Objective. Students will complete a fabrication traveler, a welder qualification log entry, and a non-conformance report (NCR) for a given scenario, demonstrating understanding of traceability, quality records, and corrective-action documentation.
In structural welding, a finished weld is only half the product. The other half is the paper trail — or today, the digital record — that proves the weld was made to the right procedure, by a qualified welder, from the right material, and inspected at every required hold point. Without complete records, an owner cannot verify code compliance, an inspector cannot release a structure for service, and a welder cannot prove their work meets the contract. Three document types carry most of that burden: the fabrication traveler, the weld log, and the non-conformance report (NCR).
A fabrication traveler (sometimes called a router or shop traveler) is a form that follows a weldment through every stage of production — from raw material receipt to final inspection and shipment. Think of it as the birth certificate of a structural component.
Key fields you will see on a traveler:
Every field serves traceability: the ability to reconstruct exactly how a part was built, from which material, by whom, and under what process.
The weld log (also called a welder qualification log or welder performance log) is the record that links each individual weld to the welder who made it and the procedure that authorized it. Under AWS D1.1, a welder's qualification is process- and position-specific; the log documents that the right person welded in the right position with the right process.
Typical weld log entries include: joint designation, welding process (SMAW, GMAW, FCAW, GTAW), base metal specification and thickness, filler metal classification and heat/lot number, preheat temperature (if required), position, WPS number, welder ID, date, and the result of any required visual or nondestructive examination (NDE).
Shops that work to ASME Section IX keep similar qualification records because Section IX has its own essential variables that must be tracked whenever a welder's continuity or qualification is at stake.
A non-conformance report (NCR) is the formal document raised whenever an inspection finds that a weld or material does not meet the acceptance criteria in the governing code or specification. Writing a clear NCR is not an admission of failure — it is the professional, quality-system response to a finding. Ignoring a defect or concealing it is both a safety risk and a code violation.
A complete NCR contains:
1. Nonconformance description – what was found, stated objectively (for example: "undercut exceeds 1/32 in. on the top flange weld, joint B-7").
2. Location – drawing number, joint designation, and physical location on the structure (weld bead, weld pass, heat-affected zone).
3. Applicable acceptance criterion violated – cite the code. For structural steel welding, this will be a clause or table in AWS D1.1. Be specific: name the document, edition if known, and the criterion value.
4. Proposed corrective action – one of three dispositions:
5. Verification sign-off – the inspector confirms the corrective action was completed and re-inspects.
Rework welding involves all the same hazards as original welding — plus the added hazard of gouging or grinding out the defective weld. Before any repair begins, verify that the work area lockout/tagout (LOTO) procedures for any nearby mechanical or electrical equipment are in place. Wear the appropriate PPE for the repair process: welding helmet with correct lens shade, flame-resistant clothing, leather gloves, and respiratory protection appropriate for the filler metal and base metal being used. During grinding and gouging, add a face shield over safety glasses and hearing protection.
AWS SENSE and NCCER Welding programs require students to demonstrate understanding of quality records because industry employers expect entry-level welders to fill out travelers and logs accurately from day one. AWS D1.1 Certified Welder testing requires a qualified WPS — the same document referenced on every traveler. ASME Section IX qualification demands rigorous record-keeping of essential variables. Good documentation is not paperwork for its own sake; it is the backbone of structural safety and professional accountability.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.
Does the school offer financial aid?
No. We don’t offer financial aid because we’re free. No, really: completely free.
Do you offer industry certification?
No. We are not certified yet, so we can’t offer that to students. What we do offer is knowledge and understanding of a trade.
Enroll first in the trade you’re interested in. You get your key, your program opens, and you begin studying.
Enroll free →