BLD-CONS02-09 · Lesson 6 · 9 clock hours · theory

Pricing Materials: Unit Costs, Supplier Quotes, and the Estimate Summary

Objective. Students will apply current unit prices to a completed bill of materials, extend quantities to produce line-item totals, and compile a formatted estimate summary with subtotals by CSI division.

⚠ Pending professional review

This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.

VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.

Pricing Materials: Unit Costs, Supplier Quotes, and the Estimate Summary

Why Pricing Matters

A bill of materials (BOM) tells you what you need and how much. Pricing converts those quantities into dollars. An accurate estimate protects the contractor from losing money on a job and gives the owner a realistic budget. One math error carried through a spreadsheet can cost thousands of dollars, so every number must be checked before the estimate leaves your hands.

Reading a Supplier Quote or Price Sheet

Before you multiply anything, read the price sheet carefully. Four pieces of information govern every line:

Unit of measure (UOM). Lumber is priced per linear foot or per board foot; drywall by the sheet; concrete by the cubic yard; roofing materials by the square (100 sq ft). If your quantity is in square feet and the price is per square, you must convert before you multiply.

Price breaks. Many suppliers offer lower unit prices at higher quantities—for example, a different rate per sheet for orders over 50 sheets versus under 50. Always check which tier your quantity falls into.

Delivery charges. Delivery may be a flat fee, a per-mile rate, or free above a minimum order. Record it as a separate line item; do not hide it inside unit costs.

Sales tax. Most states tax construction materials. Tax is applied to the material subtotal after all line items are summed, not to each line individually. Confirm your state and local rate with your instructor; never guess.

The Pricing Formula

Every line on a priced BOM uses one formula:

> Quantity × Unit Cost = Extended Cost

In a spreadsheet, if quantity is in column C and unit cost is in column D, the formula in column E is `=C2*D2`. Copy that formula down every row. Never type an extended cost by hand—a formula catches a keying error; a hand-typed number hides it.

Material Cost vs. Installed Cost

A material cost covers only what you buy from the supplier. An installed cost (also called the all-in cost) adds labor, equipment, and overhead to place that material in the building. This course focuses on material cost, but you need to know the difference because an owner may ask why your estimate is lower than a contractor's bid—the bid includes installed cost.

CSI MasterFormat Divisions

The Construction Specifications Institute (CSI) MasterFormat organizes construction work into numbered divisions so that everyone on a project uses the same language. For this program you will use five divisions:

Assigning each material to the correct division keeps the estimate organized and makes it easy for an owner, architect, or lender to review specific portions of the work.

Building the Estimate Summary

The estimate summary combines all priced BOMs into one document. Follow these steps:

1. Collect priced BOMs from each previous lesson (concrete, masonry, framing, roofing/thermal, finishes).

2. Group line items by CSI division. Each division becomes a section of the summary.

3. Subtotal each division. Sum the extended costs within each section.

4. Add delivery charges as a separate line below all divisions, or within the division they serve.

5. Calculate the material subtotal (sum of all division subtotals plus delivery).

6. Apply sales tax to the material subtotal.

7. State the grand total.

Label every column clearly: Description, UOM, Quantity, Unit Cost, Extended Cost. Include the project name, date, preparer's name, and a note that the estimate covers materials only.

The Summary Memo

Attach a two-paragraph memo to the printed estimate. The first paragraph identifies the project, the scope covered, and the date. The second paragraph highlights any assumptions (e.g., prices are based on quotes valid for 30 days, tax rate assumed, delivery included or excluded). A clear memo prevents misunderstandings and demonstrates professionalism.

Accuracy and Safety

Arithmetic errors in an estimate are not a safety issue in the physical sense, but they create financial harm. Treat formula checking the way you treat lockout/tagout on a job site—it is a required step, not optional. Before printing:

When working in the computer lab, follow the lab's electrical safety rules: do not bring liquids near equipment, and report any frayed cords or damaged outlets to the instructor immediately.

Key terms9

Unit of Measure (UOM)The standard quantity in which a material is bought and priced, such as linear foot, square foot, sheet, cubic yard, or square (100 sq ft).
Extended CostThe total cost for one line item on a bill of materials, calculated by multiplying quantity by unit cost.
Price BreakA lower unit price offered by a supplier when a buyer purchases above a specified minimum quantity.
CSI MasterFormatA standard numbering system published by the Construction Specifications Institute that organizes construction work and materials into numbered divisions used industry-wide.
Material CostThe purchase price of construction materials from a supplier, not including the labor or equipment needed to install them.
Installed CostThe total cost to purchase and place a material in the building, including materials, labor, equipment, and overhead.
Estimate SummaryA single consolidated spreadsheet that lists all priced bill-of-materials line items grouped by CSI division, with subtotals per division and a grand total.
Delivery ChargeA separate fee charged by a supplier to transport materials to the job site; recorded as its own line item in the estimate rather than added to unit costs.
Sales TaxA state or local government tax applied to the purchase price of materials; calculated on the material subtotal after all line items are summed.

Worked examples4

1. A project requires 48 sheets of 5/8-inch drywall. The supplier price list shows $14.75 per sheet for orders of 1–49 sheets and $13.50 per sheet for 50 or more sheets. What is the extended cost at the correct price break?
  1. Step 1 – Determine the correct price tier. The order is 48 sheets, which falls in the 1–49 range, so the unit cost is $14.75 per sheet.
  2. Step 2 – Apply the formula: Extended Cost = Quantity × Unit Cost = 48 × $14.75.
  3. Step 3 – Multiply: 48 × $14.75 = 48 × 14 + 48 × 0.75 = $672.00 + $36.00 = $708.00.
Answer: Extended cost = $708.00
2. A framing BOM lists 320 linear feet of 2×6 lumber at $0.92 per linear foot, and 15 sheets of 3/4-inch OSB sheathing at $38.60 per sheet. What is the Division 06 material subtotal for these two items?
  1. Step 1 – Calculate extended cost for 2×6 lumber: 320 × $0.92 = $294.40.
  2. Step 2 – Calculate extended cost for OSB sheathing: 15 × $38.60 = $579.00.
  3. Step 3 – Add the two extended costs to get the Division 06 subtotal: $294.40 + $579.00 = $873.40.
Answer: Division 06 subtotal = $873.40
3. An estimate summary has the following division subtotals: Division 03 = $1,840.00, Division 06 = $3,215.00, Division 07 = $980.00, Division 09 = $1,425.00. Delivery charge is $175.00. The applicable sales tax rate is 7%. Calculate the material subtotal (before tax), tax amount, and grand total.
  1. Step 1 – Sum all division subtotals: $1,840.00 + $3,215.00 + $980.00 + $1,425.00 = $7,460.00.
  2. Step 2 – Add delivery charge: $7,460.00 + $175.00 = $7,635.00. This is the material subtotal.
  3. Step 3 – Calculate sales tax: $7,635.00 × 0.07 = $534.45.
  4. Step 4 – Calculate grand total: $7,635.00 + $534.45 = $8,169.45.
Answer: Material subtotal = $7,635.00 | Sales tax = $534.45 | Grand total = $8,169.45
4. Roofing shingles are sold by the square (1 square = 100 sq ft). A roof has 2,400 sq ft of surface area. The price is $95.00 per square. What is the extended cost?
  1. Step 1 – Convert square feet to squares: 2,400 sq ft ÷ 100 = 24 squares.
  2. Step 2 – Apply the formula: Extended Cost = 24 squares × $95.00 per square.
  3. Step 3 – Multiply: 24 × $95.00 = $2,280.00.
Answer: Extended cost = $2,280.00

The math in this lesson2

Learners compare tiered drywall pricing, extend unit costs for lumber and OSB, and total division subtotals.
6.RP.37.RP.3
Brush up in the math halls at newSchoolWorks.com:
In class: Instructor lecture and worked example: demonstrate how to read a supplier price list or quote (unit of measure, price breaks, delivery charges, tax); apply unit prices to a 10-line bill of materials on a projected spreadsheet, showing the formula: quantity × unit cost = extended cost; discuss the difference between material cost and installed cost. · Hands-on pricing exercise: each student receives the bill of materials they produced in Lesson 5 (drywall, roofing, finish materials) and a current or representative price sheet from a local building supply dealer (or instructor-prepared equivalent); students enter unit prices and calculate extended costs on a provided spreadsheet template in Excel or Google Sheets. · Estimate summary construction: students combine priced bills of materials from Lessons 3, 4, and 5 into a single summary spreadsheet organized by CSI division (framing = Division 06, concrete = Division 03, masonry = Division 04, thermal/moisture = Division 07, finishes = Division 09); they add a grand total line and write a two-paragraph summary memo suitable for presentation to an owner.
Materials: Current or representative supplier price sheets (lumber yard, concrete supplier, roofing supply), Excel or Google Sheets on lab computers, estimate summary spreadsheet template (instructor-prepared), printer for final output, CSI MasterFormat division list
Check: Printed estimate summary graded on accuracy of extended math (all formulas checked; no arithmetic errors allowed), correct CSI division assignment for each material category, and presence of a readable summary memo; passing score 80% on a rubric.

Practice check8

Answer each question, then check it. Nothing is recorded; this is your own practice.

NCCER Construction Technology – Materials Estimating
1. A student is pricing 60 sheets of drywall. The supplier charges $15.00 per sheet for 1–50 sheets and $13.00 per sheet for 51 or more sheets. What is the correct extended cost?
NCCER Core – Construction Fundamentals
2. Which CSI MasterFormat division covers dimensional lumber used in wall framing?
NCCER Construction Technology – Materials Estimating
3. In the estimate summary, where should sales tax be applied?
NCCER Construction Technology – Materials Estimating
4. What is the main difference between material cost and installed cost?
NCCER Construction Technology – Materials Estimating
5. A student enters extended costs manually by typing each answer rather than using a spreadsheet formula. What is the primary risk of this practice?
NCCER Core – Construction Fundamentals
6. Roofing felt underlayment is listed in which CSI MasterFormat division?
NCCER Construction Technology – Materials Estimating
7. A project's division subtotals are: Div 03 = $2,100, Div 06 = $4,500, Div 09 = $1,800. Delivery is $200. What is the material subtotal before tax?
OSHA 10 – Electrical Safety