BLD-MASO04-08 · Lesson 6 · 12 clock hours · practice

Keystone Setting, Striking Joints, and Centering Removal

Objective. Students will set the keystone, finish and strike all exposed joints to a consistent profile, and safely remove the centering after the required cure period without cracking or displacing the arch

⚠ Pending professional review

This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.

VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.

Keystone Setting, Striking Joints, and Centering Removal

The final three operations on a masonry arch — setting the keystone, finishing the joints, and removing the centering — decide whether the arch looks professional and whether it carries load safely. Each step must be done in the right order, at the right time, and with care.

Setting the Keystone

The keystone is the last voussoir placed and the one that locks the arch together. Because it is the final piece, the opening it must fill is fixed. If your keystone was cut accurately during layout, it will slide into position without forcing and without excessive gap. Before you set it, double-check that the two adjacent voussoirs (called the skewbacks of the keystone pocket) are clean and free of hardened mortar blobs that would prevent full bearing.

Apply a full, even bed of mortar to both angled faces of the adjacent voussoirs, not to the keystone itself. This gives you better control. Lower the keystone straight down into the pocket — do not rock or twist it, as that breaks mortar bond on the voussoirs already set. Use a rubber mallet and light taps to seat it; heavy blows can crack a brick or displace neighboring units.

Once seated, hold a 4-foot level across the arch face at the keystone position to verify the unit is flush with the adjacent voussoir faces. Being even a small amount proud (sticking out) or recessed will be obvious once the centering is out and the arch is in full view. Check plumb on the keystone's exposed face as well. The tolerance for this course is 1/8 inch. If the keystone is proud, do not hammer it down — remove it, trim excess mortar, reset, and re-check. If it is recessed, remove it, add a thin skim of mortar, and re-set.

Safety note: Wear safety glasses and leather gloves during setting. A dropped keystone, especially a cut stone, can cause serious foot or hand injuries. Keep your feet clear of the drop zone and ensure no one is below you if you are working at elevation.

Finishing and Striking Joints

Joints must be struck (tooled) while the mortar is thumbprint-hard — firm enough that a thumb pressed to the surface leaves a clean print without mortar sticking to the thumb, but not so hard that the jointing tool tears the mortar rather than compresses it. On a warm, dry day this window may arrive in 30–60 minutes after laying; in cool or humid weather it may take longer. Striking too soon produces sagging joints; striking too late produces torn, rough surfaces and poor weather resistance.

For an arch, work all joints on both faces of the wall. Begin with the bed joints (the angled mortar joints between voussoirs) and then do the head joints if any are present. Match the jointing tool to the specified profile:

After tooling, sponge the face with a damp (not wet) sponge to remove mortar smears. Work in light passes — scrubbing too hard with too much water will pull mortar out of the fresh joint and smear it back onto the face. Inspect each face under raking light (hold a flashlight or work light at a low, nearly parallel angle to the wall surface). Raking light reveals voids (holidays), uneven tool pressure, and torn edges that straight-on lighting hides. Mark any void or inconsistency and re-tool before the mortar hardens fully.

Safety note: Dispose of mortar-laden rinse water properly. Do not pour large quantities down a floor drain; cement slurry can harden in pipes.

Removing the Centering (Striking the Form)

Centering is the temporary wooden or steel form that supports the arch voussoirs while the mortar cures. Removing it too soon is one of the most common causes of arch failure or cracking. Your instructor will confirm when adequate cure has been achieved before this step begins — do not remove centering on your own schedule.

Centering is typically held in place by wedges, adjustable shores, or falsework. Remove wedges or lower shores incrementally and evenly — a little from each support point in rotation, not all the way down on one side first. This allows the arch to begin carrying its own load gradually and symmetrically. Sudden, uneven release can create an asymmetric load that cracks the arch or displaces voussoirs before the mortar has developed full strength.

While one student operates the wedges or shores, a second student watches the intrados (the inner curved surface of the arch) closely for any sign of movement, cracking, or joint opening. The moment you observe any of those, stop the removal process and call the instructor.

After the centering is fully removed, both students examine the arch: intrados, extrados (outer curve), and both faces. Record your observations in your lab log — the time of removal, the condition of every joint and unit you can see, and the presence or absence of any cracking or displacement. This written record is a professional habit that carries into real jobsite practice.

Safety notes during centering removal: Wear a hard hat — if any component of the arch or formwork moves unexpectedly, falling material is the primary hazard. Keep bystanders out of the area below and around the arch. Never reach under the arch to pull centering while the arch is still partially supported.

Summary

A successful arch finish depends on accurate keystone placement within 1/8 inch of flush and plumb, consistently struck joints with no voids, and a slow, even centering removal after adequate cure. Document everything. These three operations are what the owner and the inspector will see and judge.

Key terms10

KeystoneThe final voussoir placed at the crown of an arch; its wedge shape locks the other voussoirs in place and completes the structural unit.
VoussoirAny wedge-shaped masonry unit that makes up the body of an arch, including the keystone.
Centering (falsework)A temporary form — usually wood or adjustable shoring — that supports arch voussoirs during construction until the mortar cures sufficiently for the arch to be self-supporting.
Striking (tooling) jointsThe process of compressing and shaping fresh mortar joints with a jointing tool to produce a specific profile, improve weather resistance, and create a finished appearance.
Thumbprint-hardThe point of mortar stiffness at which a thumb pressed to the surface leaves a clean impression without mortar sticking to the thumb; the correct time to strike joints.
IntradosThe inner (concave) curved surface of an arch, visible from below; the surface most closely watched during centering removal for signs of cracking or movement.
ExtradosThe outer (convex) curved surface of an arch, opposite the intrados.
Raking lightA light source held at a low, nearly parallel angle to a masonry surface to reveal surface irregularities, voids in joints, and mortar smears that straight-on lighting hides.
Holiday (void)An unfilled area or gap in a mortar joint that reduces weather resistance and structural integrity; detected visually, especially under raking light.
ProudA masonry unit set slightly beyond the plane of the surrounding face; the opposite of recessed. A proud keystone must be corrected before mortar sets.

Worked examples3

1. The keystone you set measures 1/4 inch proud of the adjacent voussoir face when you hold a 4-foot level across the arch. The mortar is still fresh. What is the error relative to the 1/8-inch tolerance, and what is the correct action?
  1. Step 1 — Identify the tolerance: the passing standard is keystone flush within 1/8 inch (0.125 in) of the adjacent voussoir faces.
  2. Step 2 — Compare the measured error to the tolerance: 1/4 inch = 0.250 inch. The error (0.250 in) exceeds the tolerance (0.125 in) by 0.125 inch.
  3. Step 3 — Determine the correct action: because the mortar is still fresh, carefully remove the keystone using the trowel to pry gently, scrape excess mortar from both the keystone pocket and the keystone faces to reduce the buildup causing the proud condition, then re-set and re-check with the level.
Answer: The keystone is 0.125 inch outside the allowable tolerance. Remove it while mortar is fresh, trim the excess mortar, re-set, and verify flush alignment to within 1/8 inch before proceeding.
2. Your arch has 9 joints visible on the front face. You begin striking on one side and finish the other side 45 minutes later. The first joints you struck are now rock-hard and cannot be compressed with the jointing tool. How many joints are likely to require corrective action, and what does 'rock-hard' tell you about timing?
  1. Step 1 — Identify the problem: mortar that is rock-hard when the jointing tool is applied has already set past the workable window; the tool will tear or scratch rather than compress the surface.
  2. Step 2 — Count affected joints: if the first joints struck were acceptable but joints on the opposite side struck 45 minutes later are rock-hard, the affected joints are those at the end of the sequence — the exact number depends on when in the 45-minute window they stiffened, but any joint the tool cannot compress cleanly must be corrected.
  3. Step 3 — Identify the timing lesson: on warm, dry days the thumbprint-hard window can close in 30–60 minutes. Striking should begin as soon as the earliest joints reach thumbprint-hard and proceed efficiently across the entire face. Working one side completely before starting the other on a large arch risks losing the window on the second side.
  4. Step 4 — Corrective action: joints that have hardened beyond tooling must be raked out to adequate depth and re-pointed with fresh mortar, then struck immediately.
Answer: Any joints struck after the mortar hardened past the toolable window are defective and must be raked out and re-pointed. The lesson is to strike all joints on both faces systematically as soon as the mortar reaches thumbprint-hard, not to complete one face entirely before starting the other.
3. The arch centering is supported by four wedge pairs — one pair at each end of each shore. You need to lower the centering evenly. If each full removal of one wedge pair lowers that end of the shore by 1/2 inch, and you need a total descent of 2 inches before the arch is fully free, how many incremental passes of all four wedge pairs are required?
  1. Step 1 — Identify the descent needed per complete pass: in each pass you remove one increment from each of the four wedge pairs. One removal = 1/2 inch of descent at that point.
  2. Step 2 — Calculate passes required: total descent needed ÷ descent per pass = 2 inches ÷ 0.5 inches = 4 passes.
  3. Step 3 — Confirm the procedure: in pass 1, loosen all four wedge pairs by one increment (each point drops 1/2 inch). Observe the arch. In passes 2, 3, and 4, repeat. After 4 passes, total descent = 4 × 0.5 in = 2.0 inches, and the arch is free of the centering.
Answer: Four incremental passes of all four wedge pairs are required, with the arch observed for movement or cracking between each pass.
In class: Keystone placement: students apply a full bed of mortar to both adjacent voussoirs, carefully lower the keystone into position, check plumb and alignment with a level, and tap gently with a rubber mallet; instructor demonstrates how to verify the keystone is not proud of or recessed below the arch face · Joint finishing: students use a jointing tool matched to the specified profile (concave, flush, or grapevine as assigned) to strike all exposed joints on both faces; they sponge-clean the masonry face without smearing mortar into the joint and inspect under raking light for voids or holidays · Centering removal (striking): after instructor confirms adequate cure time, students remove wedges or lower shores incrementally and evenly while a second student watches the arch intrados for any movement or cracking; students document the removal process and record the arch's condition immediately after striking in their lab log
Materials: Keystone brick (cut to calculated dimensions), mortar and trowel, rubber mallet, 4-foot level, jointing tool, sponge, bucket, raking light source (flashlight or worklight), lab log forms, PPE as in prior lessons
Check: Instructor inspects keystone for plumb within 1/8 inch and flush alignment with adjacent voussoirs; all struck joints must be consistently profiled with no voids, cracks, or smeared mortar on the face; lab log entry for centering removal must include recorded observations of arch condition immediately after striking; all three criteria must be satisfactory to pass

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

NCCER Masonry — Masonry Units and Installation
1. When setting the keystone, mortar should be applied to which surfaces?
NCCER Masonry — Masonry Units and Installation
2. What is the correct technique for lowering the keystone into its pocket after mortar is applied?
NCCER Masonry — Masonry Units and Installation
3. A student checks the keystone and finds it is 3/16 inch proud of the adjacent voussoir face. The mortar is still fresh. What is the correct response?
NCCER Masonry — Masonry Units and Installation
4. Raking light is used during joint inspection primarily to:
NCCER Masonry — Mortar and Grout
5. Mortar joints should be struck when the mortar is described as 'thumbprint-hard.' This means:
NCCER Masonry — Structural Masonry
6. During centering removal, wedges or shores should be released:
NCCER Masonry — Structural Masonry
7. Which surface of the arch must be watched most closely by the second student during centering removal?
OSHA 10 — Construction — Personal Protective Equipment
8. Which required PPE item is most important to add during centering removal that may not have been emphasized during earlier laying operations?