Objective. Students will complete a wet-layup structural repair on a scarfed composite panel, placing plies in the correct orientation and sequence per a provided laminate schedule, and produce a cured laminate that passes tap-test and meets thickness tolerance.
This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
Blade shells and nacelle fairings are built from fiber-reinforced polymer (FRP) composites. When a blade suffers an impact crack, delamination, or erosion damage that penetrates into the structural laminate, a wet-layup repair restores load-carrying capacity. Wet layup means you saturate dry fabric plies with liquid resin—usually a two-part epoxy—and build them up in a controlled stack directly on the prepared surface. Done correctly, the cured repair transfers stress across the damage zone just as the original laminate does. Done incorrectly, a hidden void or wrong ply orientation can cause the repair to fail under load, creating a blade or nacelle failure risk at height.
A laminate schedule is the engineering document that specifies, ply by ply, the fabric type, areal weight, fiber orientation, and stacking order. Orientations are given in degrees relative to a reference axis—typically the blade span direction. Common orientations in wind blade repairs include 0°, ±45°, and 90°. The schedule is not a suggestion; deviating from the specified sequence changes the stiffness and strength of the repair. Always read the schedule before cutting a single ply.
For a stepped scarf repair the plies are stepped outward in size from the deepest point of the scarf to the surface, so each successive ply overlaps the one below. The largest ply—usually the last one placed—covers the full repair footprint.
Before layup begins the damage area must be scarfed: ground into a gradual taper so the repair plies can be bonded without a stress concentration at the edge. Typical scarf ratios for structural composite repairs are specified by the OEM or repair manual—ratios such as 1:20 or 1:30 (rise over run) are common in the industry. The scarf must be dry, clean, and free of grease or release agent. Wipe with an approved solvent per the material safety data sheet (MSDS/SDS), allow to dry, and confirm surface cleanliness before mixing resin.
Epoxy systems consist of a resin and a hardener. The mix ratio—by weight or by volume—is specified by the manufacturer and must be followed exactly. An incorrect ratio produces an under-cured or brittle laminate. Mix thoroughly for the time stated on the technical data sheet (TDS), scraping the sides and bottom of the container, then pour into a fresh container and mix again to avoid unmixed material at the edges.
Epoxy has a working time (pot life) after which it begins to gel. Keep your mixed batch small enough to use within the pot life. Curing generates heat (exothermic reaction); a large mass in a cup gels faster than a thin spread layer. If the batch feels warm, work quickly or discard and mix fresh material.
Use the provided ply template and scissors to cut each glass-fiber ply to the correct shape and size. Mark the fiber orientation on each ply with a dry-erase marker before you move it to the layup area—once the ply is wet with resin, re-identifying orientation is nearly impossible. Number each ply to match the laminate schedule. Lay them out in order on a clean table so you can pick them up in sequence during layup.
1. Apply a thin coat of catalyzed epoxy to the scarfed surface with a foam roller.
2. Place Ply 1 (the smallest, deepest ply) onto the wet surface.
3. Wet out the ply thoroughly with more epoxy using the foam roller—work from the center outward.
4. Use the grooved aluminum consolidation roller to press out air bubbles and excess resin. Roll in multiple directions.
5. Repeat for each successive ply in schedule order. Keep resin content consistent—dry plies and resin-starved spots are as harmful as excessive resin.
6. After the final ply, apply peel ply, then perforated release film, then breather fabric.
7. Seal the vacuum bag film with sealant tape; make sure no creases bridge the bag at the seal.
8. Connect the vacuum pump, draw down to the target vacuum level specified in the repair procedure, and check for leaks by isolating the pump. A bag that holds vacuum without the pump running is properly sealed.
Vacuum pressure consolidates the stack, removes entrapped air, and holds the laminate in contact with the substrate during cure. Monitor the gauge periodically. Maintain cure temperature per the epoxy TDS—most structural blade repair epoxies cure at ambient shop temperature but some require a heat blanket for elevated-temperature post-cure. Record cure start time and temperature on the repair card.
Tap test: After full cure, remove the bag, breather, release film, and peel ply. Using the tap-test hammer and a grid drawn on the surface, tap every square of the grid systematically. A clear, high-pitched ring indicates a well-bonded area. A dull, hollow sound indicates a delamination or void—a defect that requires further evaluation or re-repair. Mark any dull areas immediately.
Thickness measurement: Measure repair thickness at five specified points using a calibrated digital caliper. Record each measurement on the repair card. Compare against the laminate schedule target; all five readings must fall within the specified tolerance.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.
Does the school offer financial aid?
No. We don’t offer financial aid because we’re free. No, really: completely free.
Do you offer industry certification?
No. We are not certified yet, so we can’t offer that to students. What we do offer is knowledge and understanding of a trade.
Enroll first in the trade you’re interested in. You get your key, your program opens, and you begin studying.
Enroll free →