Objective. Students identify common engineered wood products used in framing, specify correct installation orientation, and complete a mock AHJ (Authority Having Jurisdiction) framing inspection checklist on a partially framed structure.
This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
Engineered wood products (EWPs) are manufactured from wood fibers, veneers, or strands bonded with adhesives under heat and pressure. Unlike dimensional lumber, EWPs are designed to precise engineering standards, which means they carry predictable load ratings and must be installed exactly as the manufacturer specifies. The three products you will work with most in residential and light commercial framing are laminated veneer lumber (LVL), I-joists, and glulam beams.
LVL is made by bonding thin wood veneers together with all grain running parallel to the length of the member. This makes LVL much stronger and stiffer than sawn lumber of the same size, and far more consistent. LVL is commonly used for headers over doors and windows, ridge beams, hip and valley members, and carrying beams.
Installation requirements: LVL must be installed with the laminations vertical — never flat unless the engineer has specifically detailed it that way. Bearing length (the amount of LVL sitting on a support) must meet the manufacturer's minimum, typically 1.5 inches at interior supports and 3.5 inches at end supports, but always confirm with the product's technical guide. LVL is not field-notchable. Any notch, hole, or cut not shown in the approved plan voids the engineered rating.
An I-joist has a top flange, a bottom flange, and an OSB or plywood web connecting them. The flanges carry bending stress; the web resists shear. Because each zone does a specific job, you must protect each zone.
Prohibited notching zones: Never notch either flange anywhere along the joist. Web holes are permitted only in the middle third of the span, within round knockouts already provided, or within dimensions listed in the manufacturer's hole chart — holes outside those limits require engineering approval.
Web stiffeners: At bearing points (walls, beams, and hangers) vertical blocks of wood called web stiffeners are nailed to both sides of the web. They prevent the web from rolling or crushing under point loads. Install them tight against the flange and flush with the bearing surface.
Blocking and rim board: At the ends of an I-joist floor system, a rim board — typically LVL or a product rated for that use — closes the floor system and transfers loads. Solid blocking between joists is required at supports and wherever specified in the design to restrain the top flange from rotating laterally.
Top-chord flush: When setting I-joists in joist hangers or on a beam, the top face (top chord) of every joist must be flush or within the manufacturer's tolerance so the subfloor lies flat. Use a string line or straightedge to check alignment before fastening.
Glulam (glued laminated timber) beams are built from horizontal layers of dimension lumber bonded together. They are used for long spans and large loads. Glulams are stamped with a combination symbol (for example, 24F-V4) that specifies bending stress and lay-up. The top of a glulam is marked; install it with the correct face up as stamped. Camber (a slight upward bow) is intentional — the beam deflects to near level under load.
Structural sheathing — whether plywood or OSB — has a face grain direction (plywood) or a strength axis (OSB). Panels must be installed with the strength axis perpendicular to framing members (across the joists or studs) unless the layout specifies otherwise. Panel edges must be staggered (offset) between rows. APA-rated sheathing carries a stamp that tells you span rating, exposure rating, and thickness. Match the stamp to the job specification.
Before insulation or drywall is installed, the Authority Having Jurisdiction (the local building department) sends an inspector to verify that framing meets the approved plans and adopted building code. Failing this inspection means you stop work until deficiencies are corrected. Smart framing crews do their own pre-inspection walk before calling for the official one.
A typical framing inspection checklist covers:
Document every item as PASS or FAIL. For every FAIL, write the corrective action required — be specific (for example: "Install web stiffener both sides, nail per manufacturer schedule").
Wear your hard hat, safety glasses, and work boots with ankle support at all times on the deck. Keep the floor clear of off-cuts before walking on I-joists — a tripping hazard on an open floor system is a fall hazard. When using a framing nailer, keep your free hand clear of the muzzle, confirm the safety tip is depressed against the workpiece before firing, and engage the tool's safety when carrying it. Never use a nailer overhead without being certain of what is on the other side of the member. Construction adhesive tubes are under pressure; point the nozzle away from your face when cutting the tip.
When lifting LVL or glulam sections, use team lifts — these members are heavy and awkward. Keep your back straight and lift with your legs.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.
Does the school offer financial aid?
No. We don’t offer financial aid because we’re free. No, really: completely free.
Do you offer industry certification?
No. We are not certified yet, so we can’t offer that to students. What we do offer is knowledge and understanding of a trade.
Enroll first in the trade you’re interested in. You get your key, your program opens, and you begin studying.
Enroll free →