TRN-AVIA22-06 · Lesson 1 · 72 clock hours · theory

Project Planning, Regulatory Framework, and Safety Baseline

Objective. Given a project aircraft and a defined scope of work, the student will produce a complete work-order package—including task cards, required FAA-approved data references, parts list, and a documented safety plan—that meets 14 CFR Part 43 and Part 65 requirements before any hands-on work begins.

⚠ Pending professional review

This lesson, its worked examples and its practice questions has not yet been verified by a certified examiner or master technician in the trade or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.

VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.

Why Planning Comes First

In aviation maintenance, work done without a complete plan is a liability—not just to the technician, but to every person who will ever board that aircraft. The FAA requires that maintenance be performed in accordance with approved data, properly documented, and returned to service only when all regulatory requirements are met. The capstone project begins, therefore, not with a wrench but with paperwork. A thorough work-order package created before any hands-on work is the foundation that keeps the project legal, safe, and traceable.

Regulatory Framework: 14 CFR Parts 43 and 65

14 CFR Part 43 governs the performance of maintenance, preventive maintenance, rebuilding, and alteration of civil aircraft. It defines who may perform work, what constitutes major versus minor repairs and alterations (Appendix A), how work must be recorded (Appendix B), and what airworthiness standards must be met before return to service. Every task card you write must identify its regulatory basis within Part 43—typically by citing the applicable category in Appendix A so that the correct approval authority and return-to-service endorsement are clear.

14 CFR Part 65 establishes the certification requirements for aviation mechanics holding an Airframe (A) certificate, a Powerplant (P) certificate, or both—the combined A&P. Part 65 defines the privileges and limitations of each certificate. As a student, you work under the direct supervision of a certificated mechanic; your work-order package must reflect who holds the certificate of approval for each task.

FAA-Approved Data: The Data-Reference Log

No maintenance action is legal unless it is performed in accordance with FAA-approved data. Approved data sources include:

Your data-reference log must list each source by title, document number, revision or date, and the specific task or section it supports. Consulting an out-of-date manual revision is a common and serious error; always verify the current revision before beginning any documentation.

The FAA AD portal (accessible through the FAA website) is the authoritative database for searching ADs by aircraft make, model, or component. Search both the aircraft type certificate and any installed appliances. Record every applicable AD: its number, effective date, compliance interval, and whether it has been complied with, is due, or is not applicable.

Building the Task-Card Set

A task card is a single-page or single-screen document that defines one discrete maintenance action. A well-built task card contains:

1. Task title and unique card number for traceability

2. Regulatory basis (e.g., 14 CFR Part 43 Appendix A, major repair category, or preventive maintenance item)

3. Approved data reference with revision

4. Step-by-step procedure in imperative language

5. Required tools, equipment, and consumables

6. Required parts with part numbers and quantities

7. Estimated labor hours

8. Inspection hold points—steps that must be verified by an authorized inspector before work continues

9. Sign-off blocks for performing technician and approving certificate holder

Sequence your task cards logically: tasks that require access panels to be open must precede tasks that close them; leak checks follow component installation; operational tests follow leak checks. Poor sequencing forces work to be undone and redone, wasting hours and introducing error.

The Project Safety Plan

Aviation maintenance environments contain multiple energy hazards. Your written safety plan must identify each hazard category present in your project scope and specify controls before work begins.

Lockout/Tagout (LOTO): The OSHA standard for the control of hazardous energy (29 CFR 1910.147) applies in all maintenance shops. For aircraft, this means de-energizing and physically locking out electrical buses, hydraulic systems, and pneumatic lines before work on those systems begins. Each LOTO step in your safety plan must name the energy source, the isolation point (circuit breaker, valve, disconnect), the lock or tag type, and the verification method (e.g., attempt to operate the actuator after isolation to confirm zero energy state).

PPE by task: Assign specific PPE to each task rather than listing PPE generically. Fuel system work requires chemical-resistant gloves and eye protection rated for fuel splash; sheet metal cutting requires hearing protection and cut-resistant gloves; battery work requires face shield and acid-resistant gloves. Safety glasses are the baseline PPE for all shop work.

Electrical hazards: Confirm aircraft master switch is off and battery disconnected before work on electrical systems. Use a multimeter to verify zero voltage at the work point.

Fuel hazards: Ensure adequate ventilation, eliminate ignition sources, and have an appropriate class fire extinguisher within reach before opening any fuel line.

Hydraulic and pneumatic hazards: Depressurize systems to zero before breaking any fitting. Trapped hydraulic fluid under pressure can inject through skin at levels that cause serious injury.

Completing the Work-Order Package

The finished package submitted for instructor review contains: (1) the data-reference log, (2) a parts list with part numbers and quantities, (3) the full sequenced task-card set, and (4) the written safety plan. Every page must be dated and identified with the aircraft registration number and project scope. This package is not busywork—it is the same documentation discipline that certificated mechanics use every day in certificated repair stations and airline maintenance operations. Mastering it here is mastering a core professional skill.

Key terms10

14 CFR Part 43Federal regulation that governs the performance, recording, and approval of maintenance, preventive maintenance, rebuilding, and alterations on civil aircraft registered in the United States.
14 CFR Part 65Federal regulation that establishes certification requirements, privileges, and limitations for aviation mechanics holding Airframe, Powerplant, or combined A&P certificates.
FAA-Approved DataDocumentation that the FAA has accepted as the authoritative basis for performing a specific maintenance action; includes manufacturer maintenance manuals (current revision), ADs, approved repair specifications, and certain advisory circulars when adopted by reference.
Airworthiness Directive (AD)A mandatory regulation issued under 14 CFR Part 39 that requires corrective action on an aircraft, engine, propeller, or appliance found to have an unsafe condition; compliance is legally required.
Task CardA standardized document describing one discrete maintenance task, including the step-by-step procedure, approved data reference, required tools and parts, labor estimate, and sign-off blocks for performing technician and approving authority.
Inspection Hold PointA designated step within a task card at which work must stop and an authorized inspector must verify the work before the task may continue.
Lockout/Tagout (LOTO)A safety procedure—governed by OSHA standards—that physically isolates and de-energizes hazardous energy sources (electrical, hydraulic, pneumatic) and applies a lock or tag to prevent accidental re-energization during maintenance.
Data-Reference LogA project document that lists every approved data source used for the work scope, including document title, number, revision or date, and the specific tasks each source supports.
Service Bulletin (SB)A manufacturer-issued notice recommending inspections, modifications, or procedural changes; advisory in nature unless incorporated into an Airworthiness Directive, at which point compliance becomes mandatory.
Return to ServiceThe formal approval, recorded in the aircraft maintenance record under 14 CFR Part 43, that certifies the work was performed in accordance with approved data and the aircraft is airworthy.
In class: Review the assigned aircraft's maintenance manual, airworthiness directives, and service bulletins; identify all applicable FAA-approved data sources and list them in a formal data-reference log. · Draft a written project safety plan identifying all applicable hazards (electrical, fuel, hydraulic, pneumatic, compressed gas), the required PPE for each task, and lockout/tagout procedures for each energy-isolating step. · Build a sequenced task-card set for the full project scope, annotating each card with the regulatory basis (e.g., 14 CFR Part 43 Appendix A categories), estimated labor hours, required tooling, and inspection hold points.
Materials: Assigned training aircraft or approved airframe/powerplant assembly; manufacturer's maintenance manual (current revision); applicable FAA Advisory Circulars (AC 43.13-1B and AC 43.13-2B); 14 CFR Parts 43 and 65; airworthiness directive database (FAA AD portal); OSHA lockout/tagout standard reference; task-card template forms; PPE (safety glasses, gloves, hearing protection as required by task)
Check: Instructor reviews the completed work-order package against a 20-point rubric covering accuracy of regulatory citations, completeness of parts list, correctness of LOTO procedures, and logical task sequencing; student must score 80% or higher to proceed to lab work.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

Regulations
1. Under 14 CFR Part 43, which document provides the categories that determine whether a repair is classified as major or minor?
Regulations
2. A technician discovers an open Airworthiness Directive that affects a hydraulic actuator on the project aircraft. Which of the following correctly describes the compliance requirement?
Regulations
3. Which statement best describes the status of AC 43.13-1B when performing a sheet-metal repair on a general aviation aircraft?
Safety
4. Before breaking a hydraulic line fitting on an aircraft landing gear system, the FIRST action required in the lockout/tagout procedure is to:
Regulations
5. A student's data-reference log lists a manufacturer's maintenance manual dated three revisions prior to the current issue. What is the most significant regulatory concern with this situation?
Maintenance Practices
6. Which of the following items is required on every task card as an inspection hold point?
Regulations
7. Under 14 CFR Part 65, a student aviation mechanic who has not yet earned an A&P certificate may legally:
Maintenance Practices
8. When building a sequenced task-card set for an engine cylinder removal and replacement project, which sequencing principle is most critical for airworthiness?