NIC, SATA/SAS drives, thermal compound, torque screwdriver, ESD wrist straps and mat, anti-static bags, manufacturer QVL memory chart, lab documentation sheets | Server completes POST with all installed components detected and no hardware error codes; ESD procedure checklist signed off by instructor; lab sheet complete—pass requires both POST success and ESD checklist. |
| 3 | BIOS/UEFI Configuration and Out-of-Band Management | 12 | lab | Students will configure BIOS/UEFI settings—boot order, secure boot state, memory operating speed, and IPMI/iDRAC/iLO network address—and demonstrate remote server power control from a management workstation. |
| Servers with iDRAC/iLO/IPMI configured, management workstations on a dedicated out-of-band network, configuration record forms, CompTIA Server+ objectives (server management domain), manufacturer BIOS/iDRAC user guide | Configuration record form matches instructor-provided spec sheet with no deviations; remote power cycle successfully demonstrated and documented—pass requires both. |
| 4 | RAID Configuration and Storage Subsystems | 10 | lab | Students will create RAID 1 and RAID 5 virtual disks using a hardware RAID controller utility, explain the fault-tolerance and capacity trade-offs of each level, and simulate a drive failure and rebuild. |
| Servers with hardware RAID controllers and at least six identical drives, RAID controller utility access, RAID calculation worksheets, CompTIA Server+ study guide (storage domain), lab documentation forms | Both RAID arrays created with correct properties (capacity, stripe size); drive failure and rebuild documented accurately with event log screenshot or printout—pass requires correct arrays and complete documentation. |
| 5 | Network Switch Installation and Data Center Cabling | 15 | lab | Students will install a top-of-rack (ToR) network switch into a rack, connect servers and uplinks using structured patch cords, apply consistent port labeling, and verify end-to-end layer-2 connectivity with a cable tester and ping. |
| 1U managed Ethernet switches (Cisco Catalyst or equivalent), console cables and USB adapters, Cat 6 patch cords, SFP transceivers and fiber patch cords (if applicable), cable tester (Fluke LinkRunner or equivalent), label maker, rack with cable managers, lab port-assignment worksheet, CompTIA A+ and Server+ networking objectives | All server ports show link; cable tester reports pass on every run; ping between servers succeeds; port-label map matches physical cabling—instructor signs off on physical walkthrough. |
| 6 | Hardware Diagnostics and Fault Isolation | 12 | practice | Students will use POST error codes, manufacturer diagnostic utilities, and system event logs to identify an injected hardware fault in a server and document the root cause and corrective action in a change-management ticket. |
| Servers with known injected faults, manufacturer diagnostic software, system event log access, fault-isolation worksheets, ticketing system access or printed ticket forms, CompTIA A+ and Server+ troubleshooting methodology references | Fault correctly identified and root cause stated accurately on the worksheet; trouble ticket complete with all required fields and corrective action verified—pass requires correct diagnosis and fully completed ticket. |
| 7 | Integrated Server Build and Documentation Review | 8 | lab | Students will independently build a server from bare chassis to network-connected, RAID-configured, IPMI-enabled state within a set time limit and produce complete documentation that a second technician could use to replicate the build. |
| Server chassis and complete parts kits, specification sheets, ESD protection equipment, label maker, camera or phone for photographs, documentation packet templates, build checklist, ticketing system or printed forms | Build complete within the allotted time with POST success and network connectivity verified; documentation packet passes peer review checklist with no more than one minor omission; instructor final review score 80% or higher. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Hardware Knowledge Exam | Written exam | 25% | 75% or higher (38 of 50 questions correct) | A 50-question multiple-choice and matching exam covering server component identification, RAID level trade-offs, BIOS/UEFI functions, out-of-band management concepts, and network switch fundamentals, mapped directly to CompTIA A+ Core 1 hardware objectives and CompTIA Server+ hardware/storage/networking domains. Students have 90 minutes; the exam is administered in the school's testing environment with no open notes. Standard met · Safety · Time · Quality/finish · Documentation |
| Server Build Skills Demonstration | Skills demonstration | 45% | All critical steps scored Satisfactory; overall rubric score 80% or higher; ESD procedure must be Satisfactory or the attempt does not pass regardless of other scores | The instructor observes the student perform a complete server build from bare chassis to POST-verified, network-connected state, scoring each step on a rubric that covers ESD compliance, correct component installation, BIOS configuration accuracy, RAID creation, IPMI setup, cabling, labeling, and connectivity verification. This demonstration maps to CNet CDCTP hands-on competencies and CompTIA Server+ installation objectives. Standard met · Safety · Time · Quality/finish · Documentation |
| Lab Log Portfolio | Log | 15% | All seven lesson lab sheets/documentation packets submitted; average accuracy score 80% or higher across all entries; no entry may be missing a safety section | Students submit a compiled portfolio of all lab documentation produced during the course—including component diagrams, configuration records, fault-isolation worksheets, cable maps, RAID property records, and trouble tickets—demonstrating the ability to create complete, accurate, and readable technical records consistent with data center change-management standards and CNet CDCTP documentation competencies. Standard met · Safety · Time · Quality/finish · Documentation |
| ESD and Safe Handling Safety Check | Safety audit | 15% | All five critical safety behaviors observed as Satisfactory; a single Unsatisfactory on any critical item requires immediate re-instruction and re-check before the student handles live equipment again | During or immediately after the Lesson 2 lab, the instructor uses a five-item binary (Satisfactory/Unsatisfactory) checklist to verify that the student bonds the ESD wrist strap correctly, keeps components in anti-static bags until the moment of installation, grounds themselves to the chassis before touching internal parts, handles boards and cards by edges only, and replaces ESD packaging on removed components. This safety check satisfies the personal safety competency requirement aligned with OSHA 10 general industry electrical hazard awareness objectives. Standard met · Safety · Time · Quality/finish · Documentation |
This course introduces learners to the Linux operating system as used in production data center environments, covering command-line navigation, file-system management, user administration, network configuration, and service monitoring. Students work directly on physical and virtual Linux servers to build the hands-on competency required of entry-level data center technicians. Lesson content maps to CompTIA A+ (Core 2 OS technologies), CompTIA Server+ (server administration and OS management), and CNet CDCTP (data center operational skills).
OutcomesThis course introduces learners to the Linux operating system as used in production data center environments, covering command-line navigation, file-system management, user administration, network configuration, and service monitoring. Students work directly on physical and virtual Linux servers to build the hands-on competency required of entry-level data center technicians. Lesson content maps to CompTIA A+ (Core 2 OS technologies), CompTIA Server+ (server administration and OS management), and CNet CDCTP (data center operational skills).
How the course runs. 7 blocks: Linux in the Data Center: Architecture, Distributions, and Safe Access; Command-Line Navigation and File-System Management; Users, Groups, and File Permissions; Network Configuration and Verification; Package Management and Software Installation; Service Management, Logging, and System Monitoring; Safe Shutdown, Reboot, Remote Access, and Data Center Operational Policies.
What competent looks like. Navigate the Linux file system and execute essential command-line operations to locate, copy, move, and modify files and directories without GUI assistance. Create, modify, and delete local user accounts and groups and apply correct file permissions using octal and symbolic notation. Configure and verify basic network settings on a Linux server including IP address, subnet mask, default gateway, and DNS resolver. Manage and troubleshoot system services using systemd, interpret log files with journalctl and /var/log entries, and report findings in a structured ticket. Install, update, and remove software packages using a distribution-appropriate package manager and verify package integrity. Apply safe shutdown, reboot, and remote-access procedures consistent with data center lockout/tagout and change-control policies.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Linux in the Data Center: Architecture, Distributions, and Safe Access | 10 | theory | Students will identify the major Linux distributions used in enterprise data centers, explain the kernel/shell/user-space model, and log into a remote server securely using SSH without error. |
| Lab servers (physical or VM) running Ubuntu Server 22.04 LTS and RHEL 9 / AlmaLinux 9; student workstations with terminal emulator; CompTIA Server+ Study Guide (current edition); CNet CDCTP learner handbook; SSH key-pair generation reference card. | Students submit their completed change-request form and a screenshot showing a successful passwordless SSH login; instructor verifies the authorized_keys file on the server. Pass mark: correct key placement and successful login with zero password prompts; 100% of students must reach this threshold before the course advances. |
| 2 | Command-Line Navigation and File-System Management | 14 | lab | Students will navigate the Linux directory hierarchy and create, copy, move, rename, and delete files and directories using at least ten core commands with correct syntax and no data-loss errors. |
| Lab servers with a practice partition; printed command reference card (GNU coreutils); CompTIA A+ Core 2 Exam Objectives (current version, Domain: Operating Systems); whiteboard and markers; lab log notebooks. | Instructor reviews the lab log for all ten commands executed with correct syntax and expected output; scavenger hunt graded on accuracy of final file placement. Pass mark: 9 of 10 commands documented correctly and all scavenger-hunt files in correct locations (90% accuracy). |
| 3 | Users, Groups, and File Permissions | 12 | lab | Students will create user accounts and groups, set passwords, and assign file and directory permissions using both octal notation and symbolic chmod syntax, resulting in access control that matches a given security specification. |
| Lab servers; printed permissions scenario worksheet; CompTIA Server+ Study Guide (user and security chapter); Linux man pages (man useradd, man chmod, man chown); lab log notebooks. | Instructor logs into each student's server as a test user and attempts actions that should be permitted and actions that should be denied per the scenario; student must also submit written vulnerability-analysis notes. Pass mark: all six directories match the specified access control and student correctly identifies and remediates all three misconfigured files (100% of security items correct). |
| 4 | Network Configuration and Verification | 12 | lab | Students will configure a static IP address, subnet mask, default gateway, and DNS resolver on a Linux server using the distribution's standard tooling, then verify end-to-end connectivity with diagnostic commands. |
| Lab servers connected to a managed lab switch with a dedicated VLAN; pre-printed IP addressing plan; CompTIA A+ Core 2 and Server+ exam objectives (Networking domain); ip, nmcli, netplan man pages; lab log notebooks. | Instructor pings each student's server from an external host and from the server to an external address; student must demonstrate DNS resolution of at least two hostnames and show the correct static configuration with ip addr show. Pass mark: full bidirectional connectivity, correct static config visible, and lab log entries for all three faults (pass/fail binary on connectivity; 3/3 fault logs required). |
| 5 | Package Management and Software Installation | 10 | demo | Students will install, update, query, and remove software packages using apt (Debian/Ubuntu) and dnf (RHEL/AlmaLinux), verify package integrity, and explain the role of repositories in a controlled data center environment. |
| Lab servers (one Ubuntu, one AlmaLinux per student pair); apt and dnf command reference cards; CompTIA Server+ Study Guide (software management chapter); mock repository-policy document; lab log notebooks. | Instructor checks each server for correct installation/removal state and reviews the repository-policy worksheet. Pass mark: correct install/remove/verify state on both distros and 4 of 5 policy questions answered correctly. |
| 6 | Service Management, Logging, and System Monitoring | 14 | lab | Students will start, stop, restart, enable, and disable system services with systemctl, interpret service status output, query the system journal with journalctl, and locate relevant entries in /var/log to diagnose a simulated service failure. |
| Lab servers; systemctl and journalctl man pages; CompTIA Server+ Study Guide (server monitoring and troubleshooting chapter); CNet CDCTP learner handbook (operational procedures section); incident-note template; lab log notebooks. | Instructor reviews incident note for correct root-cause identification, corrective action, and restored service; resource-utilization table is checked for correct values and threshold annotations. Pass mark: service restored with correct configuration, incident note complete with root cause and fix, and resource table with at least one correctly flagged threshold (all three elements required to pass). |
| 7 | Safe Shutdown, Reboot, Remote Access, and Data Center Operational Policies | 9 | practice | Students will execute controlled shutdown and reboot procedures on a Linux server, explain the impact of ungraceful power-off in a data center context, and demonstrate compliant remote-access practices aligned with data center change-control and lockout/tagout policies. |
| Lab servers with hypervisor access (snapshot capability); mock change-request form; mock operational policy document; OSHA lockout/tagout quick-reference card (cross-reference from Course 1); CompTIA Server+ Study Guide; post-change confirmation note template. | Instructor reviews completed change-request form, post-change note, and scenario quiz; lab server must be in correct state after shutdown/reboot drill. Pass mark: change-request form complete with no missing required fields, post-change note accurate, and 4 of 5 scenario quiz questions correct. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Linux Concepts Knowledge Exam | Written exam | 25% | 75% (38 of 50 questions correct) | A 50-question multiple-choice and multiple-select exam covering Linux architecture, distributions, file-system hierarchy, permissions notation, package management, systemd service states, and network configuration concepts; questions are mapped to CompTIA A+ Core 2 (Operating Systems domain) and CompTIA Server+ (Server Administration domain) exam objectives to serve as diagnostic preparation. Standard met · Safety · Time · Quality/finish · Documentation |
| Practical Skills Demonstration | Skills demonstration | 45% | All eight required tasks completed correctly within 60 minutes; any task failure requires one remediation attempt before the next course day | Working alone on a freshly provisioned lab server, each student completes eight timed tasks: create a user and group, set specified file permissions, configure a static IP, install and verify a package, start and enable a service, diagnose a seeded service failure using journal logs, perform a graceful shutdown, and document all actions in a structured lab record; the instructor evaluates correctness of each task against a binary checklist. Standard met · Safety · Time · Quality/finish · Documentation |
| Lab Log Portfolio | Log | 15% | At least 85% of required log entries present, legible, and technically accurate as judged by the instructor rubric | Students submit their complete lab log accumulated across all seven lessons; the log must include command-and-output records, the network-fault troubleshooting notes, the service-failure incident note, the resource-utilization table, and the change-request and post-change forms; the instructor grades each entry for completeness, accuracy, and professional formatting using a printed rubric. Standard met · Safety · Time · Quality/finish · Documentation |
| Safe-Procedures Safety Check | Safety audit | 15% | Pass/fail — all five safety behaviors must be observed; any critical failure (e.g., skipping lockout/tagout step) requires immediate remediation and recheck before course credit is awarded | During the Lesson 7 shutdown drill, the instructor uses a five-point behavioral checklist to verify that the student: (1) checks for active user sessions before initiating shutdown, (2) issues a properly timed warning before rebooting a shared resource, (3) follows the mock change-control procedure without skipping steps, (4) correctly identifies when a physical lockout/tagout would be required before a hardware-level power action, and (5) logs off the remote session and confirms the terminal is closed after the task. Standard met · Safety · Time · Quality/finish · Documentation |
Students learn to use industry-standard monitoring platforms to observe server, network, power, and environmental health in a data center, interpret alerts, and manage the full lifecycle of an incident ticket from detection through closure. Emphasis is placed on reading dashboards, setting meaningful alert thresholds, escalating correctly, and writing clear technical documentation that meets ITSM best practices. Lesson content maps directly to CompTIA Server+ infrastructure monitoring objectives and CNet CDCTP operational procedures.
OutcomesStudents learn to use industry-standard monitoring platforms to observe server, network, power, and environmental health in a data center, interpret alerts, and manage the full lifecycle of an incident ticket from detection through closure. Emphasis is placed on reading dashboards, setting meaningful alert thresholds, escalating correctly, and writing clear technical documentation that meets ITSM best practices. Lesson content maps directly to CompTIA Server+ infrastructure monitoring objectives and CNet CDCTP operational procedures.
How the course runs. 7 blocks: Foundations of Data Center Monitoring: Concepts, Protocols, and Tools; Configuring Monitoring Agents and SNMP on Servers and Network Devices; Reading Dashboards and Interpreting Infrastructure Metrics; Environmental and Power Monitoring: Temperature, Humidity, and PDU Readings; IT Service Management and the Incident Ticket Lifecycle; Using a Service Desk Platform: Ticket Creation, Escalation, and Closure; Incident Reporting, Change Requests, and Shift Handoff Documentation.
What competent looks like. Configure basic monitoring agents and SNMP polling on servers and network devices and verify that metrics are collected correctly. Interpret real-time and historical dashboard data for CPU, memory, disk I/O, network throughput, temperature, humidity, and power draw to identify anomalies. Create, categorize, prioritize, assign, escalate, and close incident tickets in a service-desk platform following ITIL-aligned procedures. Write clear, accurate incident reports and change-request documentation that a technician unfamiliar with the event can follow. Apply alert threshold best practices to reduce false positives while ensuring genuine faults are caught within defined response time targets. Demonstrate safe work habits—including awareness of electrical hazards and proper PPE—when accessing live monitoring consoles and physical hardware during on-floor checks.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Foundations of Data Center Monitoring: Concepts, Protocols, and Tools | 10 | theory | Students will explain how SNMP, IPMI, syslog, and agentless vs. agent-based monitoring methods collect data from data center infrastructure and name at least four common open-source and commercial monitoring platforms used in the trade. |
| Whiteboard, printed data center topology diagrams, CompTIA Server+ official study guide (current edition), instructor-prepared comparison worksheet, internet access for platform research, projector for group discussion | Students complete the comparison worksheet and short-answer questions; passing standard is 80% correct answers on the ten comprehension questions and a fully populated feature matrix with no blank cells. |
| 2 | Configuring Monitoring Agents and SNMP on Servers and Network Devices | 14 | lab | Students will install a monitoring agent on a Linux server, configure SNMP v2c or v3 on a managed switch, and confirm that both devices appear as monitored hosts returning live metric data in the class monitoring server within the lab session. |
| Lab servers or PCs running Linux VMs (Ubuntu LTS recommended), managed switch with SNMP support, Zabbix or Nagios Core installed on class monitoring server, console cables, SSH client, stress-testing utility (e.g., 'stress' package), CompTIA Server+ study guide | Instructor verifies that each student's assigned host appears online in the monitoring dashboard, SNMP data is populating, and all three triggers fire correctly when thresholds are crossed; all three conditions must be met to pass this lab. |
| 3 | Reading Dashboards and Interpreting Infrastructure Metrics | 12 | demo | Students will analyze a pre-built monitoring dashboard showing historical and real-time metrics for servers, power distribution, cooling, and network equipment, correctly identify at least four abnormal conditions, and explain the likely cause and urgency of each. |
| Projector, monitoring dashboard with seeded anomaly scenarios (live lab or recorded screen captures), printed dashboard snapshot packets, Uptime Institute tier definitions reference sheet, CompTIA Server+ study guide chapter on performance baselining | Individual interpretation quiz is scored by the instructor; students must correctly identify the abnormal condition, severity, and recommended action for at least 4 of 6 scenarios (approximately 67%) to pass, with any life-safety scenario (overheating, UPS failure) requiring a correct answer to pass. |
| 4 | Environmental and Power Monitoring: Temperature, Humidity, and PDU Readings | 10 | practice | Students will locate environmental sensor data and PDU outlet-level power readings within a monitoring platform, compare values against ASHRAE A1/A2 recommended ranges and equipment nameplate ratings, and document findings in a structured log entry. |
| Monitoring platform with environmental sensor and PDU data (live lab or instructor-prepared dataset), ASHRAE Thermal Guidelines for Data Processing Environments summary card, PDU spec sheets, rack elevation diagram templates, NEC load calculation reference (general derate principle), log entry template | Instructor reviews each student's completed rack elevation diagram and log entry; passing requires correct identification of any out-of-range readings and a log entry that contains all required fields with plausible corrective actions, assessed on a provided rubric with a minimum score of 80%. |
| 5 | IT Service Management and the Incident Ticket Lifecycle | 12 | theory | Students will describe the full lifecycle of an incident ticket—from detection and logging through categorization, prioritization, escalation, resolution, and closure—using ITIL-aligned terminology and explain how ticketing integrates with monitoring alert workflows. |
| Whiteboard, printed process-step cards, impact/urgency matrix template, ten incident scenario cards, ITIL 4 Foundation reference summary (publicly available), CompTIA Server+ study guide section on change and incident management | Students complete the priority matrix worksheet for all ten scenarios; passing requires correct priority assignment on at least 8 of 10 scenarios and written justifications that reference impact and urgency for each. |
| 6 | Using a Service Desk Platform: Ticket Creation, Escalation, and Closure | 13 | lab | Students will use a service desk application to open, update, escalate, and close tickets for simulated data center incidents, producing documentation that meets a provided quality rubric without instructor assistance. |
| Service desk application (cloud trial or lab-hosted instance), scenario script cards for four incidents, ticket quality rubric, computers with browser access, CompTIA Server+ study guide, CNet CDCTP operational documentation reference | Instructor reviews all four ticket sets using the quality rubric; students must score 80% or higher across all rubric categories combined, and any ticket involving a life-safety scenario (power loss) must include an escalation note to pass. |
| 7 | Incident Reporting, Change Requests, and Shift Handoff Documentation | 10 | practice | Students will produce a complete, professional incident report, a basic change request, and a shift handoff summary for a simulated data center event using standard templates, demonstrating writing clarity sufficient for a technician unfamiliar with the incident to take over. |
| Incident report template, change request form template, shift handoff memo template, detailed scenario narrative packet, peer clarity checklist, CompTIA Server+ study guide documentation section, CNet CDCTP operational documentation standards reference | Instructor scores each document (incident report, change request, shift handoff) on the provided rubric; passing requires an overall score of 80% or higher across all three documents, with the incident report requiring a complete and accurate timeline to pass. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Monitoring & Ticketing Knowledge Exam | Written exam | 25% | 75% or higher (38 of 50 questions correct) | A 50-question multiple-choice and matching exam covering SNMP, IPMI, and syslog monitoring concepts; ASHRAE environmental thresholds; ITIL incident lifecycle stages; priority matrix logic; and change management vocabulary, mapped to CompTIA Server+ monitoring and operational procedure objectives and CNet CDCTP operational knowledge areas. Students are given 75 minutes and may not use notes. Standard met · Safety · Time · Quality/finish · Documentation |
| Live Dashboard Interpretation and Ticket Creation Skills Demo | Skills demonstration | 45% | Instructor checklist: all six required tasks rated 'Meets Standard'; any critical-severity scenario must be handled correctly or the student does not pass | The instructor presents the student with a live or high-fidelity simulated monitoring dashboard containing four injected anomalies of varying severity; the student must verbally identify each anomaly, assign correct severity, explain the likely cause, and open a properly completed ticket in the service desk platform for each—observed and rated by the instructor against a six-task performance checklist in real time. Standard met · Safety · Time · Quality/finish · Documentation |
| Lab Log Portfolio | Log | 15% | 80% aggregate score across all five lab log entries on the provided rubric, with no mandatory field left blank in any entry | Students submit a portfolio of five completed lab log entries collected across the course labs covering agent installation, SNMP configuration, environmental audit, incident ticket lifecycle, and incident report/change request; each entry is scored on accuracy, completeness, correct use of terminology, and legibility using a common rubric aligned to CNet CDCTP operational documentation standards. Standard met · Safety · Time · Quality/finish · Documentation |
| Safety Practices Verification | Safety audit | 15% | Pass requires 100% compliance on all safety checklist items; any failed item must be corrected and re-demonstrated before the student receives course credit | The instructor observes the student accessing live lab equipment (powered servers, energized PDU) and completing a monitoring check; the instructor uses a binary (compliant/not-compliant) safety checklist verifying correct PPE selection, adherence to lockout/tagout procedures before any hardware access, safe cable handling to prevent trip hazards, and correct verbal reporting of any observed hazard—consistent with OSHA 10 general industry safety principles. Standard met · Safety · Time · Quality/finish · Documentation |
This course covers the physical security systems, access-control technologies, surveillance infrastructure, and security policies used to protect data center assets, personnel, and uptime. Students apply layered-defense principles to real equipment including badge readers, biometric units, CCTV cameras, and alarmed cabinets. Lessons are mapped to CompTIA A+, CompTIA Server+, and CNet CDCTP exam domains covering physical security and environmental controls.
OutcomesThis course covers the physical security systems, access-control technologies, surveillance infrastructure, and security policies used to protect data center assets, personnel, and uptime. Students apply layered-defense principles to real equipment including badge readers, biometric units, CCTV cameras, and alarmed cabinets. Lessons are mapped to CompTIA A+, CompTIA Server+, and CNet CDCTP exam domains covering physical security and environmental controls.
How the course runs. 7 blocks: Layered Defense and Data Center Security Architecture; Access Control Systems: Cards, Credentials, and Biometrics; Installing and Testing Access Control Hardware; CCTV and IP Camera Systems; Cabinet and Cage Security: Locks, Alarmed Enclosures, and Asset Tracking; Security Policies, Visitor Management, and Incident Response; Integrated Physical Security Audit and Remediation Lab.
What competent looks like. Explain and apply a layered physical security model (perimeter, facility, data hall, cabinet) to a real or simulated data center floor plan. Install, configure, and test access-control hardware including proximity card readers, PIN pads, and a basic biometric unit following manufacturer procedures and safety requirements. Mount, aim, and verify operation of IP-based and analog CCTV cameras and review recorded footage for an incident scenario. Identify, document, and escalate physical security incidents using a ticketing workflow consistent with industry incident-response procedures. Interpret and apply a data center physical security policy, including visitor escorting rules, media-handling procedures, and clean-desk standards. Demonstrate lockout/tagout and safe work practices during all hands-on security-hardware installations.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Layered Defense and Data Center Security Architecture | 10 | theory | Students will correctly map each physical security control to its appropriate layer (perimeter, building, data hall, cabinet) on a sample data center floor plan and justify placement using industry-standard reasoning. |
| BICSI TDMM current edition (physical security chapters), CNet CDCTP study guide, sample floor plans, colored markers, whiteboard | Each student submits an annotated floor plan with written justification for every control placement; instructor verifies all four layers are represented and justifications are technically accurate. Pass = all layers correctly populated with no critical placements missing. |
| 2 | Access Control Systems: Cards, Credentials, and Biometrics | 14 | demo | Students will identify the components and signal flow of a proximity-card access-control system and explain how multi-factor authentication is achieved by combining card, PIN, and biometric readers. |
| Bench access-control training kit (reader, controller, power supply), Wiegand 26-bit reference card, 125 kHz and 13.56 MHz sample cards, standalone fingerprint reader (enrollment-capable demo unit), multimeter, lab notebook template | Exit ticket: students draw and label a signal-flow diagram from credential presentation through reader to controller to door strike, and answer five multiple-choice questions covering credential types and MFA concepts. Pass = diagram contains all five required elements and four of five questions answered correctly. |
| 3 | Installing and Testing Access Control Hardware | 14 | lab | Students will mount a proximity card reader and electric door strike on a practice door frame, wire both devices to a provided controller, and verify correct grant/deny operation for enrolled and unenrolled credentials. |
| Practice door frame with frame-mounted strike pocket, surface-mount card reader, electric door strike (fail-secure type), 22 AWG 4-conductor cable, controller with power supply, manufacturer wiring diagram, screwdrivers, cable staple gun, multimeter, LOTO kit (padlock, hasp, lockout tags), lab notebook | Instructor observes LOTO execution before wiring and checks terminal connections against the wiring diagram before power-up; student demonstrates grant and deny operation live. Pass = LOTO performed correctly with no skipped steps, all terminations within tolerance confirmed by multimeter continuity check, and both grant/deny functions operate correctly on first test or after one documented troubleshooting cycle. |
| 4 | CCTV and IP Camera Systems | 12 | demo | Students will differentiate between analog CCTV and IP-based camera systems, mount and aim an IP camera to cover a defined field of view, and retrieve recorded footage from a network video recorder. |
| IP dome camera with PoE injector or PoE switch, NVR with pre-loaded footage, Cat 6 patch cables, ceiling mounting bracket, laptop with web browser, scale floor plan, camera field-of-view calculator (free web tool), screwdrivers, ladder, lab notebook | Students submit the completed floor plan with camera placement annotations and the written incident summary from the footage review. Pass = camera placement eliminates documented blind spots at the entrance, and incident summary correctly identifies the tailgating event with time stamp and description of both individuals involved. |
| 5 | Cabinet and Cage Security: Locks, Alarmed Enclosures, and Asset Tracking | 10 | practice | Students will install an electronic cabinet lock, configure a door-open alarm threshold, and complete a physical asset inventory for a populated practice rack using a barcode scanner and asset-tracking spreadsheet. |
| Practice rack (populated with labeled mock equipment), electronic cabinet lock kit, door-contact sensor, low-voltage controller, barcode scanner (USB), asset-tracking spreadsheet template, barcode labels, policy document (instructor-prepared), laptop | Instructor verifies alarm activates within five seconds of the configured threshold being exceeded; student asset-register reconciliation must identify all pre-planted discrepancies. Pass = alarm operates to specification and all discrepancies identified with correct incident-ticket entries. |
| 6 | Security Policies, Visitor Management, and Incident Response | 11 | theory | Students will interpret a data center physical security policy and correctly apply visitor-escorting rules, media-handling procedures, and incident-escalation procedures to a set of realistic scenarios. |
| Sample data center physical security policy document, visitor log template, temporary badge (sample), incident-response form template, whiteboard for debrief notes | Students individually complete a five-scenario written quiz where they choose the correct policy-compliant action for each situation. Pass = four of five scenarios answered correctly with written justification citing the relevant policy section. |
| 7 | Integrated Physical Security Audit and Remediation Lab | 10 | lab | Students will conduct a structured physical security audit of a practice data center room, document all identified vulnerabilities using an audit checklist, and implement at least two corrective actions within the lab session. |
| Practice data center room with seeded vulnerabilities (instructor-prepared), physical security audit checklist, tablet with camera, risk-ranking guide, audit report template, laptop, any hardware needed for corrections (cables, locks, etc.) | Instructor scores the audit checklist for completeness and accuracy against the seeded-vulnerability key; audit report is reviewed for correct severity ranking and technically accurate corrective actions. Pass = at least 80 percent of seeded vulnerabilities identified, all critical vulnerabilities listed, and both implemented corrections verified functional by instructor. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Written Knowledge Exam: Physical Security Concepts | Written exam | 25% | 75 percent (38 of 50 questions correct) | A 50-question multiple-choice and short-answer exam covering layered security models, access-control credential types, CCTV system components, cabinet security controls, asset tracking, and physical security policy interpretation. Questions are mapped to CompTIA A+ Core 1 (hardware/security physical topics), CompTIA Server+ (physical security domain), and CNet CDCTP exam content areas. Standard met · Safety · Time · Quality/finish · Documentation |
| Skills Demonstration: Access Control and Camera Installation | Skills demonstration | 45% | All critical steps passed with no safety violations; minimum score of 80 percent on the rubric | Each student independently mounts a card reader, wires it to a controller with a door strike, and mounts and aims an IP camera to cover a specified field of view; the instructor scores performance on a rubric covering LOTO compliance, correct wiring termination, grant/deny functionality, and camera coverage with no blind spots in the target zone. Standard met · Safety · Time · Quality/finish · Documentation |
| Lab Log: Physical Security Audit Portfolio | Log | 15% | Complete entries for all seven lessons; audit report scores at least 80 percent on the provided rubric | Students submit their cumulative lab notebook containing structured entries from every hands-on and demo lesson, plus the formal written audit report from the final integrated lab; entries are evaluated for completeness, technical accuracy, correct LOTO documentation, and professional writing quality. Standard met · Safety · Time · Quality/finish · Documentation |
| Safety Check: LOTO and PPE Compliance Observation | Safety audit | 15% | 100 percent on all critical safety steps; any critical failure requires immediate remediation and recheck before the student may continue hands-on work | During the access-control installation lab, the instructor uses a standardized safety observation checklist to verify that each student correctly performs lockout/tagout on the practice panel, dons appropriate PPE (safety glasses for drilling, insulated gloves when near energized terminals), and does not energize the circuit until the instructor has cleared the wiring; this check is a course completion requirement independent of other grades. Standard met · Safety · Time · Quality/finish · Documentation |
This course develops the safety knowledge and skills required to work in live data center environments, covering electrical hazard control, lockout/tagout procedures, PPE selection, arc flash awareness, confined space entry, emergency response, and OSHA regulatory compliance. Learners apply OSHA 10 principles directly to data center tasks such as working in energized equipment rooms, overhead cable trays, and raised-floor spaces. Successful completion prepares students for the OSHA 10 credential and reinforces safety content tested in CompTIA Server+ and CNet CDCTP exam objectives.
OutcomesThis course develops the safety knowledge and skills required to work in live data center environments, covering electrical hazard control, lockout/tagout procedures, PPE selection, arc flash awareness, confined space entry, emergency response, and OSHA regulatory compliance. Learners apply OSHA 10 principles directly to data center tasks such as working in energized equipment rooms, overhead cable trays, and raised-floor spaces. Successful completion prepares students for the OSHA 10 credential and reinforces safety content tested in CompTIA Server+ and CNet CDCTP exam objectives.
How the course runs. 7 blocks: OSHA Framework and Data Center Hazard Recognition; Electrical Safety and Arc Flash Awareness; Lockout/Tagout Procedures for Data Center Equipment; PPE Selection, Inspection, and Ergonomics; Confined Space Entry, Fall Protection, and Elevated Work; Emergency Response: First Aid, CPR, AED, and Incident Reporting; Hazard Communication, Chemical Safety, and Safety Culture.
What competent looks like. Apply OSHA General Industry standards to common data center hazards including electrical, fall, ergonomic, and chemical risks, achieving at least 80% on a written knowledge exam. Execute a complete lockout/tagout procedure on a de-energized server rack PDU using the correct sequence, verified hardware, and documentation without prompting. Select and inspect the correct PPE for at least five distinct data center hazard scenarios, including arc-flash-rated PPE for electrical work, with zero critical errors. Demonstrate first-aid and CPR response to an electrical shock victim following current American Heart Association guidelines, including AED operation, to evaluator satisfaction. Identify and document confined-space and elevated-work hazards in a simulated data center walk-through, producing a written hazard assessment with corrective actions. Correctly report a simulated incident using the workplace injury and illness recordkeeping process consistent with OSHA recordkeeping requirements, including required timelines.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | OSHA Framework and Data Center Hazard Recognition | 12 | theory | Students will identify the OSHA regulatory structure, worker rights and employer obligations, and at least eight specific hazard categories present in data center environments. |
| OSHA 10 General Industry student workbook (authorized trainer edition), OSHA.gov hazard recognition resources, printed data center floor photographs, hazard classification worksheet, whiteboard | Exit ticket: students correctly classify 8 of 10 hazard photographs by type and cite the relevant OSHA standard area; 80% correct required to advance. |
| 2 | Electrical Safety and Arc Flash Awareness | 14 | demo | Students will explain the physiological effects of electrical shock, identify arc flash boundary categories, and select appropriate arc-flash-rated PPE for a given incident energy level based on NFPA 70E principles. |
| Sample arc flash PPE kit (Cat. 2 arc-rated jacket and bib, face shield, rubber insulating gloves with leather protectors, safety glasses), reproduced arc flash label examples, NFPA 70E overview reference card, comprehension question handout, OSHA 10 workbook electrical chapter | Instructor observes each student select the correct PPE category for three scenario cards; all three must be correct to pass, with immediate re-instruction for any error. |
| 3 | Lockout/Tagout Procedures for Data Center Equipment | 14 | lab | Students will perform a six-step lockout/tagout sequence on a de-energized training PDU and server rack, producing a completed LOTO permit with zero procedural sequence errors. |
| Training PDU with lockable breakers (de-energized), simulated UPS unit, personal safety padlocks and hasps (one per student), LOTO tags, LOTO permit forms, lab logbook, voltage tester (non-contact), OSHA 29 CFR 1910.147 reference card | Instructor uses a LOTO procedure checklist; all six steps must be performed in correct sequence with no skipped steps and a completed, legible permit. Any critical sequence error requires full restart and re-evaluation. |
| 4 | PPE Selection, Inspection, and Ergonomics | 10 | practice | Students will inspect, don, doff, and document the condition of all PPE types used in data center work, and apply ergonomic lifting and pushing techniques to server and rack handling tasks. |
| Full PPE kit per student (hard hat, safety glasses, ESD strap set, cut-resistant gloves, disposable earplugs), weighted server prop (approx. 25 lb), slide rail kit, equipment cart, PPE inspection checklist, ergonomic risk worksheet, OSHA ergonomics guidelines reference | Observer checklist: student correctly identifies all pre-marked defects on PPE samples (minimum 4 of 5 defects found) and performs server lift with zero unsafe posture cues observed by instructor; any dropped item or back-bend failure requires repeat. |
| 5 | Confined Space Entry, Fall Protection, and Elevated Work | 10 | theory | Students will classify raised-floor plenum spaces and overhead cable tray areas using OSHA permit-required confined space criteria, and describe the controls required before entry. |
| OSHA 29 CFR 1910.146 summary card, sample confined space entry permit (complete and incomplete versions), scenario cards, atmospheric monitor demonstration unit (4-gas monitor, for show-and-tell), raised-floor tile lifter (props), OSHA 10 workbook confined space chapter | Written scenario quiz: students correctly classify all three spaces and list minimum three required controls for a permit-required space; 80% score (6 of 8 questions) required to pass. |
| 6 | Emergency Response: First Aid, CPR, AED, and Incident Reporting | 14 | practice | Students will demonstrate hands-only CPR and two-rescuer CPR with AED operation on a training manikin, and complete a simulated OSHA-compliant incident report for an electrical shock scenario. |
| Adult CPR manikins (minimum 1 per 3 students), AED trainer units, bag-valve mask (BVM) trainer, disposable face shields, first aid kit (for familiarization), OSHA 300/300A/301 form samples, incident scenario handout, American Heart Association CPR reference card | Skills evaluator checklist: student achieves adequate CPR compression depth and rate for minimum 2 minutes and completes AED trainer cycle with correct pad placement — both must pass. Incident report must correctly identify recordable status with no missing required fields. |
| 7 | Hazard Communication, Chemical Safety, and Safety Culture | 7 | theory | Students will locate and interpret a Safety Data Sheet for a data center chemical (such as thermal paste, battery electrolyte, or fire suppression agent), explain the GHS labeling system, and describe the elements of a positive safety culture. |
| Printed SDSs for thermal paste, VRLA battery electrolyte, and data center cleaning solvent; GHS label examples; GHS pictogram reference card; NIOSH safety culture summary; OSHA Hazard Communication Standard overview (29 CFR 1910.1200 summary) | SDS reading guide scored by instructor: student correctly answers all questions for minimum 2 of 3 SDSs including correct PPE identification; GHS label matching must be 100% correct (3 of 3) to demonstrate baseline chemical safety literacy. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| OSHA 10 and Electrical Safety Knowledge Exam | Written exam | 25% | 80% (40 of 50 questions correct) | A 50-question multiple-choice written exam covering OSHA General Industry regulatory framework, electrical hazard identification, arc flash boundaries, PPE category selection, hazard communication (GHS/SDS), confined space classification, and OSHA recordkeeping requirements — all mapped to the OSHA 10 outreach program topic areas and CNet CDCTP safety knowledge objectives. Students who score below 80% receive targeted remediation and one retake opportunity. Standard met · Safety · Time · Quality/finish · Documentation |
| Lockout/Tagout and Emergency Response Skills Demonstration | Skills demonstration | 45% | All critical steps on the evaluator checklist marked correct; zero critical errors permitted on LOTO sequence; CPR and AED skills both rated satisfactory by the evaluator | A live performance evaluation in which each student individually executes a complete LOTO sequence on the training PDU, then responds to a scripted electrical shock scenario by performing hands-only CPR and operating the AED trainer through a full cycle. The evaluator uses a binary (correct/incorrect) checklist for each step; any critical error on LOTO sequence or failure to achieve adequate CPR quality requires the student to complete additional practice and re-demonstrate that section before advancing. Standard met · Safety · Time · Quality/finish · Documentation |
| Safety Lab Logbook | Log | 15% | All seven lab entries present and complete; minimum satisfactory rating on instructor rubric for accuracy, completeness, and reflection quality | Students maintain a running lab logbook throughout the course with one entry per lesson documenting the hazard addressed, the control methods applied, equipment used, any errors made and how they were corrected, and a one-paragraph personal reflection on how the lesson applies to their future data center work. The logbook is reviewed twice during the course and submitted in full at the end; incomplete or inaccurate entries must be corrected before the logbook is accepted. Standard met · Safety · Time · Quality/finish · Documentation |
| Final Safety Walk-Through and Hazard Correction Check | Safety audit | 15% | Student identifies minimum 8 of 10 planted hazards, correctly classifies each by type and applicable OSHA area, and proposes a feasible corrective action for each — no safety-critical hazard may be missed | Using a simulated data center lab space in which the instructor has planted exactly ten realistic hazards (including at least one LOTO violation, one arc flash label error, one PPE deficiency, one confined space marking absence, and one improper chemical storage), each student conducts a solo walk-through, completes a written hazard assessment form, and verbally debriefs findings with the evaluator. Missing any of the pre-designated safety-critical hazards (LOTO, electrical, or arc flash) is an automatic fail requiring remediation and a repeat walk-through on a different day. Standard met · Safety · Time · Quality/finish · Documentation |
Students integrate every skill from the program by planning, physically building, cabling, powering, cooling, securing, and documenting a scaled data center rack environment that meets industry standards. The project culminates in a formal technical portfolio and an oral defense before a panel of instructors and, where available, an industry evaluator. All work is governed by OSHA lockout/tagout procedures, proper PPE, and the documentation practices expected on the job.
OutcomesStudents integrate every skill from the program by planning, physically building, cabling, powering, cooling, securing, and documenting a scaled data center rack environment that meets industry standards. The project culminates in a formal technical portfolio and an oral defense before a panel of instructors and, where available, an industry evaluator. All work is governed by OSHA lockout/tagout procedures, proper PPE, and the documentation practices expected on the job.
How the course runs. 4 blocks: Project Planning and Design Specification; Integrated Build: Rack, Cabling, Power, Cooling, and Security; Fault Injection and Structured Troubleshooting; Portfolio Finalization and Oral Defense.
What competent looks like. Plan and execute a complete rack-and-stack build — including structured cabling, power distribution, cooling airflow management, and physical security controls — to a written design specification. Produce a professional documentation package including an as-built diagram, cable log, equipment inventory, change-management ticket, and safety checklist that meets BICSI and data center industry standards. Demonstrate safe work practices throughout the build: selecting and wearing appropriate PPE, applying OSHA lockout/tagout procedures before servicing energized panels, and correcting any identified hazards. Troubleshoot at least two simulated fault scenarios — one hardware and one environmental — using a structured, ticket-driven methodology and document the root cause and resolution. Present the completed build and documentation package in a 20-minute oral defense, answering technical and safety questions clearly and accurately. Reflect on credential exam objectives for CompTIA A+, Server+, CNet CDCTP, and BICSI Installer by connecting each major project decision to the relevant exam domain.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Project Planning and Design Specification | 30 | theory | Given a client scenario document, the student will produce a complete project plan — including a rack-elevation diagram, cable schedule, power-load worksheet, airflow strategy, and safety checklist — before any physical work begins. |
| Client scenario handout, blank rack-elevation template, Visio or draw.io (free tier), BICSI TDMM reference excerpts, power-load calculation worksheet, OSHA LOTO reference card, PPE selection guide | Instructor approves the plan as complete and internally consistent before lab access is granted; all five documents (rack diagram, cable schedule, power worksheet, airflow plan, safety checklist) must be present and free of critical errors — missing or incorrect power calculations, missing LOTO points, or unscaled diagrams are automatic revisions required before approval. |
| 2 | Integrated Build: Rack, Cabling, Power, Cooling, and Security | 80 | lab | Following the approved project plan, the student will physically install all equipment, run and terminate structured cabling, connect and label power distribution, verify airflow management (blanking panels, cable routing), and install physical security controls while maintaining a real-time change log. |
| 42U lab rack, 1U/2U servers and switches (real or decommissioned training units), patch panels, Cat 6 cable and keystones, OS2 fiber cable and LC connectors, fusion splicer or pre-terminated pigtails, cable certifier, optical power meter, VFL, PDU, blanking panels, cable managers, temperature/humidity datalogger, badge reader or lock hardware, label maker, LOTO kit (hasp, locks, tags), non-contact voltage tester, torque screwdriver, ESD strap and mat, safety glasses, leather gloves for fiber work | Instructor walks the completed build against the rack-elevation diagram and cable schedule: all devices seated and labeled, all copper links certifier-pass (100%), all fiber links power-meter within acceptable loss budget, no open 1U gaps without blanking panels, PDU cords labeled and load within design limits, change log current — any single critical safety deficiency (exposed live conductor, missing LOTO documentation, unlabeled live circuit) requires immediate correction and re-inspection before the student may proceed. |
| 3 | Fault Injection and Structured Troubleshooting | 28 | practice | Given two simulated fault scenarios injected by the instructor — one hardware fault and one environmental fault — the student will use a ticketing system and structured troubleshooting methodology to identify root cause, implement a resolution, and document the full process within the allowed time window. |
| Injected fault list (instructor-held, sealed until exercise start), cable certifier, multimeter, optical power meter, temperature/humidity datalogger, monitoring dashboard (PRTG free or equivalent), ticketing tool, incident report template, OSHA LOTO kit | Each ticket is scored on a rubric: correct root cause identified (required), all troubleshooting steps documented in ticket (required), resolution verified with a measurement or alarm-clear screenshot (required), incident report grammatically complete and technically accurate — students must earn at least 80% of rubric points on each ticket to pass this lesson; a failed ticket must be reworked with a different injected fault before the portfolio is accepted. |
| 4 | Portfolio Finalization and Oral Defense | 24 | field | The student will assemble the complete project portfolio, deliver a 20-minute structured oral defense of the build and documentation to a panel, and respond accurately to at least 80% of technical and safety questions posed. |
| Completed portfolio (printed and digital copy), presentation slides or rack access, panel evaluation rubric, credential exam domain mapping handout, stopwatch | Portfolio accepted by instructor before defense date (all required documents present, cable test reports attached, no missing signatures on change log); defense scored by at least two evaluators on the panel rubric — student must earn 80% or higher overall on the rubric AND answer at least 80% of Q&A questions correctly to pass; a student who fails either component completes one revision cycle and a second defense within two weeks. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Capstone Build and Documentation Package | Project | 60% | All mandatory checklist items physically verified by instructor; cable certifier reports show 100% copper pass; fiber links within loss budget; portfolio packet complete with all required documents; incident reports score 80% or higher on rubric. | The physical rack build and its full documentation package — rack diagram, cable schedule, power-load record, airflow plan, cable test reports, change log, and two incident reports — are evaluated against a pass/fail checklist and a scored rubric. A single unresolved safety deficiency (unlabeled live circuit, missing LOTO record, open rack gap in a live build) is an automatic incomplete until corrected. Meets specification · Within estimate · Workmanship · Safety · Documentation |
| Technical Portfolio | Portfolio | 20% | All nine required documents present, organized in specified order, and free of critical factual errors; credential exam domain mapping references at least five distinct exam objectives across at least two credentials; submitted by the deadline established in the course calendar. | The portfolio is a bound or digitally organized dossier that serves as a professional work sample the student can show to employers. It is reviewed by the instructor using a document-completeness checklist and a content-accuracy rubric; any document with a critical technical error (e.g., incorrect wire-pair assignment on a cable schedule, power calculation that exceeds circuit capacity without annotation) must be corrected before the oral defense date. Completeness · Organization · Evidence quality |
| Oral Defense | Oral / panel | 20% | Overall panel rubric score of 80% or higher AND at least 80% of Q&A questions answered correctly by both evaluators' independent scores; presentation delivered within the 15-20 minute window. | A panel of at least two evaluators (instructors and, where available, an industry guest) scores the student's presentation and Q&A session using a standardized rubric covering technical accuracy, safety knowledge, documentation quality, and professional communication. Results are provided in writing within two business days; a student who does not pass completes one revision cycle and a second defense. Explains decisions · Answers technical questions · Professional communication |
Students complete 243 supervised hours at a host data center or managed-services facility, applying rack-and-stack, cabling, power, cooling, hardware, monitoring, and safety skills in a live production environment. A credentialed site supervisor evaluates daily performance using a standardized competency rubric aligned to CompTIA A+, Server+, CNet CDCTP, and BICSI Installer task areas. The externship bridges classroom training and entry-level employment by requiring students to execute real work orders, follow site-specific procedures, and maintain a reflective work log throughout the placement.
OutcomesStudents complete 243 supervised hours at a host data center or managed-services facility, applying rack-and-stack, cabling, power, cooling, hardware, monitoring, and safety skills in a live production environment. A credentialed site supervisor evaluates daily performance using a standardized competency rubric aligned to CompTIA A+, Server+, CNet CDCTP, and BICSI Installer task areas. The externship bridges classroom training and entry-level employment by requiring students to execute real work orders, follow site-specific procedures, and maintain a reflective work log throughout the placement.
How the course runs. 4 blocks: Externship Orientation and Site Safety Onboarding; Supervised Production Tasks — Rack, Cable, Power, and Cooling; Ticketing, Monitoring, and Professional Communication Practice; Final Review, Supervisor Evaluation, and Externship Closeout.
What competent looks like. Execute assigned data center tasks—including hardware installation, cable management, and thermal checks—according to site SOPs and OSHA lockout/tagout requirements without a recordable safety incident. Demonstrate professional reliability by completing at least 90 percent of scheduled externship hours and meeting site attendance and dress-code standards. Apply structured troubleshooting to at least three real or supervised ticket scenarios, documenting steps and resolution in the site's ticketing system or a provided log. Perform physical infrastructure tasks—rack mounting, cable labeling, patch-panel termination, or PDU/UPS checks—meeting the quality standard set by the site supervisor for each assigned work order. Maintain a daily work log that records tasks performed, tools used, safety measures taken, and personal learning reflections for every shift, submitted without gaps. Receive a final supervisor evaluation score of at least 75 out of 100 on the program's standardized competency rubric, covering technical skill, safety compliance, communication, and professionalism.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Externship Orientation and Site Safety Onboarding | 20 | field | Given a site-specific safety orientation and facility walkthrough, the student will correctly identify emergency egress routes, describe site-specific lockout/tagout and PPE requirements, and pass the host employer's site-access safety quiz with a score of 80 percent or higher. |
| Site SOP binder or digital portal, employer PPE kit (ESD wrist strap, safety glasses, hard hat if required), blank floor-plan worksheet, OSHA 10 pocket card, program work-log booklet | Student produces a labeled floor-plan sketch reviewed and initialed by the site supervisor; achieves 80 percent or higher on the site safety quiz; no PPE or access violations noted in the first week. |
| 2 | Supervised Production Tasks — Rack, Cable, Power, and Cooling | 140 | lab | Over the core placement weeks, the student will complete assigned work orders in rack-and-stack, structured cabling, power distribution, and cooling/airflow under supervisor oversight, meeting the site's quality standard on each task as documented in the work log and supervisor check-ins. |
| Site-issued tools (screwdrivers, cable ties, label maker, punch-down tool, patch cords), ESD mat and wrist strap, site SOP for each task type, thermal camera or DCIM console access (site-provided), program work-log booklet, site ticketing system credentials | Supervisor signs off each completed work order as meeting site quality standards; work log entries are present for every shift with task description, tools, safety steps, and reflection; no unresolved safety incidents recorded. |
| 3 | Ticketing, Monitoring, and Professional Communication Practice | 48 | field | The student will open, update, and close at least three tickets in the site's ITSM or monitoring system, communicate status accurately to the site supervisor or NOC team, and receive a supervisor rating of satisfactory or higher on the professional-communication dimension of the midpoint evaluation. |
| Site ITSM or ticketing system (e.g., ServiceNow, Remedy, Jira Service Management, or equivalent), monitoring console access (site-provided), work-log booklet, program midpoint evaluation form | At least three tickets documented with complete open-through-close notes; supervisor rates communication dimension at 'satisfactory' or higher on the midpoint rubric (score of 18/25 on that section); monitoring log entries present for each relevant shift. |
| 4 | Final Review, Supervisor Evaluation, and Externship Closeout | 35 | field | The student will compile the complete work log, participate in a final supervisor evaluation meeting, and achieve a total score of at least 75 out of 100 on the program's standardized competency rubric, demonstrating readiness for entry-level data center employment. |
| Program standardized supervisor competency rubric (100-point scale), complete work-log booklet, one-page professional summary template, externship closeout checklist, student experience survey form | Final supervisor rubric score of 75/100 or higher; complete and gap-free work log submitted by the last day of the placement; closeout checklist signed by both site supervisor and program coordinator. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Supervisor Competency Skills Demonstration (skills_demo) | Skills demonstration | 70% | Score of 75 out of 100 on the program's standardized supervisor competency rubric; no unresolved safety violations recorded during the placement. | The host-site supervisor scores the student at the end of the placement on five equally weighted dimensions—technical task execution, safety and PPE compliance, communication and teamwork, professionalism and reliability, and initiative—using the program's standardized 100-point rubric. The completed, signed rubric is submitted to the program coordinator as the primary skills-demonstration record. Competency · Safety · Attendance · Conduct · Initiative |
| Daily Work Log Portfolio (lab_log) | Log | 30% | Log contains a dated entry for every scheduled shift with no unexplained gaps; professional summary submitted; program coordinator accepts the portfolio as complete. | The student submits the full chronological work log plus a one-page professional summary at the end of the externship. The log must document tasks performed, tools and equipment used, safety measures applied, ticket or monitoring activities, and a personal reflection for each shift, providing a verifiable record of the 243 placement hours and serving as a portfolio artifact for job applications. Complete · Verified |
This course systematically reviews every exam domain covered by the five target credentials — CompTIA A+, CompTIA Server+, CNet CDCTP, BICSI Installer, and OSHA 10 — using timed practice questions, domain-by-domain gap analysis, and full-length mock exams that mirror actual test conditions. Learners identify weak areas through diagnostic scoring, then concentrate study time on those domains before sitting scored mock exams that replicate the format, question style, and time limits of each credential. By course end, learners will have a documented readiness profile for each exam and a personal study plan to address any remaining gaps before scheduling their live credential tests.
OutcomesThis course systematically reviews every exam domain covered by the five target credentials — CompTIA A+, CompTIA Server+, CNet CDCTP, BICSI Installer, and OSHA 10 — using timed practice questions, domain-by-domain gap analysis, and full-length mock exams that mirror actual test conditions. Learners identify weak areas through diagnostic scoring, then concentrate study time on those domains before sitting scored mock exams that replicate the format, question style, and time limits of each credential. By course end, learners will have a documented readiness profile for each exam and a personal study plan to address any remaining gaps before scheduling their live credential tests.
How the course runs. 4 blocks: Diagnostic Assessment & Exam Strategy: Mapping Domains Across All Five Credentials; Domain-by-Domain Review: CompTIA A+, Server+, and CNet CDCTP; Domain-by-Domain Review: BICSI Installer and OSHA 10; Full-Length Mock Certification Exams & Final Readiness Review.
What competent looks like. Score at or above the published passing threshold on a full-length mock exam for each of the five target credentials: CompTIA A+, CompTIA Server+, CNet CDCTP, BICSI Installer, and OSHA 10. Identify personal weak domains on a diagnostic assessment for each credential and articulate a targeted remediation strategy before the final mock exam. Demonstrate accurate recall and application of data-center-specific content across all CompTIA A+ and Server+ exam domains, including hardware, networking, virtualization, storage, and troubleshooting. Correctly answer questions on CNet CDCTP topics including data center physical infrastructure, tiered design concepts, power and cooling fundamentals, and operational best practices. Apply BICSI Installer knowledge of structured cabling standards, fiber and copper termination, pathway and spaces, and testing requirements to scenario-based exam questions. Complete OSHA 10 review questions on general industry hazard recognition, lockout/tagout, electrical safety, PPE selection, and emergency action with a passing score.
| # | Lesson | Hr | Type | Objective | Activities | Materials | Check |
|---|---|---|---|---|---|---|---|
| 1 | Diagnostic Assessment & Exam Strategy: Mapping Domains Across All Five Credentials | 10 | theory | Given a set of diagnostic practice questions for each credential, the learner will score each domain, identify gaps scoring below the target threshold, and produce a written personal study plan prioritizing remediation by credential and domain. |
| Diagnostic question banks drawn from CompTIA A+ and Server+ official objectives (CompTIA website), CNet CDCTP candidate guide, BICSI Installer study materials (BICSI.org), OSHA 10 outreach curriculum outline; domain-tracking spreadsheet template; pencils and scratch paper for calculations; personal laptops or lab workstations for digital question platforms. | Learner submits a completed domain-tracking spreadsheet with a score recorded for every domain of every credential and a signed personal study plan; instructor reviews for completeness and realistic goal-setting — pass requires all domains scored and plan submitted. |
| 2 | Domain-by-Domain Review: CompTIA A+, Server+, and CNet CDCTP | 22 | practice | After focused domain review and targeted practice sets, the learner will answer scenario-based questions on CompTIA A+ Core 1 hardware and networking, Core 2 operating systems and security, Server+ server architecture and storage, and CNet CDCTP physical infrastructure at or above the target passing level for each domain. |
| CompTIA A+ and Server+ official exam objectives documents (downloaded from CompTIA.org); CNet CDCTP candidate guide and study materials; practice question platforms (e.g., professor-provided question banks or authorized exam-prep software); whiteboard for concept mapping; lab servers and networking gear from Course 6 for hands-on hardware identification during review. | Learner completes a 60-question mixed practice exam covering A+, Server+, and CDCTP domains under timed conditions (90 minutes); pass requires a minimum of 75% overall with no individual domain below 70%; instructor reviews flagged items with each learner. |
| 3 | Domain-by-Domain Review: BICSI Installer and OSHA 10 | 14 | practice | After structured review of BICSI Installer cabling knowledge areas and OSHA 10 general industry safety topics, the learner will correctly classify cabling pathways, identify testing parameters, recognize job-site hazards, and select appropriate controls on a combined practice question set at or above passing level. |
| BICSI Installer study guide and TDMM (Telecommunications Distribution Methods Manual) reference excerpts (BICSI.org); OSHA 10 General Industry outreach curriculum (OSHA-authorized trainer materials); cabling bench with copper patch panels, fiber connectors, and cable testers from Course 3; PPE kit (safety glasses, gloves, hard hat) for hazard-scenario demonstrations; scenario card sets printed by instructor. | Learner completes a 30-question BICSI Installer practice set and a 30-question OSHA 10 practice set under timed conditions; pass requires 75% or higher on each set independently; learners who do not pass either set receive a targeted remediation assignment before the final mock exam. |
| 4 | Full-Length Mock Certification Exams & Final Readiness Review | 22 | practice | Under timed, exam-condition settings that replicate the format of each credential, the learner will complete full-length mock exams for CompTIA A+ Core 1, A+ Core 2, Server+, CNet CDCTP, BICSI Installer, and OSHA 10, scoring at or above the target threshold on each, and will produce a final readiness statement identifying any remaining gaps and a plan to address them before scheduling live exams. |
| Full-length mock exam question banks for each credential (instructor-curated, drawn from authorized prep materials and official practice tests where available); printed answer sheets and scratch paper; stopwatch or classroom timer; domain-tracking spreadsheets from Lesson 1; CompTIA, CNet, BICSI, and OSHA 10 official candidate guides for post-exam review; personal laptops for exam scheduling research (CompTIA, Pearson VUE, BICSI). | Pass requires a score at or above 75% on every mock exam (serving as a conservative readiness buffer above each credential's actual published passing score); learners who do not meet the threshold on any mock exam receive a written remediation assignment and may retake that mock exam once before the course closes; all learners must submit a completed final readiness statement to receive a course completion grade. |
| Assessment | Type | Weight | Pass standard | Method & rubric |
|---|---|---|---|---|
| Comprehensive Mock Certification Exam Battery | Mock certification exam | 100% | A minimum score of 75% on each of the six individual mock exams (CompTIA A+ Core 1, A+ Core 2, Server+, CNet CDCTP, BICSI Installer, and OSHA 10), with no single credential domain scoring below 70%; learners who do not meet the threshold on any one exam after one retake receive an incomplete and an extended individual study plan. | Administered in Lesson 4 under proctored, timed conditions that replicate the real testing environment for each credential, this battery consists of six full-length mock exams covering every published domain of the five target credentials. Results are scored by domain, compared to the Lesson 1 diagnostic baseline to confirm measurable improvement, and reviewed in a one-on-one readiness conference with the instructor to finalize each learner's live exam registration plan. Score · Time management |
Students sit the CompTIA A+ and CompTIA Server+ exams administered by Computing Technology Industry Association (CompTIA), the CNet CDCTP exam administered by CNet Training, the BICSI Installer exam administered by BICSI, and the OSHA 10 course assessment administered through an OSHA-authorized outreach trainer. Pass standard: Credential issued by the body.
Back to Data Center Technician · How the school gets authority to award these credentials
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.